System for reducing ash deposition in flue of circulating fluidized bed boiler
By installing a metal hose with a wind cap under the horizontal flue of the circulating fluidized bed boiler, and using a cold primary fan to blow into the bottom of the flue, the ash is fluidized and taken away by the flue gas, thus solving the problems caused by ash accumulation in the flue. Boiler operation problems, achieving the effect of reducing wear and extending the operating cycle.
Patent Information
- Application Number
- CN202323230443.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-11-29
AI Technical Summary
Ash accumulation in the horizontal flue of circulating fluidized bed boilers causes fluctuations in flue gas flow rate, increases the resistance of the wind and smoke system, and intensifies wear and tear, affecting the boiler operating cycle and efficiency. In addition, the sintering of the accumulated ash may cause clogging of the cyclone separator, affecting the boiler's load capacity.
Design a system for reducing flue ash accumulation for circulating fluidized bed boilers. A metal hose with a hood is installed under the horizontal flue, and a cold primary fan is used to blow into the bottom of the flue to fluidize the ash and be removed by the smoke. The air is taken away and the dust accumulation is reduced.
It can effectively reduce the wear and tear of boiler equipment, ensure safe and stable operation, reduce the resistance of the wind and smoke system, extend the normal operation cycle of the boiler, maintain uniform flow distribution of the cyclone separator, and avoid separator clogging. The system has a simple structure, low cost, and convenient construction.
Smart Images

Figure CN221801769U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a system for reducing dust accumulation in a flue of a circulating fluidized bed boiler, belonging to the technical field of thermal power plant design. Background Art
[0002] Circulating fluidized bed boilers use fluidized combustion, and their main structure includes two parts: the combustion chamber (including dense phase area and dilute phase area) and the circulating furnace (including high-temperature gas-solid separator and return system). Circulating fluidized bed boilers have well solved the basic problems of thermodynamics, mechanics, materials science, and engineering problems such as expansion, wear, and overheating, and have become an advanced technology for the energy utilization of difficult-to-burn solid fuels (such as coal gangue, oil shale, urban garbage, sludge and other wastes).
[0003] However, there are still many problems in the operation of circulating fluidized bed boilers, and ash accumulation in the horizontal flue of the boiler is one of the more serious problems. Due to the inherent characteristics of circulating fluidized bed boilers: the flue gas carries a large number of material particles for strong disturbance, combustion, and heat exchange, and the concentration of fly ash in the flue gas is relatively high. When the boiler load fluctuates, the flue gas flow rate decreases, and the flue gas velocity decreases accordingly. A large number of ash particles are deposited in the horizontal flue, and the gradual increase in ash level will directly reduce the flow area of the horizontal flue; when the boiler load increases, the flue gas velocity increases, the flow area at the horizontal flue decreases, and the resistance of the wind and smoke system increases accordingly. First, the output of the induced draft fan is increased, and the power consumption rate of the plant is increased; secondly, as the flue gas velocity increases, the wear of the horizontal flue is also aggravated, which is very likely to cause the castable to fall off and the water-cooled wall pipe to leak, especially the erosion and wear of the tangential part of the cyclone separator - the target area is more serious, which greatly reduces the normal operation cycle of the boiler; thirdly, due to the accumulation of ash in the horizontal flue, the flow field of the original flue gas entering the cyclone separator is changed, resulting in a decrease in the separation efficiency of the cyclone separator, affecting the heat transfer of the heating surface, and in severe cases affecting the load-bearing capacity of the boiler and the boiler efficiency; finally, due to the large amount of ash accumulation in the horizontal flue, the cooling time after the boiler is shut down is greatly extended, and the operation time in the maintenance furnace is extended. The number of cyclone separators in the circulating fluidized bed boiler is different, but generally not less than 2. When the horizontal flue is ash-accumulated, it cannot be guaranteed that the ash accumulation is the same, resulting in uneven flow distribution of multiple cyclone separators, affecting the ash circulation loop and material distribution in the furnace. In addition, the flue gas temperature at the furnace outlet is above 900℃, and the accumulated ash is easy to sinter. After falling into the separator, it may cause the separator to be blocked and induce coking of the circulation loop. In severe cases, the return device may stop returning materials and the furnace may be forced to shut down.
[0004] Therefore, a system for reducing ash accumulation in the flue of a circulating fluidized bed boiler is designed to overcome the above problems. Summary of the invention
[0005] The utility model aims to design a system for reducing ash accumulation in the flue of a circulating fluidized bed boiler, which has low cost, makes full use of the air volume margin of the primary fan, is convenient to construct and has significant effect, aiming at the above-mentioned problems.
[0006] The utility model is realized through the following technical scheme: a system for reducing dust accumulation in flues of circulating fluidized bed boilers, which comprises a circulating fluidized bed boiler body, on which a plurality of horizontal flues are respectively arranged, each flue is respectively connected to a separator, each separator is connected to a main pipe through a branch pipe and then leads to the rear heating surface of the boiler, and a plurality of dust cleaning devices are arranged below the plurality of horizontal flues.
[0007] Preferably, the cleaning device consists of multiple fans and a metal hose with a hood arranged under each horizontal flue, wherein the metal hose is connected to the cold primary air main pipe through a cold primary air branch pipe, one end of the cold primary air main pipe is connected to the preheater, and the other end is connected to the fan, and dampers are arranged in front of the fan and in front of each metal hose.
[0008] Preferably, there are two fans, and the ventilation duct of each fan is connected to the cold primary air mother pipe through a tee. One end of the cold primary air mother pipe is connected to the preheater, and the other end is connected to each metal hose with a hood through a cold primary air branch pipe. The cold air enters the horizontal flue through the hood to fluidize the accumulated ash, and is carried away by the flue gas circulating in the horizontal flue.
[0009] The beneficial technical effect of the utility model is that the utility model is a system for reducing dust accumulation in the flue of a circulating fluidized bed boiler. The system uses the cold primary air of the circulating fluidized bed boiler to blow into the bottom of the horizontal flue through the wind hood to reduce dust accumulation, which can reduce the wear of boiler-related equipment and ensure the safe and stable operation of the boiler. The entire system has a simple structure and a low cost, and fully utilizes the air volume margin of the primary fan. It has the advantages of convenient construction, significant effect, and no need for new equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a schematic diagram of the overall composition of the utility model. DETAILED DESCRIPTION
[0011] In order to enable ordinary technicians in the field to more clearly understand the purpose, technical solutions and advantages of the utility model, the utility model is further explained below in conjunction with the accompanying drawings and embodiments.
[0012] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as "upper", "lower", "left", "right", "inner", "outer", "horizontal" and "vertical" are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention. They do not indicate or imply that the device or component referred to must have a specific direction and therefore should not be understood as a limitation on the present invention.
[0013] The utility model will be described in detail below with reference to the accompanying drawings: Figure 1 As shown, a system for reducing ash accumulation in the flue of a circulating fluidized bed boiler comprises a circulating fluidized bed boiler body 1, on which a plurality of horizontal flues 2 are respectively arranged, each flue 2 is respectively connected to a separator 3, each separator 3 is connected to a main pipe 5 through a branch pipe 4 and then leads to a heating surface 6 at the rear of the boiler, and a plurality of ash cleaning devices are arranged below the plurality of horizontal flues 2.
[0014] The cleaning device consists of a plurality of fans 7 and a metal hose 9 with a hood 8 arranged under each horizontal flue 2, wherein the metal hose 9 is connected to a cold primary air main pipe 11 through a cold primary air branch pipe 10, one end of the cold primary air main pipe 11 is connected to a preheater 12, and the other end is connected to the fan 7, and a damper 13 is arranged in front of the fan 7 and in front of each metal hose 9.
[0015] There are two fans 7, and the ventilation duct of each fan 7 is connected to the cold primary air main pipe 11 through a tee. One end of the cold primary air main pipe 11 is connected to the preheater 12, and the other end is connected to each metal hose 9 with a hood 8 through a cold primary air branch pipe 10. The cold air enters the horizontal flue 2 through the hood 8 to fluidize the accumulated ash, and is carried away by the flue gas circulating in the horizontal flue. Specific embodiments
[0016] Reference Figure 1As shown, the cold primary air branch pipe in the utility model is led out from the cold primary air mother pipe after the primary fan and the outlet merge, and connected to the horizontal flue near the outlet of the circulating fluidized bed boiler furnace and the inlet of the separator. The circulating fluidized bed boiler is equipped with two separators, which are located on the left and right sides of the center line of the boiler. The cold primary air branch pipe is divided into two left and right branches above the boiler, corresponding to the two horizontal flues at the inlets of the two separators respectively. Electric dampers are set on the left and right air ducts, which can be opened and closed independently. Several wind caps are set below the horizontal flue of the boiler, evenly distributed on the bottom plane of the horizontal flue. The air duct is further divided into several small-diameter air ducts below the horizontal flue, corresponding to each wind cap respectively. The small-diameter air duct and the wind cap are connected by a metal hose, which can fully absorb the thermal displacement of the horizontal flue. The air duct (including the metal hose) is made of high-temperature resistant 06Cr25Ni20 material near the wind cap interface, and the rest are made of Q235-B material.
[0017] This system is suitable for circulating fluidized bed boilers, and also has application potential for units with horizontal flue structures and severe ash accumulation that burn garbage, sludge, biomass and other fuels. By reducing ash accumulation in the horizontal flue, this system can reduce flue gas velocity, reduce the resistance of the wind and smoke system, reduce the output of the induced draft fan, and reduce the power consumption rate of the plant; it can reduce wear at the horizontal flue, effectively prevent castables from falling off and water-cooled wall pipes from leaking, avoid separator blockage and coking of the circulation loop, and extend the normal operation cycle of the boiler; it can keep the flow distribution of multiple cyclone separators relatively uniform and consistent, and maintain the uniformity of the ash circulation loop and material distribution in the furnace. The entire system has a simple structure and low cost, fully utilizes the air volume margin of the primary fan, has the advantages of convenient construction, significant effects, and no additional equipment.
[0018] The specific embodiments described herein are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.
Claims
1. A system for reducing ash accumulation in a flue of a circulating fluidized bed boiler, comprising a circulating fluidized bed boiler body, characterized in that: The circulating fluidized bed boiler body is provided with a plurality of horizontal flues, each flue is connected to a separator, each separator is connected to the main pipe through a branch pipe and then leads to the rear heating surface of the boiler, and a plurality of ash cleaning devices are arranged below the plurality of horizontal flues.
2. The system for reducing ash accumulation in flue of a circulating fluidized bed boiler according to claim 1, characterized in that: The cleaning device consists of multiple fans and a metal hose with a hood arranged under each horizontal flue, wherein the metal hose is connected to the cold primary air main pipe through a cold primary air branch pipe, one end of the cold primary air main pipe is connected to the preheater, and the other end is connected to the fan, and dampers are arranged in front of the fan and in front of each metal hose.
3. The system for reducing ash accumulation in flue of a circulating fluidized bed boiler according to claim 2, characterized in that: There are two fans, and the ventilation duct of each fan is connected to the cold primary air main pipe through a tee. One end of the cold primary air main pipe is connected to the preheater, and the other end is connected to each metal hose with a hood through a cold primary air branch pipe. The hood enters the horizontal flue to fluidize the accumulated ash and is carried away by the flue gas circulating in the horizontal flue.