Special device and method for near-electricity hoisting of large dry-type reactor

By designing a large dry reactor near-electric lifting device including support frame beams, adjustable steel beams and suspended beams, the problem that the existing technology cannot meet the needs of large dry reactors near-electric lifting is solved, and the problem of the current technology being unable to meet the needs of large dry reactors is realized. Safe and efficient lifting in complex operating environments.

CN119429938APending Publication Date: 2025-02-14MAINTENANCE BRANCH OF STATE GRID HEBEI ELECTRIC POWER +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411510940.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

The existing technology cannot effectively solve the near-electric lifting problem of large dry reactors in ultra-high voltage substations, especially when adjacent live equipment or span lines cannot be powered out in time, traditional cranes or new folding arm cranes cannot meet different operating environments. lifting requirements.

Method used

A large dry reactor near-electric lifting device was designed, including support frame beams, adjustable steel beams and suspended beams. Through the combination of frame beam suspension rings, steel beam suspension rings and main frame suspension rings, flexible adjustment of the lifting device and Guarantee of safe distance.

Benefits of technology

It realizes safe and efficient near-electric lifting of large dry reactors in the event of insufficient safe distance and in the event of timely power outage of live equipment, which is convenient to operate and is suitable for a variety of operating environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119429938A_ABST
    Figure CN119429938A_ABST
Patent Text Reader

Abstract

The invention discloses a special device and method for near-electricity hoisting of a large dry type electric reactor. The special device comprises a supporting frame beam, an adjustable steel beam and a hoisting beam. The supporting frame beams comprise transverse frame beams, longitudinal frame beams, inclined frame beams, inter-beam supporting frames, frame beam sliding grooves and frame beam lifting rings, the adjustable steel beams comprise transverse adjustable steel beams, longitudinal adjustable steel beams, transverse steel beam lifting rings, longitudinal steel beam lifting rings, steel beam main frames and main frame lifting rings, and the lifting beams comprise lifting feet and connecting screw holes. The transverse frame beams are connected with the inter-beam supporting frames, the longitudinal frame beams are connected with the inter-beam supporting frames, the inclined frame beams are connected with the inter-beam supporting frames, the lifting feet are connected with the inter-beam supporting frames, the transverse adjustable steel beams are connected with the steel beam main frame, and the longitudinal adjustable steel beams are connected with the steel beam main frame. In order to solve the problems that the safe distance is insufficient and adjacent electrified equipment or overlines cannot be timely powered off when the large dry type reactor is hoisted, the near-electricity hoisting of the large dry type reactor is realized, and the near-electricity hoisting device is suitable for solving the problem that the near-electricity hoisting of the large dry type reactor in different working environments cannot be solved by a traditional crane or a novel folding arm crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hoisting and replacing large dry-type reactors in ultra-high voltage substations, and more specifically to a device and method for hoisting large dry-type reactors close to the power grid. Background Art

[0002] The primary equipment in the ultra-high voltage (500 kV and above) substation has high requirements for insulation level. The design size of large dry-type reactors is usually large. When the equipment needs to be hoisted and replaced due to aging or failure, a large crane is required to cooperate with the operation. To ensure the safety of operators and equipment, the crane body, boom, and hoisted equipment should strictly maintain a safe distance of the corresponding voltage level from the adjacent live equipment when hoisting the dry-type reactor.

[0003] At present, when hoisting large dry-type reactors, in order to ensure a safe distance from nearby live equipment, it is necessary to shut down the adjacent equipment or nearby cross-lines. This hoisting condition is affected by the overall power grid operation mode and reactive load distribution. The adjacent equipment or nearby cross-lines cannot be shut down in time, which seriously affects the hoisting of aging and faulty dry-type reactors. In addition, due to the complex structure of dry-type reactors and the numerous overall replacement procedures, the use of traditional cranes or new folding arm cranes cannot solve the problem of hoisting large dry-type reactors near live equipment under different operating environments.

[0004] There are few relevant technical patents for the close-to-electric lifting of large dry-type reactors in ultra-high voltage substations. The existing document CN117800209A (Large-scale reactor lifting equipment in ultra-high voltage 1100kV GIS AC withstand voltage test) proposes a reactor lifting device with multiple lifting locks and telescopic rods for the lifting of reactors in the AC withstand voltage test of ultra-high voltage substations; the document CN115783990A (A dry-type reactor lifting device) provides a lifting device suitable for the lifting of small dry-type reactors; the document CN216971694U (New large-size reactor lifting device) provides a device for lifting large dry-type reactors.

[0005] The above technical patents can only be used for lifting live equipment near the reactor or during cross-line power outages. They are not suitable for lifting near power lines. In addition, many devices and equipment are required to complete the lifting, which is not easy to operate and does not meet the requirements for lifting near power lines.

[0006] Therefore, how to provide a special device and method for near-power hoisting of large dry-type reactors that can adapt to a wide range of scenarios, is easy to operate, portable, and meets the needs of near-power hoisting is an issue that technical personnel in this field urgently need to solve. Summary of the invention

[0007] In view of this, the present invention provides a special device and method for near-line lifting of a large dry-type reactor, aiming to solve the technical problems that the device and method can only be used for lifting live equipment near the reactor or during a cross-line power outage, is not suitable for near-line lifting, requires many devices and equipment to complete the lifting, is not easy to operate, and does not meet the requirements for near-line lifting.

[0008] In order to achieve the above object, the present invention adopts the following technical solution:

[0009] A special device for near-electric lifting of a large dry-type reactor, comprising: a supporting frame beam, an adjustable steel beam, and a hanging beam;

[0010] The supporting frame beams include transverse frame beams, longitudinal frame beams, oblique frame beams, inter-beam supports, frame beam slides and frame beam lifting rings; the adjustable steel beams include transverse adjustable steel beams, longitudinal adjustable steel beams, transverse steel beam lifting rings, longitudinal steel beam lifting rings, steel beam main frames and main frame lifting rings; the lifting beams include hanging feet and connecting screw holes.

[0011] The transverse frame beam is connected to the inter-beam support frame, the longitudinal frame beam is connected to the inter-beam support frame, the oblique frame beam is connected to the inter-beam support frame, the hanging foot is connected to the inter-beam support frame, the transverse adjustable steel beam is connected to the steel beam main frame, and the longitudinal adjustable steel beam is connected to the steel beam main frame.

[0012] Furthermore, the beam-mounting slide is connected to the transversely adjustable steel beam by bolts, the beam-mounting slide is connected to the longitudinally adjustable steel beam by bolts, and the beam-mounting lifting ring is connected to the inter-beam support frame.

[0013] Furthermore, the transverse steel beam lifting ring is connected to the transverse adjustable steel beam, and the adjustable steel beam also includes a longitudinal steel beam lifting ring, and the longitudinal steel beam lifting ring is connected to the longitudinal adjustable steel beam.

[0014] Furthermore, the adjustable steel beam also includes a main frame lifting ring, and the main frame lifting ring is connected to the steel beam main frame.

[0015] Furthermore, the hanging foot is connected to the oblique frame beam, and the hanging beam also includes a connecting screw hole, and the connecting screw hole is connected to the top connecting part of the reactor body through bolts.

[0016] Furthermore, the transverse frame beams are connected to the inter-beam supports by welding, the longitudinal frame beams are connected to the inter-beam supports by welding, and the diagonal frame beams are connected to the inter-beam supports by welding.

[0017] Furthermore, the transversely adjustable steel beam is connected to the transverse frame beam by bolts passing through the frame beam slide groove, and the longitudinally adjustable steel beam is connected to the longitudinal frame beam by bolts passing through the frame beam slide groove.

[0018] Furthermore, the steel beam main frame is connected to the transverse adjustable steel beam by bolt connection, and the steel beam main frame is connected to the longitudinal adjustable steel beam by bolt connection.

[0019] Furthermore, the transverse steel beam lifting ring is connected to the transverse adjustable steel beam by welding, the longitudinal steel beam lifting ring is connected to the longitudinal adjustable steel beam by welding, and the main frame lifting ring is connected to the steel beam main frame by welding.

[0020] A method for near-electric lifting of a large dry-type reactor comprises the following steps: lifting a transverse frame beam, a longitudinal frame beam, an oblique frame beam and a beam support frame to the ground near the dry-type reactor through a frame beam lifting ring; lifting a transverse adjustable steel beam to the supporting frame beam through a transverse steel beam lifting ring; lifting a longitudinal adjustable steel beam to the supporting frame beam through a longitudinal steel beam lifting ring; lifting a steel beam main frame to the transverse adjustable steel beam and the longitudinal adjustable steel beam through a main frame lifting ring; connecting the steel beam main frame to the transverse adjustable steel beam and the longitudinal adjustable steel beam respectively through bolts; measuring the crane boom and the Find the shortest safe distance between live equipment above or nearby, adjust the angle between the transverse adjustable steel beam and the transverse frame beam, adjust the angle between the longitudinal adjustable steel beam and the longitudinal frame beam, ensure that the two angles are consistent and meet the shortest safe distance between the crane boom and live equipment above or nearby, tighten the connecting bolts between the transverse adjustable steel beam and the transverse frame beam, tighten the connecting bolts between the longitudinal adjustable steel beam and the longitudinal frame beam, tighten the connecting bolts between the main steel beam frame and the transverse adjustable steel beam and the longitudinal adjustable steel beam respectively. After the bolts of each component are tightened, lift the dry-type reactor body close to the live equipment.

[0021] The above technical solution includes at least the following technical effects:

[0022] Through the above technical solutions, it can be known that the present invention discloses a special device and method for hoisting a large dry-type reactor close to the power supply. Compared with the prior art, the present invention can solve the problems of insufficient safety distance during hoisting of large dry-type reactors, and the inability to shut down the adjacent live equipment or cross-line in time, and realize the hoisting of large dry-type reactors close to the power supply. This special device is easy to operate and is suitable for the problem of hoisting large dry-type reactors close to the power supply in different working environments that cannot be solved by traditional cranes or new folding arm cranes. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0024] Figure 1 The present invention is a structural front view of a special device for near-electric hoisting of a large dry-type reactor.

[0025] Figure 2 The present invention is a top view of the structure of a special device for near-electric hoisting of a large dry-type reactor.

[0026] Figure 3 The present invention is a structural side view of a special device for near-electric hoisting of a large dry-type reactor.

[0027] Figure 4 The present invention is a schematic flow chart of a method for a special device for near-electric lifting of a large dry-type reactor.

[0028] Among them, 1 is a supporting frame beam, 11 is a transverse frame beam, 12 is a longitudinal frame beam, 13 is an oblique frame beam, 14 is a support frame between beams, 15 is a frame beam slide, 16 is a frame beam lifting ring, 2 is an adjustable steel beam, 21 is a transverse adjustable steel beam, 22 is a longitudinal adjustable steel beam, 23 is a transverse steel beam lifting ring, 24 is a longitudinal steel beam lifting ring, 25 is a steel beam main frame, 26 is a main frame lifting ring, 3 is a hanging beam, 31 is a hanging foot, and 32 is a connecting screw hole. DETAILED DESCRIPTION

[0029] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See attached Figure 1-3 The supporting frame beam 1 includes a transverse frame beam 11, a longitudinal frame beam 12, an oblique frame beam 13, an inter-beam support frame 14, a frame beam slide 15, a frame beam slide 16, and a frame beam lifting ring 16. The adjustable steel beam 2 includes a transverse adjustable steel beam 21, a longitudinal adjustable steel beam 22, a transverse steel beam lifting ring 23, a longitudinal steel beam lifting ring 24, a steel beam main frame 25 and a main frame lifting ring 26. The hanging beam 3 includes a hanging foot 31 and a connecting screw hole 32;

[0031] The transverse frame beam 11 is connected to the beam support frame 14, the longitudinal frame beam 12 is connected to the beam support frame 14, the oblique frame beam 13 is connected to the beam support frame 14, the hanging foot 31 is connected to the beam support frame 14, the transverse adjustable steel beam 21 is connected to the steel beam main frame 25, and the longitudinal adjustable steel beam 22 is connected to the steel beam main frame 25; the frame beam slide 15 is connected to the transverse adjustable steel beam 21 by bolts, the frame beam slide 15 is connected to the longitudinal adjustable steel beam 22 by bolts, and the frame beam lifting ring 16 is connected to the beam support frame 14; the transverse steel beam lifting ring 23 is connected to the transverse adjustable steel beam 21, and the adjustable steel beam 2 also includes a longitudinal steel beam lifting ring 24, and the longitudinal steel beam lifting ring 24 is connected to the longitudinal adjustable The steel beam 22 is connected; the main frame lifting ring 26 is connected to the steel beam main frame 25; the hanging foot 31 is connected to the oblique frame beam 13, and the hanging beam 3 also includes a connecting screw hole 32, and the connecting screw hole 32 is connected to the top connecting part of the reactor body by bolts; the transverse frame beam 11 is connected to the beam support frame 14 by welding, the longitudinal frame beam 12 is connected to the beam support frame 14 by welding, and the oblique frame beam 13 is connected to the beam support frame 14 by welding; the transverse adjustable steel beam 21 is connected to the transverse frame beam 11 by bolts passing through the frame beam slide groove 15, and the longitudinal adjustable steel beam 22 is connected to the longitudinal frame beam 12 by bolts passing through the frame beam slide groove 15. The steel beam main frame 25 is connected to the transverse adjustable steel beam 21 by bolt connection, and the steel beam main frame 25 is connected to the longitudinal adjustable steel beam 22 by bolt connection; the transverse steel beam lifting ring 23 is connected to the transverse adjustable steel beam 21 by welding, the longitudinal steel beam lifting ring 24 is connected to the longitudinal adjustable steel beam 22 by welding, and the main frame lifting ring 26 is connected to the steel beam main frame 25 by welding.

[0032] A method for near-electric lifting of a large dry-type reactor comprises the following steps: lifting a transverse frame beam 11, a longitudinal frame beam 12, an oblique frame beam 13 and an inter-beam support frame 14 to the ground near the dry-type reactor through a frame beam lifting ring 16; lifting a transverse adjustable steel beam 21 onto a supporting frame beam 1 through a transverse steel beam lifting ring 23; lifting a longitudinal adjustable steel beam 22 onto the supporting frame beam 1 through a longitudinal steel beam lifting ring 24; lifting a steel beam main frame 25 onto the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 through a main frame lifting ring 26; connecting the steel beam main frame 25 to the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 respectively through bolts; and measuring the measurement results. Measure the minimum safe distance between the crane boom and the live equipment above or nearby, adjust the angle between the transverse adjustable steel beam 21 and the transverse frame beam 11, adjust the angle between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12, ensure that the two angles are consistent and meet the minimum safe distance between the crane boom and the live equipment above or nearby, tighten the connecting bolts between the transverse adjustable steel beam 21 and the transverse frame beam 11, tighten the connecting bolts between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12, tighten the connecting bolts between the steel beam main frame 25 and the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 respectively, after the bolts of each component are tightened, lift the dry-type reactor body close to the live equipment.

[0033] Implementation method 1: Traditional crane with supporting beam erection system

[0034] In this implementation, we use a traditional crane to cooperate with the support beam system to carry out the near-electric lifting of large dry-type reactors. The following are the detailed steps:

[0035] Preparation stage:

[0036] First, we need to prepare a supporting beam system, including transverse beams 11, longitudinal beams 12, diagonal beams 13, beam supports 14, beam slides 15 and beam lifting rings 16.

[0037] Check that all components are intact and that all welds and bolted connections are tight and secure.

[0038] Lifting support beam:

[0039] Use a crane to hoist the support beam 1 to the ground near the dry-type reactor and hoist it through the beam lifting ring 16.

[0040] Make sure the support beams 1 are level and firmly on the ground, using inter-beam braces 14 to increase stability.

[0041] Install the adjustable steel beam:

[0042] The transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 are hoisted onto the supporting frame beam 1 through the transverse steel beam hoisting ring 23 and the longitudinal steel beam hoisting ring 24 .

[0043] The transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 are connected to the beam-laying slideway 15 by bolts to ensure that the adjustable steel beams can be flexibly adjusted.

[0044] Install the main steel beam frame:

[0045] The steel beam main frame 25 is hoisted onto the transversely adjustable steel beam 21 and the longitudinally adjustable steel beam 22 through the main frame hoisting ring 26 .

[0046] Use bolts to connect the steel beam main frame 25 with the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 to ensure a firm connection.

[0047] Adjust the angle:

[0048] Measure the safe distance between the crane boom and the live equipment above or nearby, and adjust the angle between the transverse adjustable steel beam 21 and the transverse frame beam 11, as well as the angle between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12 according to the measurement results.

[0049] Make sure the two angles are consistent and meet the safety distance requirements.

[0050] Fastening bolts:

[0051] Tighten the connecting bolts between the transverse adjustable steel beam 21 and the transverse frame beam 11 , tighten the connecting bolts between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12 , and the connecting bolts between the steel beam main frame 25 and the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 .

[0052] Hoisting reactor:

[0053] After all the bolts of the components are tightened, the dry-type reactor body is hoisted by a crane and connected to the top of the reactor body through the hanging feet 31 and the connecting screw holes 32 on the hanging beam 3.

[0054] Monitoring and Adjustment:

[0055] During the lifting process, continuously monitor the safe distance between the crane boom and live equipment, and make fine adjustments when necessary to ensure the safety of the lifting process.

[0056] Implementation method 2: Knuckle boom crane with supporting beam erection system

[0057] In this implementation method, we use a new type of knuckle boom crane to cooperate with the support beam system to carry out the near-electric lifting of large dry-type reactors. The following are the detailed steps:

[0058] Preparation stage:

[0059] Prepare a supporting beam system, including transverse beams 11, longitudinal beams 12, diagonal beams 13, inter-beam supports 14, beam slides 15 and beam lifting rings 16.

[0060] Check that all components are intact and that all welds and bolted connections are tight and secure.

[0061] Lifting support beam:

[0062] Use a folding arm crane to hoist the support frame beam 1 to the ground near the dry-type reactor, and hoist it through the frame beam lifting ring 16.

[0063] Make sure the support beams 1 are level and firmly on the ground, using inter-beam braces 14 to increase stability.

[0064] Install the adjustable steel beam:

[0065] The transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 are hoisted onto the supporting frame beam 1 through the transverse steel beam hoisting ring 23 and the longitudinal steel beam hoisting ring 24 .

[0066] The transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 are connected to the beam-laying slideway 15 by bolts to ensure that the adjustable steel beams can be flexibly adjusted.

[0067] Install the main steel beam frame:

[0068] The steel beam main frame 25 is hoisted onto the transversely adjustable steel beam 21 and the longitudinally adjustable steel beam 22 through the main frame hoisting ring 26 .

[0069] Use bolts to connect the steel beam main frame 25 with the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 to ensure a firm connection.

[0070] Adjust the angle:

[0071] Measure the safe distance between the boom of the knuckle boom crane and the live equipment above or nearby, and adjust the angle between the transverse adjustable steel beam 21 and the transverse frame beam 11, as well as the angle between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12 according to the measurement results.

[0072] Make sure the two angles are consistent and meet the safety distance requirements.

[0073] Fastening bolts:

[0074] Tighten the connecting bolts between the transverse adjustable steel beam 21 and the transverse frame beam 11 , tighten the connecting bolts between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12 , and the connecting bolts between the steel beam main frame 25 and the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 .

[0075] Hoisting reactor:

[0076] After all the bolts of the components are tightened, the dry-type reactor body is hoisted by a folding arm crane and connected to the top of the reactor body through the hanging feet 31 and the connecting screw holes 32 on the hanging beam 3.

[0077] Monitoring and Adjustment:

[0078] During the lifting process, continuously monitor the safe distance between the boom of the knuckle boom crane and the live equipment, and make fine adjustments when necessary to ensure the safety of the lifting process.

[0079] Implementation method 3: Remote control operation with beam support system

[0080] In this implementation, we use a remote-controlled crane to coordinate with the support beam system to perform near-line installation of large dry-type reactors. The following are the detailed steps:

[0081] Preparation stage:

[0082] Prepare a supporting beam system, including transverse beams 11, longitudinal beams 12, diagonal beams 13, inter-beam supports 14, beam slides 15 and beam lifting rings 16.

[0083] Check that all components are intact and that all welds and bolted connections are tight and secure.

[0084] Lifting support beam:

[0085] The support beam 1 is hoisted to the ground near the dry-type reactor using a remote-controlled crane, and is hoisted through the beam hoisting ring 16 .

[0086] Make sure the support beams 1 are level and firmly on the ground, using inter-beam braces 14 to increase stability.

[0087] Install the adjustable steel beam:

[0088] The transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 are hoisted onto the supporting frame beam 1 through the transverse steel beam hoisting ring 23 and the longitudinal steel beam hoisting ring 24 .

[0089] The transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 are connected to the beam-laying slideway 15 by bolts to ensure that the adjustable steel beams can be flexibly adjusted.

[0090] Install the main steel beam frame:

[0091] The steel beam main frame 25 is hoisted onto the transversely adjustable steel beam 21 and the longitudinally adjustable steel beam 22 through the main frame hoisting ring 26 .

[0092] Use bolts to connect the steel beam main frame 25 with the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 to ensure a firm connection.

[0093] Adjust the angle:

[0094] Measure the safe distance between the remote-controlled crane boom and the live equipment above or nearby, and adjust the angle between the transverse adjustable steel beam 21 and the transverse frame beam 11, as well as the angle between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12 according to the measurement results.

[0095] Make sure the two angles are consistent and meet the safety distance requirements.

[0096] Fastening bolts:

[0097] Tighten the connecting bolts between the transverse adjustable steel beam 21 and the transverse frame beam 11 , tighten the connecting bolts between the longitudinal adjustable steel beam 22 and the longitudinal frame beam 12 , and the connecting bolts between the steel beam main frame 25 and the transverse adjustable steel beam 21 and the longitudinal adjustable steel beam 22 .

[0098] Hoisting reactor:

[0099] After all the bolts of the components are tightened, the dry-type reactor body is hoisted by a remote-controlled crane and connected to the top of the reactor body through the hanging feet 31 and the connecting screw holes 32 on the hanging beam 3.

[0100] Monitoring and Adjustment:

[0101] During the lifting process, the safe distance between the remote-controlled crane boom and the live equipment is continuously monitored, and fine-tuned when necessary to ensure the safety of the lifting process

[0102] According to the invention, a special device and method for hoisting a large dry-type reactor close to the power supply is designed. Compared with the prior art, the invention can solve the problems of insufficient safety distance during hoisting of large dry-type reactors, and the inability to shut down the adjacent live equipment or cross-line in time, and realize the hoisting of large dry-type reactors close to the power supply. The special device is easy to operate and is suitable for the problem of hoisting large dry-type reactors close to the power supply in different working environments that cannot be solved by traditional cranes or new folding arm cranes.

[0103] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0104] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A special device for near-line hoisting of large dry-type reactors, characterized in that: include: It comprises a supporting frame beam (1), an adjustable steel beam (2), and a hanging beam (3); The supporting frame beam (1) comprises a transverse frame beam (11), a longitudinal frame beam (12), an oblique frame beam (13), an inter-beam support frame (14), a frame beam slide groove (14) and a frame beam lifting ring (16); the adjustable steel beam (2) comprises a transverse adjustable steel beam (21), a longitudinal adjustable steel beam (22), a transverse steel beam lifting ring (23), a longitudinal steel beam lifting ring (24), a steel beam main frame (25) and a main frame lifting ring (26); the hanging beam (3) comprises a hanging foot (31) and a connecting screw hole (32); The transverse frame beam (11) is connected to the inter-beam support frame (14), the longitudinal frame beam (12) is connected to the inter-beam support frame (14), the oblique frame beam (13) is connected to the inter-beam support frame (14), the hanging foot (31) is connected to the inter-beam support frame (14), the transverse adjustable steel beam (21) is connected to the steel beam main frame (25), and the longitudinal adjustable steel beam (22) is connected to the steel beam main frame (25).

2. A device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The supporting frame beam (1) also includes a frame beam slide groove (15), the frame beam slide groove (15) is connected to the transverse adjustable steel beam (21) by bolts, the frame beam slide groove (15) is connected to the longitudinal adjustable steel beam (22) by bolts, and the frame beam lifting ring (16) is connected to the beam support frame (14).

3. A device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The transverse steel beam lifting ring (23) is connected to the transverse adjustable steel beam (21), and the adjustable steel beam (2) further comprises a longitudinal steel beam lifting ring (24), and the longitudinal steel beam lifting ring (24) is connected to the longitudinal adjustable steel beam (22).

4. A device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The main frame lifting ring (26) is connected to the steel beam main frame (25).

5. The device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The hanging foot (31) is connected to the oblique beam (13), and the hanging beam (3) further comprises a connecting screw hole (32), and the connecting screw hole (32) is connected to the top connecting part of the reactor body by bolts.

6. A device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The transverse frame beam (11) is connected to the inter-beam support frame (14) by welding, the longitudinal frame beam (12) is connected to the inter-beam support frame (14) by welding, and the oblique frame beam (13) is connected to the inter-beam support frame (14) by welding.

7. A device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The transverse adjustable steel beam (21) is connected to the transverse frame beam (11) by bolts passing through the frame beam sliding groove (15), and the longitudinal adjustable steel beam (22) is connected to the longitudinal frame beam (12) by bolts passing through the frame beam sliding groove (15).

8. The device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The steel beam main frame (25) is connected to the transverse adjustable steel beam (21) by means of bolt connection, and the steel beam main frame (25) is connected to the longitudinal adjustable steel beam (22) by means of bolt connection.

9. The device for hoisting a large dry-type reactor near the power supply according to claim 1, characterized in that: The transverse steel beam lifting ring (23) is connected to the transverse adjustable steel beam (21) by welding, the longitudinal steel beam lifting ring (24) is connected to the longitudinal adjustable steel beam (22) by welding, and the main frame lifting ring (26) is connected to the steel beam main frame (25) by welding.

10. A method for hoisting a large dry-type reactor close to the power supply, based on any one of the dedicated devices for hoisting a large dry-type reactor close to the power supply according to claims 1-9, characterized in that: The transverse frame beam (11), the longitudinal frame beam (12), the oblique frame beam (13) and the inter-beam support frame (14) are hoisted to the ground near the dry-type reactor through the frame beam hoisting ring (16); the transverse adjustable steel beam (21) is hoisted onto the support frame beam (1) through the transverse steel beam hoisting ring (23); the longitudinal adjustable steel beam (22) is hoisted onto the support frame beam (1) through the longitudinal steel beam hoisting ring (24); the steel beam main frame (25) is hoisted onto the transverse adjustable steel beam (21) and the longitudinal adjustable steel beam (22) through the main frame hoisting ring (26); the steel beam main frame (25) is connected to the transverse adjustable steel beam (21) and the longitudinal adjustable steel beam (22) respectively through bolts, and the measurement is performed. The crane arm is at the safest distance from the live equipment above or nearby, the angle between the transverse adjustable steel beam (21) and the transverse frame beam (11) is adjusted, and the angle between the longitudinal adjustable steel beam (22) and the longitudinal frame beam (12) is adjusted to ensure that the two angles are consistent and meet the safest distance between the crane arm and the live equipment above or nearby, the connecting bolts between the transverse adjustable steel beam (21) and the transverse frame beam (11) are tightened, the connecting bolts between the longitudinal adjustable steel beam (22) and the longitudinal frame beam (12) are tightened, and the connecting bolts between the steel beam main frame (25) and the transverse adjustable steel beam (21) and the longitudinal adjustable steel beam (22) are tightened respectively. After the bolts of each component are tightened, the dry-type reactor body is hoisted close to the live equipment.

Citation Information

Patent Citations

  • Dry-type electric reactor lifting appliance

    CN115783990A

  • Large reactor hoisting equipment in extra-high voltage 1100kV GIS alternating current withstand voltage test

    CN117800209A

  • Novel large-size reactor hoisting device

    CN216971694U