Waterproof heat preservation protection snow melting integrated structure of gutter
By using a combination of electric heating layer and thermal conductive plate with good thermal conductivity in the gutter, combined with a hard foamed polyurethane waterproof layer and sealing coating, the problems of uneven heat distribution and complicated installation of the existing gutter snow melting structure are solved, and the problem of uneven heat distribution and complicated installation is solved. Rapid melting of ice and snow and safe and efficient installation.
Patent Information
- Application Number
- CN202323551756.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-26
AI Technical Summary
The existing gutter snow melting structure has uneven heat distribution, making it difficult to melt the ice and snow at the corners of the gutter. The complex structure requires on-site installation, which increases assembly costs and risks of high-altitude operations.
It adopts a combination of electric heating layer and thermal conductive plate with good thermal conductivity. The heating wires are evenly arranged in a snake shape, combined with a hard foamed polyurethane waterproof layer and sealing coating. After indoor assembly, it is installed directly in the gutter to avoid high-altitude operations.
It achieves uniform melting of ice and snow in the gutter, reduces installation costs and risks, improves installation efficiency, and avoids the dangers of high-altitude operations.
Smart Images

Figure CN221798940U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gutter snow melting structures, in particular to a gutter waterproof, heat-insulating, protective and snow-melting integrated structure. Background Art
[0002] Due to the housing needs of modern people, many areas are building more residential areas, not only residential areas, but also villa areas. In our country, there is less rain in the north and more rain in the south. A lot of rain falls under the eaves, which easily corrodes the walls, so many houses will adopt rainwater drainage systems, and most people will adopt gutter waterproofing methods. The so-called gutter is a channel on our roof that collects rainwater and discharges it into the gutter in an organized manner. Therefore, the gutter must have the function of collecting rainwater and draining water, and it also needs to prevent water from flowing down the wall. However, if the gutter is not done well, leakage may occur, and there is also the problem of water flowing on the wall.
[0003] The existing gutter snow-melting structures still have some shortcomings. For example, most of the snow-melting structures simply install a heating plate at the bottom of the gutter to use the temperature difference to melt the ice and snow. The heat distribution of this snow-melting structure is uneven, and it is difficult to melt the ice and snow at the corners of the gutter. Some of the snow-melting structures are more complicated and need to be installed on-site, which will incur additional assembly costs and require high-altitude operations and a series of complex installations, threatening the lives of the installers. Summary of the invention
[0004] In view of the deficiencies in the prior art, the utility model provides an integrated gutter waterproof, heat-insulating, protective and snow-melting structure, which has good thermal conductivity, can quickly melt the ice and snow inside the gutter, and can be directly installed inside the gutter after the snow-melting structure is assembled indoors, saving installation costs and avoiding the advantages of high-altitude operations. It solves the problems of uneven heat distribution of the snow-melting structure, difficulty in melting the ice and snow at the corners of the gutter, and a relatively complex structure. On-site installation will incur additional assembly costs, and high-altitude operations and a series of complex installations are required, threatening the life safety of the installers.
[0005] In order to achieve the above-mentioned good thermal conductivity, the ice and snow inside the gutter can be melted quickly and the snow melting structure can be assembled indoors and directly installed inside the gutter to avoid high-altitude operations. The utility model provides the following technical solutions: A gutter waterproof, heat-insulating, protective and snow-melting integrated structure, including a roof base, an isolation layer is fixedly installed on one end of the upper surface of the roof base, a parapet is fixedly installed on the upper surface of the roof base and away from the isolation layer. A gutter is arranged between the isolation layer and the parapet, and an installation frame is arranged between the isolation layer and the parapet and on the top surface of the gutter, a first waterproof layer is arranged on the bottom surface of the installation frame, an electric heating layer is laid above the first waterproof layer, a heat-conducting layer is laid on the upper surface of the electric heating layer, and a second waterproof layer is arranged on the upper surface of the heat-conducting layer, and sealing coatings are arranged on the top of the contact surfaces of the installation frame and the isolation layer with the installation frame and the parapet.
[0006] Preferably, the electric heating layer includes a heating wire, an electric wire, a mounting plate and a switch. The heating wire is fixedly installed inside the electric heating layer. The input end of the heating wire is electrically connected to the output end of the electric wire. One end of the electric wire away from the heating wire is fixedly connected with a switch. The switch is arranged on the surface of the mounting plate, and the mounting plate is fixedly installed on the indoor wall.
[0007] Preferably, the heating wire is evenly fixed inside the electric heating layer in a snake shape, and at least two straight sections of the heating wire arranged in a snake shape are connected with a U-shaped bend, which can evenly provide heat to the heat-conducting layer.
[0008] Preferably, the first waterproof layer and the second waterproof layer are both made of hard foamed polyurethane, and the sealing coating is made of the same material as the first waterproof layer and the second waterproof layer, which can effectively prevent water generated by melting ice and snow from flowing into the gutter through the gap between the mounting frame and the inner wall of the gutter.
[0009] Preferably, there is a small gap between the contact surface of the isolation layer and the mounting frame, and there is also a small gap between the contact surface of the parapet and the mounting frame. The filler between the gaps is made of the same material as the first waterproof layer and the second waterproof layer, both of which are a hard foamed polyurethane. This material has waterproof, heat-insulating and protective properties. When this material solidifies, it can play a good role in waterproofing, heat-insulating and protecting.
[0010] Preferably, the thermal conductive layer is made of graphene heating paint with good thermal conductivity, and the thermal conductive layer is evenly arranged between the electric heating layer and the second waterproof layer. The thermal conductive layer can evenly conduct the heat generated by the electric heating layer to the bottom surface of the second waterproof layer, slowly increase the temperature of the second waterproof layer, thereby melting the snow inside the installation frame.
[0011] Compared with the prior art, the present invention provides a method having the following beneficial effects:
[0012] 1. The gutter waterproof, heat-insulating, protective and snow-melting integrated structure uses an electric heating layer and a heat-conducting plate in combination. When the switch is turned on, the heating wire inside the electric heating layer starts to heat up, and the surface temperature of the electric heating layer gradually increases. Since the heating wire is evenly arranged in a serpentine shape inside the electric heating layer, the heat-conducting plate can evenly conduct the temperature of the surface of the electric heating layer to the bottom surface of the second waterproof layer, slowly increasing the temperature of the second waterproof layer, thereby melting the accumulated snow inside the installation frame, thereby achieving good thermal conductivity and quickly melting the ice and snow inside the gutter.
[0013] 2. The integrated gutter waterproofing, heat preservation and snow-melting structure can be assembled indoors by using a mounting frame, a first waterproof layer, an electric heating layer, a heat-conducting layer and a second waterproof layer. The assembled snow-melting structure is then placed inside the gutter. The gap between the mounting frame and the gutter is then filled with a sealing coating made of the same material as the first waterproof layer and the second waterproof layer. The installation is complete, saving a lot of installation time and operational risks. The snow-melting structure can be assembled indoors and then directly installed inside the gutter, saving installation costs and avoiding high-altitude operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 This is a schematic diagram of the structure of the electric heating layer of the utility model;
[0016] Figure 3 This is a schematic diagram of the installation process of the utility model.
[0017] In the figure: 1. Roof base; 2. Isolation layer; 3. Parapet; 4. Gutter; 5. Installation frame; 6. First waterproof layer; 7. Electric heating layer; 701. Heating wire; 702. Electric wire; 703. Installation board; 704. Switch; 8. Heat conductive layer; 9. Second waterproof layer; 10. Sealing coating. Implementation
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figure 1-3 A gutter waterproofing, heat preservation, protection and snow melting integrated structure, comprising a roof base 1, an isolation layer 2 is fixedly installed on one end of the upper surface of the roof base 1, a parapet 3 is fixedly installed on the upper surface of the roof base 1 and away from the isolation layer 2, a gutter 4 is arranged between the isolation layer 2 and the parapet 3, a mounting frame 5 is arranged between the isolation layer 2 and the parapet 3 and on the top surface of the tiankeng 4, a first waterproof layer 6 is arranged on the bottom surface of the mounting frame 5, an electric heating layer 7 is laid above the first waterproof layer 6, and the electric heating layer 7 includes a heating wire 701, an electric wire 702, a mounting plate 703 and a switch 70 4. The heating wire 701 is fixedly installed inside the electric heating layer 7. The heating wire 701 is fixed inside the electric heating layer 7 in a snake shape. At least two straight sections of the heating wire 701 arranged in a snake shape are connected with a U-shaped bend, which can evenly provide heat to the heat-conducting layer 8. The input end of the heating wire 701 is electrically connected to the output end of the wire 702. The end of the wire 702 away from the heating wire 701 is fixedly connected with a switch 704. The switch 704 is arranged on the surface of the mounting plate 703. The mounting plate 703 is fixedly installed on the indoor wall. The upper surface of the electric heating layer 7 is paved with the heat-conducting layer 8. The heat-conducting layer The upper surface of the heat-conducting layer 8 is provided with a second waterproof layer 9, the material of the heat-conducting layer 8 is graphene heating paint, which has good thermal conductivity, and the heat-conducting layer 8 is evenly arranged between the electric heating layer 7 and the second waterproof layer 9, and the heat-conducting layer 8 can evenly conduct the heat generated by the electric heating layer 7 to the bottom surface of the second waterproof layer 9, slowly increase the temperature of the second waterproof layer 9, so that the snow inside the installation frame 5 melts, the contact surface between the isolation layer 2 and the installation frame 5 has a small gap, and the contact surface between the parapet 3 and the installation frame 5 also has a small gap, and the filler between the gaps is consistent with the material of the first waterproof layer 6 and the second waterproof layer 9. The first waterproof layer 6 and the second waterproof layer 9 are made of hard foamed polyurethane. The material is waterproof, heat-insulating and protective. When the material solidifies, it can play a good role in waterproofing, heat-insulating and protecting. The top of the mounting frame 5 and the isolation layer 2 in contact with the mounting frame 5 and the parapet 3 are provided with a sealing coating 10. The first waterproof layer 6 and the second waterproof layer 9 are made of hard foamed polyurethane. The material of the sealing coating 10 is the same as that of the first waterproof layer 6 and the second waterproof layer 9, which can effectively prevent the water generated by the melting of ice and snow from flowing into the inside of the gutter 4 through the gap between the mounting frame 5 and the inner wall of the gutter 4.
[0020] The installation steps are as follows: S101: manufacturing an installation frame 5 that can be adapted to the gutter 4 according to the size of the gutter 4;
[0021] S102: evenly spraying a first waterproof layer 6 on the inner bottom surface of the manufactured installation frame 5;
[0022] S103: Laying the electric heating layer 7 on the surface of the first waterproof layer 6;
[0023] S104: Spraying a sealing coating 10 on the gap between the inner side of the mounting frame 5 and the left and right ends of the electric heating layer 7;
[0024] S105: Laying a heat-conducting layer 8 on the surface of the electric heating layer 7;
[0025] S106: Spraying a sealing coating 10 on the gap between the inner side of the mounting frame 5 and the left and right ends of the heat conducting layer 8;
[0026] S107: spraying a second waterproof layer 9 evenly on the surface of the heat conductive layer 8;
[0027] S108: placing the mounting frame 5 into the gutter 4;
[0028] S109: Spray sealing coating 10 on the top of the contact surface between the installation frame 5 and the isolation layer 2 and the installation frame 5 and the parapet 3.
[0029] Working principle: First, according to the size of the gutter 4 provided by the customer, the installation frame 5 to be installed inside the gutter 4 is made, and the made installation frame 5 is assembled with other structures indoors. At this time, a first waterproof layer 6 is sprayed on the bottom of the installation frame 5. The material of the first waterproof layer 6 is hard foamed polyurethane. Then the electric heating layer 7 is laid on the upper surface of the first waterproof layer 6, and the small gap between the surrounding of the electric heating layer 7 and the inner wall of the installation frame 5 is filled with hard foamed polyurethane. The hard foamed polyurethane filled in the gap can play a role in waterproofing, heat preservation and protection, so that the electric heating layer 7 can be fixed inside the installation frame 5 and can prevent heat generation. The heat generated by the wire 701 will not be lost, thereby accelerating the melting of ice and snow; then the heat-conducting layer 8 is laid on the upper surface of the electric heating layer 7, and the gap between the electric heating layer 7 and the mounting frame 5 is filled again. After the filling is completed, the hard foamed polyurethane is evenly sprayed on the upper surface of the heat-conducting layer 8, which is recorded as the second waterproof layer 9. At this time, a test is carried out, and the wire 702 connected to one end of the heating wire 701 is electrically connected to the switch 704, and then the switch 704 is connected to the external power supply. The inspection personnel turns on the switch 704, and the wire 702 provides power to the heating wire 701 to make it heat up, and the heat generated by the heating wire 701 is evenly transferred by the heat-conducting layer 8. The second waterproof layer 9 is led to the bottom surface of the second waterproof layer 9, so that the temperature of the second waterproof layer 9 gradually increases. Since it does not require a too high temperature to melt ice and snow, the output power of this heating wire 701 is relatively low. The inspection personnel detect whether the temperature of the surface of the second waterproof layer 9 can reach the temperature that melts the ice and snow, whether the gap is filled completely, and whether there is any temperature loss. When the inspection result is qualified, it can be transported to the installation site. First, the debris and dust inside the gutter 4 are cleaned up, and then the hard foamed polyurethane is evenly sprayed on the bottom and inner wall of the gutter 4. The assembled installation frame 5 is placed inside the gutter 4. The hard foamed polyurethane sprayed on the bottom and inner wall of the gutter 4 can It plays the role of fixing the installation frame 5. Finally, the sealing coating 10 is sprayed on the top of the contact surface between the installation frame 5 and the parapet 3. Similarly, the sealing coating 10 is also sprayed on the top of the contact surface between the installation frame 5 and the isolation layer 2. The sealing coating 10 is made of the same material as the first waterproof layer 6 and the second waterproof layer 9, all of which are hard foamed polyurethane. The sealing coating 10 sprayed on the contact surface between the parapet 3 and the installation frame 5 and the isolation layer 2 and the installation frame 5 can prevent the melted ice and snow water from flowing into the inside of the gutter 4 along the gap of the contact surface, thereby effectively preventing the melted ice and snow water from eroding the roof base 1, and avoiding the problem of water leakage due to long-term erosion of the roof base 1.
[0030] In summary:
[0031] 1. The integrated structure of the gutter waterproofing, heat preservation, protection and snow melting, through the coordinated use of the electric heating layer 7 and the heat conductive layer 8, turns on the switch 704, so that the heating wire 701 inside the electric heating layer 7 starts to heat up, and the surface temperature of the electric heating layer 7 gradually increases. Since the heating wire 701 is evenly arranged in a serpentine shape inside the electric heating layer 7, the heat conductive layer 8 can evenly conduct the temperature of the surface of the electric heating layer 7 to the bottom surface of the second waterproof layer 9, and slowly increase the temperature of the second waterproof layer 9, thereby melting the snow inside the mounting frame 5, thereby achieving good thermal conductivity and the effect of quickly melting the ice and snow inside the gutter 4.
[0032] 2. The integrated gutter waterproof, heat-insulating, protective and snow-melting structure can be assembled indoors by using the mounting frame 5, the first waterproof layer 6, the electric heating layer 7, the heat-conducting layer 8 and the second waterproof layer 9. The assembled snow-melting structure is then placed inside the gutter 4. The gap between the mounting frame 5 and the gutter 4 is then filled with a sealing coating 10 made of the same material as the first waterproof layer 6 and the second waterproof layer 9. The installation is completed, saving a lot of installation time and operation risks, thereby achieving the effect of assembling the snow-melting structure indoors and then installing it directly inside the gutter 4, saving installation costs and avoiding high-altitude operations.
[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A gutter waterproofing, heat preservation, protection and snow melting integrated structure, comprising a roof base (1), characterized in that: An isolation layer (2) is fixedly mounted on one end of the upper surface of the roof base (1); a parapet (3) is fixedly mounted on one end of the upper surface of the roof base (1) away from the isolation layer (2); a gutter (4) is arranged between the isolation layer (2) and the parapet (3); a mounting frame (5) is arranged between the isolation layer (2) and the parapet (3) and on the top surface of the gutter (4); a first waterproof layer (6) is arranged on the bottom surface of the mounting frame (5); an electric heating layer (7) is laid above the first waterproof layer (6); a heat conducting layer (8) is laid on the upper surface of the electric heating layer (7); a second waterproof layer (9) is arranged on the upper surface of the heat conducting layer (8); and a sealing coating (10) is arranged on the top of the contact surface between the mounting frame (5) and the isolation layer (2) and the mounting frame (5) and the parapet (3).
2. The integrated gutter waterproofing, heat preservation, protection and snow melting structure according to claim 1 is characterized by: The electric heating layer (7) comprises a heating wire (701), an electric wire (702), a mounting plate (703) and a switch (704); the heating wire (701) is fixedly mounted inside the electric heating layer (7); an input end of the heating wire (701) is electrically connected to an output end of the electric wire (702); an end of the electric wire (702) away from the heating wire (701) is fixedly connected to a switch (704); the mounting plate (703) is fixedly mounted on a wall in a room; and the switch (704) is arranged on a surface of the mounting plate (703).
3. The integrated gutter waterproofing, heat preservation, protection and snow melting structure according to claim 2 is characterized by: The heating wire (701) is evenly fixed inside the electric heating layer (7) in a snake-like shape, and at least two straight sections of the heating wire (701) arranged in a snake-like shape are connected to a U-shaped bend.
4. The integrated gutter waterproofing, heat preservation, protection and snow melting structure according to claim 1 is characterized by: The material of the first waterproof layer (6) and the second waterproof layer (9) are both hard foamed polyurethane, and the material of the sealing coating (10) is the same as that of the first waterproof layer (6) and the second waterproof layer (9).
5. The integrated gutter waterproofing, heat preservation, protection and snow melting structure according to claim 1 is characterized by: There is a gap between the contact surface between the isolation layer (2) and the installation frame (5), and there is also a gap between the contact surface between the parapet (3) and the installation frame (5). The filler between the gaps is made of the same material as the first waterproof layer (6) and the second waterproof layer (9), and is made of hard foamed polyurethane.
6. The integrated gutter waterproofing, heat preservation, protection and snow melting structure according to claim 1 is characterized by: The material of the heat-conducting layer (8) is graphene heating paint, and the heat-conducting layer (8) is evenly arranged between the electric heating layer (7) and the second waterproof layer (9).
