Construction method for constructing bank protection structure by adopting coral mortar combined with earthwork standard room

By laying built-in grid mold bags on the shore slope and filling coral mortar, the problems of high cost and resource dependence in traditional shore protection structures are solved, and the shore protection effect of low-cost and rapid construction is achieved.

CN119663793AActive Publication Date: 2025-03-21CHINA HARBOUR ENGINEERING
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411916413.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-03-21
Estimated Expiration
2044-12-24

AI Technical Summary

Technical Problem

Traditional shore revet structures require a large amount of concrete and stone, which is costly and long construction periods, and are not suitable for coastal areas and island areas that lack these resources.

Method used

The construction method of coral mortar combined with geogrid chamber structure is used to construct a bank guard structure. By laying built-in grid mold bags on the bank slope and filling the mold bags with coral mortar to form a stable bank guard structure.

Benefits of technology

Reliance on concrete and stone is reduced, the coral sand resources on the coast are fully utilized, construction costs are reduced, and construction cycles are shortened, and it is suitable for coastal areas with scarce resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119663793A_ABST
    Figure CN119663793A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for constructing a bank protection structure by adopting coral mortar in combination with earthwork standard rooms, a special built-in standard room type mold bag structure is designed, built-in standard room type mold bags are laid on a bank slope, and the built-in standard room type mold bags are filled with coral mortar, so that a large amount of concrete and stone materials are saved, and the construction cost is reduced. And local abundant coral sand resources of the coast are fully utilized, so that the cost is lower. According to the built-in lattice chamber type mold bag, the plastic lattice chambers are embedded in the built-in lattice chamber type mold bag, and the mold bag is provided with the transverse reinforcing ribs, the longitudinal reinforcing ribs and the vertical reinforcing ribs for reinforcing, so that the filled coral sand can be stably positioned in the built-in lattice chamber type mold bag, and a stable bank protection structure is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bank protection, in particular to a construction method of a bank protection structure constructed by using coral mortar and geocell. Background Art

[0002] Bank protection is an engineering measure to artificially reinforce the existing coastal slopes to prevent the invasion and scouring of waves and currents and the action of groundwater to maintain the stability of the coastline. The traditional bank protection structure is to lay concrete mortar bags and stones on the slopes to achieve the purpose of bank protection. This traditional bank protection method requires a large amount of concrete and natural stones, which is costly and has a long construction period. Moreover, this traditional bank protection method is not applicable to coastal areas and island reef areas that lack concrete and stones. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a construction method for constructing a bank protection structure using coral mortar combined with geocells.

[0004] The present invention is achieved through the following technical solutions:

[0005] A construction method for constructing a revetment structure using coral mortar and geocells, comprising the following steps:

[0006] Step 1, leveling and sloping the bank slope;

[0007] Step 2: laying geotextile on the bank slope, constructing a wave-blocking wall on the top of the bank slope, and digging a groove area at the bottom of the bank slope;

[0008] Step 3, laying a built-in cell-type mold bag on the bank slope, so that the top of the built-in cell-type mold bag extends to the front position of the wave-breaking wall, and the bottom of the built-in cell-type mold bag extends to the groove area at the bottom of the bank slope;

[0009] The built-in cell-type mold bag includes a mold bag body, transverse reinforcement ribs, longitudinal reinforcement ribs, vertical reinforcement ribs and cells. The mold bag body is bag-shaped, including a top surface, a bottom surface and four surrounding covers. The transverse reinforcement ribs and longitudinal reinforcement ribs are evenly arranged on the top surface of the mold bag body to form a grid array; the transverse reinforcement ribs and longitudinal reinforcement ribs are also evenly arranged on the bottom surface of the mold bag body to form a grid array; the vertical reinforcement ribs are connected between the intersection points of the grid array on the top surface of the mold bag body and the intersection points of the grid array on the bottom surface of the mold bag body; the cells are arranged inside the mold bag body.

[0010] Step 4, filling the built-in cell-type mold bag with coral mortar;

[0011] Step 5, after the filling is completed, stones are laid in the groove area at the bottom of the slope so that the bottom of the built-in cell-type mold bag is stably pressed in the stones.

[0012] In the above technical solution, in step 3, when laying the built-in cell-type mold bag, first lay the bottom surface of the mold bag body, then lay the cells on the bottom surface of the mold bag body, and then lay the top surface of the mold bag body, so that the cells are sandwiched between the top and bottom surfaces of the mold bag body; then connect the top and bottom surfaces of the mold bag body around to form a surrounding cover, and connect the top and bottom surfaces through vertical reinforcement ribs, thereby constructing the built-in cell-type mold bag.

[0013] In the above technical solution, in step 3, it is necessary to first lay and construct the built-in cell-type mold bag in the waterless shore area, and then move the constructed built-in cell-type mold bag downward as a whole so that the bottom of the built-in cell-type mold bag is moved to the groove area at the bottom of the slope.

[0014] In the above technical solution, the mold bag is kept moist before filling, and the filling should be carried out from bottom to top, compartment by compartment. When the pump tube is inserted into the filling port, a shock-reducing baffle should be set at the pump tube port.

[0015] In the above technical solution, the filling flow rate is (10~15)m 3 / h, the filling pressure is (0.2~0.3)MPa.

[0016] In the above technical solution, a filling port is provided on the top surface of the mold bag body of the built-in cell-type mold bag, which is used to fill the coral mortar into the built-in cell-type mold bag.

[0017] In the above technical solution, the wave-breaking wall is made of plain concrete or coral sand concrete.

[0018] In the above technical solution, the blocks are made of plain concrete or coral sand concrete.

[0019] The advantages and beneficial effects of the present invention are:

[0020] The construction method of the present invention adopts coral mortar combined with geocell to construct a revetment structure, designs a special built-in cell-type mold bag structure, lays the built-in cell-type mold bag on the bank slope, and fills the built-in cell-type mold bag with coral mortar, which saves a lot of concrete and stone, and makes full use of the rich local coral sand resources on the coast, with lower cost. Since the built-in cell-type mold bag of the present invention has plastic cells embedded in it, and the mold bag itself has transverse reinforcement bars, longitudinal reinforcement bars and vertical reinforcement bars for reinforcement, the filled coral sand can be stably placed in the built-in cell-type mold bag to form a stable revetment structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the bank protection structure using coral mortar combined with geocell structure of the present invention.

[0022] Figure 2 yes Figure 1 A schematic diagram of the enlarged cross-sectional structure of FIG.

[0023] Figure 3 It is a structural schematic diagram of a mold bag body of a built-in cell-type mold bag adopted by the present invention.

[0024] Figure 4 It is a schematic diagram of the structure of the cell.

[0025] Figure 5 It is a schematic diagram of the structure after the cell and the mold bag body are combined.

[0026] Figure 6 The invention discloses a construction flow chart of a construction method for constructing a bank protection structure using coral mortar.

[0027] For ordinary technicians in this field, other relevant drawings can be obtained based on the above drawings without any creative work. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with specific embodiments.

[0029] A revetment structure using coral mortar and geocell structure, see attached Figure 1 A built-in cell-type mold bag 1 is laid on the bank slope, and the interior of the built-in cell-type mold bag is filled with coral mortar.

[0030] The top of the built-in cellular mold bag 1 extends to the top of the bank slope, and the bottom of the built-in cellular mold bag extends to the bottom of the bank slope; further, a wave-blocking wall 2 is arranged at the top of the bank slope, the top of the built-in cellular mold bag 1 extends to the front position of the wave-blocking wall 2, a groove area 3 is dug at the bottom of the bank slope, the bottom of the built-in cellular mold bag 1 extends to the groove area 3, and blocks 4 are laid in the groove area, and the bottom of the built-in cellular mold bag 1 is stably pressed in the blocks 4. Further, 1-3 layers of geotextiles 5 are laid between the bank slope and the built-in cellular mold bag.

[0031] See the attached Figure 2 -Attached Figure 5 , the specific structure of the built-in cell-type mold bag 1 is specifically introduced.

[0032] The built-in cell-type mold bag includes a mold bag body 101, transverse reinforcement ribs (or "reinforcement warp") 102, longitudinal reinforcement ribs (or "reinforcement weft") 103, vertical reinforcement ribs (or "hanging ribs") 104, and cells 105. The mold bag body 101 is bag-shaped, including a top surface, a bottom surface, and four surrounding covers. The transverse reinforcement ribs 102 and the longitudinal reinforcement ribs 103 are evenly arranged on the top surface of the mold bag body 101 to form a grid array; the transverse reinforcement ribs 102 and the longitudinal reinforcement ribs 103 are also evenly arranged on the bottom surface of the mold bag body 101 to form a grid array. 2 and longitudinal reinforcement ribs 103 to form a grid array; the vertical reinforcement ribs 104 are connected between the intersection of the grid array on the top surface of the mold bag body 101 and the intersection of the grid array on the bottom surface of the mold bag body 101 (that is, one end of the vertical reinforcement rib 104 is connected to the intersection of the transverse reinforcement ribs 102 and the longitudinal reinforcement ribs 103 on the top surface of the mold bag body 101, and the other end of the vertical reinforcement rib 104 is connected to the intersection of the transverse reinforcement ribs 102 and the longitudinal reinforcement ribs 103 on the bottom surface of the mold bag body 101); the structure of the cell 105 is shown in the attached Figure 4 It is an existing conventional product. The cell 105 is arranged inside the mold bag body 101, and plays the role of reinforcing ribs for the mortar in the mold bag body 101.

[0033] Furthermore, a filling port is provided on the top surface of the mold bag body 101 of the built-in cell-type mold bag 1 for filling the built-in cell-type mold bag 1 with coral mortar.

[0034] Preferably, the wave-breaking wall 2 is made of plain concrete or coral sand concrete.

[0035] Preferably, the block stone 4 is made of plain concrete or coral sand concrete.

[0036] The construction method of the above-mentioned bank protection structure of the present invention is as follows:

[0037] Step 1: Level the slope of the bank slope. The slope ratio shall not be steeper than the designed slope. If the flatness does not meet the requirements, gravel or small sand bags can be laid for leveling.

[0038] Step 2: laying 1-3 layers of geotextile on the bank slope, constructing a wave-blocking wall 2 on the top of the bank slope, and digging a groove area 3 at the bottom of the bank slope.

[0039] Step 3: laying the built-in cellular mold bag on the bank slope, so that the top of the built-in cellular mold bag 1 extends to the front position of the wave-breaking wall 2, and the bottom of the built-in cellular mold bag 1 extends to the groove area at the bottom of the bank slope.

[0040] Furthermore, when laying the built-in cell-type mold bag, first lay the bottom surface of the mold bag body 101, then lay the cell 105 on the bottom surface of the mold bag body 101, and then lay the top surface of the mold bag body 101, so that the cell 105 is sandwiched between the top and bottom surfaces of the mold bag body 101; then the top and bottom surfaces of the mold bag body 101 are connected around to form a surrounding cover, and the top and bottom surfaces are connected by vertical reinforcement ribs 104 (that is, the top end of the vertical reinforcement rib 104 is connected to the intersection of the transverse reinforcement rib 102 and the longitudinal reinforcement rib 103 on the top surface of the mold bag body 101, and the other end of the vertical reinforcement rib 104 is connected to the intersection of the transverse reinforcement rib 102 and the longitudinal reinforcement rib 103 on the bottom surface of the mold bag body 101), thereby constructing the built-in cell-type mold bag.

[0041] Furthermore, since there will be water at the bottom of the bank slope, it is necessary to first lay and construct the built-in cell-type mold bag 1 in the waterless shore area, and then move the constructed built-in cell-type mold bag 1 downward as a whole, so that the bottom of the built-in cell-type mold bag 1 moves to the groove area at the bottom of the bank slope.

[0042] Step 4: Fill the built-in cell-type mold bag 1 with coral mortar. The mold bag should be kept moist before filling. The filling should be done from bottom to top, cell by cell. The pump tube and the filling port of the mold bag should be fastened. When the pump tube is inserted into the filling port, a shock-reducing baffle should be installed at the pump tube port. The stress of the mold bag should be observed during the filling process. The filling flow rate should be (10-15) m 3 / h, the filling pressure should be (0.2~0.3)MPa.

[0043] Step 5, after the filling is completed, stones 4 are laid in the groove area at the bottom of the bank slope, so that the bottom of the built-in cell-type mold bag 1 is stably pressed in the stones 4.

[0044] The present invention is described above by way of example. It should be noted that, without departing from the core of the present invention, any simple deformation, modification or other equivalent replacement that can be made by those skilled in the art without inventive effort falls within the protection scope of the present invention.

Claims

1. A construction method for constructing a revetment structure using coral mortar combined with geocells, characterized in that: The following steps are involved: Step 1, leveling and sloping the bank slope; Step 2: laying geotextile on the bank slope, constructing a wave-blocking wall on the top of the bank slope, and digging a groove area at the bottom of the bank slope; Step 3, laying a built-in cell-type mold bag on the bank slope, so that the top of the built-in cell-type mold bag extends to the front position of the wave-breaking wall, and the bottom of the built-in cell-type mold bag extends to the groove area at the bottom of the bank slope; The built-in cell-type mold bag includes a mold bag body, transverse reinforcement ribs, longitudinal reinforcement ribs, vertical reinforcement ribs and cells. The mold bag body is bag-shaped, including a top surface, a bottom surface and four surrounding covers. The transverse reinforcement ribs and longitudinal reinforcement ribs are evenly arranged on the top surface of the mold bag body to form a grid array; the transverse reinforcement ribs and longitudinal reinforcement ribs are also evenly arranged on the bottom surface of the mold bag body to form a grid array; the vertical reinforcement ribs are connected between the intersection points of the grid array on the top surface of the mold bag body and the intersection points of the grid array on the bottom surface of the mold bag body; the cells are arranged inside the mold bag body. Step 4, filling the built-in cell-type mold bag with coral mortar; Step 5, after the filling is completed, stones are laid in the groove area at the bottom of the slope so that the bottom of the built-in cell-type mold bag is stably pressed in the stones.

2. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 1 is characterized by: In step 3, when laying the built-in cell-type mold bag, first lay the bottom surface of the mold bag body, then lay the cells on the bottom surface of the mold bag body, and then lay the top surface of the mold bag body, so that the cells are sandwiched between the top and bottom surfaces of the mold bag body; then connect the top and bottom surfaces of the mold bag body around to form a surrounding cover, and connect the top and bottom surfaces through vertical reinforcement ribs, thereby constructing the built-in cell-type mold bag.

3. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 2 is characterized by: In step 3, the built-in cellular mold bag is first laid and constructed in the waterless shore area, and then the built-in cellular mold bag is moved downward as a whole so that the bottom of the built-in cellular mold bag is moved to the groove area at the bottom of the slope.

4. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 1 is characterized by: The mold bag should be kept moist before filling. The filling should be carried out from bottom to top, compartment by compartment. When the pump tube is inserted into the filling port, a shock-reducing baffle should be installed at the pump tube port.

5. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 1 is characterized by: Filling flow rate is (10~15)m 3 / h, the filling pressure is (0.2~0.3)MPa.

6. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 1 is characterized by: The top surface of the mold bag body of the built-in cell-type mold bag is provided with a filling port for filling coral mortar into the built-in cell-type mold bag.

7. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 1 is characterized by: The wave-breaking wall is made of plain concrete or coral sand concrete.

8. The construction method of using coral mortar and geocell to construct a revetment structure according to claim 1 is characterized by: The blocks are made of plain concrete or coral sand concrete.

Citation Information

Patent Citations

  • Mold bag concrete slope protecting structure and rebar cage with anchoring structure

    CN107724334A

  • Anti-scouring ecological combined revetment and construction method thereof

    CN112112126A

  • Construction method of riverway balance environment-friendly river levee structure and river levee structure

    CN112431170A

  • Combined geotechnical mold bag for slope protection

    CN112813924A

  • Geosynthetic material reinforced coral sand inverted filter type seawall structure

    CN117926755A