Inverted arch precast block structure for water conservancy project diversion tunnel TBM construction
The prefabricated invert block structure solves the problem of low invert cast-in-place efficiency in traditional hydraulic tunnel construction, achieves efficient TBM operation and shortens the construction period, and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202420231299.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-31
AI Technical Summary
In the traditional hydraulic tunnel construction method, the invert cast-in-place process has low cross-operation efficiency, resulting in a long construction period, and the invert is an irregular concrete structure, which affects the formwork time and construction efficiency.
It adopts a prefabricated invert block structure, including top embedded road spikes, central ditch, boom, rubber waterstop and composite expansion waterstop. Adjacent blocks are connected through concave and convex surfaces, and the TBM track is directly set on the invert block. to achieve prefabricated construction.
It improves the operating efficiency of TBM, shortens the construction period, reduces track maintenance time and concrete transportation risks, simplifies the construction organization, and reduces the cleaning and water supply period.
Smart Images

Figure CN221799804U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water conservancy projects, and in particular relates to a prefabricated block structure of an invert arch for TBM construction of a water diversion tunnel of a water conservancy project. Background Art
[0002] Hydraulic tunnels are one of the important components of water conservancy hubs. Hydraulic tunnels can be used for irrigation, power generation, water supply, water discharge, water transfer, construction diversion and navigation. Tunnel with free water surface in the tunnel is called unpressured tunnel; tunnel with full cross section and making the tunnel wall bear a certain water pressure is called pressurized tunnel.
[0003] The existing construction methods of hydraulic tunnels are mainly shield construction, drilling and blasting construction, and TBM construction. The traditional TBM method adopts synchronous cast-in-place for tunnel inverts, which is specifically: surveying and setting out → invert excavation → bottom elevation verification → initial spraying of concrete → installation of invert steel arch frame → final spraying of concrete → construction of drainage pipes → construction of invert lining steel bars → installation of invert formwork → C30 concrete construction → backfilling of invert. Due to the cross-operation of various processes of invert cast-in-place, the construction efficiency is low, and the invert is an irregular concrete structure, which greatly affects the formwork time, making the construction period of the entire hydraulic tunnel long and the construction efficiency low. Utility Model Content
[0004] In order to make up for the deficiencies of the prior art, the utility model provides a prefabricated block structure of an invert arch for TBM construction of a water diversion tunnel in a hydraulic project. The invert arch is prefabricated, and the TBM track is directly arranged on the invert arch block, thereby ensuring efficient operation of the TBM and effectively shortening the construction period of the hydraulic tunnel.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] An inverted arch prefabricated block structure for TBM construction of a water conservancy project diversion tunnel, comprising an inverted arch prefabricated block, wherein 8 groups of spikes are pre-buried on the top of the inverted arch prefabricated block, and the spikes are used to fix the rails;
[0007] The top surface of the inverted arch prefabricated block is provided with a central ditch;
[0008] A top suspension rod is arranged on the top of the inverted arch prefabricated block, and a bottom suspension rod is arranged on the bottom;
[0009] The joints on both sides of the longitudinal joints of the prefabricated inverted arch block are made of rubber water stop strips, and the circumferential concave and convex surfaces are made of composite expansion water stop strips;
[0010] Two rows of joint reinforcement holes are reserved circumferentially in the prefabricated blocks of the invert.
[0011] Furthermore, two adjacent sections of the inverted arch prefabricated blocks are connected by providing a concave and convex surface.
[0012] Furthermore, each section of the invert prefabricated block is 1.8 m long.
[0013] Furthermore, the inverted arch prefabricated blocks are divided into inverted arch prefabricated blocks without bottom grooves and inverted arch prefabricated blocks with bottom grooves.
[0014] Furthermore, the central ditch is provided with a main drainage pipe.
[0015] Furthermore, the inverted arch prefabricated block is provided with grouting holes.
[0016] Furthermore, the invert prefabricated block is arranged at the TBM head.
[0017] Furthermore, the top of the inverted arch prefabricated block is provided with three top suspension rods, and the bottom is provided with three bottom suspension rods.
[0018] Beneficial effects of the utility model:
[0019] 1) The bolts are embedded in the inverted arch block during prefabrication. The track is directly placed on the inverted arch block and fixed with bolts and fasteners. The fixing effect is good, which effectively reduces the maintenance time of the track and the probability of the locomotive jumping the track, which is beneficial to the safety of the locomotive. At the same time, it can increase the transportation speed, improve the work efficiency, reduce the quality risk faced by long-distance concrete transportation, and deal with the sudden problems in the late construction period more timely;
[0020] 2) The central ditch of the utility model is set up to facilitate the desilting work of the tunnel. At the same time, the central ditch can be used to place the main drainage pipe, which relieves the pressure of pipeline relocation when the lining trolley is moving, and has positive significance for the civilized construction and construction organization in the tunnel;
[0021] 3) After the utility model project is completed, the time for cleaning the track dismantling tunnel is shortened, which can save construction time for water supply to the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is the front view of the utility model;
[0023] Figure 2 This is a plan view of the prefabricated inverted arch block without a groove at the bottom of the utility model;
[0024] Figure 3 This is a plan view of the bottom slotted inverted arch prefabricated block of the utility model;
[0025] Figure 4 This is the installation layout diagram of the tunnel of the utility model;
[0026] In the figure, 1-inverted arch prefabricated block, 2-inverted arch prefabricated block without bottom slot, 3-inverted arch prefabricated block with bottom slot, 4-rubber water stop strip, 5-DP-821BF composite expansion water stop strip, 6-grouting hole, 7-spike, 8-center ditch, 9-top hanger, 10-bottom hanger. DETAILED DESCRIPTION
[0027] The present invention is described in detail below in conjunction with specific implementation methods.
[0028] like Figure 1 As shown, the utility model comprises an inverted arch prefabricated block 1, which is prefabricated on site using C40 reinforced concrete, and two adjacent sections of the inverted arch prefabricated blocks 1 are connected by setting a concave and convex surface. The length of the inverted arch prefabricated block is designed according to a TBM excavation stroke of 1.8m.
[0029] like Figure 2 , 3 As shown, the inverted arch prefabricated block 1 is divided into the inverted arch prefabricated block 2 without bottom slot and the inverted arch prefabricated block 3 with bottom slot. The inverted arch prefabricated block 2 without bottom slot is suitable for the sections where the surrounding rock of Class I, II and III is not provided with steel arch frame; the inverted arch prefabricated block 3 with bottom slot is suitable for the sections where the surrounding rock of Class IV and V is provided with steel arch frame. The two inverted arch prefabricated blocks have the same dimensions except for the different structural forms.
[0030] The top of the inverted arch precast block 1 is provided with three top suspension rods 9, and the bottom is provided with three bottom suspension rods 10. The top suspension rods 9 are used for TBM construction and installation, and the bottom suspension rods 10 are used for demoulding the production precast blocks. The rail transport is a "four-track three-line mode", and the side rails are only used for the travel of the TBM and the lining trolley.
[0031] The top surface of the inverted arch prefabricated block 1 is provided with a central ditch 8, and the central ditch 8 is provided with a main drainage pipe; the joints on both sides of the longitudinal joints of the inverted arch prefabricated block 1 are provided with rubber water stop strips 4, and the circumferential concave and convex surface is provided with DP-821BF composite expansion water stop strips 5; the inverted arch prefabricated block 1 is provided with two rows of joint reinforcement holes in the circumferential direction, so that it can form a whole with the inverted arch prefabricated block when the secondary lining of the arch wall is cast in the later stage. The installation layout of the hydraulic tunnel is shown in the figure below. Figure 4 shown.
[0032] The inverted arch prefabricated block 1 is provided with grouting holes 6 for filling the gap between the bottom of the inverted arch prefabricated block and the surrounding rock.
[0033] By using the prefabricated inverted arch component of the utility model and the TBM mechanical equipment, the rapid excavation of the tunnel and the installation of the inverted arch can be realized. The specific steps are as follows:
[0034] Step 1: The inverted arch prefabricated blocks are processed and produced in the inverted arch block production workshop outside the tunnel. After reaching the curing and compressive strength, they are transported from the inverted arch prefabrication plant to the tunnel face by converting the transport vehicle into a rail vehicle. Before the inverted arch blocks are transported, the DP-821BF composite expansion waterstop is pasted in the reserved waterstop groove, and rubber waterstop strips are pasted on the joints on both sides of the prefabricated blocks;
[0035] Step 2: After reaching the tunnel face, the TBM's own arch crane uses three chain hooks to lift the arch block from the vehicle. According to the survey team's layout position, the direction of the arch block is adjusted to correspond to it. At the same time, a level ruler is used to check whether the left and right planes of the arch block ditch are on the same horizontal plane. After checking that they are correct, concrete pads are placed on the bottom of the arch block and the rock surface. After the arch prefabricated block is padded, the crane hook is loosened;
[0036] Step 3: After the laying is completed, the gap between the bottom of the invert precast block and the surrounding rock is backfilled with C20 fine stone concrete using the gaps on both sides, and then additional grouting is performed through the grouting holes to ensure the density of the tunnel bottom.
[0037] In order to give full play to the characteristics of TBM's continuous and rapid excavation, the utility model adopts prefabricated inverts; during the construction of hydraulic tunnels, the invert blocks are installed during the forward excavation of the TBM, providing tracks for the TBM's rear supporting walking and material vehicles, ensuring that the slag transportation operation is carried out simultaneously with the excavation operation, saving the time for the reinforcement of the invert lining and the pouring of concrete, and providing strong conditions for tunnel dredging and track disassembly after the completion of the later project. Due to mechanized construction and prefabricated assembly, the construction period can be greatly shortened, reducing labor costs and resource consumption of on-site construction.
[0038] In the description of the present invention, unless otherwise clearly specified and limited, the terms "set", "install", "connect", "connect", and "fix" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] The content of the utility model is not limited to the examples listed, and any equivalent changes made to the technical solution of the utility model by ordinary technicians in this field after reading the specification of the utility model are covered by the claims of the utility model.
Claims
1. A prefabricated block structure of an invert for TBM construction of a water conservancy project diversion tunnel, characterized in that: It comprises an inverted arch prefabricated block (1), wherein eight groups of railroad spikes (7) are pre-buried on the top of the inverted arch prefabricated block (1), and the railroad spikes (7) are used to fix the steel rails; The top surface of the inverted arch prefabricated block (1) is provided with a central water ditch (8); A top suspension rod (9) is arranged at the top of the inverted arch prefabricated block (1), and a bottom suspension rod (10) is arranged at the bottom; The joints at the longitudinal sides of the prefabricated inverted arch block (1) are provided with rubber water stop strips (4), and the circumferential concave and convex surface is provided with a composite expansion water stop strip (5); Two rows of joint reinforcement holes are reserved in the annular direction of the inverted arch prefabricated block (1).
2. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 1, characterized in that: Two adjacent sections of inverted arch prefabricated blocks (1) are connected by providing a concave and convex surface.
3. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 2, characterized in that: Each section of the inverted arch prefabricated block (1) has a length of 1.8 m.
4. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 3, characterized in that: The inverted arch prefabricated block (1) is divided into an inverted arch prefabricated block (2) without a bottom groove and an inverted arch prefabricated block (3) with a bottom groove.
5. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 4, characterized in that: The central ditch (8) is provided with a main drainage pipe.
6. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 5, characterized in that: The inverted arch prefabricated block (1) is provided with a grouting hole (6) penetrating therethrough.
7. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 6, characterized in that: The invert prefabricated block (1) is arranged on the head of the TBM.
8. The prefabricated block structure of the invert for TBM construction of a water conservancy project diversion tunnel according to claim 7, characterized in that: The top of the inverted arch prefabricated block (1) is provided with three top suspension rods (9), and the bottom is provided with three bottom suspension rods (10).
Citation Information
Cited By
Inverted arch structure and construction method thereof
CN119981961A
Inverted arch structure and construction method thereof
CN119981962A
Hidden water stop and drainage system for TBM non-pressure water delivery tunnel and construction method thereof
CN121556898A
Hidden drainage system of TBM non-pressure water conveyance tunnel and construction method thereof
CN121556898B