Creeping formwork platform dismounting and changing structure and method for super high-rise outrigger truss column installation

By designing a climbing platform structure with guide rails and rollers in the construction of super high-rise buildings, the problem of difficulty in demolition and modification of the climbing platform during the installation of extended arm truss columns is solved, and rapid disassembly and installation is achieved, saving construction period and maintaining platform stability.

CN119593579APending Publication Date: 2025-03-11中建八局(日照)建设有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510046870.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-13
Publication Date
2025-03-11

AI Technical Summary

Technical Problem

In the construction of super high-rise buildings, during the installation of extended arm truss columns, the four corners of the five-story platform of the climbing mold platform need to be removed to avoid conflict between the column ox legs and the climbing mold, resulting in the overall damage to the climbing mold. After demolition and modification, a lot of manpower, material resources and construction period are wasted.

Method used

Design a structure and method for removing and modifying the climbing platform for ultra-high-level extended arm truss column installation. By cutting the four corners of the climbing mold during the standard layer and setting guide rails and rollers, the sub-platform plate can be quickly moved to a designated position, simplifying the installation and disassembly process.

Benefits of technology

It realizes the rapid disassembly and installation of the mold climbing platform, which only takes 1-2 hours to save construction period and maintain the integrity and stability of the platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119593579A_ABST
    Figure CN119593579A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building construction, and particularly relates to a creeping formwork platform dismounting and changing structure and method for mounting a super high-rise outrigger truss column, the method mainly comprises the steps of cutting off a sub-platform plate, mounting a guide rail and a roller and mounting a roller support, and the creeping formwork platform dismounting and changing structure structurally comprises a mother platform plate, the sub-platform plate and a fixing block; rollers are arranged on the guide rails, rolling supporting frames are rotationally connected to the rollers, and the other ends of the roller supporting frames are rotationally connected with the sub-platform plates. Compared with the prior art, disassembly and assembly are convenient and fast, stability is good, disassembly and change only need 1-2 hours, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a dismantling and modification structure and method of a climbing formwork platform installed on a super-high-rise cantilever truss column. Background Art

[0002] At present, all super high-rise buildings in my country are equipped with refuge floors. After the core tube of the refuge floor is cast, the outer frame needs to be supported by cantilever truss columns to ensure the integrity and stability of the outer frame of the refuge floor. However, since the size of the climbing formwork used in the casting process of the core tube of the super high-rise building is all expanded around the outer periphery of the core tube, conflicts between the column corbels and the climbing formwork will occur during the installation of the cantilever truss columns, resulting in the need to dismantle the four corners of the five-story climbing formwork platform to ensure climbing. This method will lead to the destruction of the integrity of the climbing formwork, and the restoration of the climbing formwork platform after dismantling and modification will waste a lot of manpower, material resources and construction period. It is urgent to study a method for dismantling and modifying a climbing formwork platform that cooperates with the installation of super high-rise cantilever truss columns. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention develops a dismantling and modification structure and method for a climbing formwork platform for installing a super-high-rise cantilever truss column. The structure has convenient dismantling and installation, good stability, and only takes 1-2 hours to dismantle and modify, thus saving construction time.

[0004] The technical solution to the technical problem of the present invention is: a method for dismantling and modifying a climbing formwork platform installed on a super-high-rise outrigger truss column, comprising the following steps: Step 1: At the standard level, cut off the four corners of the climbing surface, punch holes in the sub-platform board and set two pins at the bottom to fix the roller support frame; Step 2: Punch holes in the mother platform plate and set guide rails on the top; Step 3: Place the roller on the guide rail and connect the roller support frame to the roller and the sub-platform board; Step 4: Drill holes on the mother platform plate and the sub-platform plate, matching the hole positions with the holes on the fixing block, and temporarily fix the sub-platform plate to the fixing block by bolts; Step 5: When the outrigger truss needs to be installed, open the fixing block, lift the sub-platform plate upwards and push the sub-platform plate in the direction of the guide rail until the roller enters the roller hole; Step 6: After the climbing platform is finished climbing, pull the sub-platform board in the initial direction of the sub-platform board, then install the fixing block to restore the initial state to ensure the stability of the platform.

[0005] Preferably, the direction in which the guide rail is set in step 2 is parallel to the line connecting the holes punched on the mother platform plate and the sub-platform plate.

[0006] Preferably, in step 3, the roller support frame is rotationally connected to the roller and the sub-platform plate.

[0007] Preferably, during the process of opening the sub-platform plate in step 4, facade protection must be provided around it until the cantilever truss is installed.

[0008] A climbing formwork platform for installing a super-high-rise cantilever truss column comprises a mother platform plate, a sub-platform plate and a fixed block, wherein the mother platform plate is provided with a guide rail, the guide rail is provided with a roller, the roller is rotatably connected to a rolling support frame, and the other end of the roller support frame is rotatably connected to the sub-platform plate.

[0009] Preferably, the mother platform plate and the sub-platform plate are temporarily fixed by fixing block bolts.

[0010] Preferably, a roller hole is provided on the end of the mother platform plate in the length direction of the guide rail away from the sub-platform plate.

[0011] The effects provided in the content of the invention are only the effects of the embodiments, rather than all the effects of the invention. The above technical solution has the following advantages or beneficial effects: 1. The disassembly structure of the climbing and touching platform of the present invention is safe, reliable and stable in structure, convenient to disassemble and install, easy to operate, and saves labor costs; 2. By modifying the platform cut off at the four corners of the climbing formwork in advance and setting rollers and guide rails, the sub-platform plate can be quickly and conveniently moved to the designated position when installing the outrigger truss, greatly shortening the construction time; 3. The main platform plate and the sub-platform plate are temporarily fixed by fixing blocks and bolts. After the climbing formwork platform is completed, the sub-platform plate can be restored to its initial state and remain stable, ensuring the structural stability of the entire platform; 4. The rotating connection between the roller support frame, the roller and the sub-platform makes the sub-platform more flexible during movement and convenient for various operations; 5. During the opening process of the sub-platform board, the surrounding facade protection must be carried out until the installation of the cantilever truss is completed, which effectively ensures the safety of the construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 The overall structure of the present invention Figure 1 ; Figure 2 The overall structure of the present invention Figure 2 ; Figure 3 This is a schematic diagram of the construction location structure; Figure 4 This is an overhead view of the construction location.

[0013] Among them: 1. Mother platform plate; 2. Sub-platform plate; 3. Roller hole; 4. Guide rail; 5. Roller; 6. Fixed block; 7. Roller support frame; 8. Cantilever truss. DETAILED DESCRIPTION

[0014] In order to clearly illustrate the technical features of the present invention, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings.

[0015] Example 1 See also Figures 1 to 4 A method for dismantling and modifying a climbing formwork platform installed with an 8-column super-high-rise outrigger truss comprises the following steps: Step 1: At the standard layer, cut off the four corners of the climbing touch, punch holes in the sub-platform plate 2 and set two pins at the bottom to fix the roller 5 support frame; Step 2: Punch holes in the mother platform plate 1 and set a guide rail 4 on the upper part; Step 3: Place the roller 5 on the guide rail 4, and connect the roller 5 support frame to the roller 5 and the sub-platform plate 2; Step 4: Drill holes on the mother platform plate 1 and the sub-platform plate 2, the hole positions match the hole positions on the fixing block 6, and temporarily fix the sub-platform plate 2 to the fixing block 6 by bolts; Step 5: When the outrigger truss 8 needs to be installed, open the fixing block 6, lift the sub-platform board 2 upward and push the sub-platform board 2 in the direction of the guide rail 4 until the roller 5 enters the roller 5 hole 3; Step 6: After the climbing platform is finished climbing, pull the sub-platform board 2 in the initial direction of the sub-platform board 2, and then install the fixing block 6 to restore the initial state to ensure the stability of the platform.

[0016] In step 2, the direction in which the guide rail 4 is arranged is parallel to the connecting line of the holes punched on the mother platform plate 1 and the sub-platform plate 2 .

[0017] In step 3, the roller 5 support frame is rotatably connected to the roller 5 and the sub-platform plate 2.

[0018] During the opening process of the sub-platform plate 2 in step 4, the surrounding surface must be protected until the cantilever truss 8 is installed.

[0019] A climbing formwork platform installed with 8 columns of a super high-rise cantilever truss comprises a mother platform plate 1, a sub-platform plate 2 and a fixing block 6, the mother platform plate 1 is provided with a guide rail 4, the guide rail 4 is provided with a roller 5, the roller 5 is rotatably connected with a rolling support frame, and the other end of the roller 5 support frame is rotatably connected with the sub-platform plate 2; the mother platform plate 1 and the sub-platform plate 2 are temporarily fixed by the fixing block 6 and bolts; a roller 5 hole 3 is provided at one end of the guide rail 4 on the mother platform plate 1 which is away from the sub-platform plate 2 in the length direction.

[0020] Principle and specific operation process Aiming at the problem that the climbing formwork platform must be inevitably cut off when encountering a floor where an outrigger truss 8 columns are installed during the construction of a super high-rise building in the prior art, the present invention proposes a structure and method for dismantling and modifying a climbing formwork platform installed with an outrigger truss 8 columns: When the standard layer is used, the platforms at the four corners of the climbing formwork are cut off, holes are punched in the sub-platform board 2 to be removed, and two pins are set at the bottom to fix the roller 5 support frame. The sub-platform board 2 can rotate around the pins, which is convenient for movement in subsequent steps. At the same time, the pins can provide stable support for the roller 5 to ensure the stability of the sub-platform board 2 during movement.

[0021] The mother platform plate 1 is punched, and a guide rail 4 is arranged on the upper part. The setting direction of the guide rail 4 is parallel to the connecting line of the holes punched on the mother platform plate 1 and the sub-platform plate 2. It is ensured that the sub-platform plate 2 can slide along the direction of the guide rail 4 during the movement, providing a guide for the movement of the sub-platform plate 2. The roller 5 is placed on the guide rail 4, and the roller 5 support frame is rotatably connected between the roller 5 and the sub-platform plate 2. The sub-platform plate 2 can move along the guide rail 4 driven by the roller 5, and the angle of the sub-platform plate 2 can be flexibly adjusted during the movement. A roller 5 hole 3 is arranged at one end of the guide rail 4 on the mother platform plate 1 that is away from the sub-platform plate 2 in the length direction. The position and size design of the roller 5 hole 3 match the roller 5, ensuring that the sub-platform plate 2 can be accurately positioned to the specified position during the movement. When the sub-platform plate 2 needs to be moved to a specific position, the roller 5 support frame can adjust the angle of the sub-platform plate 2 according to the actual situation to ensure that the sub-platform plate 2 smoothly enters the roller 5 hole 3.

[0022] Holes are punched on the mother platform board 1 and the sub-platform board 2, the positions of the holes match the positions of the holes on the fixing block 6, and the sub-platform board 2 is temporarily fixed by bolts connected to the fixing block 6. This allows the sub-platform board 2 to remain stable when it does not need to be moved, and the fixing block 6 can be easily opened for operation when it needs to be moved.

[0023] When the cantilever truss 8 needs to be installed, open the fixing block 6, lift the sub-platform board 2 upwards and push the sub-platform board 2 in the direction of the guide rail 4 until the roller 5 enters the roller 5 hole 3. During the pushing process of the sub-platform board 2, the roller 5 rolls along the guide rail 4 until the roller 5 enters the roller 5 hole 3. The position and size design of the roller 5 hole 3 match the roller 5 to ensure that the sub-platform board 2 can be accurately positioned at the specified position. After the climbing formwork platform completes the climbing, pull the sub-platform board 2 in the initial direction of the sub-platform board 2, and then install the fixing block 6 to restore the initial state.

[0024] The sub-platform board 2 is connected to the roller 5 through the roller 5 support frame, and this connection mode enables the sub-platform board 2 to move on the mother platform board 1. The structural design of the sub-platform board 2 matches the mother platform board 1 to ensure that the sub-platform board 2 can remain stable during movement.

[0025] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Based on the technical solution of the present invention, various modifications or variations that can be made by those skilled in the art without creative work are still within the scope of protection of the present invention.

Claims

1. A method for dismantling and modifying a climbing formwork platform installed on a super-high-rise outrigger truss column, characterized in that: The following steps are involved: Step 1: At the standard level, the four corners of the climbing frame are cut off, holes are punched in the sub-platform plate (2), and two pins are set at the bottom to fix the roller (5) support frame; Step 2: Punch holes in the mother platform plate (1) and set a guide rail (4) on the upper part; Step 3: Place the roller (5) on the guide rail (4), and connect the roller (5) support frame to the roller (5) and the sub-platform plate (2); Step 4: Drill holes on the mother platform plate (1) and the sub-platform plate (2), the positions of the holes matching the positions of the holes on the fixing block (6), and temporarily fix the sub-platform plate (2) to the fixing block (6) by bolts. Step 5: When it is necessary to install the outrigger truss (8), open the fixing block (6), lift the sub-platform plate (2) upward, and push the sub-platform plate (2) in the direction of the guide rail (4) until the roller (5) enters the roller (5) hole (3); Step 6: After the climbing platform is finished climbing, pull the sub-platform board (2) in the initial direction of the sub-platform board (2), and then install the fixing block (6) to restore the initial state to ensure that the platform is stable.

2. The method for dismantling and modifying a climbing formwork platform installed in a super high-rise outrigger truss column according to claim 1 is characterized in that: In step 2, the direction in which the guide rail (4) is arranged is parallel to the connecting line of the holes punched on the mother platform plate (1) and the sub-platform plate (2).

3. The method for dismantling and modifying a climbing formwork platform installed in a super high-rise outrigger truss column according to claim 1, characterized in that: In step 3, the roller (5) support frame is rotatably connected to the roller (5) and the sub-platform plate (2).

4. The method for dismantling and modifying a climbing formwork platform installed in a super high-rise outrigger truss column according to claim 1 is characterized in that: During the opening process of the sub-platform plate (2) in step 4, the surrounding surface must be protected until the cantilever truss (8) is installed.

5. A dismantling and modification structure of a climbing formwork platform for installing a super high-rise outrigger truss column, characterized in that: The invention comprises a mother platform plate (1), a sub-platform plate (2) and a fixed block (6); the mother platform plate (1) is provided with a guide rail (4); the guide rail (4) is provided with a roller (5); the roller (5) is rotatably connected to a rolling support frame; the other end of the roller (5) support frame is rotatably connected to the sub-platform plate (2).

6. The dismantling and modification structure of a climbing formwork platform for installing a super high-rise outrigger truss column according to claim 5 is characterized in that: The mother platform plate (1) and the sub-platform plate (2) are temporarily fixed by means of a fixing block (6) in cooperation with bolts.

7. The dismantling and modification structure of a climbing formwork platform for installing a super high-rise outrigger truss column according to claim 5 is characterized in that: A roller (5) hole (3) is provided at one end of the guide rail (4) on the mother platform plate (1) in the length direction away from the sub-platform plate (2).