Basement outer wall leakage area repairing structure

By setting grouting holes for cement-based grouting material and water-stopping adhesive in the leakage area of ​​the basement exterior wall, combined with water-stopping curtain and waterproof coating layer, a comprehensive waterproofing system is formed, which solves the leakage problem of the basement exterior wall and improves its durability and waterproofing performance.

CN221798519UActive Publication Date: 2024-10-01MCC SOUTH (WUHAN) CONSTR DESIGN CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323391276.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-10-01
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

The existing basement exterior wall waterproofing structure has poor durability and ineffective waterproofing, making it prone to secondary leakage and affecting the overall quality of the building.

Method used

A first grouting hole is installed through the leakage area of ​​the exterior wall and filled with cement-based grout to form a water-blocking layer. A second grouting hole is then filled with a water-stopping adhesive layer to form a waterproof layer. A water-stopping curtain is installed on the back of the exterior wall, and a waterproof coating layer and a composite fiber cloth layer are applied to the surface to form a comprehensive waterproof system.

Benefits of technology

It improves the waterproof performance of the exterior wall, prevents secondary leakage, enhances corrosion resistance and durability, and ensures the long-term effectiveness of the repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798519U_ABST
    Figure CN221798519U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building construction, and particularly provides a basement outer wall leakage area repairing structure which comprises an outer wall. A plurality of first grouting holes penetrating through the outer wall are formed in the leakage area of the outer wall; the first grouting hole is filled with a cement-based grouting material; an external line is arranged on the periphery of the leakage area; a plurality of second grouting holes penetrating through the outer wall are formed between the external line and the leakage area; the second grouting holes are filled with water stop glue. The first grouting holes filled with the cement-based grouting materials are formed in the leakage area of the outer wall to form the water blocking layer, the places where soil of the basement outer wall is seriously lost are coagulated and reinforced, and the service life after repairing is prolonged. And a waterproof layer is formed by the second grouting hole filled with the water stop glue layer, the repairing and reinforcing effects are achieved, the waterproof layer is matched with a water blocking layer formed by the first grouting hole, a waterproof system is formed, the waterproof performance of the outer wall is improved, and secondary leakage is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and in particular relates to a repair structure for a leakage zone of a basement outer wall. Background Art

[0002] With the rapid development of the construction industry, most modern buildings are designed with basements, and the number of designed basement floors is also increasing. Therefore, during the initial structural pouring process, due to the long construction period of large-volume concrete in the basement and frequent night construction, it is difficult to ensure the quality of the basement concrete construction. When the quality of the underground exterior wall is uneven, the increase in groundwater pressure will cause the exterior wall to be squeezed, and leakage points will be formed.

[0003] The existing exterior wall anti-seepage repair structure generally involves painting waterproof materials on the wall base or pasting waterproof membranes, and then pasting foam protective plates. This structure has the disadvantages of poor durability, poor anti-seepage effect, and prone to secondary leakage. In serious cases, it is very easy to affect the overall quality of the building. Utility Model Content

[0004] The utility model aims to overcome the problems of poor durability, poor anti-seepage effect and easy secondary leakage in the prior art.

[0005] To this end, the utility model provides a basement exterior wall leakage area repair structure, including an exterior wall; a plurality of first grouting holes penetrating the exterior wall are arranged in the leakage area of ​​the exterior wall; the first grouting holes are filled with cement-based grouting material; an outer line is provided on the periphery of the leakage area; a plurality of second grouting holes penetrating the exterior wall are arranged between the outer line and the leakage area; the second grouting holes are filled with a waterproof adhesive layer.

[0006] Specifically, the above-mentioned basement outer wall leakage area repair structure also includes a water-stop curtain; the water-stop curtain is arranged on the side of the outer wall away from the basement.

[0007] Specifically, the first grouting holes are arranged in a plum blossom shape in the leakage area of ​​the outer wall.

[0008] Specifically, the second grouting holes are arranged in a crisscross pattern between the outer line and the leakage area.

[0009] Specifically, a waterproof coating layer is coated on the side of the outer wall facing the basement; the waterproof coating layer covers the leakage area.

[0010] Specifically, the waterproof coating layer is a cement-based penetrating crystalline waterproof coating layer.

[0011] Specifically, a composite fiber cloth layer is provided outside the waterproof coating layer.

[0012] Specifically, the composite fiber cloth layer and the waterproof coating layer are connected via an adhesive layer.

[0013] Specifically, the composite fiber cloth layer comprises a polypropylene cloth layer and a fiber layer; the polypropylene cloth layer is connected between the fiber layer and the waterproof coating layer.

[0014] Specifically, the shortest distance from each point on the outer line to the leakage area is 1.2 m.

[0015] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0016] The basement outer wall leakage area repair structure provided by the utility model forms a water-blocking layer by setting a first grouting hole filled with cement-based grouting material in the leakage area of ​​the outer wall, and condenses and reinforces the areas where the soil loss of the basement outer wall is serious, thereby improving the service life after repair. Then, a waterproof layer is formed by using a second grouting hole filled with a water-stopping adhesive layer to play a role in repair and reinforcement. It cooperates with the water-blocking layer formed by the first grouting hole to form a waterproof system, increase the waterproof performance of the outer wall, and prevent secondary leakage. In addition, a water-stopping curtain is set on the back of the outer wall to relieve the water pressure around and directly below the outer wall, further solving the problem of water leakage. A waterproof coating layer and a composite fiber cloth layer are set on the surface of the construction range, and the surface of the construction range is covered and closed. The waterproof performance of the fiber cloth is used to isolate the water vapor entering and exiting the outer wall of the basement, thereby improving the corrosion resistance and durability of the outer wall.

[0017] The present invention will be described in further detail below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a cross-sectional view of a basement outer wall leakage area repair structure provided by the utility model.

[0019] Figure 2 It is a front view of a basement outer wall leakage area repair structure provided by the utility model.

[0020] Explanation of the reference numerals: 1. exterior wall; 101. leakage area; 102. external outer line; 2. first grouting hole; 3. second grouting hole; 4. water-stop curtain; 5. waterproof coating layer; 6. composite fiber cloth layer; 7. basement. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0023] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present utility model, unless otherwise specified, "plurality" means two or more.

[0024] Reference Figure 1-2 The utility model provides a repair structure for the leakage area of ​​the outer wall of a basement, comprising an outer wall 1; a plurality of first grouting holes 2 penetrating the outer wall 1 are arranged in the leakage area 101 of the outer wall 1; the first grouting holes 2 are filled with cement-based grouting material; an outer line 102 is arranged on the periphery of the leakage area 101; a plurality of second grouting holes 3 penetrating the outer wall 1 are arranged between the outer line 102 and the leakage area 101; the second grouting holes 3 are filled with a waterproof adhesive layer. During construction, a grouting pipe is pre-buried at the corresponding position of the first grouting hole 2 arranged in the leakage area 101, and cement-based grouting material is poured into the grouting pipe, so that the cement-based grouting material flows into the first grouting hole 2, and a cement-based grouting material layer is formed in the first grouting hole 2, and the areas of the outer wall 1 of the basement 7 where soil loss is serious are condensed and reinforced, and the joints between the grouting holes are filled and plugged densely, thereby increasing the strength and improving the service life after repair. At the same time, a new water-blocking layer is formed under the outer wall 1 using cement-based grouting material. Remove the first grouting hole 2 and the grouting nozzle on the first grouting hole 2, and seal them. Then drill holes within the designed outer line 102 construction range to form multiple second grouting holes 3, inject water-stop glue into the holes, and fill the fine cracks and capillary voids inside the structure of the outer wall 1 of the basement 7 tightly, which plays a role in repair and reinforcement, so that the interconnected internal spaces are formed into pieces at multiple points and multiple pieces into surfaces, forming a waterproof system to fill and repair the cracks, honeycombs and gaps in the outer wall 1 of the basement 7. After the construction of the second grouting hole 3 is completed, clean the wet stains or grouting positions on the second grouting hole 3. The purpose of arranging the second grouting hole 3 is to prevent the upper stagnant water from penetrating into the curtain gap under pressure, which plays a role in encryption.

[0025] The utility model forms a water-blocking layer by providing a first grouting hole 2 filled with cement-based grouting material in the leakage area 101 of the outer wall 1, and solidifies and reinforces the areas of the outer wall 1 of the basement 7 where soil loss is serious, thereby improving the service life after repair. A second grouting hole 3 filled with water-stopping glue is then used to form a waterproof layer, which plays a role in repair and reinforcement, and cooperates with the water-stopping layer formed by the first grouting hole 2 to form a waterproof system, thereby increasing the waterproof performance of the outer wall 1 and preventing secondary leakage. The water-stopping glue is preferably a water-swelling water-stopping glue, such as a water-soluble polyurethane prepolymer, sodium acrylate and chloroprene rubber synthetic glue, which has good water resistance, can be in contact with leaking water for a long time, has high tensile strength of the gel, high anti-extrusion failure ratio, can withstand high water pressure, has good durability, and has a stable gel chemical structure.

[0026] Furthermore, the repair structure of the leakage area 101 of the outer wall 1 of the basement 7 further includes a water-stop curtain 4, which is arranged on the side of the outer wall 1 away from the basement 7. The water-stop curtain 4 is used to relieve the water pressure around and directly below the outer wall 1, thereby further solving the water leakage problem.

[0027] Specifically, the first grouting holes 2 are arranged in the leakage area 101 of the outer wall 1 in a square, rectangular or plum blossom shape, preferably a plum blossom shape, to increase the repetition rate of the slurry between the first grouting holes 2 and ensure that the thickness of the formed water-blocking layer meets the expected requirements.

[0028] Optionally, the second grouting holes 3 are arranged in a crisscross pattern between the outer line 102 and the leakage area 101 .

[0029] In a detailed embodiment, a waterproof coating layer 5 is coated on the side of the outer wall 1 facing the basement 7; the waterproof coating layer 5 covers the leakage area 101. The waterproof coating layer 5 is preferably a cement-based permeable crystalline waterproof coating layer.

[0030] Furthermore, a composite fiber cloth layer 6 is provided outside the waterproof coating layer 5 .

[0031] Optionally, the composite fiber cloth layer 6 is bonded to the surface of the waterproof coating layer 5 through an adhesive layer. The adhesive layer is preferably an epoxy adhesive layer to prevent tiny leakage points in the later construction area. The fiber can evenly distribute the water pressure received at a single point to the entire base surface to which it is attached.

[0032] Furthermore, the composite fiber cloth layer 6 includes a polypropylene cloth layer and a fiber layer; the fiber layer is arranged on one side of the polypropylene cloth layer; the other side of the polypropylene cloth layer is connected to the waterproof coating layer 5. The number of fiber layers can be designed according to needs, and generally two layers are provided, which are integrated with the polypropylene cloth layer through compression treatment, have strong corrosion resistance and durability, and good waterproof and permeability.

[0033] In order to prevent the construction scope from not covering the entire seepage area, the shortest distance from each point on the outer line 102 to the leakage area 101 is preferably 1.2 m.

[0034] In summary, the basement outer wall leakage area repair structure provided by the utility model forms a water-blocking layer by setting a first grouting hole 2 filled with cement-based grouting material in the leakage area 101 of the outer wall 1, and condenses and reinforces the area where the soil loss of the outer wall 1 of the basement 7 is serious, thereby improving the service life after repair. Then, a second grouting hole 3 filled with a water-stopping adhesive layer is used to form a waterproof layer, which plays a role in repair and reinforcement. It cooperates with the water-blocking layer formed by the first grouting hole 2 to form a waterproof system, increase the waterproof performance of the outer wall 1, and prevent secondary leakage. In addition, a water-stopping curtain 4 is set on the back of the outer wall 1 to relieve the water pressure around and directly below the outer wall 1, further solving the problem of water leakage. A waterproof coating layer 5 and a composite fiber cloth layer 6 are set on the surface of the construction range, and the surface of the construction range is covered and closed. The waterproof performance of the fiber cloth is used to isolate the water vapor in and out of the outer wall 1 of the basement 7, thereby improving the corrosion resistance and durability of the outer wall 1.

[0035] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. All designs that are identical or similar to the present invention fall within the protection scope of the present invention.

Claims

1. A basement exterior wall leakage area repair structure, characterized by: The invention comprises an outer wall (1); a plurality of first grouting holes (2) penetrating the outer wall (1) are arranged in a leakage zone (101) of the outer wall (1); the first grouting holes (2) are filled with cement-based grouting material; an outer line (102) is arranged on the periphery of the leakage zone (101); a plurality of second grouting holes (3) penetrating the outer wall (1) are arranged between the outer line (102) and the leakage zone (101); the second grouting holes (3) are filled with a waterproof adhesive layer.

2. The basement exterior wall leakage area repair structure according to claim 1, characterized in that: It also comprises a water-stop curtain (4); the water-stop curtain (4) is arranged on the side of the outer wall (1) facing away from the basement (7).

3. The basement exterior wall leakage area repair structure according to claim 1, characterized in that: The first grouting holes (2) are arranged in a plum blossom shape in the leakage area (101) of the outer wall (1).

4. The basement exterior wall leakage area repair structure according to claim 1, characterized in that: The second grouting holes (3) are arranged in a crisscross pattern between the outer boundary (102) and the leakage area (101).

5. The basement exterior wall leakage repair structure according to claim 1, characterized in that: A waterproof coating layer (5) is coated on the side of the outer wall (1) facing the basement (7); the waterproof coating layer (5) covers the leakage area (101).

6. The basement exterior wall leakage area repair structure according to claim 5, characterized in that: The waterproof coating layer (5) is a cement-based permeable crystallization type waterproof coating layer.

7. The basement exterior wall leakage area repair structure according to claim 5, characterized in that: A composite fiber cloth layer (6) is provided outside the waterproof coating layer (5).

8. The basement exterior wall leakage area repair structure according to claim 7, characterized in that: The composite fiber cloth layer (6) and the waterproof coating layer (5) are connected via an adhesive layer.

9. The basement outer wall leakage area repair structure according to claim 7, characterized in that: The composite fiber cloth layer (6) comprises a polypropylene cloth layer and a fiber layer; the polypropylene cloth layer is connected between the fiber layer and the waterproof coating layer (5).

10. The basement exterior wall leakage area repair structure according to claim 1, characterized in that: The shortest distance from each point on the outer line (102) to the leakage area (101) is 1.2 m.