Sludge removing equipment for water conservancy project
By designing a sludge removal equipment containing main components and adjustment components, and using the gravity of the sludge itself to squeeze the filter water, the problem of high sludge water content in water conservancy projects is solved, the sludge water separation efficiency and sludge quality are improved, and the Automatic filter cleaning function.
Patent Information
- Application Number
- CN202411872562.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-12-18
AI Technical Summary
The sludge cleaned in water conservancy projects contains high moisture, which affects its subsequent utilization and treatment effect.
A sludge removal equipment for water conservancy projects is designed, including main components such as storage boxes, drainage pipes, support legs, sewage pipes, slurry inlet pipes and sludge filter cloths, as well as adjustment components, including lifting tables, guide pipes, first Springs, support rings, support columns, support plates, metal pipes, through holes, conveyor pipes, extrusion plates, sealing cylinders, support rods, sealing rings, rotating shafts and butterfly valves. Through the synergy of these components, the sludge itself uses the gravity of the sludge to squeeze the filter water, and automatically achieves the sludge and water separation.
It significantly improves the efficiency and automation of silt silt, reduces processing time, ensures that the moisture in silt is removed more thoroughly, improves the quality of silt after treatment, and automatically flushs the silt filter cloth to prevent the filter holes from being blocked. .
Smart Images

Figure CN119430599A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sludge treatment devices, in particular to sludge removing equipment used in water conservancy projects. Background Art
[0002] In the implementation of water conservancy projects, sludge treatment has always been an important link. Silt is mainly composed of water, organic matter, inorganic matter and a small amount of microorganisms. Its composition is complex and its water content is high, which brings great challenges to treatment. Traditional sludge treatment methods, such as natural drying and manual excavation, are not only inefficient, but also require a lot of manpower, material resources and time costs. At the same time, these methods often cannot completely achieve the separation of mud and water in sludge, resulting in the treated sludge still containing high water content, affecting its subsequent utilization and treatment effects. Summary of the invention
[0003] In view of the above problems existing in the existing sludge removing equipment used in water conservancy projects, the present invention is proposed.
[0004] Therefore, the problem to be solved by the present invention is that the sludge cleaned up from the water conservancy project contains a relatively high amount of water, which affects its subsequent utilization and treatment effect.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a sludge removal device for water conservancy projects, comprising a main body assembly, including a storage box, a drainage pipe, a support leg, a sewage pipe, a slurry inlet pipe and a sludge filter cloth, wherein the drainage pipe and the sewage pipe are both fixed to the bottom of the storage box and communicated with the storage box, the support leg is fixed to the bottom of the storage box for supporting the storage box, the slurry inlet pipe is fixed to the top of the storage box, and the sludge filter cloth is fixed to the inner bottom wall of the storage box; The adjusting assembly is arranged on the storage box, and comprises a lifting platform sliding in the storage box, a guide tube is fixed on the top of the lifting platform, a first spring is arranged in the guide tube, a support ring is fixed on the top of the storage box, a support column is fixed on the top of the support ring, a support plate is fixed on the top of the support column, two ends of the first spring are respectively fixed on the top of the lifting platform and the bottom of the support plate, a metal pipe is fixed on the top of the lifting platform, a through hole is opened on the surface of the lifting platform, and the through hole is located below the metal pipe, a conveying pipe is fixed on the bottom of the lifting platform, an extrusion disk is fixed on the bottom of the conveying pipe, a sealing cylinder is fixed on the top of the extrusion disk, the top of the sealing cylinder is fixed to the bottom of the lifting platform, a support rod is fixed on the top of the extrusion disk, and the other end of the support rod is fixed to the bottom of the lifting platform, a sealing ring is fixed in the conveying pipe, a rotating shaft is rotatably connected in the conveying pipe, a butterfly valve is fixed on the end of the rotating shaft, and the sludge filter cloth is fixed to the bottom of the extrusion disk.
[0006] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, the adjusting component also includes a cleaning piece, which is arranged on the extrusion plate, including a water pipe fixed in the extrusion plate, an adjusting frame is fixed on the top of the extrusion plate, the end of the water pipe is fixed in the adjusting frame, and the other end of the water pipe points to the outer surface of the sludge filter cloth, an adjusting ring is slidably connected in the adjusting frame, and a through groove is opened on the surface of the adjusting ring.
[0007] As a preferred embodiment of the sludge removal equipment for water conservancy projects described in the present invention, the adjusting component also includes a sealing member, which is arranged in the sewage pipe, including a sealing block fixed to the inner wall of the sewage pipe, a rotating rod is rotatably connected in the sewage pipe, a switch block is fixed on the surface of the rotating rod, a lifting block is fixed on the bottom of the storage box, and the rotating rod is rotatably connected in the lifting block.
[0008] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, the adjustment component also includes an adjustment member, which is arranged on the storage box, including a top support seat fixed to the surface of the storage box, a bottom support seat is fixed to one side of the support leg, and an adjustment column is rotatably connected between the top support seat and the bottom support seat.
[0009] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, a lifting frame is fixed to one side of the extrusion disk, a guide block slides inside the lifting frame, a second spring is arranged inside the guide block, and two ends of the second spring are respectively fixed to the inner wall of the lifting frame and the inner wall of the guide block.
[0010] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, a first bevel gear is fixed to the surface of the adjusting column, a second bevel gear is fixed to the surface of the rotating rod, a first slide groove, a second slide groove, a third slide groove, a fourth slide groove, a fifth slide groove and a sixth slide groove are provided on the surface of the adjusting column, the end of the guide block slides in the above six slide grooves, and a corrugated plate is fixed to the bottom of the lifting frame.
[0011] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, the adjustment component also includes a switch member, which is arranged on the adjustment member, including a lifting rod sliding in the lifting frame, a lifting ring is fixed on the top of the lifting rod, and a connecting rod is fixed on the bottom of the lifting rod.
[0012] As a preferred embodiment of the sludge removal equipment for water conservancy projects described in the present invention, a fixed rod is fixed on the surface of the lifting ring, a rack is fixed on the end of the fixed rod, a first adjusting gear and a second adjusting gear are fixed on the surface of the rotating shaft, the first adjusting gear is meshed with the rack, a toothed plate is fixed on the top of the adjusting ring, and the second adjusting gear is meshed with the toothed plate.
[0013] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, a positioning column is fixed at the bottom of the lifting ring, the other end of the positioning column is fixed to the top of the connecting rod, a positioning groove is opened on the surface of the positioning column, there are two positioning grooves, which are respectively arranged at both ends of the positioning column, a clamping block is clamped in the positioning groove, a positioning block is fixed on one side of the clamping block, a driving sleeve is fixed on one side of the clamping block, and a third spring is arranged in the driving sleeve.
[0014] As a preferred solution of the sludge removal equipment for water conservancy projects described in the present invention, a lifting groove is provided on the surface of the adjusting column, a lifting sleeve slides in the lifting groove, a fourth spring is provided in the lifting sleeve, a driving block is fixed on the surface of the lifting sleeve, a placement groove is provided on the surface of the adjusting column, and the positioning block can be moved into the placement groove.
[0015] The beneficial effects of the present invention are as follows: by setting up an adjustment component, the gravity of the sludge itself can be automatically used to squeeze and filter water without manual intervention, which significantly improves the efficiency and degree of automation of mud-water separation, not only reduces the processing time, but also ensures that the moisture in the sludge is more thoroughly removed, thereby improving the quality of the treated sludge. At the same time, the sludge filter cloth can be automatically flushed so that the filter holes of the sludge filter cloth will not be blocked. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them: Figure 1 This is a structural diagram of silt removal equipment used in water conservancy projects.
[0017] Figure 2 A partial cross-sectional structural diagram of a storage tank for sludge removal equipment used in water conservancy projects.
[0018] Figure 3 For silt removal equipment used in water conservancy projects Figure 2 A magnified view of the local structure at point A.
[0019] Figure 4 For silt removal equipment used in water conservancy projects Figure 2 Enlarged view of the local structure at point B in the middle.
[0020] Figure 5 For silt removal equipment used in water conservancy projects Figure 2 Enlarged view of the local structure at point C in the middle.
[0021] Figure 6 This is a cross-sectional structural diagram of a storage tank for sludge removal equipment used in water conservancy projects.
[0022] Figure 7 For silt removal equipment used in water conservancy projects Figure 6 Enlarged view of the local structure at point D in the middle.
[0023] Figure 8 For silt removal equipment used in water conservancy projects Figure 6 Enlarged view of the local structure at point E in the middle.
[0024] Fig. 9 This is a cross-sectional structural diagram of a guide block of a sludge removal device used in water conservancy projects.
[0025] Fig.10 This is a structural diagram of the connection between the delivery pipe and the rotating shaft of the sludge removal equipment used in water conservancy projects.
[0026] Fig.11 For silt removal equipment used in water conservancy projects Fig.10 Enlarged view of the local structure at point F in the middle.
[0027] Fig.12 This is a partial structural diagram of the adjustment ring of the sludge removal equipment used in water conservancy projects.
[0028] Fig.13 This is a structural diagram of two placement slots on an adjusting column of a sludge removal device used in water conservancy projects.
[0029] Fig.14 This is a structural diagram of the positioning column of the silt removal equipment used in water conservancy projects.
[0030] Fig.15 This is a cross-sectional structural diagram of a positioning block of a sludge removal device used in water conservancy projects.
[0031] Fig.16 This is a partial structural diagram of the regulating column of the silt removal equipment used in water conservancy projects. DETAILED DESCRIPTION
[0032] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0033] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0034] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0035] Example 1, reference Figure 1 to Figure 16 , which is the first embodiment of the present invention, and this embodiment provides a sludge removal device for water conservancy projects. The sludge removal device for water conservancy projects includes a main component 100, including a storage box 101, a drainage pipe 102, a support leg 103, a sewage pipe 104, a slurry inlet pipe 105 and a sludge filter cloth 106. The drainage pipe 102 and the sewage pipe 104 are both fixed to the bottom of the storage box 101 and are connected to the storage box 101. The support leg 103 is fixed to the bottom of the storage box 101 for supporting the storage box 101. The slurry inlet pipe 105 is fixed to the top of the storage box 101, and the sludge filter cloth 106 is fixed to the inner bottom wall of the storage box 101.
[0036] The storage box 101 is arranged on the bank of the dredging site. The mud water can be transported to the storage box 101 through the slurry inlet pipe 105 by a mud pump, so that the sludge can be treated on site. The drain pipe 102 is used to discharge the water separated from the sludge in the storage box 101. The support legs 103 are used to fix and support the storage box 101. The sewage pipe 104 is used to discharge the sludge after the water is separated. The sludge filter cloth 106 is used to squeeze and filter the sludge to obtain sludge with less water.
[0037] The adjustment assembly 200 is arranged on the storage box 101, and includes a lifting platform 201a sliding in the storage box 101, a guide tube 201b is fixed on the top of the lifting platform 201a, a first spring 201c is arranged in the guide tube 201b, a support ring 201d is fixed on the top of the storage box 101, a support column 201e is fixed on the top of the support ring 201d, a support plate 201f is fixed on the top of the support column 201e, two ends of the first spring 201c are respectively fixed to the top of the lifting platform 201a and the bottom of the support plate 201f, a metal tube 201g is fixed on the top of the lifting platform 201a, and a through hole 201a-1 is opened on the surface of the lifting platform 201a. 1a-1 is located below the metal pipe 201g, a delivery pipe 201h is fixed at the bottom of the lifting platform 201a, an extrusion plate 201i is fixed at the bottom of the delivery pipe 201h, a sealing cylinder 201j is fixed at the top of the extrusion plate 201i, the top of the sealing cylinder 201j is fixed to the bottom of the lifting platform 201a, a support rod 201k is fixed at the top of the extrusion plate 201i, and the other end of the support rod 201k is fixed to the bottom of the lifting platform 201a, a sealing ring 201l is fixed in the delivery pipe 201h, a rotating shaft 201m is rotatably connected in the delivery pipe 201h, a butterfly valve 201n is fixed at the end of the rotating shaft 201m, and the sludge filter cloth 106 is fixed to the bottom of the extrusion plate 201i.
[0038] The first spring 201c is in a stretched state, the support plate 201f is used to fix and support the first spring 201c, the lifting platform 201a is used to support the sludge transported to the storage box 101 by the slurry inlet pipe 105, and a plurality of holes are opened on the surface of the metal pipe 201g, and the surface of the metal pipe 201g is covered with a filter cloth, so that the moisture in the sludge can enter the metal pipe 201g through the filter cloth, and the moisture is transported by the metal pipe 201g so that the moisture enters the bottom of the lifting platform 201a through the through hole 201a-1. The sealing cylinder 201j is set between the lifting platform 201a and the extrusion plate 201i to form a sealed space, thereby storing the water flowing down from the through hole 201a-1.
[0039] The switch of the butterfly valve 201n can be controlled by rotating the rotating shaft 201m. The setting of the sealing ring 201l enables the butterfly valve 201n to seal the delivery pipe 201h. When the delivery pipe 201h is in a sealed state, the sludge on the top of the lifting platform 201a can squeeze the lifting platform 201a, so that the lifting platform 201a moves downward, so that the lifting platform 201a stretches the first spring 201c. At this time, the lifting platform 201a can squeeze the extrusion plate 201i through the sealing cylinder 201j and the support rod 201k, so that the extrusion plate 201i moves downward. Since the butterfly valve 201n is closed at this time, the sludge in the sludge filter cloth 106 is squeezed, so that the moisture in the sludge in the sludge filter cloth 106 is squeezed out and discharged through the drain pipe 102 at the bottom of the storage box 101.
[0040] When the butterfly valve 201n is opened, the sludge on the top of the lifting platform 201a can flow downward. At this time, the pressure of the sludge on the lifting platform 201a is reduced. Under the pulling force of the first spring 201c, the lifting platform 201a can move upward to reset.
[0041] Specifically, the adjustment component 200 also includes a cleaning part 202, which is arranged on the extrusion plate 201i, including a water pipe 202a fixed in the extrusion plate 201i, an adjustment frame 202b is fixed on the top of the extrusion plate 201i, the end of the water pipe 202a is fixed in the adjustment frame 202b, and the other end of the water pipe 202a points to the outer surface of the sludge filter cloth 106, and an adjustment ring 202c is slidably connected in the adjustment frame 202b, and a through groove 202c-1 is opened on the surface of the adjustment ring 202c.
[0042] By moving the adjusting ring 202c, the through groove 202c-1 on the surface of the adjusting ring 202c can be connected to the end of the water pipe 202a, so that the water on the top of the extrusion plate 201i enters the water pipe 202a through the adjusting frame 202b, and then flushes to the outer surface of the sludge filter cloth 106 from the other end of the water pipe 202a, thereby cleaning the sludge filter cloth 106.
[0043] Specifically, the adjustment component 200 also includes a seal 203, which is arranged in the sewage pipe 104, including a sealing block 203a fixed to the inner wall of the sewage pipe 104, a rotating rod 203b is rotatably connected in the sewage pipe 104, a switch block 203c is fixed on the surface of the rotating rod 203b, a hanging block 203d is fixed at the bottom of the storage box 101, and the rotating rod 203b is rotatably connected in the hanging block 203d.
[0044] The sealing block 203a is used to cooperate with the switch block 203c to control the on and off of the sewage pipe 104. By rotating the rotating rod 203b, the switch block 203c can be driven to rotate so that the switch block 203c is away from one of the sealing blocks 203a. At this time, the sludge in the sewage pipe 104 can be discharged through between the sealing block 203a and the switch block 203c.
[0045] Example 2, reference Figure 1 to Figure 16 , which is the second embodiment of the present invention, and this embodiment is based on the previous embodiment.
[0046] Specifically, the adjustment component 200 also includes an adjustment member 204, which is arranged on the storage box 101, including a top support seat 204a fixed to the surface of the storage box 101, a bottom support seat 204b fixed to one side of the support leg 103, and an adjustment column 204c rotatably connected to the top support seat 204a and the bottom support seat 204b.
[0047] With the support of the top support seat 204a and the bottom support seat 204b, the adjustment column 204c can be stably rotated in situ, and the adjustment column 204c will not move up and down.
[0048] Specifically, a lifting frame 204d is fixed to one side of the extrusion plate 201i, a guide block 204e slides inside the lifting frame 204d, a second spring 204f is arranged inside the guide block 204e, and two ends of the second spring 204f are respectively fixed to the inner wall of the lifting frame 204d and the inner wall of the guide block 204e.
[0049] The lifting frame 204d is used to support the guide block 204e. The second spring 204f is in a compressed state and is used to push the guide block 204e. When the extrusion plate 201i is lifted or lowered, the lifting frame 204d can be driven to move synchronously, so that the end of the guide block 204e can slide in the adjustment column 204c.
[0050] Specifically, a first bevel gear 204g is fixed on the surface of the adjusting column 204c, a second bevel gear 204h is fixed on the surface of the rotating rod 203b, a first slide groove 204c-1, a second slide groove 204c-2, a third slide groove 204c-3, a fourth slide groove 204c-4, a fifth slide groove 204c-5 and a sixth slide groove 204c-6 are provided on the surface of the adjusting column 204c, an end of the guide block 204e slides in the above six slide grooves, and a corrugated plate 204i is fixed to the bottom of the lifting frame 204d.
[0051] The corrugated plate 204i can prevent water in the storage box 101 from splashing out. The first bevel gear 204g and the second bevel gear 204h are engaged, so that the adjustment column 204c rotates to drive the rotating rod 203b to rotate, thereby the rotating rod 203b drives the switch block 203c to rotate.
[0052] When the extrusion plate 201i moves downward, the end of the guide block 204e first slides from the first slide groove 204c-1 to the second slide groove 204c-2.
[0053] When the end of the guide block 204e slides downward in the first slide groove 204c-1, the guide block 204e does not drive the adjusting column 204c to rotate. At this time, the squeezing plate 201i squeezes the sludge filter cloth 106, so that the sludge in the sludge filter cloth 106 is separated from the water.
[0054] When the end of the guide block 204e slides from the first slide groove 204c-1 to the second slide groove 204c-2, the guide block 204e starts to drive the adjusting column 204c to rotate, and the adjusting column 204c can drive the switch block 203c to rotate. At this time, the sewage pipe 104 can be opened, so that the sludge under the sludge filter cloth 106 is squeezed and discharged from the sewage pipe 104. At this time, the opening of the sewage pipe 104 gradually increases, and as the squeezing plate 201i squeezes the sludge filter cloth 106, water in the sludge will still be separated.
[0055] When the end of the guide block 204e slides from the second slide groove 204c-2 to the third slide groove 204c-3, the opening of the sewage pipe 104 is the largest. At this time, the guide block 204e slides downward in the third slide groove 204c-3 to keep the opening of the sewage pipe 104 at the largest, so that the sludge under the sludge filter cloth 106 is stably squeezed and discharged from the sewage pipe 104.
[0056] When the end of the guide block 204e slides from the third slide groove 204c-3 to the fourth slide groove 204c-4, the guide block 204e can drive the adjustment column 204c to reset and rotate, so that the switch block 203c starts to reset, thereby gradually reducing the opening of the sewage pipe 104.
[0057] When the end of the guide block 204e slides from the fourth slide groove 204c-4 to the fifth slide groove 204c-5, the sewage pipe 104 has been closed, and the sludge is no longer discharged. As the squeezing plate 201i moves downward, the sludge moisture in the sludge filter cloth 106 is separated again.
[0058] When the guide block 204e moves downward in the fifth slide groove 204c-5, the switch member 205 can open the butterfly valve 201n, so that the sludge in the conveying pipe 201h can enter the sludge filter cloth 106. At this time, the lifting platform 201a can move upward through the reset tension of the first spring 201c, thereby driving the extrusion plate 201i to move upward, so that the guide block 204e slides from the fifth slide groove 204c-5 to the sixth slide groove 204c-6. As the extrusion plate 201i moves upward, the guide block 204e slides from the sixth slide groove 204c-6 to the first slide groove 204c-1.
[0059] The slot depths of the fifth slide groove 204c-5 and the sixth slide groove 204c-6 are greater than the slot depth of the fourth slide groove 204c-4, so that the guide block 204e can only slide from the fifth slide groove 204c-5 to the sixth slide groove 204c-6.
[0060] The groove depth at the connection between the first slide groove 204c-1 and the second slide groove 204c-2 is greater than the groove depth of the sixth slide groove 204c-6 on one side thereof, so that the guide block 204e can only move from the first slide groove 204c-1 to the second slide groove 204c-2.
[0061] Specifically, the adjustment component 200 also includes a switch member 205, which is arranged on the adjustment member 204, including a lifting rod 205a sliding in the lifting frame 204d, a lifting ring 205b is fixed on the top of the lifting rod 205a, and a connecting rod 205c is fixed on the bottom of the lifting rod 205a.
[0062] The lifting rod 205a is used to support the lifting ring 205b so that the lifting ring 205b can be lifted and lowered stably. The connecting rod 205c is used to connect multiple lifting rods 205a, thereby improving the stability of the lifting rods 205a.
[0063] Specifically, a fixed rod 205d is fixed on the surface of the lifting ring 205b, a rack 205e is fixed to the end of the fixed rod 205d, a first adjusting gear 205f and a second adjusting gear 205g are fixed to the surface of the rotating shaft 201m, the first adjusting gear 205f and the rack 205e are meshed, a toothed plate 205h is fixed on the top of the adjusting ring 202c, and the second adjusting gear 205g and the toothed plate 205h are meshed.
[0064] By rising the lifting ring 205b, the fixed rod 205d can be driven to move upward, so that the fixed rod 205d drives the first adjusting gear 205f to rotate through the rack 205e, so that the rotating shaft 201m drives the butterfly valve 201n to rotate, thereby opening the butterfly valve 201n, so that the sludge in the conveying pipe 201h can enter the sludge filter cloth 106.
[0065] When the rotating shaft 201m rotates, it can drive the second adjusting gear 205g to rotate, so that the second adjusting gear 205g drives the tooth plate 205h to move, and the tooth plate 205h drives the adjusting ring 202c to move, so that the through groove 202c-1 on the adjusting ring 202c is connected to the end of the water pipe 202a, so that the water on the top of the extrusion plate 201i enters the water pipe 202a through the adjusting frame 202b, and then flushes from the other end of the water pipe 202a to the outer surface of the sludge filter cloth 106, so as to clean the sludge filter cloth 106.
[0066] Specifically, a positioning column 205i is fixed at the bottom of the lifting ring 205b, and the other end of the positioning column 205i is fixed to the top of the connecting rod 205c. A positioning groove 205i-1 is opened on the surface of the positioning column 205i. There are two positioning grooves 205i-1, which are respectively arranged at both ends of the positioning column 205i. A clamping block 205j is clamped in the positioning groove 205i-1, a positioning block 205k is fixed on one side of the clamping block 205j, and a driving sleeve 205l is fixed on one side of the clamping block 205j. A third spring 205m is arranged in the driving sleeve 205l.
[0067] The third spring 205m is in a compressed state. The reset elastic force of the third spring 205m can enable the driving sleeve 205l to drive the clamping block 205j away from the positioning groove 205i-1, thereby releasing the limit on the positioning column 205i, so that the positioning column 205i can slide in the lifting frame 204d, and the positioning block 205k slides on the surface of the adjusting column 204c.
[0068] Specifically, a lifting groove 204c-7 is provided on the surface of the adjusting column 204c, a lifting sleeve 205n slides in the lifting groove 204c-7, a fourth spring 205o is arranged in the lifting sleeve 205n, a driving block 205p is fixed on the surface of the lifting sleeve 205n, a placement groove 204c-8 is provided on the surface of the adjusting column 204c, and the positioning block 205k can be moved into the placement groove 204c-8.
[0069] The upper and lower sides of the adjusting column 204c are provided with lifting sleeves 205n, a fourth spring 205o, a driving block 205p and a placement groove 204c-8 in opposite directions, and the fourth spring 205o is in a compressed state.
[0070] When the extrusion plate 201i moves downward, the lifting frame 204d can drive the lifting ring 205b to move toward the driving block 205p under the adjusting column 204c, so that the lifting ring 205b squeezes the driving block 205p, thereby compressing the fourth spring 205o. When the positioning block 205k moves to the side of the placement groove 204c-8 under the adjusting column 204c, the positioning block 205k can be moved into the placement groove 204c-8 under the thrust of the third spring 205m. At this time, the clamping block 205j is away from the positioning groove 205i-1, thereby releasing the restriction on the positioning column 205i. At this time, under the action of the reset elastic force of the fourth spring 205o, the driving block 205p can drive the lifting ring 205b to move upward, so that the connecting rod 205c moves to the bottom of the lifting frame 204d. During the upward movement of the lifting ring 205b, the butterfly valve 201n can be opened, so that the sludge in the conveying pipe 201h can enter the sludge filter cloth 106, and at the same time, the water on the top of the extrusion plate 201i enters the water pipe 202a through the regulating frame 202b, and then flushes to the outer surface of the sludge filter cloth 106 from the other end of the water pipe 202a, so as to clean the sludge filter cloth 106.
[0071] During the upward movement of the lifting ring 205b, the positioning block 205k moves into the placement groove 204c-8, making the lifting frame 204d unable to move relative to the adjusting column 204c, thereby positioning the extrusion disk 201i. As the lifting ring 205b rises, another positioning groove 205i-1 on the surface of the positioning column 205i will move to the side of the clamping block 205j. At this time, the extrusion disk 201i will move upward under the pulling force of the first spring 201c, so that the positioning block 205k can be moved out of the placement groove 204c-8 through the inclined squeezing of the placement groove 204c-8 under the adjusting column 204c. At this time, the positioning block 205k can push the clamping block 205j to move into the positioning groove 205i-1, thereby positioning the positioning column 205i, so that there will be no relative movement between the positioning column 205i and the lifting frame 204d, thereby fixing the opened butterfly valve 201n to prevent the butterfly valve 201n from closing by itself.
[0072] At this time, the extrusion plate 201i will move upward under the pulling force of the first spring 201c, and the lifting frame 204d will rise on the surface of the adjusting column 204c at the same time. When the lifting ring 205b moves to the bottom of the driving block 205p above the adjusting column 204c, the driving block 205p can be pushed to move the driving block 205p upward, so that the corresponding fourth spring 205o is compressed. When the positioning block 205k rises to the side of the placement groove 204c-8 above the adjusting column 204c, the positioning block 205k can be moved to the placement groove 204c-8 under the pushing force of the third spring 205m. c-8, at this time, the clamping block 205j is away from the positioning groove 205i-1, thereby releasing the limit on the positioning column 205i. At this time, under the action of the reset elastic force of the fourth spring 205o, the driving block 205p can drive the lifting ring 205b to move downward, so that the lifting ring 205b drives the butterfly valve 201n to close, and the water pipe 202a is cut off by the adjusting ring 202c, and the cleaning of the sludge filter cloth 106 is stopped. At this time, the lifting ring 205b falls on the top of the lifting frame 204d, and the positioning groove 205i-1 above the positioning column 205i just moves to the side of the clamping block 205j.
[0073] As the slurry inlet pipe 105 transports muddy water into the storage box 101, the lifting platform 201a drives the extrusion plate 201i to move downward, and the extrusion plate 201i drives the positioning block 205k to move downward through the lifting frame 204d, so that the inclined surface below the placement groove 204c-8 squeezes the positioning block 205k, so that the clamping block 205j moves into the positioning groove 205i-1. At this time, the positioning block 205k can slide downward on the surface of the adjusting column 204c.
[0074] When in use, the current state shown in the figure is the state of the lifting platform 201a moving downward. As the slurry inlet pipe 105 transports mud and water into the storage box 101, the load-bearing capacity of the lifting platform 201a becomes larger, thereby driving the extrusion plate 201i to move downward, so that the sludge in the sludge filter cloth 106 is squeezed, thereby squeezing the water in the sludge in the sludge filter cloth 106 and discharging it through the drain pipe 102 at the bottom of the storage box 101. At this time, the end of the guide block 204e slides downward in the first slide groove 204c-1.
[0075] As the extrusion plate 201i moves downward, the end of the guide block 204e slides from the first slide groove 204c-1 to the second slide groove 204c-2, and then slides from the second slide groove 204c-2 to the third slide groove 204c-3, and then slides from the third slide groove 204c-3 to the fourth slide groove 204c-4, and then slides from the fourth slide groove 204c-4 to the fifth slide groove 204c-5. This process can filter out the moisture in the sludge and discharge the sludge from the sewage pipe 104 until the sewage pipe 104 is closed again.
[0076] When the guide block 204e slides downward in the fifth slide groove 204c-5, the lifting frame 204d drives the lifting ring 205b to move toward the driving block 205p below the adjusting column 204c, so that the lifting ring 205b squeezes the driving block 205p, thereby compressing the fourth spring 205o. When the positioning block 205k moves to the side of the placement groove 204c-8 below the adjusting column 204c, the positioning block 205k can be moved into the placement groove 204c-8 under the thrust of the third spring 205m. At this time, the clamping block 205j is away from the positioning groove 205i-1, thereby releasing the positioning column 204c. 05i is limited. At this time, under the action of the reset elastic force of the fourth spring 205o, the driving block 205p can drive the lifting ring 205b to move upward, so that the connecting rod 205c moves to the bottom of the lifting frame 204d. During the upward movement of the lifting ring 205b, the butterfly valve 201n can be opened, so that the sludge in the conveying pipe 201h can enter the sludge filter cloth 106, and at the same time, the water on the top of the squeezing plate 201i enters the water pipe 202a through the regulating frame 202b, and then flushes from the other end of the water pipe 202a to the outer surface of the sludge filter cloth 106, so as to clean the sludge filter cloth 106.
[0077] During the upward movement of the lifting ring 205b, the positioning block 205k moves into the placement groove 204c-8, making the lifting frame 204d unable to move relative to the adjusting column 204c, thereby positioning the extrusion disk 201i. As the lifting ring 205b rises, another positioning groove 205i-1 on the surface of the positioning column 205i will move to the side of the clamping block 205j. At this time, the extrusion disk 201i will move upward under the pulling force of the first spring 201c, so that the positioning block 205k can be moved out of the placement groove 204c-8 through the inclined squeezing of the placement groove 204c-8 under the adjusting column 204c. At this time, the positioning block 205k can push the clamping block 205j to move into the positioning groove 205i-1, thereby positioning the positioning column 205i, so that there will be no relative movement between the positioning column 205i and the lifting frame 204d, thereby fixing the opened butterfly valve 201n to prevent the butterfly valve 201n from closing by itself.
[0078] At this time, as the extrusion plate 201i rises, the sludge continues to enter the sludge filter cloth 106 from the conveying pipe 201h. During this process, the guide block 204e slides from the fifth slide groove 204c-5 to the sixth slide groove 204c-6, and then slides from the sixth slide groove 204c-6 to the first slide groove 204c-1. As the guide block 204e rises in the first slide groove 204c-1, the lifting ring 205b moves to the bottom of the driving block 205p above the adjusting column 204c, pushing the driving block 205p to move the driving block 205p upward, so that the corresponding fourth spring 205o is compressed. When the positioning block 205k rises to the placement groove 204c-8 above the adjusting column 204c, the lifting ring 205b moves to the bottom of the driving block 205p above the adjusting column 204c. When the lifting and lowering parts are in the upper and lower parts, the lifting and lowering rings 205a and 205b are in the upper and lower parts, respectively. When the lifting and lowering parts are in the upper and lower parts, the lifting and lowering rings 205a and 205b are in the upper and lower parts, respectively. When the lifting and lowering parts are in the upper and lower parts, the lifting and lowering rings 205a and 205b are in the upper and lower parts, respectively. When the lifting and lowering parts are in the upper and lower parts, the lifting and lowering rings 205a and 205b are in the upper and lower parts, respectively. When the lifting and lowering parts are in the upper and lower parts, the lifting and lowering rings 205a and 205b are in the upper and lower parts, respectively.
[0079] As the slurry inlet pipe 105 transports muddy water into the storage box 101, the lifting platform 201a drives the extrusion plate 201i to move downward, and the extrusion plate 201i drives the positioning block 205k to move downward through the lifting frame 204d, so that the inclined surface below the placement groove 204c-8 squeezes the positioning block 205k, so that the clamping block 205j moves into the positioning groove 205i-1. At this time, the positioning block 205k can slide downward on the surface of the adjusting column 204c.
[0080] Through the above technical solution, the gravity of the sludge can be used to apply pressure to the sludge itself, thereby improving the sludge separation efficiency, and the sludge filter cloth 106 can be automatically cleaned to prevent the filter holes of the sludge filter cloth 106 from being blocked.
[0081] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A sludge removal device for water conservancy projects, characterized in that: include, A main body component (100) comprises a storage box (101), a drainage pipe (102), a support leg (103), a sewage pipe (104), a slurry inlet pipe (105) and a sludge filter cloth (106), wherein the drainage pipe (102) and the sewage pipe (104) are both fixed to the bottom of the storage box (101) and are in communication with the storage box (101); the support leg (103) is fixed to the bottom of the storage box (101) and is used to support the storage box (101); the slurry inlet pipe (105) is fixed to the top of the storage box (101); and the sludge filter cloth (106) is fixed to the inner bottom wall of the storage box (101); The adjustment component (200) is arranged on the storage box (101), comprising a lifting platform (201a) sliding in the storage box (101), a guide tube (201b) being fixed on the top of the lifting platform (201a), a first spring (201c) being arranged in the guide tube (201b), a support ring (201d) being fixed on the top of the storage box (101), a support column (201e) being fixed on the top of the support ring (201d), a support plate (201f) being fixed on the top of the support column (201e), two ends of the first spring (201c) being respectively fixed to the top of the lifting platform (201a) and the bottom of the support plate (201f), a metal tube (201g) being fixed on the top of the lifting platform (201a), and a through hole (201a-1) being provided on the surface of the lifting platform (201a), and the through hole (201 a-1) is located below the metal pipe (201g), a conveying pipe (201h) is fixed at the bottom of the lifting platform (201a), an extrusion plate (201i) is fixed at the bottom of the conveying pipe (201h), a sealing cylinder (201j) is fixed at the top of the extrusion plate (201i), the top of the sealing cylinder (201j) is fixed to the bottom of the lifting platform (201a), a support rod (201k) is fixed at the top of the extrusion plate (201i), the other end of the support rod (201k) is fixed to the bottom of the lifting platform (201a), a sealing ring (201l) is fixed in the conveying pipe (201h), a rotating shaft (201m) is rotatably connected in the conveying pipe (201h), a butterfly valve (201n) is fixed at the end of the rotating shaft (201m), and the sludge filter cloth (106) is fixed to the bottom of the extrusion plate (201i).
2. The sludge removal equipment for water conservancy projects according to claim 1, characterized in that: The adjustment component (200) further comprises a cleaning piece (202) which is arranged on the extrusion plate (201i) and comprises a water pipe (202a) fixed inside the extrusion plate (201i); an adjustment frame (202b) is fixed on the top of the extrusion plate (201i); an end of the water pipe (202a) is fixed inside the adjustment frame (202b); the other end of the water pipe (202a) points to the outer surface of the sludge filter cloth (106); an adjustment ring (202c) is slidably connected inside the adjustment frame (202b); a through groove (202c-1) is provided on the surface of the adjustment ring (202c).
3. The sludge removal equipment for water conservancy projects according to claim 2, characterized in that: The regulating assembly (200) further comprises a sealing member (203), which is arranged in the sewage pipe (104) and comprises a sealing block (203a) fixed to the inner wall of the sewage pipe (104); a rotating rod (203b) is rotatably connected in the sewage pipe (104); a switch block (203c) is fixed on the surface of the rotating rod (203b); a hanging block (203d) is fixed at the bottom of the storage box (101); and the rotating rod (203b) is rotatably connected in the hanging block (203d).
4. The sludge removal equipment for water conservancy projects according to claim 3, characterized in that: The adjustment assembly (200) further comprises an adjustment member (204), which is arranged on the storage box (101) and comprises a top support seat (204a) fixed to the surface of the storage box (101), a bottom support seat (204b) fixed to one side of the support leg (103), and an adjustment column (204c) rotatably connected inside the top support seat (204a) and the bottom support seat (204b).
5. The sludge removal equipment for water conservancy projects according to claim 4, characterized in that: A lifting frame (204d) is fixed on one side of the extrusion plate (201i), a guide block (204e) is slidably disposed inside the lifting frame (204d), a second spring (204f) is disposed inside the guide block (204e), and two ends of the second spring (204f) are respectively fixed to the inner wall of the lifting frame (204d) and the inner wall of the guide block (204e).
6. The sludge removal equipment for water conservancy projects according to claim 5, characterized in that: A first bevel gear (204g) is fixed on the surface of the adjusting column (204c), a second bevel gear (204h) is fixed on the surface of the rotating rod (203b), a first slide groove (204c-1), a second slide groove (204c-2), a third slide groove (204c-3), a fourth slide groove (204c-4), a fifth slide groove (204c-5) and a sixth slide groove (204c-6) are provided on the surface of the adjusting column (204c), an end of the guide block (204e) slides in the above six slide grooves, and a corrugated plate (204i) is fixed on the bottom of the lifting frame (204d).
7. The sludge removal equipment for water conservancy projects according to claim 5 or 6, characterized in that: The adjustment component (200) further comprises a switch member (205) which is arranged on the adjustment member (204) and comprises a lifting rod (205a) which slides in the lifting frame (204d), a lifting ring (205b) being fixed on the top of the lifting rod (205a), and a connecting rod (205c) being fixed on the bottom of the lifting rod (205a).
8. The sludge removal equipment for water conservancy projects according to claim 7, characterized in that: A fixed rod (205d) is fixed on the surface of the lifting ring (205b), a rack (205e) is fixed to the end of the fixed rod (205d), a first adjusting gear (205f) and a second adjusting gear (205g) are fixed on the surface of the rotating shaft (201m), the first adjusting gear (205f) and the rack (205e) are meshed, and a toothed plate (205h) is fixed on the top of the adjusting ring (202c), the second adjusting gear (205g) and the toothed plate (205h) are meshed.
9. The sludge removal equipment for water conservancy projects according to claim 8, characterized in that: A positioning column (205i) is fixed at the bottom of the lifting ring (205b), and the other end of the positioning column (205i) is fixed to the top of the connecting rod (205c). A positioning groove (205i-1) is provided on the surface of the positioning column (205i). There are two positioning grooves (205i-1), which are respectively arranged at two ends of the positioning column (205i). A clamping block (205j) is clamped in the positioning groove (205i-1), a positioning block (205k) is fixed on one side of the clamping block (205j), a driving sleeve (205l) is fixed on one side of the clamping block (205j), and a third spring (205m) is arranged in the driving sleeve (205l).
10. The sludge removal equipment for water conservancy projects according to claim 9, characterized in that: The surface of the adjusting column (204c) is provided with a lifting groove (204c-7), a lifting sleeve (205n) is slidably arranged in the lifting groove (204c-7), a fourth spring (205o) is arranged in the lifting sleeve (205n), a driving block (205p) is fixed on the surface of the lifting sleeve (205n), a placement groove (204c-8) is provided on the surface of the adjusting column (204c), and the positioning block (205k) can be moved into the placement groove (204c-8).
Citation Information
Patent Citations
Water treatment settling pond
CN108159743A
Small vertical sludge dewatering device
CN113105089A
Vertical filter press
CN211611759U
Filter press device special for mud
CN2928838Y
Sludge recovering filter cloth and dewatering filter using the same
JP2004174434A