Coordinate reduction pay-off construction device and operation method

By introducing horizontal detection components and fine-tuning components into the total station construction device, the problem of operation troubles and difficulty in guaranteeing the horizontal state of the total station when used on complex support ground in the prior art is solved, and higher usage flexibility and accuracy are achieved.

CN119508685APending Publication Date: 2025-02-25THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411621224.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-14
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

In the prior art, the triangular support frame of the total station lacks appropriate control auxiliary components, which leads to troublesome operation when used on complex support grounds and is difficult to ensure the level of the total station.

Method used

A coordinate reduction and line laying construction device is designed, including the total station main body, tripod, connecting base, horizontal detection component, fine-tuning component and auxiliary support accessories. Through the use of horizontal detection components and fine-tuning components, it is possible to quickly determine whether the total station is level and fine-tune to adapt to complex supporting grounds.

Benefits of technology

It improves the flexibility and accuracy of the total station on complex support ground, reduces operating steps, simplifies the adjustment process, and enhances the accuracy and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119508685A_ABST
    Figure CN119508685A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a coordinate restoration pay-off construction device and an operation method.The coordinate restoration pay-off construction method is reasonable in design and easy to operate, and is suitable for construction lofting of a new and old building connection part of a reconstruction and extension project and engineering surveying of a coordinate-free base map; good popularization and application values are realized; moreover, in the actual measurement operation, the total station provided by the invention has the advantages that through the matched use of the horizontal detection assembly, the fine adjustment assembly and the auxiliary supporting accessory, on one hand, whether the total station is in a horizontal state is very intuitively judged, and convenience is brought to operators; in addition, the total station can better adapt to the complex supporting ground through the arranged fine adjustment assembly and auxiliary supporting accessories, and the working flexibility is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a coordinate restoration and setting-out construction device and an operation method. Background Art

[0002] With the rapid economic development of the city, the urban infrastructure in the central urban area can no longer meet the current needs. Therefore, the original buildings are renovated to further optimize the urban functional layout, improve the living environment, enhance the urban image, and promote the sustainable development of the city. The original control points of the existing buildings in the central urban expansion and reconstruction project no longer exist with the urban renewal, and the coordinate reference points need to be re-established. However, there is a deviation between the newly built coordinate system and the original coordinate system of the existing buildings, which will lead to deviations in the connection parts of the "construction of the same building" buildings that far exceed the requirements of the regulations.

[0003] In the coordinate restoration and layout construction, a total station is needed to measure the position. After searching, a document with the existing announcement number CN113309963A discloses a total station, which includes an instrument body and a tripod. The tripod includes a mounting platform for mounting the instrument body and three rotating drums rotatably connected to the lower side of the mounting platform, and support rods for supporting on the ground are slidably embedded in the rotating drums; a first limiting mechanism for limiting and fixing one of the rotating drums is provided on the mounting platform, and a second limiting mechanism for limiting and fixing the support rod is provided on one of the rotating drums; the mounting platform is slidably connected with a sliding rod in the vertical direction, each support rod is rotatably connected with a rotating rod, and the three rotating rods are rotatably connected to the sliding rod.

[0004] In the existing construction process, the use of the total station is generally to determine whether it is level by observing the position display of the total station body after adjusting the tripod support frame; if it is not level, the operator needs to adjust it again, usually multiple adjustments are required, and the operation is cumbersome; the existing tripod support base lacks suitable auxiliary adjustment components to adapt to complex supporting ground, and needs to be improved and optimized.

[0005] The tripod support frame of the total station in the prior art lacks a suitable support assembly to use different supporting surfaces.

[0006] To this end, the present invention proposes a coordinate restoration and layout construction device and an operation method for solving the above-mentioned problems. Summary of the invention

[0007] The object of the present invention is to provide a coordinate restoration and layout construction device and an operation method to solve the problems raised in the above-mentioned background technology.

[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a coordinate restoration and setting-out construction device, comprising a total station body, a tripod, a connecting base, a level detection component, a fine-tuning component and auxiliary support accessories;

[0009] The total station body is arranged on a tripod, and a connecting base is fixedly arranged at the bottom end of the tripod;

[0010] A level detection component is arranged between adjacent connection bases, a fine-tuning component is arranged at the bottom end of the connection base, and the fine-tuning component is connected to the auxiliary support accessory.

[0011] Preferably, the level detection assembly includes a connecting plate body, a connecting rod, a connecting sleeve and a spirit level; connecting sleeves are symmetrically fixed at both ends of the spirit level, a connecting rod is movably inserted in the connecting sleeve, a connecting plate body is fixed at one end of the connecting rod, and the connecting plate body is fixedly connected to the side wall of the connecting base by screws.

[0012] Preferably, the fine-tuning assembly includes an auxiliary bearing, an internally threaded regulating sleeve, an auxiliary convex strip, a threaded groove, a fastening screw, a knob and a support screw; the auxiliary bearing is arranged at the bottom end of the connecting base, and the auxiliary bearing is sleeved on one end of the internally threaded regulating sleeve, and an auxiliary convex strip is arranged on the side position of the other end of the internally threaded regulating sleeve, the internally threaded regulating sleeve is threadedly connected to the support screw, and an auxiliary supporting accessory is arranged at the bottom end of the support screw.

[0013] Preferably, a threaded groove is provided on the outer side wall of the bottom end of the internally threaded regulating sleeve, and the threaded groove is connected to the internally threaded regulating sleeve, the threaded groove is threadedly connected to a fastening screw, and a knob is fixedly provided at one end of the fastening screw.

[0014] Preferably, the auxiliary support accessories include a connecting chassis, mounting threaded holes, a supporting threaded column, a handle and an auxiliary structure; the connecting chassis is fixedly arranged at the bottom end of the supporting screw, and mounting threaded holes are equidistantly arranged on the connecting chassis, a supporting threaded column is threadedly connected in the mounting threaded holes, a handle is fixedly arranged at one end of the supporting threaded column, and an auxiliary structure is arranged at the bottom end of the supporting threaded column.

[0015] Preferably, the auxiliary structure includes a loading cavity groove, a positioning thread groove, a receiving groove, a positioning screw, a loading plug, a positioning card groove, a rubber gasket and a spherical auxiliary surface; the loading cavity groove is arranged on the bottom end surface of the supporting thread column, the positioning thread groove is arranged on the side wall of the supporting thread column, and the positioning thread groove is connected to the loading cavity groove, and the positioning thread groove is threadedly connected to the positioning screw.

[0016] Preferably, the notch of the positioning thread groove is provided with a receiving groove.

[0017] Preferably, the loading cavity is adapted to be plugged into a loading plug, and the loading plug is fixedly arranged at one end of the rubber gasket.

[0018] Preferably, the bottom end surface of the rubber gasket is configured as a spherical auxiliary surface.

[0019] An operating method of a coordinate restoration and setting-out construction device, the operating method comprising:

[0020] S1: Control point layout

[0021] The construction unit provides the first-level control points and sets up the second-level encrypted control points in the construction site; the elevation control points are arranged at the outer wall columns of the original structure and marked with red triangles;

[0022] S2: Total Station Traverse Measurement

[0023] Adopt the attached traverse measurement method, set up the total station that has been identified and calibrated at the control point, set the temperature, air pressure and other parameters according to the actual situation, and accurately align and level it; two prisms are respectively set at the adjacent control points before and after the measuring station;

[0024] S3: Adjustment calculation

[0025] Prepare an adjustment calculation table and fill in known data, calculate angle closure error, calculate left angle correction, deduce the azimuth of each traverse side, calculate coordinate increment closure error, calculate traverse full length closure error and traverse full length relative closure error, calculate coordinate increment correction of each traverse side and the corrected coordinate increment, and calculate the coordinates of each control point.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The present invention utilizes the relative relationship between the existing construction and the original GPS coordinates of the territory, takes the local coordinates as the reference, measures and sets the relative coordinates of the existing buildings, and obtains the original coordinate map of the existing buildings based on the multi-point coordinate return map, thus solving the impact of the lack of the original coordinate base map of the old buildings on the layout of the renovation and expansion;

[0028] Through coordinate conversion, the measured coordinates are converted into the working coordinates of the project, so that the main axis in the design drawing is parallel to the construction coordinate system. The distance between two points can be solved by adding and subtracting the coordinates, which can more conveniently check the measurement data and simply perform construction layout through distance measurement;

[0029] In the actual measurement process, due to the measurement instrument error, observation personnel operation error, environmental error, original structure construction error and other reasons, through measurement adjustment, the observation data obtained from multiple measurements are processed to obtain more accurate and reliable measurement results, thereby improving the accuracy of construction layout;

[0030] Provide measurement basis for the connection between old and new buildings during renovation and expansion, and ensure the unification of axis and elevation for the connection between renovated and newly built buildings.

[0031] The coordinate restoration and layout construction method in this scheme is reasonably designed and simple to operate. This method is suitable for construction layout of the connection between new and old buildings in renovation and expansion projects and engineering measurement without coordinate base maps, and has great promotion and application value.

[0032] In actual measurement operations, the total station provided by the present invention, through the coordinated use of the set level detection component, the fine-tuning component and the auxiliary support accessories, on the one hand, is very intuitive as to whether the total station is in a horizontal state, which brings convenience to the operator; on the other hand, the set fine-tuning component and the auxiliary support accessories can make the total station better adapt to complex supporting ground and have better working flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 This is a schematic diagram of the structure connection of the total station of the present invention;

[0034] Figure 2 For the present invention Figure 1 A magnified schematic diagram of the local structural connection;

[0035] Figure 3 It is a schematic diagram of the connection structure of the tripod, the level detection component, the fine adjustment component, and the auxiliary support accessories of the present invention;

[0036] Figure 4 For the present invention Figure 3 A magnified schematic diagram of the local structural connection;

[0037] Figure 5 A bottom view of the connection between the fine-tuning assembly and the auxiliary support accessory structure of the present invention;

[0038] Figure 6 For the present invention Figure 5 A magnified schematic diagram of the local structural connection;

[0039] Figure 7 A top view of the connection between the fine-tuning assembly and the auxiliary support accessory structure of the present invention;

[0040] Figure 8 For the present invention Figure 7 A magnified schematic diagram of the local structural connection;

[0041] Fig. 9 It is a schematic diagram of the connection between the supporting threaded column and the auxiliary structure of the present invention;

[0042] Fig.10 For the present invention Fig. 9 Enlarged schematic diagram of local structural connection.

[0043] In the figure: total station body 1, tripod 2, connecting base 3, connecting plate 401, connecting rod 402, connecting sleeve 403, level 404, auxiliary bearing 501, internal thread regulating sleeve 502, auxiliary convex strip 503, threaded groove 504, fastening screw 505, knob 506, support screw 507, connecting chassis 601, mounting threaded hole 602, supporting threaded column 603, handle 604, loading cavity 701, positioning threaded groove 702, accommodating groove 703, positioning screw 704, loading plug 705, positioning card slot 706, rubber pad 707, spherical auxiliary surface 708. DETAILED DESCRIPTION

[0044] The technical solutions in the embodiments of the present invention are described clearly and completely below. The embodiments of the present invention and all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.

[0045] Example 1: Please refer to Figure 1-Figure 10 A coordinate restoration and layout construction device comprises a total station body 1, a tripod 2, a connecting base 3, a level detection component, a fine-tuning component and an auxiliary support accessory; wherein the total station body 1 is arranged on the tripod 2, and a connecting base 3 is fixedly arranged at the bottom end of the tripod 2; a level detection component is arranged between adjacent connecting bases 3, a fine-tuning component is arranged at the bottom end of the connecting base 3, and the fine-tuning component is connected to the auxiliary support accessory.

[0046] An operating method of a coordinate restoration and setting-out construction device, the operating method comprising:

[0047] S1: Control point layout

[0048] The construction unit provides the first-level control points and sets up the second-level encrypted control points in the construction site; the elevation control points are arranged at the outer wall columns of the original structure and marked with red triangles;

[0049] S2: Total Station Traverse Measurement

[0050] Adopt the attached traverse measurement method, set up the total station that has been identified and calibrated at the control point, set the temperature, air pressure and other parameters according to the actual situation, accurately align and level; two prisms are respectively set at the adjacent control points in front and behind the measuring station; aim at the rear point at the left position of the disk, manually set the horizontal angle to zero, and record the horizontal angle reading at this time on the observation record sheet. Then measure the distance, select the stable value after multiple measurements, and record the data.

[0051] Aim at the front point at the left position of the disk. The horizontal angle reading will change. Record the change value. Repeat the previous step. Complete the first half of the measurement.

[0052] Aim at the rear point at the right side of the plate, record the horizontal angle reading, measure the distance and record the reading; aim at the front point at the right side of the plate, record the horizontal angle reading, measure the distance and record the reading; one measurement is completed.

[0053] Repeat the above steps to complete the second measurement (the starting position is 90 degrees).

[0054] S3: Adjustment calculation

[0055] 1) Make an adjustment calculation table and fill in known data

[0056] Enter the starting and ending coordinates of the starting side and the attached side as required and calculate the azimuth and side length. Then refer to the observation record table and fill in each measuring point in the "Measurement Point" column in turn, fill in the average angle value measured at each measuring station in the "Observation Left Angle Value" column, and fill in the average side length of each traverse side in the "Distance" column.

[0057] 2) Calculate the angle closure error

[0058] The purpose of calculating the angle closure error is to check whether the accuracy of the field angle observation meets the technical requirements of the corresponding grade of traverse. If the measured angle closure error is less than the allowable angle closure error, the field angle observation is qualified and adjustment can be performed; otherwise, if the field observation is unqualified, re-observation is required.

[0059] Measured angle closure error = measured azimuth of the side - theoretical azimuth of the side

[0060] Measured azimuth of the attached side = azimuth of the starting side - N*180 + sum of measured left angle values

[0061] There are corresponding regulations for the allowable angle closure error for each grade of conductor (the technical requirements for each grade of conductor are in the previous article).

[0062] Note: N is the number of measuring stations. The azimuth angle ranges from 0 degrees (inclusive) to 360 degrees (exclusive). If it is greater than 360 degrees, subtract 360 degrees. If it is less than 0 degrees, add 360 degrees.

[0063] 3) Calculate the left angle correction

[0064] After calculating the angle closure error and determining that the field results are qualified, it is necessary to calculate the left angle correction.

[0065] Left angle correction = the opposite of the angle closure error / number of measuring stations

[0066] Corrected left angle value = observed left angle value + left angle correction value

[0067] 4) Calculate the azimuth of each conductor edge

[0068] Starting from the azimuth data of the starting side, the azimuth of each line side is calculated side by side. Formula:

[0069] The azimuth of the traverse side = the azimuth of the previous side + 180 degrees + the corrected left angle value of the station

[0070] 5) Calculate the coordinate increment closure error

[0071] Before calculating the coordinate increment closure error, you must first calculate the coordinate increment and fill in the corresponding position, and then sum the X coordinate increment and Y coordinate increment respectively.

[0072] X coordinate increment = distance (i.e. side length) * COS (azimuth)

[0073] Y coordinate increment = distance (i.e. side length) * SIN (azimuth)

[0074] X-coordinate incremental closure error = sum of X-coordinate increments - (X-coordinate of the end point of the attached edge - X-coordinate of the starting point of the initial edge)

[0075] Y coordinate incremental closure error = sum of Y coordinate increments - (Y coordinate of the end point of the attached edge - Y coordinate of the starting point of the starting edge)

[0076] 6) Calculate the full-length closure error of the conductor and the relative closure error of the full-length of the conductor

[0077] The purpose of calculating the relative closure error of the full length of the wire is to verify whether the accuracy of the field distance measurement meets the technical requirements. The calculation formula is:

[0078] The total length of the conductor is closed = square root (the square of the incremental closure error of the X coordinate + the square of the incremental closure error of the Y coordinate)

[0079] Relative closure error of the entire conductor length = closure error of the entire conductor length / total length of the conductor (i.e. the sum of the side lengths)

[0080] The allowable value of the relative closure error of the entire length of the conductor has corresponding regulations for each level of conductor. If the calculated relative closure error of the entire length of the conductor is less than the allowable value, the field distance measurement accuracy is qualified and the adjustment calculation can continue; otherwise, it is unqualified and needs to be re-measured.

[0081] 7) Calculate the coordinate increment correction number and the corrected coordinate increment of each wire edge

[0082] The coordinate increment correction is similar to the left angle correction. After reversing the sign of the coordinate increment closure error, distribute it in proportion to the measured side length of each conductor. Calculation formula:

[0083] The X-coordinate increment correction number of a certain wire side = the opposite number of the X-coordinate increment closure error * (the measured length of the side / the total length of the wire)

[0084] The Y-coordinate increment correction number of a certain wire side = the opposite number of the Y-coordinate increment closure error * (the measured length of the side / the total length of the wire)

[0085] Corrected coordinate increment = coordinate increment + coordinate increment correction number

[0086] 8) Calculate the coordinates of each control point

[0087] Based on the starting point coordinates of the starting edge, the calculation formula is:

[0088] X coordinate = X coordinate of the previous point + corrected coordinate increment of the station;

[0089] Y coordinate = Y coordinate of the previous point + corrected coordinate increment of the measuring station.

[0090] For coordinate transformation

[0091] In small-area projects, the plane rectangular coordinate system does not need to take into account the curvature of the earth. Therefore, the coordinate transformation generally adopts the "three-parameter" method (two translations ΔN, ΔE, and one rotation α) for coordinate transformation calculation.

[0092] Review of the original structure

[0093] 1) Review of the original axis

[0094] Using the polar coordinate method, the main axis of the new structure is projected and compared with the axis of the original structure. The deviation direction and deviation data of the two axes are calculated, and the review results are submitted to the designer for reasonable adjustments in subsequent construction.

[0095] 2) Review of original elevation

[0096] Use the points provided by the Surveying and Mapping Institute to review the one-meter line on each floor of the original structure, submit the review results to the design party, and make reasonable adjustments in subsequent construction.

[0097] For axis placement

[0098] The axis is placed by using the wire measurement to guide the control points. After the excavation of the foundation pit and the pouring of the cushion layer in each section, the foundation slab axis is placed. The total station is used to cast points on the cushion layer, and the main control axis is first popped up. Then the total station is moved into the pit, and the four sides of the main axis are closed. After verification, other axes are drawn out, and the relationship with the existing structure is verified. After correction, it is used as the basis for the construction of the foundation slab structure.

[0099] The axis of the upper structure is placed. The control axis is measured from the reserved opening to each floor, and the axis position can be released when necessary. At the same time, on the 0m level structure, measurement embedded parts are set according to the reserved opening position. The control points must be checked against each other each time they are conducted, and records are kept to check the distance and angle between each point until they fully meet the requirements.

[0100] For elevation control

[0101] After the reinforcement of the foundation slab and basement floor slab is tied, the elevation is measured on the permanent structure and marked with red paint. There are no less than 4 points around the foundation pit (no less than 1 point in each direction) as the elevation control points when pouring concrete for the foundation structure; where there is no inserted reinforcement, short steel bars are welded and marked to ensure that the distance between the elevation control points does not exceed 4m. The red paint mark is marked 500mm above the bottom plate surface to prevent the control points from being contaminated by concrete slurry and becoming unrecognizable when pouring concrete.

[0102] The elevation control points of the upper structure are arranged on the tower crane at the construction site. Inverted triangles are marked with red paint, and the elevation data is noted as a basis for the subsequent level elevation measurement. For the elevation control points, regular reviews are conducted to avoid errors caused by the settlement of the tower crane, which may affect the level elevation of the building. As the building rises, a steel ruler is used to divide the sections into 1 ruler for every 2 floors (within 10m) (and converted once) to control the required elevation of each floor. Each measurement is strictly based on the principle of drawing from the elevation control point to avoid cumulative errors. The elevation of each point on the floor is measured and set using an S3 level according to the measured elevation.

[0103] Example 2: Based on Example 1, please refer to Figure 2 The horizontal detection component here includes a connecting plate body 401, a connecting rod 402, a connecting sleeve 403 and a spirit level 404; the connecting sleeves 403 are symmetrically fixedly arranged at both ends of the spirit level 404, and the connecting rod 402 is movably inserted in the connecting sleeve 403, and a connecting plate body 401 is fixedly arranged at one end of the connecting rod 402, and the connecting plate body 401 is fixedly connected to the side wall of the connecting base 3 by screws.

[0104] This solution sets a level detection component between the tripod 2 and observes the state of the level meter 404. After the total station is placed, it can be quickly checked whether it is in a horizontal state, thereby avoiding unnecessary adjustment and testing operations.

[0105] Example 3: Based on Example 2, please refer to Figure 3-Figure 10The fine-tuning assembly here includes an auxiliary bearing 501, an internally threaded regulating sleeve 502, an auxiliary convex strip 503, a threaded groove body 504, a fastening screw 505, a knob 506 and a support screw 507; the auxiliary bearing 501 is arranged at the bottom end of the connecting base 3, and the auxiliary bearing 501 is sleeved on one end of the internally threaded regulating sleeve 502, and an auxiliary convex strip 503 is arranged on the side position of the other end of the internally threaded regulating sleeve 502, the internally threaded regulating sleeve 502 is threadedly connected with the support screw 507, and the bottom end of the support screw 507 is provided with an auxiliary supporting accessory; the outer side wall of the bottom end of the internally threaded regulating sleeve 502 here is provided with a threaded groove body 504, and the threaded groove body 504 is connected with the internally threaded regulating sleeve 502, the threaded groove body 504 is threadedly connected with the fastening screw 505, and a knob 506 is fixedly provided at one end of the fastening screw 505.

[0106] The auxiliary support accessories here include a connecting chassis 601, mounting threaded holes 602, a supporting threaded column 603, a handle 604 and an auxiliary structure; the connecting chassis 601 is fixedly arranged at the bottom end of the support screw 507, and mounting threaded holes 602 are equidistantly arranged on the connecting chassis 601, a supporting threaded column 603 is threadedly connected in the mounting threaded holes 602, a handle 604 is fixedly arranged at one end of the supporting threaded column 603, and an auxiliary structure is arranged at the bottom end of the supporting threaded column 603.

[0107] When it is necessary to adjust a certain leg of the tripod 2, the adjustment is performed by rotating the internal thread adjustment sleeve 502, and then the adjustment is performed by tightening the screw 505 until the level 404 between the legs of the tripod 2 is in a horizontal state.

[0108] The auxiliary structure here includes a loading cavity groove 701, a positioning thread groove 702, a receiving groove 703, a positioning screw 704, a loading plug 705, a positioning slot 706, a rubber gasket 707 and a spherical auxiliary surface 708; the loading cavity groove 701 is arranged on the bottom end surface of the supporting thread column 603, the positioning thread groove 702 is arranged on the side wall of the supporting thread column 603, and the positioning thread groove 702 is connected to the loading cavity groove 701, and the positioning thread groove 702 is threadedly connected to the positioning screw 704; the notch of the positioning thread groove 702 here is provided with a receiving groove 703; the loading cavity groove 701 here is adapted to be plugged in with the loading plug 705, and the loading plug 705 is fixedly arranged at one end of the rubber gasket 707; the bottom end surface of the rubber gasket 707 here is arranged as a spherical auxiliary surface 708.

[0109] In this solution, multiple supporting threaded columns 603 are arranged on the connecting chassis 601, which can adapt well to uneven or pothole-prone supporting surfaces, and an auxiliary structure is arranged at the bottom end of the supporting threaded column 603. The rubber gasket 707 in the auxiliary structure serves the purpose of improving the supporting stability, and the rubber gasket 707 is arranged to be detachable to facilitate its replacement and has good supporting flexibility.

[0110] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A coordinate restoration and setting-out construction device, characterized in that: It comprises a total station body (1), a tripod (2), a connecting base (3), a level detection component, a fine adjustment component and auxiliary support accessories; The total station body (1) is arranged on a tripod (2), and a connecting base (3) is fixedly arranged at the bottom end of the tripod (2); A level detection component is arranged between adjacent connection bases (3), a fine-tuning component is arranged at the bottom end of the connection base (3), and the fine-tuning component is connected to the auxiliary support accessory.

2. A coordinate restoration and setting-out construction device according to claim 1, characterized in that: The level detection assembly comprises a connecting plate body (401), a connecting rod (402), a connecting sleeve (403) and a spirit level (404); the connecting sleeves (403) are symmetrically fixedly arranged at both ends of the spirit level (404); the connecting rod (402) is movably inserted in the connecting sleeve (403); a connecting plate body (401) is fixedly arranged at one end of the connecting rod (402); and the connecting plate body (401) is fixedly connected to the side wall of the connecting base (3) by means of screws.

3. A coordinate restoration and setting-out construction device according to claim 1, characterized in that: The fine-tuning assembly comprises an auxiliary bearing (501), an internally threaded regulating sleeve (502), an auxiliary convex strip (503), a threaded groove (504), a fastening screw (505), a knob (506) and a support screw (507); the auxiliary bearing (501) is arranged at the bottom end of the connecting base (3), and the auxiliary bearing (501) is sleeved on one end of the internally threaded regulating sleeve (502), and the auxiliary convex strip (503) is arranged on the side position of the other end of the internally threaded regulating sleeve (502), the internally threaded regulating sleeve (502) is threadedly connected to the support screw (507), and the bottom end of the support screw (507) is provided with an auxiliary support accessory.

4. A coordinate restoration and setting-out construction device according to claim 3, characterized in that: A threaded groove (504) is provided on the outer wall of the bottom end of the internally threaded regulating sleeve (502), and the threaded groove (504) is connected to the internally threaded regulating sleeve (502). The threaded groove (504) is threadedly connected to a fastening screw (505), and a knob (506) is fixedly provided at one end of the fastening screw (505).

5. A coordinate restoration and setting-out construction device according to claim 1, characterized in that: The auxiliary support accessory comprises a connecting chassis (601), a mounting threaded hole (602), a supporting threaded column (603), a handle (604) and an auxiliary structure; the connecting chassis (601) is fixedly arranged at the bottom end of the supporting screw rod (507), and the connecting chassis (601) is equidistantly arranged with mounting threaded holes (602), a supporting threaded column (603) is threadedly connected in the mounting threaded hole (602), a handle (604) is fixedly arranged at one end of the supporting threaded column (603), and an auxiliary structure is arranged at the bottom end of the supporting threaded column (603).

6. A coordinate restoration and setting-out construction device according to claim 5, characterized in that: The auxiliary structure comprises a loading cavity (701), a positioning thread groove (702), a receiving groove (703), a positioning screw (704), a loading plug (705), a positioning slot (706), a rubber gasket (707) and a spherical auxiliary surface (708); the loading cavity (701) is arranged on the bottom end surface of the supporting thread column (603), the positioning thread groove (702) is arranged on the side wall of the supporting thread column (603), and the positioning thread groove (702) is connected to the loading cavity (701), and the positioning thread groove (702) is threadedly connected to the positioning screw (704).

7. A coordinate restoration and setting-out construction device according to claim 6, characterized in that: The notch of the positioning thread groove (702) is provided with a receiving groove (703).

8. A coordinate restoration and setting-out construction device according to claim 6, characterized in that: The loading cavity (701) is adapted to be plugged into a loading plug (705), and the loading plug (705) is fixedly arranged at one end of the rubber pad (707).

9. A coordinate restoration and setting-out construction device according to claim 6, characterized in that: The bottom end surface of the rubber pad (707) is configured as a spherical auxiliary surface (708).

10. An operating method of a coordinate restoration and setting-out construction device as claimed in any one of claims 1 to 9, characterized in that: The operation method is: S1: Control point layout The construction unit provides the first-level control points and sets up the second-level encrypted control points in the construction site; the elevation control points are arranged at the outer wall columns of the original structure and marked with red triangles; S2: Total Station Traverse Measurement Adopt the attached traverse measurement method, set up the total station that has been identified and calibrated at the control point, set the temperature, air pressure and other parameters according to the actual situation, and accurately align and level it; two prisms are respectively set at the adjacent control points before and after the measuring station; S3: Adjustment calculation Prepare an adjustment calculation table and fill in known data, calculate angle closure error, calculate left angle correction, deduce the azimuth of each traverse side, calculate coordinate increment closure error, calculate traverse full length closure error and traverse full length relative closure error, calculate coordinate increment correction of each traverse side and the corrected coordinate increment, and calculate the coordinates of each control point.