Accropode hoisting construction device and method

By designing a lifting construction device for twisting blocks, the automatic unbinding is achieved by combining chains and ropes, the safety risks in the unbinding process of larger twisting blocks is solved, and construction efficiency and safety are improved .

CN119460994AActive Publication Date: 2025-02-18CCCC FOURTH HARBOR ENG CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411636497.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2025-02-18
Estimated Expiration
2044-11-15

AI Technical Summary

Technical Problem

During the construction and hoisting process of the Twist King Block, the larger Twist King Block needs to be equipped with a special platform and manual operation during the unbinding process, which increases the construction safety risks.

Method used

A construction device for lifting a twisted king block is designed, including a first sling, a second sling, a first latch connection assembly and a second latch connection assembly. Through the cooperation of the chain and the sling rope, the automatic unbinding of the twisted king block is realized. , avoid manual participation.

Benefits of technology

The entire unbinding process does not require manual participation, which reduces construction safety risks and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119460994A_ABST
    Figure CN119460994A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of accropode hoisting construction for steel pipe piles, in particular to an accropode hoisting construction device and method. The lower part of the first lifting appliance is connected with a first chain, a second chain, a third chain and a fourth chain; the lower part of the second lifting appliance is connected with a first lifting rope and a second lifting rope; the first plug pin connecting assembly comprises a first male connecting piece, a first female connecting piece and a first plug pin which are matched with one another; the second bolt connecting assembly comprises a second male connecting piece, a second female connecting piece and a second bolt which are matched with one another; the lower end of the first chain is connected with a first female connecting piece, the lower end of the second chain is connected with a first male connecting piece, the lower end of the third chain is connected with a second female connecting piece, and the lower end of the fourth chain is connected with a second male connecting piece. According to the accropode hoisting construction device, manual participation is not needed in the whole unbinding process, and the safety risk of the unbinding process to personnel is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of twist block lifting construction, and in particular to a twist block lifting construction device and a construction method. Background Art

[0002] At present, during the construction and hoisting process of twist king blocks, some twist king blocks are large in size. Generally, the large-volume stones are bundled and then lifted to the installation or placement position by crane equipment (shore crane or lifting ship), and then untied manually to complete the hoisting, placement or installation of the twist king blocks.

[0003] In the above process, due to the large size of the twist block, a special platform needs to be set up during the untying process, and the rope on the stone needs to be pulled out manually. If a crane equipment and manual labor are used, the safety risk of personnel construction will be greatly increased. Summary of the invention

[0004] The purpose of the present invention is to overcome the problem in the background technology that during the untying process, a special platform needs to be set up and the rope on the stone needs to be pulled out manually. If a crane equipment and manual labor are used, the safety risk of personnel construction will be greatly increased. A twist block lifting construction device and construction method are provided.

[0005] The twist block lifting construction device described in the present application comprises a first lifting device, a second lifting device, a first latch connection assembly and a second latch connection assembly, wherein: A first chain, a second chain, a third chain and a fourth chain are connected to the lower part of the first sling, the length of the first chain is longer than the length of the second chain, and the length of the third chain is longer than the length of the fourth chain; A first lifting rope and a second lifting rope are connected to the lower part of the second lifting device, and the second lifting rope is longer than the first lifting rope; The first latch connection assembly comprises a first male connector, a first female connector and a first latch that match each other, wherein the first latch is used to connect the first male connector and the first female connector; The second latch connection assembly comprises a second male connector, a second female connector and a second latch that match each other, wherein the second latch is used to connect the second male connector and the second female connector; The lower end of the first chain is connected to the first female connector, the lower end of the second chain is connected to the first male connector, the lower end of the third chain is connected to the second female connector, the lower end of the fourth chain is connected to the second male connector, the lower end of the first suspension rope is connected to one end of the first pin, and the lower end of the second suspension rope is connected to one end of the second pin.

[0006] The twist block lifting construction device described in the present application lifts the twist block to a predetermined position through the mutual cooperation between the first chain, the second chain, the third chain, the fourth chain, the first lifting rope, the second lifting rope, the first male connector, the first female connector, the first latch, the second male connector, the second female connector, the second latch and the second latch, and then uses the first lifting rope and the second lifting rope to separate the first chain, the second chain, the third chain and the fourth chain from the twist block. The entire untying process does not require manual participation, avoiding safety risks to personnel during the untying process.

[0007] Preferably, the first chain, the second chain, the fourth chain and the third chain are arranged circumferentially in sequence, the first male connector and the first female connector are connected by a first latch, and the second male connector and the second female connector are connected by a second latch.

[0008] Preferably, in the torsion block lifting construction device described in the present application, the first chain, the second chain, the fourth chain and the third chain are arranged circumferentially in sequence, the first male connecting member and the first female connecting member are connected by a first pin, and the second male connecting member and the second female connecting member are connected by a second pin.

[0009] The present application discloses a torsion block lifting construction device. When lifting the torsion block, the first chain, the second chain, the fourth chain and the third chain are arranged in sequence along the circumference of the torsion block; then the first chain is passed under the first protrusion on one side, and the first pin is passed through the first male connector and the first female connector to connect the first male connector and the first female connector, and the third chain is passed under the first protrusion on the other side, and the second pin is passed through the second male connector and the second female connector to connect the second male connector and the second female connector; then the first lifting device and the second lifting device are lifted, so that the first chain, the second chain, the third chain and the fourth chain lift the torsion block. At this time, the first The lifting rope and the second lifting rope are both in a relaxed state; after the twist block is lifted to the target position, the first lifting device is continued to be lowered for a distance, so that the first chain, the second chain, the third chain and the fourth chain are in a relaxed state; then the second lifting device is lifted, so that the first lifting rope drives the first pin to disengage from the first male connector and the first female connector; then the second lifting device is continued to be lifted, so that the second lifting rope drives the second pin to disengage from the second male connector and the second female connector; then the first lifting device is lifted, so that the first chain, the second chain, the third chain and the fourth chain are all disengaged from the twist block. The entire untying process does not require manual participation, avoiding safety risks to personnel during the untying process.

[0010] Preferably, the twist block lifting construction device described in the present application also includes a first sub-chain, wherein: one end of the first sub-chain is connected to the second chain, and the other end of the first sub-chain is connected to a third male connecting member, and the third male connecting member and the second male connecting member can be simultaneously connected to the second female connecting member through the second pin.

[0011] During the construction process, by setting the first sub-chain, the distance between the second chain and the fourth chain is effectively controlled to avoid the risk of the second chain or the fourth chain slipping off the torsion block due to the first protrusion being larger on the inside and smaller on the outside during the lifting process.

[0012] Preferably, the twist block lifting construction device described in the present application also includes a first sub-chain, wherein: one end of the first sub-chain is connected to the fourth chain, and the other end of the first sub-chain is connected to a third male connector, and the third male connector and the first male connector can be simultaneously connected to the first female connector through the first pin.

[0013] During the construction process, by setting the first sub-chain, the distance between the second chain and the fourth chain is effectively controlled to avoid the risk of the second chain or the fourth chain slipping off the torsion block due to the first protrusion being larger on the inside and smaller on the outside during the lifting process.

[0014] Preferably, the twist block lifting construction device described in the present application also includes a second sub-chain, one end of the second sub-chain is connected to the middle part of the first sub-chain, and the other end of the second sub-chain is connected to a hook, wherein when one end of the first sub-chain is connected to the second chain, the other end of the first sub-chain is connected to a third male connecting member, and the hook is hung with the second chain.

[0015] During lifting, the first chain, the second chain, the third chain and the fourth chain are all required to be in a tensioned state. At this time, before lifting, when the torsion block lifting construction device is installed, the second sub-chain is hung on different chain links on the second chain, so that the tension adjustment between the annular structure formed between the first chain and the second chain and the annular structure formed by the third chain and the fourth chain can be achieved, thereby reducing the inclination of the torsion block when lifting.

[0016] Preferably, the twist block lifting construction device described in the present application also includes a second sub-chain, one end of the second sub-chain is connected to the middle part of the first sub-chain, and the other end of the second sub-chain is connected to a hook, wherein when one end of the first sub-chain is connected to the fourth chain and the other end of the first sub-chain is connected to the third male connecting member, the hook is hung with the fourth chain.

[0017] During lifting, the first chain, the second chain, the third chain and the fourth chain are all required to be in a tensioned state. At this time, before lifting, when the torsion block lifting construction device is installed, the second sub-chain is hung on different chain links on the fourth chain, so that the tension adjustment between the annular structure formed between the first chain and the second chain and the annular structure formed by the third chain and the fourth chain can be achieved, thereby reducing the inclination of the torsion block when lifting.

[0018] The present application also discloses a method for lifting a twist block, wherein the twist block comprises first protrusions on two sides and second protrusions on the other two sides, wherein the first protrusion on the same side is one; and the second protrusions on the same side are two and are arranged vertically spaced apart; The present application discloses a method for lifting a torsion block, which comprises the following steps: S1. Arrange the first chain, the second chain, the fourth chain and the third chain in sequence along the circumferential direction of the twist block; S2. Pass the first chain under the first protrusion on one side, and pass the first pin through the first male connector and the first female connector to connect the first male connector and the first female connector, and pass the third chain under the first protrusion on the other side, and pass the second pin through the second male connector and the second female connector to connect the second male connector and the second female connector; S3. Lift the first and second slings so that the first chain, the second chain, the third chain and the fourth chain lift the twist block, at which time the first and second ropes are in a relaxed state; S4. After the twist block is hoisted to the target position, the first hoist is lowered for a distance so that the first chain, the second chain, the third chain and the fourth chain are in a relaxed state; S5. Lift the second lifting device so that the first lifting rope drives the first latch to disengage from the first male connector and the first female connector; S6. Continue to lift the second lifting device so that the second lifting rope drives the second latch to disengage from the second male connector and the second female connector; S7. Lift the first lifting device so that the first chain, the second chain, the third chain and the fourth chain are all separated from the torsion block.

[0019] The present application describes a method for lifting a twist block, which lifts the twist block to a predetermined position through the cooperation between a first chain, a second chain, a third chain, a fourth chain, a first lifting rope, a second lifting rope, a first male connector, a first female connector, a first latch, a second male connector, a second female connector, a second latch and the second latch, and then uses the first lifting rope and the second lifting rope to separate the first chain, the second chain, the third chain and the fourth chain from the twist block. The entire untying process does not require manual participation, thereby avoiding safety risks to personnel during the untying process.

[0020] Preferably, one end of the first latch connected to the first suspension rope is directed toward the torsion block.

[0021] Preferably, in step S4, the first sling is lowered a distance so that the first latch avoids the first protrusion and the second protrusion.

[0022] Preferably, one end of the second latch connecting the second suspension rope is directed toward the torsion block.

[0023] Preferably, in step S4, the first lifting device is lowered for a distance so that the second latch avoids the first protrusion and the second protrusion.

[0024] Compared with the prior art, the present invention has the following beneficial effects: The twist block lifting construction device described in the present application lifts the twist block to a predetermined position through the mutual cooperation between the first chain, the second chain, the third chain, the fourth chain, the first lifting rope, the second lifting rope, the first male connector, the first female connector, the first latch, the second male connector, the second female connector, the second latch and the second latch, and then uses the first lifting rope and the second lifting rope to separate the first chain, the second chain, the third chain and the fourth chain from the twist block. The entire untying process does not require manual participation, avoiding safety risks to personnel during the untying process. BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 This is a schematic diagram (one side) of the coordination of a twist block lifting construction device for lifting a twist block in the present application.

[0026] Figure 2 This is a schematic diagram of the coordination of a twist block lifting construction device for lifting a twist block in the present application (the other side).

[0027] Figure 3 This is a schematic diagram of the layout of a twist block lifting construction device for this application (front and side).

[0028] Figure 4 This application is attached Figure 3 Enlarged schematic diagram of part A in the middle (front side).

[0029] Figure 5This is a schematic diagram of the layout of a twist block lifting construction device for this application (back side).

[0030] Figure 6 This application is attached Figure 3 Enlarged schematic diagram of middle part B (front side).

[0031] Figure 7 This is a schematic diagram of the layout of a twist block lifting construction device for this application (on the right).

[0032] Figure 8 This is a schematic diagram of multiple interlocking links of the present application.

[0033] Fig. 9 It is a schematic diagram of the connection and cooperation between the first male connector, the third male connector, the first female connector and the first latch of the present application.

[0034] Fig.10 This is a schematic diagram of the connection and cooperation between the second male connector, the third male connector, the second female connector and the second pin of the present application.

[0035] Markings in the figure: 4-first sling, 5-second sling, 6-first latch connection assembly, 9-second latch connection assembly, 10-chain link, 11-first chain, 12-second chain, 13-third chain, 14-fourth chain, 21-first lifting rope, 22-second lifting rope, 23-first branch chain, 24-second branch chain, 25-hook, 61-first male connector, 62-first female connector, 65-first latch, 7-connecting member, 71-first structure, 72-second structure, 8-twist block, 81-first protrusion, 82-second protrusion, 91-second male connector, 92-second female connector, 95-second latch, 96-third male connector. DETAILED DESCRIPTION

[0036] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0037] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0038] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0039] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0040] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0041] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0042] Example 1 like Figure 1-10 As shown, this embodiment provides a torsion block lifting construction device described in this application, It includes a first lifting device 4, a second lifting device 5, a main lifting assembly, a decoupling assembly, a first latch connection assembly 6 and a second latch connection assembly 9; The main lifting assembly includes a first chain 11, a second chain 12, a third chain 13 and a fourth chain 14, and the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 are connected to the lower part of the first sling 4; The dehooking assembly includes a first lifting rope 21 and a second lifting rope 22, wherein the first lifting rope 21 and the second lifting rope 22 are connected to the lower part of the second lifting device 5; The first latch connection assembly 6 comprises a first male connector 61, a first female connector 62 and a first latch 65, wherein the first latch 65 is used to connect the first male connector 61 and the first female connector 62; The second latch connection assembly 9 comprises a second male connector 91, a second female connector 92 and a second latch 95 that match each other, and the second latch 95 is used to connect the second male connector 91 and the second female connector 92; The first chain 11 has an upper end connected to the first sling 4 and a lower end connected to the first female connector 62; The upper end of the second chain 12 is connected to the first sling 4, and the lower end is connected to the first male connector 61; The length of the first chain 11 is longer than the length of the second chain 12; The upper end of the third chain 13 is connected to the first sling 4, and the lower end is connected to the second female connector 92; The fourth chain 14 has an upper end connected to the first sling 4 and a lower end connected to the second male connector 91; The length of the third chain 13 is longer than the length of the fourth chain 14; The first lifting rope 21 is connected to the second lifting device 5 at its upper end and to the first latch 65 at its lower end; The upper end of the second lifting rope 22 is connected to the second lifting device 5, and the lower end is connected to the second latch 95; The second suspension rope 22 is longer than the first suspension rope 21 .

[0043] The twist block lifting construction device described in the present application lifts the twist block 8 to a predetermined position through the first lifting device 4, the second lifting device 5, the main lifting assembly, the unhooking assembly, the first pin connecting assembly 6 and the second pin connecting assembly 9, and then uses the unhooking assembly to separate the main lifting assembly from the upper end of the twist block 8, thereby achieving the purpose of separating the main lifting assembly on the upper part of the twist block 8 from the twist block 8. The entire process does not require human participation, avoiding safety risks to personnel during the lifting process.

[0044] Specifically, the twist block lifting construction device described in the present application lifts the twist block 8 to a predetermined position through the mutual cooperation between the first chain 11, the second chain 12, the third chain 13, the fourth chain 14, the first lifting rope 21, the second lifting rope 22, the first male connector 61, the first female connector 62, the first latch 65, the second male connector 91, the second female connector 92, the second latch 95 and the second latch 95, and then uses the first lifting rope 21 and the second lifting rope 22 to separate the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 from the twist block 8. The entire untying process does not require manual participation, thereby avoiding safety risks to personnel during the untying process.

[0045] A preferred manner: the first chain 11, the second chain 12, the fourth chain 14 and the third chain 13 are arranged circumferentially in sequence, the first male connector 61 and the first female connector 62 are connected by a first pin 65, and the second male connector 91 and the second female connector 92 are connected by a second pin 95.

[0046] The present application describes a torsion block lifting construction device, wherein the first chain 11, the second chain 12, the fourth chain 14 and the third chain 13 are arranged circumferentially in sequence, the first male connector 61 and the first female connector 62 are connected by a first latch 65, and the second male connector 91 and the second female connector 92 are connected by a second latch 95.

[0047] The present application describes a torsion block lifting construction device. When lifting the torsion block 8, the first chain 11, the second chain 12, the fourth chain 14 and the third chain 13 are arranged in sequence along the circumference of the torsion block 8; then the first chain 11 is passed under the first protrusion 81 on one side, and the first latch 65 is passed through the first male connector 61 and the first female connector 62 to connect the first male connector 61 and the first female connector 62, and the third chain 13 is passed under the first protrusion 81 on the other side, and the second latch 95 is passed through the second male connector 91 and the second female connector 92 to connect the second male connector 91 and the second female connector 92; then the first hoist 4 and the second hoist 5 are lifted, so that the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 lift the torsion block 8. At this time, the first lifting rope 21 and the second lifting rope 22 are both in a relaxed state; after that, when the twist block 8 is lifted to the target position, the first sling 4 is continued to be lowered for a distance, so that the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 are in a relaxed state; then the second sling 5 is lifted, so that the first lifting rope 21 drives the first pin 65 to disengage from the first male connector 61 and the first female connector 62; then the second sling 5 is continued to be lifted, so that the second lifting rope 22 drives the second pin 95 to disengage from the second male connector 91 and the second female connector 92; then the first sling 4 is lifted, so that the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 are all disengaged from the twist block 8, and the entire untying process does not require manual participation, avoiding the safety risks of the untying process to personnel.

[0048] A preferred method: The torsion block lifting construction device described in the present application also includes a first sub-chain 23, wherein: one end of the first sub-chain 23 is connected to the second chain 12, and the other end of the first sub-chain 23 is connected to a third male connecting member 96, and the third male connecting member 96 and the second male connecting member 91 can be simultaneously connected to the second female connecting member 92 through the second pin 95.

[0049] During the construction process, by setting the first sub-chain 23, the distance between the second chain 12 and the fourth chain 14 is effectively controlled, avoiding the risk of the second chain 12 or the fourth chain 14 slipping off the torsion block during the lifting process due to the first protrusion 81 being larger on the inside and smaller on the outside.

[0050] A preferred method: The twist block lifting construction device described in the present application also includes a second sub-chain 24, one end of the second sub-chain 24 is connected to the middle part of the first sub-chain 23, and the other end of the second sub-chain 24 is connected to a hook 25, wherein when one end of the first sub-chain 23 is connected to the second chain 12, the other end of the first sub-chain 23 is connected to a third male connecting member 96, and the hook 25 is hung with the second chain 12.

[0051] During lifting, the first chain 11, the second chain 12, the third chain 13, and the fourth chain 14 are all required to be in a tensioned state. At this time, before lifting, when the torsion block lifting construction device is installed, the second sub-chain 24 is hung on different chain links 10 on the second chain 12, so that the tension between the annular structure formed between the first chain 11 and the second chain 12 and the annular structure formed by the third chain 13 and the fourth chain 14 can be adjusted, thereby reducing the inclination of the torsion block when the torsion block is lifted.

[0052] like Figure 8 As shown, in a specific preferred manner, the first chain 11, the second chain 12, the third chain 13, the fourth chain 14, the first sub-chain 23 or the second sub-chain 24 includes a plurality of chain links 10 which are sequentially interlocked.

[0053] Example 2 like Figure 2 and 7 As shown, this embodiment provides a torsion block lifting construction device described in this application, which is different from Embodiment 1 in that it also includes a first branch chain 23, wherein: one end of the first branch chain 23 is connected to the fourth chain 14, and the other end of the first branch chain 23 is connected to a third male connector 96, and the third male connector 96 and the first male connector 61 can be simultaneously connected to the first female connector 62 through the first latch 65. During the construction process, by setting the first branch chain 23, the distance between the second chain 12 and the fourth chain 14 is effectively controlled, avoiding the risk of the second chain 12 or the fourth chain 14 slipping off the torsion block due to the large inner side and small outer side of the first protrusion 81 during the lifting process.

[0054] A preferred method: The twist block lifting construction device described in the present application also includes a second sub-chain 24, one end of the second sub-chain 24 is connected to the middle part of the first sub-chain 23, and the other end of the second sub-chain 24 is connected to a hook 25, wherein when one end of the first sub-chain 23 is connected to the fourth chain 14 and the other end of the first sub-chain 23 is connected to the third male connecting member 96, the hook 25 is hung with the fourth chain 14.

[0055] During lifting, the first chain 11, the second chain 12, the third chain 13, and the fourth chain 14 are all required to be in a tensioned state. At this time, before lifting, when the torsion block lifting construction device is installed, the second sub-chain 24 is hung on different chain links 10 on the fourth chain 14, so that the tension between the annular structure formed between the first chain 11 and the second chain 12 and the annular structure formed by the third chain 13 and the fourth chain 14 can be adjusted, thereby reducing the inclination of the torsion block when lifting the torsion block.

[0056] Example 3 like Fig. 9 As shown, this embodiment provides a torsion block lifting construction device described in the present application, which is different from Embodiment 1 or 2 in that: the first lifting rope 21 is preferably a steel strand, and a connecting member 7 is connected between the first lifting rope 21 and the first pin 65, and the connecting member 7 includes a first structure 71 and a second structure 72 that are rotatably matched, the second structure 72 is rotatably connected to the first pin 65, the first structure 71 is connected to the first lifting rope 21, and the relative rotation direction of the first structure 71 and the second structure 72 is perpendicular to the relative rotation direction of the second structure 72 and the first pin 65, so as to eliminate the torsional force existing in the steel strand during use, and at the same time achieve the purpose of connecting the first pin 65 to one end of the first lifting rope 21 toward the torsion block 8.

[0057] A specific preferred method: a first rotating shaft 73 extends from one end of the first structure 71 away from the first suspension rope 21, and a first through hole and a second rotating shaft 74 are provided on the second structure 72. The first rotating shaft 73 rotates with the first through hole so that the second structure 72 can swing or rotate around the first rotating shaft 73. A second through hole is radially provided at the rear end of the first latch 65. The second through hole rotates with the second rotating shaft 74 so that the first latch 65 swings or rotates around the second rotating shaft 74.

[0058] Example 4 like Fig.10 As shown, this embodiment provides a torsion block lifting construction device described in the present application, which is different from Embodiment 1, 2 or 3 in that: the second lifting rope 22 is preferably a steel strand, and a connecting member 7 is connected between the second lifting rope 22 and the second pin 95, and the connecting member 7 includes a first structure 71 and a second structure 72 that are rotatably matched, the second structure 72 is rotatably connected to the second pin 95, the first structure 71 is connected to the second lifting rope 22, and the relative rotation direction of the first structure 71 and the second structure 72 is perpendicular to the relative rotation direction of the second structure 72 and the second pin 95, so as to eliminate the torsional force existing in the steel strand during use, and at the same time achieve the purpose of connecting the second pin 95 to one end of the second lifting rope 22 toward the torsion block 8.

[0059] A specific preferred method: a first rotating shaft 73 extends from one end of the first structure 71 away from the second suspension rope 22, and a first through hole and a second rotating shaft 74 are provided on the second structure 72. The first rotating shaft 73 rotates with the first through hole so that the second structure 72 can swing or rotate around the first rotating shaft 73. A second through hole is radially provided at the rear end of the second latch 95. The second through hole rotates with the second rotating shaft 74 so that the second latch 95 swings or rotates around the second rotating shaft 74.

[0060] Example 5 like Figure 1-10 As shown, the torsion block lifting construction method described in this embodiment, the torsion block 8 includes first protrusions 81 on two sides and second protrusions 82 on the other two sides, the first protrusion 81 on the same side is one; the second protrusions 82 on the same side have two, and are arranged vertically at intervals; The present application discloses a method for lifting a torsion block, which comprises the following steps: S1. The first chain 11, the second chain 12, the fourth chain 14 and the third chain 13 are sequentially arranged along the circumferential direction of the twist block 8; S2. The first chain 11 is passed under the first protrusion 81 on one side, and the first latch 65 is passed through the first male connector 61 and the first female connector 62 to connect the first male connector 61 and the first female connector 62, and the third chain 13 is passed under the first protrusion 81 on the other side, and the second latch 95 is passed through the second male connector 91 and the second female connector 92 to connect the second male connector 91 and the second female connector 92; S3. Lift the first sling 4 and the second sling 5, so that the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 lift the twist block 8, at which time the first lifting rope 21 and the second lifting rope 22 are in a relaxed state; S4. After the twist block 8 is hoisted to the target position, the first hoist 4 is lowered for a distance so that the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 are in a relaxed state; S5. Lift the second lifting device 5 so that the first lifting rope 21 drives the first latch 65 to be disengaged from the first male connector 61 and the first female connector 62; S6. Continue to lift the second lifting device 5, so that the second lifting rope 22 drives the second latch 95 to disengage from the second male connector 91 and the second female connector 92; S7. Lift the first lifting device 4 so that the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 are all separated from the torsion block 8.

[0061] The present application describes a method for lifting a twist block. The twist block 8 is lifted to a predetermined position by the cooperation between the first chain 11, the second chain 12, the third chain 13, the fourth chain 14, the first lifting rope 21, the second lifting rope 22, the first male connector 61, the first female connector 62, the first latch 65, the second male connector 91, the second female connector 92, the second latch 95 and the second latch 95. Thereafter, the first chain 11, the second chain 12, the third chain 13 and the fourth chain 14 are separated from the twist block 8 by using the first lifting rope 21 and the second lifting rope 22. The entire untying process does not require manual participation, thereby avoiding safety risks to personnel during the untying process.

[0062] A preferred manner: the first latch 65 is connected to one end of the first suspension rope 21 toward the twist block 8.

[0063] A further preferred embodiment is as follows: in step S4 , the first lifting device 4 is lowered for a certain distance so that the first latch 65 avoids the first protrusion 81 and the second protrusion 82 .

[0064] In the above scheme, the first lifting rope 21 is preferably a steel wire rope, and a connecting member 7 is connected between the first lifting rope 21 and the first pin 65. The connecting member 7 includes a first structure 71 and a second structure 72 that are rotatably matched. The second structure 72 is rotatably connected to the first pin 65. The first structure 71 is connected to the first lifting rope 21. The relative rotation direction of the first structure 71 and the second structure 72 is perpendicular to the relative rotation direction of the second structure 72 and the first pin 65, so as to eliminate the torsional force existing in the steel wire rope during use, and at the same time achieve the purpose of connecting the first pin 65 to one end of the first lifting rope 21 toward the torsion block 8.

[0065] A specific preferred method: a first rotating shaft 73 extends from one end of the first structure 71 away from the first suspension rope 21, and a first through hole and a second rotating shaft 74 are provided on the second structure 72. The first rotating shaft 73 rotates with the first through hole so that the second structure 72 can swing or rotate around the first rotating shaft 73. A second through hole is radially provided at the rear end of the first latch 65. The second through hole rotates with the second rotating shaft 74 so that the first latch 65 swings or rotates around the second rotating shaft 74.

[0066] A preferred manner: the second latch 95 is connected to one end of the second suspension rope 22 toward the twist block 8.

[0067] A further preferred embodiment is as follows: in step S4 , the first lifting device 4 is lowered for a certain distance so that the second latch 95 avoids the first protrusion 81 and the second protrusion 82 .

[0068] In the above scheme, the second lifting rope 22 is preferably a steel wire rope, and a connecting member 7 is connected between the second lifting rope 22 and the second pin 95. The connecting member 7 includes a first structure 71 and a second structure 72 that are rotatably matched. The second structure 72 is rotatably connected to the second pin 95. The first structure 71 is connected to the second lifting rope 22. The relative rotation direction of the first structure 71 and the second structure 72 is perpendicular to the relative rotation direction of the second structure 72 and the second pin 95, so as to eliminate the torsional force existing in the steel wire rope during use, and at the same time achieve the purpose of connecting the second pin 95 to one end of the second lifting rope 22 toward the torsion block 8.

[0069] A specific preferred method: a first rotating shaft 73 extends from one end of the first structure 71 away from the second suspension rope 22, and a first through hole and a second rotating shaft 74 are provided on the second structure 72. The first rotating shaft 73 rotates with the first through hole so that the second structure 72 can swing or rotate around the first rotating shaft 73. A second through hole is radially provided at the rear end of the second latch 95. The second through hole rotates with the second rotating shaft 74 so that the second latch 95 swings or rotates around the second rotating shaft 74.

[0070] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A torsion block lifting construction device, characterized in that: It comprises a first sling (4), a second sling (5), a first latch connection assembly (6) and a second latch connection assembly (9), wherein: A first chain (11), a second chain (12), a third chain (13) and a fourth chain (14) are connected to the lower part of the first sling (4); the length of the first chain (11) is longer than the length of the second chain (12), and the length of the third chain (13) is longer than the length of the fourth chain (14); A first lifting rope (21) and a second lifting rope (22) are connected to the lower part of the second lifting device (5), and the second lifting rope (22) is longer than the first lifting rope (21); The first latch connection assembly (6) comprises a first male connector (61), a first female connector (62) and a first latch (65) which match each other, and the first latch (65) is used to connect the first male connector (61) and the first female connector (62); The second latch connection assembly (9) comprises a second male connector (91), a second female connector (92) and a second latch (95) that match each other, wherein the second latch (95) is used to connect the second male connector (91) and the second latch (95) of the second female connector (92); The lower end of the first chain (11) is connected to the first female connector (62), the lower end of the second chain (12) is connected to the first male connector (61), the lower end of the third chain (13) is connected to the second female connector (92), the lower end of the fourth chain (14) is connected to the second male connector (91), the lower end of the first suspension rope (21) is connected to one end of the first latch (65), and the lower end of the second suspension rope (22) is connected to one end of the second latch (95).

2. A torsion block lifting construction device according to claim 1, characterized in that: The first chain (11), the second chain (12), the fourth chain (14) and the third chain (13) are sequentially arranged in a circumferential direction; the first male connecting member (61) and the first female connecting member (62) are connected by a first latch (65); and the second male connecting member (91) and the second female connecting member (92) are connected by a second latch (95).

3. A torsion block lifting construction device according to claim 1, characterized in that: It also includes a first sub-chain (23), wherein: One end of the first sub-chain (23) is connected to the second chain (12), and the other end of the first sub-chain (23) is connected to a third male connector (96), and the third male connector (96) and the second male connector (91) can be simultaneously matched and connected to the second female connector (92) via the second latch (95); or, One end of the first sub-chain (23) is connected to the fourth chain (14), and the other end of the first sub-chain (23) is connected to a third male connector (96), and the third male connector (96) and the first male connector (61) can be simultaneously connected to the first female connector (62) by means of the first latch (65).

4. A torsion block lifting construction device according to claim 3, characterized in that: It also comprises a second sub-chain (24), one end of the second sub-chain (24) being connected to the middle part of the first sub-chain (23), and the other end of the second sub-chain (24) being connected to a hook (25), wherein: When one end of the first sub-chain (23) is connected to the second chain (12), the other end of the first sub-chain (23) is connected to a third male connecting member (96), and the hook (25) is hooked to the second chain (12); When one end of the first sub-chain (23) is connected to the fourth chain (14), and the other end of the first sub-chain (23) is connected to the third male connecting member (96), the hook (25) is hooked to the fourth chain (14).

5. A torsion block lifting construction device according to claim 1, characterized in that: A connecting member (7) is connected between the first hanging rope (21) and the first latch (65), the connecting member (7) comprising a first structure (71) and a second structure (72) that are rotatably matched, the second structure (72) being rotatably connected to the first latch (65), the first structure (71) being connected to the first hanging rope (21), and a relative rotation direction between the first structure (71) and the second structure (72) being perpendicular to a relative rotation direction between the second structure (72) and the first latch (65); and / or, A connecting member (7) is connected between the second suspension rope (22) and the second latch (95), and the connecting member (7) comprises a first structure (71) and a second structure (72) that are rotatably matched, the second structure (72) is rotatably connected to the second latch (95), the first structure (71) is connected to the second suspension rope (22), and the relative rotation direction of the first structure (71) and the second structure (72) is perpendicular to the relative rotation direction of the second structure (72) and the second latch (95).

6. A method for lifting a torsion block, characterized in that: Use a twist block lifting construction device as described in any one of claims 1 to 5; The twist block (8) comprises first protrusions (81) on two sides and second protrusions (82) on the other two sides, wherein there is one first protrusion (81) on the same side and two second protrusions (82) on the same side are arranged vertically at intervals; The construction method comprises the following steps: S1. Arrange the first chain (11), the second chain (12), the fourth chain (14) and the third chain (13) in sequence along the circumference of the torsion block (8); S2. Pass the first chain (11) around the first protrusion (81) on one side, and pass the first latch (65) through the first male connector (61) and the first female connector (62), so that the first male connector (61) and the first female connector (62) are connected, and pass the third chain (13) around the first protrusion (81) on the other side, and pass the second latch (95) through the second male connector (91) and the second female connector (92), so that the second male connector (91) and the second female connector (92) are connected; S3. lifting the first lifting device (4) and the second lifting device (5) so that the first chain (11), the second chain (12), the third chain (13) and the fourth chain (14) lift the twist block (8), at which time the first lifting rope (21) and the second lifting rope (22) are both in a relaxed state; S4. After the twist king block (8) is hoisted to the target position, the first hoist (4) is lowered for a certain distance, so that the first chain (11), the second chain (12), the third chain (13) and the fourth chain (14) are in a relaxed state; S5. Lifting the second lifting device (5), so that the first lifting rope (21) drives the first latch (65) to disengage from the first male connector (61) and the first female connector (62); S6. Continue to lift the second lifting device (5) so that the second lifting rope (22) drives the second latch (95) to disengage from the second male connector (91) and the second female connector (92); S7. Lift the first lifting device (4) so ​​that the first chain (11), the second chain (12), the third chain (13) and the fourth chain (14) are all detached from the twist block (8).

7. A method for lifting a torsion block according to claim 6, characterized in that: One end of the first latch (65) connected to the first suspension rope (21) is directed toward the twist block (8).

8. A method for lifting a torsion block according to claim 7, characterized in that: In step S4, the first lifting device (4) is lowered a certain distance so that the first latch pin (65) avoids the first protrusion (81) and the second protrusion (82).

9. A method for lifting a torsion block according to any one of claims 6 to 8, characterized in that: One end of the second latch (95) connected to the second suspension rope (22) is directed toward the twist block (8).

10. A method for lifting a torsion block according to claim 9, characterized in that: In step S4, the first lifting device (4) is lowered a certain distance so that the second latch (95) avoids the first protrusion (81) and the second protrusion (82).

Citation Information

Patent Citations

  • Diesel engine slings

    CN201190083Y

  • Auxiliary tool for hoisting stand column

    CN215101440U

  • Vehicle frame and suspension-type transport vehicle spreader

    WO2023087763A1