By dividing the dragon mouth track of the pile frame of the pile frame of the pile is divided into sections and installed in sections, the problems of installation difficulty and inefficiency during the final installation of the dragon mouth track are solved, and high-precision and low-risk installation results are achieved, and construction efficiency is improved.

CN119531359APending Publication Date: 2025-02-28SHANGHAI ZHENHUA HEAVY IND QIDONG MARINE ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411631368.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2025-02-28

AI Technical Summary

Technical Problem

When the pile frame dragon mouth track of the pile driving ship is finally installed, the component installation space is small or high altitude, resulting in high installation difficulty, high operation risk, large workload and low efficiency.

Method used

The dragon-kou track is divided into several sections, built and installed in sections, including sectional column assembly, synchronous installation of dragon-kou segments, panel positioning installation, lifting platform track installation and installation of cross beams and inclined beams.

Benefits of technology

Through segmented production and installation, the accuracy and quality of the Longkou track are ensured, the installation difficulty and danger are reduced, the work efficiency is improved, and the project construction cycle is shortened.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119531359A_ABST
    Figure CN119531359A_ABST
Patent Text Reader

Abstract

The invention relates to a pile driving barge pile frame closure gap rail section manufacturing method. The pile frame is constructed by taking a closure gap track as a benchmark, and a closure gap track mounting procedure is moved forwards, and comprises the following steps: dividing a closure gap into a plurality of sections for respective construction; when the segmented stand columns are spliced, the closure gap segments are synchronously installed; panels of the closure gap sections are positioned and installed, and the closure gap panels are fixed through U-shaped clamping plates; mounting a lifting platform rail; the cross beam is installed, then the oblique beam is installed, and the oblique beam is in butt joint with the front limb tube and the front supporting foot base structure. The method has the advantages that the closure gap is divided into a plurality of sections, and the closure gap structure is constructed in sections, so that the closure gap precision is ensured; the pile driving barge pile frame is constructed with the closure gap track as the reference, the closure gap installation procedure is moved forwards, and the construction precision and quality of the closure gap track are guaranteed; the ship and the pile frame are simultaneously built and installed in the dock and simultaneously launched, so that the efficiency is improved, and the planned progress is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile frame construction of a piling ship, and in particular to a segmented manufacturing method of a longkou track of a pile frame of a piling ship. Background Art

[0002] A pile-driving ship is a vessel used for pile-driving operations on water. The hull is a steel box structure, and a pile-driving frame is installed at the end of the deck, which can be tilted forward and backward to meet the needs of driving inclined piles. A pile-driving ship is a non-self-propelled ship, which is towed into place by a pusher (tug) wheel. Pile-driving ships are widely used in the construction of bridges, docks, and water conservancy projects.

[0003] The long mouth of the pile frame of the pile driving ship is the running track structure of the pile hammer and the lifting platform, and the structural accuracy is required to be high. In order to ensure the accuracy of the long mouth of the pile frame, the general process is to install the long mouth track last after the pile frame structure is built. When the long mouth track is installed last, the installation space of the components is small or high-altitude operation is required, which makes the installation difficult, the operation is dangerous, and the workload is large. Although the accuracy of the long mouth track can be guaranteed, the efficiency is low, which prolongs the project construction period. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method for manufacturing the Longkou track of a pile-driving ship pile frame in sections, which can solve the problems in the prior art of narrow installation space or high-altitude operation of components during the final installation of the Longkou track, great installation difficulty, high operation risk, large workload and low efficiency.

[0005] In order to solve the above technical problems, the technical solution of the present invention is: when constructing the pile frame, the Longkou track is used as a reference for construction, and the Longkou track installation process is moved forward, including the following steps: S1. Divide the longkou into several sections, and build the longkou sections and lifting platform tracks respectively. The length of each lifting platform track is 6-8 meters. When cutting the longkou panel, add 20mm margin in the width direction, and add 20mm margin on the outside of the longkou track plate; S2. When assembling the segmented columns, install the dragon mouth segments simultaneously. At this time, the panels of the dragon mouth segments and the lifting platform tracks are not installed. Before installing the dragon mouth, measure and determine the center line of the dragon mouth closure, and make a benchmark; When welding the Longkou section with the main pile frame and the auxiliary pile frame, the rear panel of the Longkou section is butt-welded with the main pile frame and the auxiliary pile frame cross beam panel; the web plate of the Longkou section is double-sidedly welded with the main pile frame and the auxiliary pile frame cross beam panel; the rear panel of the Longkou section is butt-welded with the main pile frame diagonal bar I-beam panel; the rear panel of the Longkou section is double-sidedly welded with the web plate of the main pile frame diagonal bar I-beam; the web plate of the Longkou section is single-sidedly welded with the main pile frame vertical beam panel; the partition of the Longkou section is double-sidedly welded with the main pile frame cross beam panel; S3. Position and install the panel of the dragon mouth segment. The dragon mouth panel is fixed with a U-shaped pallet. During installation, first measure the overall flatness of the dragon mouth joint, then put the dragon mouth panel in place, and the U-shaped pallet is set corresponding to the dragon mouth cross rib plate; S4. Install the lifting platform rail. Leave 1 meter of the lifting platform rail at the closing mouth for welding, which is used for closing and adjusting between sections. S5. Install the cross beam and then the inclined beam. The inclined beam is connected with the front limb tube and the front support foot base structure, and then welded after the intersection and positioning.

[0006] Furthermore, in the step S1, the Longkou track plate is straightened and milled before installation.

[0007] Furthermore, in step S2, the dragon mouth segment is installed based on the center line of the dragon mouth structure, the tolerance of the rib plate size of the dragon mouth segment does not exceed ±3mm, and the structural position deviation at the interface between the column and the beam does not exceed ±5mm.

[0008] Furthermore, in step S2, the weld height of the web of the Longkou section and the main pile frame and auxiliary pile frame cross beam panels is 12 mm; the weld height of the rear panel of the Longkou section and the web of the diagonal I-beam of the main pile frame is 12 mm; the weld height of the partition of the Longkou section and the cross beam panel of the main pile frame is 8 mm.

[0009] Furthermore, in step S4, when the sections are closed, the straightness of the lifting platform track is controlled with an accuracy of 6mm / 6000mm.

[0010] The advantages of the present invention are as follows: the dragon mouth is divided into several sections, and the dragon mouth structure is constructed in sections to ensure the accuracy of the dragon mouth; in order to ensure that the pile frame and the ship are constructed at the same time, the pile frame construction process is optimized, and the pile frame of the pile driving ship is constructed based on the dragon mouth track, and the dragon mouth installation process is moved forward, which can ensure the construction accuracy and quality of the dragon mouth track; the ship and the pile frame are constructed and installed in the dock at the same time, and launched at the same time, which improves efficiency and ensures the planned progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the main pile frame, the auxiliary pile frame and the dragon mouth of the present invention; Figure 2 It is a structural schematic diagram of the dragon mouth segmented installation of the present invention; Figure 3 It is a cross-sectional view of the dragon mouth and the lifting platform track of the present invention; Figure 4 This is a schematic diagram of the structure of the dragon mouth panel of the present invention being fixed by a U-shaped clamping plate; Figure 5 It is a schematic diagram of the installation structure of the cross beam and the inclined beam of the present invention. DETAILED DESCRIPTION

[0012] In order to make the purpose, technical solution and advantages of the present invention more clear, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. The following embodiments can enable technicians in this field to understand the present invention more comprehensively, but the present invention is not limited to the scope of the embodiments.

[0013] The main pile frame 10, the auxiliary pile frame 20 and the structure of the dragon mouth 1 of the pile driving ship pile frame are as follows Figure 1 As shown, this specific implementation adopts the following technical solution: when the pile frame is constructed, it is constructed based on the Longkou track, and the Longkou track installation process is moved forward, including the following steps: S1. Divide the Longkou 1 into several sections, and construct the Longkou sections 11 and the lifting platform tracks 2 respectively. The length of each lifting platform track 2 is 6-8 meters. When cutting the Longkou panel 3, add a 20mm margin in the width direction, and add a 20mm margin on the outside of the Longkou track plate. Before installing the Longkou track plate, straighten and mill the edges.

[0014] S2. When assembling the segmented columns, install the Longkou segment 11 simultaneously. Figure 2 As shown, at this time, the panel 3 of the dragon mouth segment 11 and the lifting platform track 2 are not installed. Before the dragon mouth 1 is installed, the center line of the dragon mouth closure is measured and determined, and a benchmark is made; Figure 3 As shown, the Longkou segment 11 is installed based on the Longkou structure center line a. The tolerance of the rib size of the Longkou segment 11 does not exceed ±3mm, and the structural position deviation at the interface between the column and the beam does not exceed ±5mm, to prevent sudden shifting of the joint position and out-of-tolerance welding angles.

[0015] When the Longkou section 11 is welded with the main pile frame 10 and the auxiliary pile frame 20, the rear panel of the Longkou section 11 is butt-welded with the cross beam panel of the main pile frame 10 and the auxiliary pile frame 20; the web of the Longkou section 11 is double-sidedly welded with the cross beam panel of the main pile frame 10 and the auxiliary pile frame 20, and the weld height is 12 mm; the rear panel of the Longkou section 11 is butt-welded with the diagonal I-beam panel of the main pile frame 10; the rear panel of the Longkou section 11 is double-sidedly welded with the web of the diagonal I-beam of the main pile frame 10, and the weld height is 12 mm; the web of the Longkou section 11 is single-sidedly welded with the vertical beam panel of the main pile frame 10; the partition of the Longkou section 11 is double-sidedly welded with the cross beam panel of the main pile frame 10, and the weld height is 8 mm.

[0016] S3, Panel 3 of Longkou segment 11 is positioned and installed, such as Figure 4 As shown, the dragon mouth panel 3 is fixed with a U-shaped pallet 4. During installation, the overall flatness of the dragon mouth joint is measured first, and then the dragon mouth panel 3 is placed in place. The U-shaped pallet 4 is set corresponding to the dragon mouth cross rib plate, and the U-shaped pallet 4 is cut with materials above 12 mm.

[0017] S4. Installation of the lifting platform track. Leave a 1-meter length of the lifting platform track at the closing mouth for welding, which is used for closing and adjusting between sections. When closing the sections, the straightness of the lifting platform track is controlled with a precision of 6mm / 6000mm, with a maximum deviation of no more than 20mm. The overall accuracy requirement is to ensure the overall accuracy of the pile frame after production is completed and to ensure the overall posture of the pile frame dragon mouth.

[0018] S5, such as Figure 5 As shown, the cross beam 5 is installed and then the oblique beam 6 is installed. The oblique beam 6 is connected with the front limb tube and the front support foot base structure. The positioning accuracy of this position is high, and welding is performed after the intersection and positioning.

[0019] By dividing the dragon mouth into several sections, the dragon mouth structure is constructed in sections to ensure the accuracy of the dragon mouth; in order to ensure that the pile frame and the ship are built at the same time, the pile frame construction process is optimized, and the pile frame of the pile-driving ship is constructed based on the dragon mouth track. The longkou installation process is moved forward to ensure the construction accuracy and quality of the longkou track; the ship and the pile frame are constructed and installed at the same time in the dock and launched at the same time, which improves efficiency and ensures the planned progress.

[0020] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. The method for manufacturing the Longkou track of the pile frame of the pile driving ship in sections is characterized by: The pile frame is constructed based on the Longkou track, and the Longkou track installation process is moved forward, including the following steps: S1. Divide the longkou into several sections, and build the longkou sections and lifting platform tracks respectively. The length of each lifting platform track is 6-8 meters. When cutting the longkou panel, add 20mm margin in the width direction, and add 20mm margin on the outside of the longkou track plate; S2. When assembling the segmented columns, install the dragon mouth segments simultaneously. At this time, the panels of the dragon mouth segments and the lifting platform tracks are not installed. Before installing the dragon mouth, measure and determine the center line of the dragon mouth closure, and make a benchmark; When welding the Longkou section with the main pile frame and the auxiliary pile frame, the rear panel of the Longkou section is butt-welded with the main pile frame and the auxiliary pile frame cross beam panel; the web plate of the Longkou section is double-sidedly welded with the main pile frame and the auxiliary pile frame cross beam panel; the rear panel of the Longkou section is butt-welded with the main pile frame diagonal bar I-beam panel; the rear panel of the Longkou section is double-sidedly welded with the web plate of the main pile frame diagonal bar I-beam; the web plate of the Longkou section is single-sidedly welded with the main pile frame vertical beam panel; the partition of the Longkou section is double-sidedly welded with the main pile frame cross beam panel; S3. Position and install the panel of the dragon mouth segment. The dragon mouth panel is fixed with a U-shaped pallet. During installation, first measure the overall flatness of the dragon mouth joint, then put the dragon mouth panel in place, and the U-shaped pallet is set corresponding to the dragon mouth cross rib plate; S4. Install the lifting platform rail. Leave 1 meter of the lifting platform rail at the closing mouth for welding, which is used for closing and adjusting between sections. S5. Install the cross beam and then the inclined beam. The inclined beam is connected with the front limb tube and the front support foot base structure, and then welded after the intersection and positioning.

2. The method for manufacturing the Longkou track of the pile frame of the pile driving ship in sections according to claim 1 is characterized in that: In step S1, the Longkou track plate is straightened and milled before installation.

3. The method for manufacturing the Longkou track of the pile frame of the pile driving ship in sections according to claim 1 is characterized in that: In step S2, the dragon mouth segment is installed based on the center line of the dragon mouth structure, the tolerance of the rib plate size of the dragon mouth segment does not exceed ±3mm, and the structural position deviation at the interface between the column and the beam does not exceed ±5mm.

4. The method for manufacturing the Longkou track of a pile-driving ship pile frame in sections according to claim 1 is characterized in that: In step S2, the double-sided welding height of the web of the Longkou section and the main pile frame and auxiliary pile frame cross beam panels is 12 mm; the double-sided welding height of the rear panel of the Longkou section and the web of the main pile frame diagonal I-beam is 12 mm; the double-sided welding height of the partition of the Longkou section and the main pile frame cross beam panel is 8 mm.

5. The method for manufacturing the Longkou track of a pile-driving ship pile frame in sections according to claim 1 is characterized in that: In step S4, when the sections are closed, the straightness of the lifting platform track is controlled according to the accuracy of 6mm / 6000mm.