Resin concrete drainage ditch internally provided with decontamination mechanism

By designing internal decontamination mechanisms, including leakage mechanisms and pipeline laying mechanisms in the resin concrete drainage ditch, the problems of blockage, deposition and installation instability in the docking and cleaning of the existing drainage ditches are solved, and efficient operation of the drainage system and surface flattening are achieved.

CN119663962AInactive Publication Date: 2025-03-21ANHUI YAJING RAINWATER UTILIZATION TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202510202688.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-24
Publication Date
2025-03-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the docking and cleaning of existing resin concrete drains, there are problems such as pipeline blockage, sedimentation of sludge, and unstable installation. Especially when the flow of people is large, it is easy to collapse, resulting in uneven roads.

Method used

A resin concrete drainage ditch with internal decontamination mechanism is designed, including a leakage mechanism and a pipeline laying mechanism. The leakage mechanism is laid on the same plane as the water leakage gate through the stone slab to ensure the surface is flat; the pipeline laying mechanism realizes the flexible laying and automatic overflow mechanism of the water-through pipe through the design of four-way pipes, bent pipes and connecting pipes.

Benefits of technology

It effectively solves the problems of pipeline blockage, sedimentation and instability, ensures efficient operation of the drainage system and surface flatness, and reduces cleaning time and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119663962A_ABST
    Figure CN119663962A_ABST
Patent Text Reader

Abstract

The invention discloses a resin concrete drainage ditch internally provided with a decontamination mechanism, and relates to the technical field of resin concrete drainage ditches, the resin concrete drainage ditch comprises a drainage mechanism, the upper end of the drainage mechanism is provided with a leakage mechanism, and one end of the drainage mechanism is provided with a pipeline laying mechanism for treating sundries and changing the laying route of the drainage mechanism. The stone plates are laid on the same plane with the upper end of the water leakage gate, so that the surface flatness is ensured, the safety and the comfort degree when pedestrians or vehicles pass through are improved, water can naturally flow into the water leakage gate, and the water accumulation phenomenon is not prone to being caused. Water permeates into the lower portion of the partition plate through the water leakage gate and flows into the water passing pipeline through the through holes, the path design effectively guides rainwater or other liquid to be rapidly drained away, long-time water accumulation on the ground is avoided, and the partition blocks are used for supporting the partition plate so as to prevent the partition plate from deforming or collapsing due to pressure of stone plates above and protect the partition plate from being damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of resin concrete drainage ditches, in particular to a resin concrete drainage ditch with a built-in dirt removal mechanism. Background Art

[0002] For example, the patent document with publication number CN208830445U is named as a resin concrete drainage ditch, which includes a long strip trough body made of resin concrete material, and a cover body made of resin concrete material and covered on the surface of the trough body, a long strip drainage trough is arranged in the trough body, a slot for the cover body to cover the top of the drainage trough, a grille for sewage to flow in is arranged on the cover body, at least one "U"-shaped reinforcement rib is fixedly arranged on the outer wall of the trough body, a "U"-shaped steel column is fixedly embedded in the "U"-shaped reinforcement rib, and a first reinforcement steel column arranged parallel to the length direction of the trough body is embedded in the first side wall of the trough body.

[0003] For example, the patent document with publication number CN210263293U is named as a resin concrete drainage ditch, including a ditch body part and a cover part made of resin concrete material. A collecting bin is arranged on the outer wall on the left side of the cover part, and the collecting bin is connected to a transverse pipe. A dust suction fan is arranged on the transverse pipe. A filter layer is arranged in each vertical pipe, and the filter layer is arranged at the lower end of the transverse pipe. Switch doors are arranged at the upper and lower ends of the collecting bin, and a pipe is connected to the switch door at the lower end. The pipe passes through the ditch body part and is connected to the U-shaped groove, which greatly improves the service life and pressure resistance, and also solves the problem that people cannot pick up dropped objects.

[0004] However, when optimizing the drainage systems in cities and public areas, it is necessary to re-connect the pipes. During the connection, the connection ports need to be replaced and connected to the old pipes. Moreover, the connected pipes are prone to blockage due to long-term use, and silt is easily deposited in the pipes. It takes a lot of time to check and clean the pipes during cleaning. Moreover, the surface of the installed pipes is prone to collapse when there is a large amount of traffic, resulting in uneven roads. Therefore, the present application provides a resin concrete drainage ditch with a built-in dirt removal mechanism to meet the needs. Summary of the invention

[0005] The purpose of the present application is to provide a resin concrete drainage ditch with a built-in dirt removal mechanism, which can effectively solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a resin concrete drainage ditch with a built-in dirt removal mechanism, comprising a drainage mechanism, a leakage mechanism is provided at the upper end of the drainage mechanism, and a pipe laying mechanism for handling debris and changing the laying route of the drainage mechanism is provided at one end of the drainage mechanism; The drainage mechanism comprises a water pipe, the upper end of which is provided with a connection groove, one end of which is provided with a first connection protrusion, and one end of which is provided with a first connection recess engaged with the first connection protrusion.

[0007] Among them, the leakage mechanism includes a buried cover plate mechanism, which includes a partition and a bottom plate. A plurality of partition blocks distributed at equal intervals are arranged on the upper end of the bottom plate. A plurality of through holes are opened on the upper end of the bottom plate, and the bottom plate is installed inside the connecting groove. A leakage grid is arranged on the upper end of the partition.

[0008] Among them, the leakage mechanism includes a buried treatment mechanism, and the buried treatment mechanism includes a top plate. Two mounting blocks are symmetrically arranged at the lower end of the top plate, a connecting plate is arranged between the two mounting blocks, a plurality of leakage grooves are opened at the upper end of the connecting plate, the mounting blocks are installed inside the connecting grooves, a convex pipe is arranged at the upper end of the top plate, and a plurality of leakage holes distributed at layer spacing are opened at the upper end of the convex pipe.

[0009] The leakage mechanism comprises a cover mechanism, which comprises a cover plate, which is installed inside the connecting groove, and a plurality of leakage grooves which are evenly spaced are provided on the upper end of the cover plate.

[0010] Among them, the leakage mechanism includes a curb drainage mechanism, which includes a convex brick installed inside the connecting groove, with a number of side water holes on both sides of the convex brick, inner groove blocks on both sides of the inner wall of the convex brick, and a perforated plate is commonly arranged inside the two inner groove blocks.

[0011] The pipeline laying mechanism includes a cross connection mechanism, which includes a four-way pipe, four corners of the four-way pipe are provided with connection protrusions, the middle part of the inner cavity of the four-way pipe is provided with an inner recessed groove, the connection protrusion is matched with the first connection recess, the upper end of the four-way pipe is provided with a first sealing cover, the interior of the first sealing cover is provided with a round cover, and the upper end of the round cover is provided with a plurality of inclined grooves distributed in a ring array; A setting groove is provided in the middle of the upper end of the round cover, a plurality of water seepage holes are provided in the bottom wall of the setting groove, and a sliding hole is provided in the middle of the bottom wall of the setting groove.

[0012] Among them, a sliding tube is slidably installed inside the sliding hole, a floating cover is arranged on the upper end of the sliding tube, a first support rod is slidably installed inside the sliding tube, a silt pipe is arranged at the bottom of the first support rod, the silt pipe is located inside the sunken groove, a plurality of tooth plates for retaining debris are arranged on the inner wall of the silt pipe, and a plurality of circular holes are opened on the outer surface of the silt pipe.

[0013] Among them, the pipeline laying mechanism includes a bending mechanism, the bending mechanism includes a bent pipe, one end of the bent pipe is provided with a second connecting protrusion, and the other end of the bent pipe is provided with a second connecting recess, the upper end of the bent pipe is provided with a bending cover, the second connecting protrusion cooperates with the first connecting recess, and the second connecting recess cooperates with the first connecting protrusion.

[0014] Among them, the inner wall of the curved pipe is provided with a groove, and a partition net is slidably installed inside the groove. The inner wall of the curved pipe is provided with an installation curved plate, and the inner wall of the installation curved plate is provided with several bottom plates, and multiple drainage holes are opened inside the several bottom plates.

[0015] The pipeline laying mechanism includes a pipeline diversion mechanism, which includes a connecting pipe, four corners of the connecting pipe are provided with clamping grooves, and the clamping grooves are matched with the first connecting protrusions, a plurality of equally spaced grid sheets are provided in the middle of the inner cavity of the connecting pipe, a second support rod is commonly provided in the middle of the plurality of grid sheets, and a second sealing cover is provided at the upper end of the connecting pipe; A bottom sealing plate is arranged on one side of the inner wall of the connecting pipe, a blocking plate is arranged on the inner wall of the bottom sealing plate, and a smashing groove is arranged on one side of the blocking plate.

[0016] In summary, the technical effects and advantages of the present invention are as follows: 1. The present invention lays the stone slab on the same plane as the upper end of the water-leakage grille, ensuring a smooth surface, improving the safety and comfort of pedestrians or vehicles passing by, and helping water to flow naturally into the water-leakage grille without causing water accumulation. Water penetrates through the water-leakage grille to the bottom of the partition and flows into the water pipe through the through hole. This path design effectively guides rainwater or other liquids to drain quickly, avoiding long-term water accumulation on the ground. The spacer is used to support the partition to prevent the pressure of the stone slab above from causing the partition to deform or collapse, thereby protecting the partition from damage.

[0017] 2. In the present invention, the stone slab is laid on the upper end of the top plate and maintains the same plane as the convex pipe, which not only ensures the flatness of the surface and improves the safety and comfort of pedestrians or vehicles passing by, but also allows rainwater or other liquids to flow smoothly into the leaking hole to avoid water accumulation. Water first enters the narrower convex pipe through the leaking hole, then flows to the top of the connecting plate, and finally flows into the water pipe through the leaking groove. This water flow path design ensures that sewage can be efficiently collected and discharged, while reducing the risk of blockage. The convex pipe is designed to be narrow and used to hide the leaking hole. It can effectively prevent larger objects from falling directly into the water pipe and protect the pipe from damage by foreign objects. The convex pipe is set as part of the supporting structure, which enhances the stability of the overall structure, especially when the top is under pressure (such as pedestrians, vehicles), it can prevent deformation or collapse. Since the convex pipe hides the leaking hole, it acts as a physical barrier to prevent debris from falling directly into the water pipe.

[0018] 3. In the present invention, by aligning the connection protrusion with the first connection recess, the installation direction of the water pipe can be easily changed, which can adapt to different terrains and layout requirements, reducing the cost and time of re-laying the pipe. The sewage enters the interior of the four-way pipe through the chute. When the sewage volume exceeds the processing capacity of the chute, the extra sewage will rush into the interior of the inlaid groove, triggering the floating cover to float up and drive the sliding pipe to slide, thereby opening the seepage hole, so that the excess sewage can flow into the four-way pipe through the seepage hole. This automatic overflow mechanism effectively prevents local water accumulation. The design of the floating cover uses the change of water level to automatically control the water flow path, and can effectively manage the sewage discharge under different flow conditions without manual intervention. When it is necessary to clean the debris inside the drainage ditch, it can be operated by removing the round cover and pulling out the sludge pipe. This design simplifies the cleaning process, and the staff can directly remove the sediment and floating debris. The inner groove is used to precipitate heavier stones and sludge, and the barbs on the tooth plate hook the debris floating on the water surface, which not only helps to separate different types of pollutants, but also prevents larger objects from entering the water pipe, reducing the risk of blockage. Due to the establishment of a special sedimentation area (recessed groove) and filtering device (tooth plate), most of the debris is blocked outside, preventing them from penetrating into the pipeline and causing blockage, reducing the time and workload required for troubleshooting due to pipeline blockage.

[0019] 4. In the present invention, by connecting the second connecting protrusion to the inside of the first connecting recess, and connecting the first connecting protrusion to the inside of the second connecting recess, the laying direction of the water pipe can be flexibly adjusted, and it can also adapt to complex terrain changes, reducing the cost and time of re-laying the pipe. The sewage flows through the curved pipe, and the installation curved piece is arranged in an angle shape and is stuck inside the curved pipe, while the bottom piece is an arc-shaped U-shape, which can effectively retain debris that sinks to the bottom of the water, ensuring that larger particles or heavy objects in the sewage will not directly enter the subsequent pipes. The partition net is arranged inside the curved pipe to block debris floating on the water surface. This not only prevents floating objects from entering the water pipe and causing blockage, but also reduces maintenance problems caused by accumulation of debris. The design of the bottom film allows heavy objects in the sewage to be retained inside the elbow, while clean water is discharged through the drain hole, optimizing the water flow path, ensuring smooth water flow, and improving the system's processing efficiency. When it is necessary to clean up debris, just open the elbow cover, then take out the partition and installation elbow from the inside of the elbow to quickly clean up the debris in the pipe; due to the provision of a special sedimentation area (bottom film) and filtration device (partition screen), most of the debris is effectively intercepted, preventing them from penetrating into the pipe and causing blockage, reducing the time and workload required for troubleshooting due to pipe blockage.

[0020] 5. The present invention installs the bottom sealing plate inside the connecting pipe and uses a plugging plate to plug the pipe, so that the connecting pipe can adapt to different installation direction requirements. This design provides great flexibility, allowing subsequent pipes to be connected according to actual needs without having to re-lay or modify existing pipes. The design of the plugging plate and the punching groove simplifies the process of subsequent pipe laying. When a new pipe is needed, it is only necessary to knock open the plugging plate. In particular, by changing the wall thickness through the punching groove, the operation is easier and the construction difficulty and time cost are reduced. The grid is designed to be in the middle of the connecting pipe to perform layered barrier treatment on the debris passing through the connecting pipe. The grids are stacked and the mesh holes thereon will not hinder the flow of sewage, but can effectively intercept larger particles to prevent them from entering the subsequent pipes and causing blockages. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without paying any creative work.

[0022] Figure 1 It is a schematic diagram of the three-dimensional structure of the first embodiment of the leakage mechanism and the pipeline laying mechanism; Figure 2 It is a schematic diagram of the three-dimensional structure of the second embodiment of the pipeline laying mechanism; Figure 3 It is a schematic diagram of the three-dimensional structure of the third embodiment of the pipeline laying mechanism; Figure 4 It is a schematic diagram of the three-dimensional structure of the second embodiment of the leakage mechanism; Figure 5 It is a schematic diagram of the three-dimensional structure of the third embodiment of the leakage mechanism; Figure 6 It is a schematic diagram of the three-dimensional structure of the fourth embodiment of the leakage mechanism; Figure 7 It is a schematic diagram of the three-dimensional connection structure of the drainage mechanism; Figure 8 It is a schematic diagram of the three-dimensional connection structure of the cover mechanism; Fig. 9 It is an exploded view of the three-dimensional connection structure of the buried cover plate mechanism; Fig.10 It is an exploded view of the three-dimensional connection structure of the buried processing mechanism; Fig.11 It is an exploded diagram of the three-dimensional connection structure of the curb drainage mechanism; Fig.12 It is a schematic diagram of the three-dimensional connection structure of the cross connection mechanism; Fig.13Schematic diagram of the three-dimensional connection structure of the four-way pipe; Fig.14 It is a cross-sectional view of the three-dimensional connection structure of the cross connection mechanism; Fig.15 It is a schematic diagram of the three-dimensional connection structure of the round cover; Fig.16 It is a schematic diagram of a partial three-dimensional connection structure of a cross connection mechanism; Fig.17 It is an exploded diagram of the three-dimensional connection structure of the pipe bending mechanism; Fig.18 It is a schematic diagram of a local three-dimensional connection structure of a pipe bending mechanism; Fig.19 A schematic diagram of the three-dimensional connection structure for installing the bending piece and the bottom piece; Fig. 20 It is an exploded view of the three-dimensional connection structure of the pipeline diversion mechanism; Fig.21 It is a schematic diagram of the three-dimensional connection structure of the connecting pipe and the grid plate; Fig. 22 It is a schematic diagram of the three-dimensional connection structure of the connecting pipe and the blocking plate.

[0023] In the figure: 1, drainage mechanism; 11, water pipe; 12, connecting groove; 13, first connecting convex; 14, first connecting concave; 2, cross connecting mechanism; 21, four-way pipe; 22, sunken groove; 23, connecting convex block; 24, first cover; 25, round cover; 26, inclined groove; 27, floating cover; 28, silt pipe; 29, first support rod; 211, tooth plate; 212, round hole; 213, inlay groove; 214, seepage hole; 215, sliding hole; 216, sliding pipe; 3, cover plate mechanism; 31, cover plate; 32, leaking groove; 4, pipeline diversion mechanism; 41, connecting pipe; 42, clamping groove; 43, second cover; 44, grid; 45 , second support rod; 46, blocking plate; 47, bottom sealing plate; 48, smashing groove; 5, bending pipe mechanism; 51, bending pipe; 52, second connecting convex; 53, second connecting concave; 54, bending cover; 55, engaging groove; 56, partition net; 57, installation bending piece; 58, bottom plate; 59, drainage hole; 6, buried cover plate mechanism; 61, partition; 62, leaking grille; 63, bottom plate; 64, through hole; 65, partition block; 7, buried treatment mechanism; 71, top plate; 72, leaking hole; 73, convex pipe; 74, installation block; 75, connecting plate; 76, leaking groove; 9, curb drainage mechanism; 91, convex brick; 92, side water hole; 93, inner groove block; 94, orifice plate. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Example 1, Reference Figures 1 to 22 A resin concrete drainage ditch with a built-in decontamination mechanism is shown, comprising a drainage mechanism 1, a leakage mechanism is provided at the upper end of the drainage mechanism 1, and a pipe laying mechanism for handling debris and changing the laying route of the drainage mechanism 1 is provided at one end of the drainage mechanism 1; It is worth mentioning that when installing the resin concrete drainage ditch, the leakage mechanism is installed on the upper end of the drainage mechanism 1. When the laying direction of the drainage mechanism 1 needs to be changed, the pipeline diversion mechanism 4 is connected to the drainage mechanism 1. The set pipe laying mechanism is used to change the laying direction of the drainage mechanism 1, and the set pipe laying mechanism is internally provided with a decontamination mechanism. When the pipe of the drainage mechanism 1 is congested, the pipe laying mechanism is opened. The pipe laying mechanism is used to accumulate debris to prevent the debris from clogging the inside of the drainage mechanism 1, to avoid checking the pipeline due to the blockage of the drainage mechanism 1. The staff can open the pipe laying mechanism to directly clean up the accumulated debris, to avoid wasting cleaning time in pipeline inspection.

[0026] Among them, the design of connecting the pipeline diversion mechanism 4 with the drainage mechanism 1 allows the drainage path to be adjusted according to actual needs. The flexibility is helpful for coping with changes in the construction site or subsequent maintenance and expansion, and can reduce the cost and time of re-laying the drainage pipes.

[0027] The built-in dirt removal mechanism can collect debris by opening the pipe laying mechanism when the drainage mechanism 1 is blocked, thereby protecting the drainage mechanism 1 from blockage, reducing the cleaning workload, and making the cleaning process more direct and efficient.

[0028] Embodiment 2: Based on the leakage mechanism provided in Embodiment 1, this embodiment provides a specific technical solution of the cover mechanism 3.

[0029] The drainage mechanism 1 comprises a water pipe 11 , which has a connection groove 12 at its upper end, a first connection protrusion 13 at one end of the water pipe 11 , and a first connection recess 14 engaged with the first connection protrusion 13 at one end of the water pipe 11 .

[0030] The leakage mechanism comprises a cover mechanism 3, which comprises a cover 31. The cover 31 is installed inside the connecting groove 12, and a plurality of leakage grooves 32 distributed at equal intervals are formed at the upper end of the cover 31.

[0031] It is worth noting that when installing the cover plate 31, the cover plate 31 is installed in the connecting groove 12, and the water pipe 11 is buried in the paved soil. When installing the cover plate 31, the upper end of the cover plate 31 needs to be in the same plane as the paved road. When in use, water flows into the interior of the water pipe 11 through the leakage groove 32.

[0032] Embodiment 3: Based on the leakage mechanism provided in embodiment 1, this embodiment provides a further technical solution of burying the cover plate mechanism 6.

[0033] The leakage mechanism includes an embedded cover mechanism 6, which includes a partition 61 and a bottom plate 63. A plurality of partition blocks 65 distributed at equal intervals are arranged at the upper end of the bottom plate 63. A plurality of through holes 64 are opened at the upper end of the bottom plate 63, and the bottom plate 63 is installed inside the connecting groove 12. A water leakage grid 62 is arranged at the upper end of the partition 61.

[0034] It is worth mentioning that during installation, the bottom plate 63 is installed in the connecting groove 12, and then the stone slab is laid on the partition 61. The laying process requires that the stone slab and the upper end of the leaking grid 62 are in the same plane. When in use, water penetrates into the bottom of the partition 61 through the leaking grid 62, and the water flows into the inside of the water pipe 11 through the through hole 64. The set spacer 65 is used to support the partition 61 to prevent the stone slab installed above the partition 61 from pressing on the partition 61 to cause the partition 61 to deform or collapse, and to prevent the installation road surface from being rugged. In addition, the set bottom plate 63 and the leaking grid 62 can prevent objects falling from the gap of the leaking grid 62 from falling directly into the inside of the water pipe 11.

[0035] The stone slab is laid on the same plane as the upper end of the leaking fence 62, which ensures a smooth surface, improves the safety and comfort of pedestrians or vehicles passing by, and helps water to flow naturally into the leaking fence 62 without causing water accumulation.

[0036] Water seeps into the bottom of the partition 61 through the leaky grid 62 and flows into the water pipe 11 through the through hole 64. This path design effectively guides rainwater or other liquids to drain away quickly to avoid long-term water accumulation on the ground. The partition block 65 is used to support the partition 61 to prevent the pressure of the stone slab above from causing the partition to deform or collapse, thereby protecting the partition from damage.

[0037] The design of the bottom plate 63 and the leaking grille 62 works together to effectively prevent larger objects from falling directly into the water pipe 11 through the gap in the leaking grille, thereby reducing the risk of pipe blockage.

[0038] Embodiment 4: Based on the leakage mechanism provided in embodiment 1, this embodiment provides a further technical solution of burying the treatment mechanism 7.

[0039] The leakage mechanism includes a buried treatment mechanism 7, which includes a top plate 71. Two mounting blocks 74 are symmetrically arranged at the lower end of the top plate 71. A connecting plate 75 is arranged between the two mounting blocks 74. A plurality of leakage grooves 76 are opened at the upper end of the connecting plate 75. The mounting blocks 74 are installed inside the connecting grooves 12. A convex pipe 73 is arranged at the upper end of the top plate 71. A plurality of leakage holes 72 distributed at layer spacing are opened at the upper end of the convex pipe 73.

[0040] It is worth mentioning that when in use, the mounting block 74 is installed in the connecting groove 12. During installation, the stone slab needs to be laid on the upper end of the top plate 71. When laying the stone slab, the stone slab must be in the same plane as the convex pipe 73. When treating sewage, water enters the interior of the convex pipe 73 through the leakage hole 72, and the water enters the top of the connecting plate 75 through the convex pipe 73. Finally, the water flows into the interior of the water pipe 11 through the leakage groove 76. The convex pipe 73 is set to be relatively narrow to hide the leakage hole 72 to prevent dropped objects from falling into the water pipe 11.

[0041] Among them, the stone slab is laid on the upper end of the top plate 71 and maintains the same plane as the convex pipe 73, which not only ensures the flatness of the surface and improves the safety and comfort of pedestrians or vehicles passing by, but also allows rainwater or other liquids to flow smoothly into the leakage hole 72 to avoid water accumulation problems.

[0042] Water first enters the narrower convex pipe 73 through the leakage hole 72, then flows to the top of the connecting plate 75, and finally flows into the water pipe 11 through the leakage groove 76. This water flow path design ensures that sewage can be efficiently collected and discharged while reducing the risk of blockage.

[0043] The convex pipe 73 is designed to be relatively narrow and is used to hide the leakage hole 72. It can effectively prevent larger objects from falling directly into the water pipe 11 and protect the pipe from damage by foreign objects. The convex pipe 73 is set as part of the supporting structure, which enhances the stability of the overall structure, especially when the top is under pressure such as pedestrians and vehicles, it can prevent deformation or collapse. Since the convex pipe 73 hides the leakage hole 72, it acts as a physical barrier to prevent debris from falling directly into the water pipe 11.

[0044] Embodiment 5: Based on the leakage mechanism provided in Embodiment 1, this embodiment provides a further technical solution for the curb drainage mechanism 9.

[0045] The leakage mechanism includes a curb drainage mechanism 9, which includes a convex brick 91 installed inside the connecting groove 12, with a plurality of side water holes 92 on both sides of the convex brick 91, inner groove blocks 93 on both sides of the inner wall of the convex brick 91, and a perforated plate 94 is commonly provided inside the two inner groove blocks 93.

[0046] It is worth mentioning that when installing the resin concrete drainage ditch on the park road section, the convex brick 91 is installed in the connecting groove 12. The convex brick 91 is triangular in shape and can serve as the curb of the road surface. The sewage on the road enters the interior of the convex brick 91 through the side water hole 92, and the orifice plate 94 is in a water-permeable honeycomb shape. Water penetrates into the interior of the water pipe 11 through the orifice plate 94.

[0047] Among them, the convex brick 91 is designed to be triangular in shape, which can act as a curb of the road surface. It not only provides the definition of the road edge, but also enhances the safety and guidance of the road. The sewage on the road enters the convex brick 91 through the side water hole 92, which can quickly and effectively collect surface water and prevent the formation of water accumulation, thereby ensuring the safe passage of pedestrians and vehicles. The orifice plate 94 adopts a honeycomb shape design, which greatly increases the water penetration area. The honeycomb structure not only improves the water flow efficiency, but also evenly disperses the water flow and reduces local pressure. Its porous characteristics also play a certain filtering role, preventing larger particulate matter from entering the water pipe 11. Due to the existence of the orifice plate 94, it plays a preliminary filtering role, preventing larger solid waste from falling directly into the water pipe 11, reducing the possibility of pipe blockage.

[0048] Embodiment 6: Based on the pipeline laying mechanism provided in Embodiment 1, this embodiment provides a further technical solution for the cross connection mechanism 2.

[0049] The pipeline laying mechanism includes a cross connection mechanism 2, which includes a four-way pipe 21, four corners of which are provided with connection protrusions 23, a sunken groove 22 is provided in the middle of the inner cavity of the four-way pipe 21, the connection protrusion 23 is matched with the first connection recess 14, a first sealing cover 24 is provided at the upper end of the four-way pipe 21, a round cover 25 is provided inside the first sealing cover 24, and a plurality of inclined grooves 26 distributed in a ring array are opened at the upper end of the round cover 25; An inlay groove 213 is formed in the middle of the upper end of the circular cover 25 . A plurality of water seepage holes 214 are formed in the bottom wall of the inlay groove 213 . A sliding hole 215 is formed in the middle of the bottom wall of the inlay groove 213 .

[0050] A sliding tube 216 is slidably installed inside the sliding hole 215, a floating cover 27 is provided at the upper end of the sliding tube 216, a first support rod 29 is slidably installed inside the sliding tube 216, a silt pipe 28 is provided at the bottom of the first support rod 29, the silt pipe 28 is located inside the sunken groove 22, a plurality of tooth plates 211 for retaining debris are provided on the inner wall of the silt pipe 28, and a plurality of circular holes 212 are opened on the outer surface of the silt pipe 28.

[0051] It is worth noting that when the installation direction of the water pipe 11 needs to be changed during installation, the connection protrusion 23 is aligned with the first connection recess 14. When sewage is treated, the sewage enters the interior of the four-way pipe 21 through the inclined groove 26. When there is too much sewage, the inclined groove 26 cannot treat more sewage, and the sewage rushes into the interior of the inlay groove 213. The floating cover 27 floats up due to the water rushing into the interior of the inlay groove 213. The floating cover 27 drives the slide pipe 216 to slide inside the slide hole 215. The slide hole 215 slides on the outer surface of the first support rod 29. At this time, the floating cover 27 cannot cover the seepage hole 214 due to floating, so that the sewage flows into the interior of the four-way pipe 21 through the seepage hole 214. When it is necessary to clean the debris inside the resin concrete drainage ditch, the round cover 25 is taken out from the inside of the first cover 24, and the floating cover 27 drives the first support rod 29 to pull the sludge pipe 28 out from the inside of the sunken groove 22. The sunken groove 22 is used to precipitate the heavier stones and sludge in the water pipe 11, and the debris floating on the water surface is retained on the surface of the tooth plate 211. The tooth plate 211 is provided with a barb that can hook the debris, preventing the debris from floating and accumulating in the water pipe 11. If the water pipe 11 is blocked, it needs to be checked and wastes time.

[0052] Among them, by aligning the connecting protrusion 23 with the first connecting recess 14, the installation direction of the water pipe 11 can be easily changed, which can adapt to different terrains and layout requirements and reduce the cost and time of re-laying the pipe. The sewage enters the inside of the four-way pipe 21 through the inclined groove 26. When the amount of sewage exceeds the processing capacity of the inclined groove 26, the additional sewage will rush into the inlay groove 213, triggering the floating cover 27 to float up and drive the sliding pipe 216 to slide, thereby opening the seepage hole 214, so that the excess sewage can flow into the four-way pipe 21 through the seepage hole. This automatic overflow mechanism effectively prevents local water accumulation. The design of the floating cover 27 utilizes water level changes to automatically control the water flow path, and can effectively manage sewage discharge under different flow conditions without human intervention.

[0053] When it is necessary to clean the debris inside the drainage ditch, the operation can be performed by removing the round cover 25 and pulling out the sludge pipe 28. This design simplifies the cleaning process, and the staff can directly remove the sediment and floating debris. The inner groove 22 is used to settle the heavier stones and sludge, and the barbs on the tooth plate 211 hook the debris floating on the water surface, which not only helps to separate different types of pollutants, but also prevents larger objects from entering the water pipe 11, reducing the risk of blockage.

[0054] Since the special sedimentation zone inner groove 22 and the filter device tooth plate 211 are provided, most of the debris are blocked outside, preventing them from penetrating into the pipeline and causing blockage, thereby reducing the time and workload required for troubleshooting due to pipeline blockage.

[0055] Embodiment 7: Based on the pipeline laying mechanism provided in Embodiment 1, this embodiment provides a further technical solution for the pipe bending mechanism 5 .

[0056] The pipeline laying mechanism includes a pipe bending mechanism 5, which includes a bent pipe 51. A second connecting protrusion 52 is provided at one end of the bent pipe 51, and a second connecting recess 53 is provided at the other end of the bent pipe 51. A bending cover 54 is provided at the upper end of the bent pipe 51. The second connecting protrusion 52 cooperates with the first connecting recess 14, and the second connecting recess 53 cooperates with the first connecting protrusion 13.

[0057] The inner wall of the curved pipe 51 is provided with a groove 55, and a partition net 56 is slidably installed inside the groove 55. The inner wall of the curved pipe 51 is provided with a mounting bent piece 57, and the inner wall of the mounting bent piece 57 is provided with a plurality of bottom pieces 58, and a plurality of drainage holes 59 are opened inside the plurality of bottom pieces 58.

[0058] It is worth noting that when the laying direction of the water pipe 11 needs to be changed, the second connecting protrusion 52 needs to be connected to the inside of the first connecting recess 14, and the first connecting protrusion 13 needs to be connected to the inside of the second connecting recess 53. When treating sewage, the sewage flows through the elbow 51, and the installation bent piece 57 is arranged in an angle shape and is stuck in the inside of the elbow 51, and the bottom piece 58 is arranged in an arc-shaped U shape. The bottom piece 58 is arranged to retain the sundries sunken in the sewage in the inside of the elbow 51, and the water is discharged through the drainage hole 59, while the sundries floating in the water are blocked by the partition 56 when passing through the elbow 51; When it is necessary to clean up the debris, the bent cover 54 is opened, and then the partition net 56 and the installation bent piece 57 are taken out from the inside of the bent pipe 51, so that the debris in the pipeline can be quickly cleaned up.

[0059] Among them, by connecting the second connecting protrusion 52 to the inside of the first connecting recess 14, and connecting the first connecting protrusion 13 to the inside of the second connecting recess 53, the laying direction of the water pipe 11 can be flexibly adjusted, and it can also adapt to complex terrain changes, reducing the cost and time of re-laying the pipe. The sewage flows through the curved pipe 51, and the installation curved piece 57 is arranged in an angle shape and is stuck in the curved pipe 51, while the bottom piece 58 is an arc-shaped U-shape, which can effectively retain debris that sinks to the bottom of the water, ensuring that larger particles or heavy objects in the sewage will not directly enter the subsequent pipelines. The partition net 56 is arranged inside the curved pipe 51 to block debris floating on the water surface. This not only prevents floating objects from entering the water pipe 11 and causing blockage, but also reduces maintenance problems caused by accumulation of debris.

[0060] The design of the bottom sheet 58 allows the heavy objects in the sewage to be retained inside the elbow 51, while the clean water is discharged through the drainage hole 59, which optimizes the water flow path, ensures the smooth water flow, and improves the processing efficiency of the system. When it is necessary to clean up the debris, just open the elbow cover 54, and then take out the partition net 56 and the installation elbow sheet 57 from the elbow 51, and the debris in the pipe can be quickly cleaned up; Since a special sedimentation area bottom film 58 and a filter device screen 56 are provided, most of the debris is effectively intercepted, preventing them from penetrating into the pipeline and causing blockage, thereby reducing the time and workload required for troubleshooting due to pipeline blockage.

[0061] Embodiment 8: Based on the pipeline laying mechanism provided in Embodiment 1, this embodiment provides a further technical solution for the pipeline diversion mechanism 4.

[0062] The pipeline laying mechanism includes a pipeline diversion mechanism 4, which includes a connecting pipe 41, and the four corners of the connecting pipe 41 are provided with a clamping groove 42, and the clamping groove 42 is matched with the first connecting protrusion 13, and a plurality of equally spaced grid sheets 44 are provided in the middle of the inner cavity of the connecting pipe 41, and a second support rod 45 is commonly provided in the middle of the plurality of grid sheets 44, and a second cover 43 is provided at the upper end of the connecting pipe 41; A bottom sealing plate 47 is disposed on one side of the inner wall of the connecting pipe 41 , a blocking plate 46 is disposed on the inner wall of the bottom sealing plate 47 , and a punching groove 48 is formed on one side of the blocking plate 46 .

[0063] It is worth noting that when the installed water pipe 11 requires a three-interface pipe, the bottom sealing plate 47 is installed inside the connecting pipe 41 by cement, and the provided blocking plate 46 is used to block the pipe, so that the connecting pipe 41 can correspond to pipes in different installation directions. When it is necessary to lay a pipe that is connected to the connecting pipe 41 later, the blocking plate 46 can be knocked open, and the provided smashing groove 48 can change the wall thickness of the blocking plate 46. When the pipe is laid later, the internal pipe of the connecting pipe 41 can flow by knocking open the smashing groove 48, and the grid sheet 44 is designed to be in the middle of the connecting pipe 41. When debris passes through the connecting pipe 41, it is layered and blocked by the grid sheet 44. The grid sheets 44 are stacked, and the mesh holes on the grid sheets 44 will not hinder the flow of sewage. When cleaning the grid sheets 44, you only need to open the second sealing cover 43 to take out the grid sheets 44 for cleaning.

[0064] The bottom sealing plate 47 is installed inside the connecting pipe 41, and the pipe is blocked by the blocking plate 46, so that the connecting pipe 41 can adapt to different installation direction requirements. This design provides great flexibility, allowing subsequent pipes to be connected according to actual needs without having to re-lay or modify existing pipes.

[0065] The design of the plugging plate 46 and the punching groove 48 simplifies the subsequent pipeline laying process. When a new pipeline is needed, it is only necessary to knock open the plugging plate 46. In particular, by changing the wall thickness through the punching groove 48, the operation is easier and the construction difficulty and time cost are reduced. The grating 44 is designed to be located in the middle of the connecting pipe 41 to perform layered barrier treatment on the debris passing through the connecting pipe 41. The gratings 44 are stacked and the mesh holes thereon will not hinder the flow of sewage, but can effectively intercept larger particles to prevent them from entering the subsequent pipelines and causing blockages.

[0066] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A resin concrete drainage ditch with a built-in dirt removal mechanism, comprising a drainage mechanism (1), characterized in that: The upper end of the drainage mechanism (1) is provided with a leakage mechanism, and one end of the drainage mechanism (1) is provided with a pipe laying mechanism for handling debris and changing the laying route of the drainage mechanism (1); The drainage mechanism (1) comprises a water pipe (11), the water pipe (11) having a connection groove (12) at the upper end, a first connection protrusion (13) at one end of the water pipe (11), and a first connection recess (14) engaged with the first connection protrusion (13) at one end of the water pipe (11).

2. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The leakage mechanism comprises an embedded cover plate mechanism (6), the embedded cover plate mechanism (6) comprising a partition plate (61) and a bottom plate (63), a plurality of partition blocks (65) distributed at equal intervals are arranged at the upper end of the bottom plate (63), a plurality of through holes (64) are opened at the upper end of the bottom plate (63), and the bottom plate (63) is installed inside the connecting groove (12), and a water leakage grid (62) is arranged at the upper end of the partition plate (61).

3. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The leakage mechanism comprises a buried treatment mechanism (7), the buried treatment mechanism (7) comprises a top plate (71), two mounting blocks (74) are symmetrically arranged at the lower end of the top plate (71), a connecting plate (75) is arranged between the two mounting blocks (74), a plurality of leakage grooves (76) are opened at the upper end of the connecting plate (75), the mounting blocks (74) are installed inside the connecting grooves (12), a convex pipe (73) is arranged at the upper end of the top plate (71), and a plurality of leakage holes (72) distributed at layer spacing are opened at the upper end of the convex pipe (73).

4. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The leakage mechanism comprises a cover plate mechanism (3), the cover plate mechanism (3) comprises a cover plate (31), the cover plate (31) is installed inside the connecting groove (12), and a plurality of leakage grooves (32) distributed at equal intervals are formed at the upper end of the cover plate (31).

5. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The leakage mechanism comprises a curb drainage mechanism (9), the curb drainage mechanism (9) comprising a convex brick (91) installed inside a connection groove (12), a plurality of side water holes (92) being provided on both sides of the convex brick (91), inner groove blocks (93) being provided on both sides of the inner wall of the convex brick (91), and a perforated plate (94) being provided inside the two inner groove blocks (93).

6. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The pipeline laying mechanism comprises a cross connection mechanism (2), the cross connection mechanism (2) comprises a four-way pipe (21), four corners of the four-way pipe (21) are provided with connection protrusions (23), the middle part of the inner cavity of the four-way pipe (21) is provided with an inner recessed groove (22), the connection protrusion (23) is matched with a first connection recess (14), the upper end of the four-way pipe (21) is provided with a first sealing cover (24), the interior of the first sealing cover (24) is provided with a round cover (25), and the upper end of the round cover (25) is provided with a plurality of inclined grooves (26) distributed in a ring array; A mounting groove (213) is provided in the middle of the upper end of the circular cover (25), a plurality of water seepage holes (214) are provided in the bottom wall of the mounting groove (213), and a sliding hole (215) is provided in the middle of the bottom wall of the mounting groove (213).

7. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 6, characterized in that: A sliding tube (216) is slidably mounted inside the sliding hole (215), a floating cover (27) is provided at the upper end of the sliding tube (216), a first support rod (29) is slidably mounted inside the sliding tube (216), a sludge tube (28) is provided at the bottom of the first support rod (29), the sludge tube (28) is located inside the sunken groove (22), a plurality of tooth plates (211) for retaining debris are provided on the inner wall of the sludge tube (28), and a plurality of circular holes (212) are provided on the outer surface of the sludge tube (28).

8. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The pipeline laying mechanism comprises a pipe bending mechanism (5), the pipe bending mechanism (5) comprising a bent pipe (51), one end of the bent pipe (51) being provided with a second connecting protrusion (52), and the other end of the bent pipe (51) being provided with a second connecting recess (53), the upper end of the bent pipe (51) being provided with a bent cover (54), the second connecting protrusion (52) being matched with the first connecting recess (14), and the second connecting recess (53) being matched with the first connecting protrusion (13).

9. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 8, characterized in that: The inner wall of the curved pipe (51) is provided with a groove (55), a partition net (56) is slidably mounted inside the groove (55), the inner wall of the curved pipe (51) is provided with a mounting bent sheet (57), the inner wall of the mounting bent sheet (57) is provided with a plurality of bottom sheets (58), and a plurality of drainage holes (59) are provided inside each of the bottom sheets (58).

10. The resin concrete drainage ditch with a built-in dirt removal mechanism according to claim 1, characterized in that: The pipeline laying mechanism comprises a pipeline diversion mechanism (4), the pipeline diversion mechanism (4) comprises a connecting pipe (41), four corners of the connecting pipe (41) are provided with a clamping groove (42), and the clamping groove (42) cooperates with the first connecting protrusion (13), a plurality of grid plates (44) distributed at equal intervals are provided in the middle of the inner cavity of the connecting pipe (41), a second support rod (45) is commonly provided in the middle of the plurality of grid plates (44), and a second sealing cover (43) is provided at the upper end of the connecting pipe (41); A bottom sealing plate (47) is provided on one side of the inner wall of the connecting pipe (41), a blocking plate (46) is provided on the inner wall of the bottom sealing plate (47), and a punching groove (48) is provided on one side of the blocking plate (46).

Citation Information

Patent Citations

  • Resin concrete drainage ditch

    CN208830445U

  • Resin concrete drainage ditch

    CN210263293U

  • Heart-shaped water tank

    CN107761908A

  • Composite resin drainage ditch with corner splicing structure and splicing method thereof

    CN115613672A

  • Water drainage well cover

    CN201080650Y