Deep well crawler belt electric drive drilling machine and transportation method

By using leg components and a rotatable drilling chamber in deep well track electric drilling rigs, combining the dual power sources of motors and diesel engines, multiple technical problems in traditional drilling rigs in transportation and drilling operations are solved, and safer and more efficient transportation and operation processes are achieved.

CN119572134AActive Publication Date: 2025-03-07CHANGSHA SPECIAL ENG EQUIP IND TECH RES INST CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411849655.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-03-07
Estimated Expiration
2044-12-16

AI Technical Summary

Technical Problem

During the transportation process, traditional deep well crawler drilling rigs have problems such as high height, high center of gravity, complicated disassembly and assembly of the drilling chamber, and prone to failure of a single drilling power.

Method used

A deep well track electric drive drilling rig is designed, using leg assembly and a rotatable drilling chamber. The leg assembly includes a transverse telescopic arm and a vertical telescopic legs. The power module includes a motor and a diesel engine, which can serve as an emergency power source during drilling operations.

Benefits of technology

Through the design of the leg assembly, the height and center of gravity of the entire machine during transportation is reduced, the disassembly and assembly process of the drilling chamber is simplified, the risk of rollover caused by the high center of gravity is avoided, and the safety and efficiency of drilling operations are improved through the dual power source of the power module.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119572134A_ABST
    Figure CN119572134A_ABST
Patent Text Reader

Abstract

The invention provides a deep well crawler belt electric drive drilling machine and a transportation method, the drilling machine comprises a crawler belt walking mechanism which comprises a crawler belt walking unit and a chassis bracket, and two containing grooves are concavely formed in the chassis bracket; the frame platform comprises a platform body and two chassis cross beams, and the two chassis cross beams are correspondingly arranged in the two containing grooves respectively; the four supporting leg assemblies are correspondingly arranged on the frame platform, each supporting leg assembly comprises a transverse telescopic arm and a vertical telescopic supporting leg connected with the telescopic end of the transverse telescopic arm, and the end, away from the telescopic end, of the transverse telescopic arm is connected with the frame platform; the power module comprises a motor and a diesel engine, and the diesel engine is electrically connected with a walking hydraulic pump of the crawler walking mechanism and further electrically connected with a hydraulic main pump of the whole machine hydraulic system; the motor is electrically connected with the hydraulic main pump; the drilling mast mechanism is arranged on the frame platform and is used for executing drilling and drilling operations; the height and the width of the whole machine meet the transportation requirements, and the plate trailer can be safely and simply transported up and down.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering machinery, and in particular to a deep well crawler electric drive drilling rig and a transportation method thereof. Background Art

[0002] Deep well crawler drilling rigs are mainly used in various deep hole drilling construction such as coal bed gas drilling, deep geothermal holes, oil exploration and development, grouting holes, and detection wells. They can use air down-the-hole hammer drilling, mud drilling, and can be used with rope coring and other construction techniques. At present, this type of drilling rig products on the market are divided into two forms: diesel drive and motor drive (electric drive is equipped with a low-power diesel power module - responsible for crawler walking), but there are the following disadvantages: 1. The whole machine is relatively long when transported. Due to structural requirements, the drill mast on the vehicle is much longer than the crawler chassis on the vehicle. In addition, the whole machine is heavy when transported. If the crawler is used to move the machine, there is a great risk of rollover due to the high center of gravity of the upper and lower trucks. 2. As the relevant national road transport regulations require that the height of cargo transportation should not exceed 4.5 meters, a special flatbed truck with a platform height of 300mm or 400mm is required for transportation. The height requirement of the chassis of the transportation vehicle is relatively strict, and the transportation cost is relatively high; 3. At present, most of the driller rooms at the wellheads of crawler drilling rigs on the market need to dismantle the relevant hydraulic or electrical control pipelines every time they are moved, which is cumbersome and reduces the service life of the relevant connectors. At the same time, the transportation cost and disassembly and assembly cost are increased during the relocation and well site layout. 4. The electric-driven crawler drilling rig uses two power modules to work independently. The main motor power module provides drilling power for the entire hydraulic system of the drilling rig, and the diesel power module provides power for crawler travel. When the equipment is drilling, if the main motor power module fails, the drilling rig will lose drilling power, which can easily lead to drilling accidents such as drill sticking, bringing drilling risks.

[0003] Therefore, there is an urgent need for a deep well crawler electric drive drilling rig and a transportation method that can solve the above-mentioned shortcomings. Summary of the invention

[0004] The purpose of the present invention is to provide a deep well crawler electric drive drilling rig and a transportation method, aiming to solve the technical problems of traditional deep well crawler drilling rigs such as high transportation height of the whole machine, high center of gravity of the whole machine, cumbersome disassembly and assembly of the driller's room, and easy failure of single drilling power.

[0005] To achieve the above objectives, in a first aspect, the present invention provides a deep well crawler electric drive drilling rig, comprising: A crawler walking mechanism, comprising a left crawler walking unit and a right crawler walking unit, and a chassis bracket for connecting the left and right crawler walking units, wherein the chassis bracket is provided with two receiving grooves, and the two receiving grooves are symmetrically arranged; The frame platform comprises a platform body, and two chassis cross beams arranged on the bottom surface of the platform body, wherein the two chassis cross beams are respectively arranged in two receiving grooves of the chassis bracket; Four groups of leg assemblies, respectively arranged at the four corners of the frame platform, the leg assemblies comprising a transverse telescopic arm and a vertical telescopic leg connected to the transverse telescopic end, the end of the transverse telescopic arm away from the telescopic end being connected to the frame platform; A power module is arranged on the frame platform, and includes a motor and a diesel engine. The diesel engine is electrically connected to the travel hydraulic pump of the crawler travel mechanism and is also electrically connected to the hydraulic main pump of the hydraulic system of the whole machine; the motor is electrically connected to the hydraulic main pump; The drilling mast mechanism is arranged on the frame platform and is used for performing drilling and boring operations.

[0006] As a further improvement of the above solution, the deep well crawler electric drill also includes a driller's room, and the driller's room is rotatably arranged outside the vertical telescopic leg of a leg assembly.

[0007] As a further improvement of the above solution, the driller's chamber is rotatably arranged outside the vertical telescopic leg of a leg assembly through a rotating structure; The rotatable structure comprises a sleeve sleeved on the outer wall of the vertical telescopic leg, and a rotating pile rotatably sleeved outside the sleeve, and the rotating pile is connected to the driller's chamber.

[0008] As a further improvement of the above solution, the driller's room includes a mounting bracket and an operating room body connected to the mounting bracket; The rotary pile is connected to the mounting bracket, and the mounting bracket is also provided with a transport fixing pin shaft. Correspondingly, a pin shaft hole matching the transport fixing pin shaft is provided on the frame platform so as to fix the driller's chamber during transportation.

[0009] As a further improvement of the above scheme, the drilling mast mechanism includes a mast, a wellhead working platform detachably arranged on the mast, and a swivel arm arranged on the side of the mast, and a hydraulic tongs detachably connected to the swivel arm.

[0010] As a further improvement of the above scheme, the transverse telescopic arm includes at least one transverse arm and a transverse telescopic cylinder connected to the transverse arm, the transverse arm is telescopically arranged in the frame platform, the end of the transverse telescopic cylinder away from the telescopic end is fixedly connected to the frame platform, and the telescopic end is arranged to extend into the transverse arm and connected to the transverse arm; Furthermore, a connecting structure is provided at the telescopic end of the transverse arm for connecting the vertical telescopic legs.

[0011] As a further improvement of the above solution, the vertical telescopic legs are vertical oil cylinders, the telescopic ends of the vertical oil cylinders are arranged toward the ground, and the telescopic ends are also hinged with a support for contacting the ground; The driller's chamber is rotatably arranged outside the cylinder barrel of the vertical oil cylinder.

[0012] As a further improvement of the above solution, the motor is arranged at the end of the frame platform away from the driller's room, and is used to provide power for the hydraulic main pump of the hydraulic system of the whole machine; The diesel engine is suspended at the rear end of the frame platform and provides power for the crawler traveling mechanism when traveling; if the motor fails or there is a high power demand condition, the motor power is switched to the diesel engine or the diesel engine power is integrated into the motor to provide drilling power for the drilling rig operation.

[0013] In a second aspect, the present invention further provides a method for transporting a deep well crawler electric drive drilling rig as provided in the first aspect, the steps of which include: S1. Remove the detachable parts on the drilling mast mechanism so that the height and weight of the whole machine are lower than the national road transportation regulations; S2, first control the lateral telescopic arms of the four leg assemblies to drive the vertical telescopic legs to extend outward respectively, and make the center distance of the left and right vertical telescopic legs greater than the width of the transport truck; then control the vertical telescopic legs to prop up the whole machine, so that the net height of the crawler from the ground is greater than the height of the transport truck; S3, the transport truck is poured into the space formed between the crawler track and the ground and is at a designated position; S4, first control the vertical telescopic legs to retract and put away, and place the whole machine on the transport flatbed truck; then control the transverse telescopic arms to retract, so that the width of the whole machine is less than the road width limit specified by the state; Then the transport truck is started to transport the deep well crawler electric drive drilling rig to the designated location, and step S2 is repeated, and the transport truck drives away.

[0014] As a further improvement of the above scheme, in step S4, after the lateral telescopic arm is controlled to retract to the specified position, it is checked and confirmed that the driller's chamber is stored at the head end of the whole machine (with the forward direction as the front as a reference); If the driller's room is not stored in the head end of the whole machine, rotate the driller's room to store it in the head end of the whole machine, and connect it to the frame platform through the transportation fixing pin shaft; If the driller's chamber is stored at the head end of the whole machine, check whether the transport fixing pin connects the driller's chamber to the frame platform to ensure that the driller's chamber cannot be rotated during transportation.

[0015] Since the present invention adopts the above technical solution, the beneficial effects of this application are: 1. A deep well crawler electric drive drilling rig provided by the present invention has a leg assembly arranged on the frame platform, and the leg assembly includes a transverse telescopic arm and a vertical telescopic leg, so that the leg assembly can be extended in the left and right directions of the fuselage, and can be extended up and down in the vertical direction. With such an arrangement, during transportation, the fuselage can be first lifted up by the leg assembly, and the transport flatbed can be quickly poured into the supporting space. After reaching the designated position, the leg assembly is folded up, so that the whole machine is placed on the transport flatbed. When the purpose is achieved, when getting off the vehicle, the fuselage is also first lifted up by the leg assembly, and the transport flatbed is driven away, so that quick getting off is achieved. The arrangement of the leg assembly enables the drilling rig to quickly get on and off the transport flatbed, and compared with the traditional way of getting on and off the vehicle (driving the transport flatbed up and down by the crawler walking mechanism), the problem of rollover caused by the high center of gravity of the fuselage can be avoided, so that the method of the present invention of lifting the fuselage by the leg assembly and moving the transport flatbed on and off the vehicle is safer and more convenient. In addition, in order to meet the height, width and weight of the whole machine during transportation and make it comply with national road transportation regulations, in the present invention, by opening two accommodating grooves on the chassis bracket, the chassis crossbeam of the frame platform can be correspondingly arranged in the accommodating grooves, thereby reducing the plane height of the frame platform and the installation height of the power module, thereby effectively reducing the height of the whole machine to meet the height requirements stipulated by national roads; arranging an outrigger assembly on the frame platform, on the one hand, facilitates the up and down transportation of the flatbed truck, and on the other hand, can also reduce the width of the fuselage (by arranging a transverse telescopic arm, the outrigger assembly can be extended during construction to increase the contact range with the ground, without increasing the spacing between the two left and right crawler walking units to increase the distance between the two left and right crawler walking units). Improve construction stability, thereby reducing the width of the fuselage); in some preferred embodiments, the drilling mast mechanism includes a mast, a wellhead working platform on the mast that is detachably arranged on the mast, and a hydraulic tong that is detachably arranged on the mast through a swing arm. With such an arrangement, the wellhead working platform and the hydraulic tong can be dismantled before transportation and transported by other transportation equipment, thereby reducing the weight of the whole machine and meeting the weight value specified by national roads; after arriving at the construction site, the wellhead working platform and the hydraulic tong are installed at corresponding positions for construction operations; such an arrangement, on the basis of meeting the national road transportation regulations, can also relax the special requirements for the transport flatbed due to the reduction in width and the weight of the whole machine, thereby greatly reducing the transportation cost; Furthermore, the power module of the present invention includes a motor and a diesel engine, the diesel engine is electrically connected to the travel hydraulic pump of the crawler walking mechanism, and is also electrically connected to the hydraulic main pump of the hydraulic system of the whole machine; the motor is electrically connected to the hydraulic main pump; such an arrangement, by connecting the diesel engine to the hydraulic main pump of the hydraulic system of the whole machine as an emergency power source, when the working power motor of the drilling rig fails, the power can be switched to the diesel engine, thereby avoiding drilling accidents such as drill sticking; at the same time, for working conditions with high power requirements, the diesel engine is incorporated into the motor power unit to ensure drilling safety while improving drilling operation efficiency.

[0016] 2. A deep well crawler electric drill provided by the present invention further comprises a driller's room, wherein the driller's room is rotatably arranged outside the vertical telescopic leg of a leg assembly through a rotating structure; the rotatable structure comprises a sleeve sleeved on the outer wall of the vertical telescopic leg, and a rotating pile rotatably sleeved outside the sleeve, The rotating pile is connected to the driller's room; the driller's room includes a mounting bracket and an operating room body connected to the mounting bracket; the rotating pile is connected to the mounting bracket, and the mounting bracket is also provided with a transportation fixing pin; the present invention cleverly sets the driller's room rotatably on the outside of the vertical telescopic leg of a leg assembly, and during transportation, the driller's room can be stored and combined, and fixed to the frame platform by the transportation fixing pin; during construction, after the fixation is released, the driller's room can be rotated and unfolded, and the operator can operate the equipment in the driller's room, avoiding the operator from operating in the harsh open-air environment; at the same time, when arranging on-site at the equipment conversion site or the well site, it is only necessary to rotate the driller's room to a suitable position, thereby achieving the purpose of rapid mobile transportation and rapid on-site arrangement, which is more humane and reduces construction and transportation costs; and the arrangement of the driller's room is convenient for arranging a driller's operating handle therein, thereby reducing the difficulty of operation and work intensity. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.

[0018] Figure 1 It is a left side schematic diagram of a deep well crawler electric drive drilling rig disclosed by the present invention; Figure 2 It is a front view schematic diagram of the crawler walking mechanism disclosed in the present invention; Figure 3 for Figure 2AA cross-sectional view of ; Figure 4 It is a schematic diagram of the main view of a deep well crawler electric drive drilling rig disclosed in the present invention; Figure 5 for Figure 4 BB cross-sectional view; Figure 6 It is a front view schematic diagram of the drilling mast mechanism disclosed in the present invention in a folded state; Figure 7 It is a left-side schematic diagram of a deep well crawler electric drive drilling rig disclosed by the present invention (during operation, the driller's room is rotated and pushed open); Figure 8 It is a schematic diagram of the main view of a deep well crawler electric drive drilling rig (during transportation, the driller's room is rotated and stored) disclosed in the present invention; Fig. 9 It is a front view schematic diagram of a deep well crawler electric drive drilling rig (before transportation, the outrigger assembly is unfolded) on a transport flatbed truck disclosed by the present invention; Fig.10 It is a three-dimensional schematic diagram of the connection between the rotating arm and the hydraulic tongs disclosed in the present invention; Fig.11 It is a three-dimensional schematic diagram of the rotating arm disclosed in the present invention; Fig.12 It is a three-dimensional schematic diagram of the hydraulic tongs disclosed in the present invention.

[0019] Reference numerals: 1. Crawler travel mechanism; 11. Left crawler travel unit; 12. Right crawler travel unit; 13. Chassis bracket; 14. Accommodation slot; 2. Frame platform; 21. Platform body; 22. Chassis crossbeam; 3. Leg assembly; 31. Horizontal telescopic arm; 32. Vertical telescopic leg; 4. Power module; 41. Motor; 42. Diesel engine; 5. Drilling mast mechanism; 51. Mast; 52. Wellhead working platform; 53. Swivel arm; 531. Base; 532. Rotating cylinder; 533. Connecting sleeve; 534. First locking hole; 535. Locking pin shaft; 54, hydraulic tongs; 541, hydraulic tongs body; 542, connecting column; 543, second locking hole; 6. Drilling room; 61. Mounting bracket; 62. Operation room body; 63. Transport fixing pin; 7. Sleeve; 8. Rotating pile.

[0020] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with the implementation methods and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] It should be noted that all directional indications (such as up, down, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0023] In addition, in the present invention, the descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.

[0024] Furthermore, the technical solutions between the various embodiments of the present invention may be combined with each other, but this must be based on the fact that they can be implemented by ordinary technicians in the field. When the combination of technical solutions is mutually contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0025] Example 1

[0026] See also Figure 1-8 The present invention provides a deep well crawler electric drive drilling rig, comprising: A crawler walking mechanism 1, comprising a left crawler walking unit 11 and a right crawler walking unit 12, and a chassis bracket 13 for connecting the left and right crawler walking units 12, wherein two receiving grooves 14 are concavely provided on the chassis bracket 13, and the two receiving grooves 14 are symmetrically arranged; The frame platform 2 includes a platform body 21 and two chassis cross beams 22 arranged on the bottom surface of the platform body 21. The two chassis cross beams 22 are respectively arranged in the two receiving grooves 14 of the chassis bracket 13; Four groups of leg assemblies 3 are respectively arranged at the four corners of the frame platform 2, and the leg assemblies 3 include a transverse telescopic arm 31 and a vertical telescopic leg 32 connected to the transverse telescopic end, and the end of the transverse telescopic arm 31 away from the telescopic end is connected to the frame platform 2; The power module 4 is arranged on the frame platform 2, and includes a motor 41 and a diesel engine 42. The diesel engine 42 is electrically connected to the travel hydraulic pump of the crawler travel mechanism 1 and is also electrically connected to the hydraulic main pump of the hydraulic system of the whole machine; the motor 41 is electrically connected to the hydraulic main pump; A drilling mast mechanism 5, arranged on the frame platform 2, for performing drilling and boring operations; The present invention arranges a leg assembly 3 on the frame platform 2, and the leg assembly 3 includes a transverse telescopic arm 31 and a vertical telescopic leg 32, so that the leg assembly 3 can be extended in the left and right directions of the fuselage, and can be extended up and down in the vertical direction. With such an arrangement, during transportation, the fuselage can be first lifted up by the leg assembly 3, and the transport flatbed 9 can be quickly poured into the supporting space. After reaching the designated position, the leg assembly 3 is folded up, so that the whole machine is placed on the transport flatbed 9; when the purpose is achieved, when getting off the vehicle, the fuselage is also first lifted up by the leg assembly 3, and the transport flatbed 9 is moved away, so as to achieve quick getting off; the arrangement of the leg assembly 3 enables the drilling rig to quickly get on and off the transport flatbed 9, and compared with the traditional way of getting on and off the vehicle (driving the transport flatbed 9 up and down by the crawler walking mechanism 1), the problem of rollover caused by the high center of gravity of the fuselage can be avoided, so that the method of the present invention of lifting the fuselage by the leg assembly 3 and moving the transport flatbed 9 on and off the vehicle is safer and more convenient; In addition, in order to meet the height, width and weight requirements of the whole machine during transportation and make it comply with national road transportation regulations, in the present invention, two accommodating grooves 14 are provided on the chassis bracket 13, and the chassis crossbeam 22 of the frame platform 2 can be correspondingly arranged in the accommodating grooves 14, so that the plane height of the frame platform 2 can be reduced, and the installation height of the power module 4 can also be reduced, thereby effectively reducing the height of the whole machine to meet the height requirements stipulated by national roads; the outrigger assembly 3 is provided on the frame platform 2, which is convenient for transporting the flatbed truck 9 up and down on the one hand, and can also reduce the width of the fuselage on the other hand (by providing a transverse telescopic arm 31, the outrigger assembly 3 can be extended during construction to increase the contact range with the ground, and there is no need to increase the distance between the two left and right crawler walking units 12 to improve the construction stability, thereby reducing the width of the fuselage); In some preferred embodiments, the drilling mast mechanism 5 includes a mast 51, a wellhead working platform 52 on the mast 51 that is detachably arranged on the mast 51, and a hydraulic tongs 53 that is detachably arranged on the mast 51 through a swing arm 43. With such an arrangement, the wellhead working platform 52 and the hydraulic tongs 53 can be dismantled before transportation and transported by other transportation equipment, thereby reducing the weight of the whole machine and meeting the weight value specified by national roads; after arriving at the construction site, the wellhead working platform 52 and the hydraulic tongs 53 are installed at corresponding positions for construction operations; with such an arrangement, on the basis of meeting the national road transportation regulations, due to the reduction in width and the weight of the whole machine, special requirements for the transport flatbed 9 can be relaxed, thereby greatly reducing transportation costs; Furthermore, the power module 4 of the present invention includes a motor 41 and a diesel engine 42, the diesel engine 42 is electrically connected to the travel hydraulic pump of the crawler walking mechanism 1, and is also electrically connected to the hydraulic main pump of the hydraulic system of the whole machine; the motor 41 is electrically connected to the hydraulic main pump; such an arrangement, by connecting the diesel engine 42 to the hydraulic main pump of the hydraulic system of the whole machine as an emergency power source, when the drilling rig working power motor 41 fails, the power can be switched to the diesel engine 42, thereby avoiding drilling accidents such as drill sticking; at the same time, for working conditions with high power requirements, the diesel engine 42 is incorporated into the motor 41 power unit, which ensures drilling safety while improving drilling operation efficiency.

[0027] As a preferred embodiment, see Figure 4 , Figure 7 and Figure 8 The deep well crawler electric drive drilling rig also includes a driller's room 6, and the driller's room 6 is rotatably arranged outside the vertical telescopic leg 32 of the leg assembly 3 through a rotating structure; Specifically, the rotatable structure includes a sleeve 7 sleeved on the outer wall of the vertical telescopic leg 32, and a rotating pile 8 rotatably sleeved outside the sleeve 7, and the rotating pile 8 is connected to the driller's room 6; in this embodiment, the sleeve 7 is set on the outer wall of the vertical telescopic leg 32 of the left rear leg assembly 3 of the frame platform 2 by welding; The rotating pile 8 includes a rotating sleeve rotatably mounted outside the sleeve 7, and a connecting plate connected to and extending from the outer wall of the rotating sleeve, and the driller's chamber 6 is connected to the rotating pile 8 via the connecting plate; The present invention cleverly arranges the driller's chamber 6 rotatably outside the vertical telescopic leg 32 of a leg assembly 3, with the rotating pile 8 as the rotation point, so that the driller's chamber 6 can quickly switch its posture in the transportation and working states; during transportation, the driller's chamber 6 can be stored and combined, and fixed to the frame platform 2 by the transportation fixing pin 63; during construction work, after the fixation is released, the driller's chamber 6 can be rotated and unfolded, and the operator can operate the equipment in the driller's chamber 6, avoiding the operator from operating in the harsh open-air environment; at the same time, when arranging on-site at the equipment conversion site or the well site, it is only necessary to rotate the driller's chamber 6 to a suitable position, thereby achieving the purpose of rapid mobile transportation and rapid on-site arrangement, which is more humane and reduces construction and transportation costs; and the arrangement of the driller's chamber 6 makes it easy to set a driller's operating handle therein, thereby reducing the difficulty of operation and work intensity.

[0028] As a preferred embodiment, see Figure 10-12 The rotating arm 53 includes a base 531 and a rotating cylinder 532 rotatably connected to the base 531, and a connecting frame is further provided on the outer wall of the rotating cylinder 532; The end of the connecting frame away from the rotating cylinder 532 is provided with a connecting sleeve 533 for detachably connecting with the hydraulic tongs 54; correspondingly, the connecting sleeve 533 is also provided with a locking mechanism; The hydraulic tongs 54 include a hydraulic tongs body 541 and a connecting column 542 connected to the hydraulic tongs body 541, and the connecting column 542 can be matched and sleeved in the connecting sleeve 533 to achieve a detachable connection between the hydraulic tongs 54 and the rotating arm 53; Specifically, in the present embodiment, the rotating cylinder 532 is rotatably connected to the base 531 through a worm gear type rotary drive device; the cross section of the connecting sleeve 533 is square, and the corresponding cross section of the connecting column 542 is square matching the shape of the connecting sleeve 533; the locking mechanism includes a first locking hole 534 arranged at the bottom of the connecting sleeve 533, a second locking hole 543 correspondingly arranged on the connecting column 542, and a locking pin 535. When connecting, the connecting column 542 of the hydraulic tongs 54 is sleeved in the connecting sleeve 533, and the first locking hole 534 and the second locking hole 543 are matched, and the locking pin 535 passes through the first locking hole 534 and the second locking hole 543 in sequence to realize the connection between the hydraulic tongs 54 and the rotating arm 53; when dismantling is required, the hydraulic tongs 54 can be detached from the rotating arm 53 by simply pulling out the locking pin 535.

[0029] As a preferred embodiment, see Figure 7 The driller's room 6 includes a mounting bracket 61 and an operating room body 62 connected to the mounting bracket 61; The rotary pile is connected to the mounting bracket 61, and the mounting bracket 61 is also provided with a transport fixing pin 63. Correspondingly, the frame platform 2 is provided with a pin hole matching the transport fixing pin 63, so as to fix the driller's room 6 during transportation; In some embodiments, a locking mechanism may be provided on the rotating sleeve of the rotating pile 8. When the position and posture of the driller's chamber 6 need to be switched, the locking mechanism is released and the driller's chamber 6 is rotated to the required position, and then the current state is locked by the locking mechanism. During operation, the driller's room 6 can be extended and retracted outward with the leg assembly 3. At the same time, the driller's room 6 can rotate around the leg assembly 3 with the rotating pile 8 as the rotation point. According to the on-site operation requirements, a suitable angle for observing the wellhead operation can be selected. No disassembly is required, and transportation and operation layout can be quickly realized.

[0030] As a preferred embodiment, see Figure 1 and Figure 7 The transverse telescopic arm 31 includes at least one transverse arm and a transverse telescopic cylinder connected to the transverse arm. The transverse arm is telescopically arranged in the frame platform 2. The end of the transverse telescopic cylinder away from the telescopic end is fixedly connected to the frame platform 2. The telescopic end is arranged to extend into the transverse arm and connected to the transverse arm. The transverse telescopic arms 31 on the left and right corresponding sides of the frame platform 2 are arranged in an "I" shape or a "V" shape. The telescopic end of the transverse arm is provided with a connecting structure for connecting to the outer wall of the vertical telescopic leg 32; specifically, the connecting structure includes a first connecting plate arranged at the telescopic end of the transverse arm, and a second connecting plate arranged on the outer wall of the vertical telescopic leg 32, and the first connecting plate and the second connecting plate are connected by welding or bolting.

[0031] As a preferred embodiment, see Figure 1 The vertical telescopic leg 32 is a vertical oil cylinder, the telescopic end of the vertical oil cylinder is arranged toward the ground, and the telescopic end is also hinged with a support for contacting the ground; The driller's chamber 6 is rotatably arranged outside the cylinder barrel of the vertical oil cylinder; Specifically, the sleeve 7 is welded to the outside of the cylinder barrel of the vertical oil cylinder, and the second connecting plate is welded to the cylinder barrel of the vertical oil cylinder.

[0032] As a preferred embodiment, see Figure 8 The motor 41 is arranged at the end of the frame platform 2 away from the driller's room 6, and is used to provide power for the hydraulic main pump of the hydraulic system of the whole machine. The hydraulic main pump connects the hydraulic power to the working power of the drilling rig, which can meet the rotation and braking of the power head and can realize the lifting of the power head; The diesel engine 42 is suspended at the rear end of the frame platform 2. The diesel engine 42 is suspended at the rear end of the frame platform 2 to provide power for the crawler walking mechanism 1 when traveling. If the motor 41 fails or there is a high power demand, the power of the motor 41 is switched to the diesel engine 42 or the power of the diesel engine 42 is integrated into the motor 41 to provide drilling power for the drilling rig operation. The diesel engine 42 can also be used as an emergency power to ensure drilling safety.

[0033] Example 2

[0034] See also Fig. 9 The present invention further provides a method for transporting a deep well crawler electric drive drilling rig as described in Example 1, the steps of which include: S1. Remove the detachable parts on the drilling mast mechanism 5 so that the height and weight of the whole machine are lower than the national road transportation regulations; S2, first control the lateral telescopic arms 31 of the four leg assemblies 3 to drive the vertical telescopic legs 32 to extend outward respectively, and make the center distance of the left and right vertical telescopic legs 32 larger than the width of the transport truck 9; then control the vertical telescopic legs 32 to prop up the whole machine, so that the net height of the crawler from the ground is larger than the height of the transport truck 9; S3, the transport truck 9 is poured into the space formed between the crawler track and the ground and is at a designated position; S4, first control the vertical telescopic legs 32 to retract and put away, and place the whole machine on the transport flatbed truck 9; then control the transverse telescopic arms 31 to retract, so that the width of the whole machine is less than the national road width limit; Then start the transport truck 9 to transport the deep well crawler electric drive drilling rig to the designated location, and then repeat step S2, the transport truck 9 leaves, and the transportation and loading and unloading are completed; The transport method provided by the present invention, during transportation, the fuselage is first lifted up by the outrigger assembly 3, and the transport flatbed trolley 9 can be quickly poured into the supporting space. After reaching the specified position, the outrigger assembly 3 is folded up, so that the entire machine is placed on the transport flatbed trolley 9; when the destination is reached, when getting off the vehicle, the fuselage is also first lifted up by the outrigger assembly 3, and the transport flatbed trolley 9 is moved away, so as to achieve quick getting off; the transport method provided by the present invention cleverly switches the moving body, and replaces the traditional up and down transport flatbed trolley 9 driven by the crawler walking mechanism 1; by lifting the fuselage off the ground through the outrigger assembly 3, and having a ground clearance of at least the height of the trolley, and the transport flatbed trolley is moved up and down by pouring in or moving away. On the one hand, it can achieve quick up and down of the flatbed trolley, and on the other hand, it can avoid the problem of rollover caused by the up and down transport flatbed trolley driven by the crawler walking mechanism 1 due to the high center of gravity of the entire machine, making the transportation method provided by the present invention safer and more reliable.

[0035] As a preferred embodiment, in step S4, after the lateral telescopic arm 31 is controlled to retract to the specified position, it is checked and confirmed that the driller's chamber 6 is stored at the head end of the whole machine (with the forward direction as the front as a reference); If the driller's room 6 is not stored in the head end of the whole machine, the driller's room 6 is rotated to be stored in the head end of the whole machine, and connected to the frame platform 2 through the transportation fixing pin 63; If the driller's room 6 is stored at the head end of the whole machine, check whether the transport fixing pin 63 connects the driller's room 6 with the frame platform 2 to ensure that the driller's room 6 cannot be rotated during transportation; During transportation, the driller's chamber 6 is stored at the head end of the whole machine without increasing the width, and can be fixed on the frame platform 2 through the transportation fixing pin 63 or the locking mechanism to ensure safe and reliable transportation.

[0036] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.

Claims

1. A deep well crawler electric drive drilling rig, characterized in that: include: A crawler walking mechanism, comprising a left crawler walking unit and a right crawler walking unit, and a chassis bracket for connecting the left and right crawler walking units, wherein the chassis bracket is provided with two receiving grooves, and the two receiving grooves are symmetrically arranged; The frame platform comprises a platform body, and two chassis cross beams arranged on the bottom surface of the platform body, wherein the two chassis cross beams are respectively arranged in two receiving grooves of the chassis bracket; Four groups of leg assemblies, respectively arranged at the four corners of the frame platform, the leg assemblies comprising a transverse telescopic arm and a vertical telescopic leg connected to the transverse telescopic end, the end of the transverse telescopic arm away from the telescopic end being connected to the frame platform; A power module is arranged on the frame platform, and includes a motor and a diesel engine. The diesel engine is electrically connected to the travel hydraulic pump of the crawler travel mechanism and is also electrically connected to the hydraulic main pump of the hydraulic system of the whole machine; the motor is electrically connected to the hydraulic main pump; The drilling mast mechanism is arranged on the frame platform and is used for performing drilling and boring operations.

2. The deep well crawler electric drive drilling rig according to claim 1, characterized in that: The deep well crawler electric drive drilling rig also includes a driller's room, which is rotatably arranged outside the vertical telescopic leg of a leg assembly.

3. The deep well crawler electric drive drilling rig according to claim 2, characterized in that: The driller's chamber is rotatably arranged outside the vertical telescopic leg of a leg assembly through a rotating structure; The rotatable structure comprises a sleeve sleeved on the outer wall of the vertical telescopic leg, and a rotating pile rotatably sleeved outside the sleeve, and the rotating pile is connected to the driller's chamber.

4. A deep well crawler electric drive drilling rig according to claim 2 or 3, characterized in that: The driller's room includes a mounting bracket and an operating room body connected to the mounting bracket; The rotary pile is connected to the mounting bracket, and the mounting bracket is also provided with a transport fixing pin shaft. Correspondingly, a pin shaft hole matching the transport fixing pin shaft is provided on the frame platform so as to fix the driller's chamber during transportation.

5. A deep well crawler electric drive drilling rig according to any one of claims 1 to 3, characterized in that: The drilling mast mechanism comprises a mast, a wellhead working platform detachably arranged on the mast, and a rotating arm arranged on the side of the mast, and a hydraulic tong is detachably connected to the rotating arm.

6. A deep well crawler electric drive drilling rig according to any one of claims 1 to 3, characterized in that: The transverse telescopic arm comprises at least one transverse arm and a transverse telescopic cylinder connected to the transverse arm, the transverse arm is telescopically arranged in the frame platform, the end of the transverse telescopic cylinder away from the telescopic end is fixedly connected to the frame platform, and the telescopic end is arranged to extend into the transverse arm and connected to the transverse arm; Furthermore, a connecting structure is provided at the telescopic end of the transverse arm for connecting the vertical telescopic legs.

7. A deep well crawler electric drive drilling rig according to claim 2 or 3, characterized in that: The vertical telescopic legs are vertical oil cylinders, the telescopic ends of which are arranged toward the ground, and the telescopic ends of which are also hinged with supports for contacting the ground; The driller's chamber is rotatably arranged outside the cylinder barrel of the vertical oil cylinder.

8. A deep well crawler electric drive drilling rig according to claim 2 or 3, characterized in that: The motor is arranged at the end of the frame platform away from the driller's room and is used to provide power for the hydraulic main pump of the hydraulic system of the whole machine; The diesel engine is suspended at the rear end of the frame platform.

9. A method for transporting a deep well crawler electric drive drilling rig according to any one of claims 1 to 8, characterized in that: The steps include: S1. Remove the detachable parts on the drilling mast mechanism so that the height and weight of the whole machine are lower than the national road transportation regulations; S2, first control the lateral telescopic arms of the four leg assemblies to drive the vertical telescopic legs to extend outward respectively, and make the center distance of the left and right vertical telescopic legs greater than the width of the transport truck; then control the vertical telescopic legs to prop up the whole machine, so that the net height of the crawler from the ground is greater than the height of the transport truck; S3, the transport truck is poured into the space formed between the crawler track and the ground and is at a designated position; S4, first control the vertical telescopic legs to retract and put away, and place the whole machine on the transport flatbed truck; then control the transverse telescopic arms to retract, so that the width of the whole machine is less than the road width limit specified by the state; Then the transport truck is started to transport the deep well crawler electric drive drilling rig to the designated location, and step S2 is repeated, and the transport truck drives away.

10. The transportation method according to claim 9, characterized in that: In step S4, after the lateral telescopic arm is controlled to retract to a specified position, it is checked and confirmed that the driller's cabin is stored in the head end of the whole machine; If the driller's room is not stored in the head end of the whole machine, rotate the driller's room to store it in the head end of the whole machine, and connect it to the frame platform through the transportation fixing pin shaft; If the driller's chamber is stored at the head end of the whole machine, check whether the transport fixing pin connects the driller's chamber to the frame platform to ensure that the driller's chamber cannot be rotated during transportation.

Citation Information

Patent Citations

  • Lifting-rotation-platform crawler drill for coal mine

    CN103603596A

  • Multifunctional pipeline anchorage transportation vehicle

    CN105438292A

  • High landing leg hybrid power reverse circulation anchoring drilling machine

    CN106996273A

  • Self-propelled all-rotation all-casing drilling machine

    CN114482852A

  • Full -hydraulic drilling machine platform

    CN206280010U