Cement cushion base layer processing structure

By arranging the strengthening mechanism and concrete pouring blocks in the cement cushion, the problem of low welding connection efficiency in the existing technology is solved, the cement cushion is efficiently strengthened and the construction efficiency is improved, the service life is extended and the connection strength is enhanced.

CN221822656UActive Publication Date: 2024-10-11赵东东
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420152070.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-10-11
Estimated Expiration
2034-01-22

AI Technical Summary

Technical Problem

The existing cement cushion base treatment structure has low welding connection efficiency, which limits the construction progress and affects the overall laying efficiency.

Method used

A reinforced mechanism is adopted, including placing platforms, installation columns, connecting rods, inserts and reinforcing bars in the cement cushion. Quick installation is achieved through sliding extension and fixed connection, and the connection strength is improved by combining concrete pouring blocks and ground-inserting columns.

Benefits of technology

It improves the overall strength of the cement cushion, simplifies the construction process, improves installation efficiency, extends the service life, and enhances the connection strength between the cement cushion and the roadbed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822656U_ABST
    Figure CN221822656U_ABST
Patent Text Reader

Abstract

The utility model discloses a cement cushion layer base layer processing structure which comprises a roadbed layer, a cement cushion layer is arranged above the roadbed layer, a cement base layer is arranged above the cement cushion layer, a pavement layer is arranged above the cement base layer, and a strengthening mechanism is arranged in the cement cushion layer. The reinforcing mechanism comprises a plurality of placing tables arranged in the cement cushion layer, the top of each placing table is fixedly connected with a mounting column, and connecting rods are arranged on the periphery of each mounting column. According to the cement cushion base layer treatment structure, the overall strength of the cement cushion can be improved through the reinforcing ribs distributed longitudinally and transversely through the arranged reinforcing mechanism, so that the phenomenon that the cement cushion is broken after being used for a long time can be prevented, the service life of the cement cushion is prolonged, meanwhile, the construction mode is simple, rapid butt joint can be achieved only through simple insertion, and the construction cost is reduced. The mounting efficiency is improved, so that the overall construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cement cushion layers, in particular to a cement cushion layer base treatment structure. Background Art

[0002] The cement cushion is a structural layer between the base and the soil foundation. When the soil foundation is in poor water stability, it is used to improve the water stability of the soil foundation, improve the water stability and anti-frost heave ability of the pavement structure, and spread the load to reduce soil foundation deformation. In order to increase the service life of the cushion, it is generally reinforced.

[0003] Publication number CN217379014U discloses a cement cushion base treatment structure, including a cement cushion, a cooling oil layer is arranged at the upper end of the cement cushion, an asphalt waterproofing membrane is arranged at the upper end of the cooling oil layer, and horizontal reinforcement ribs and vertical reinforcement ribs are arranged inside the cement cushion, and the vertical reinforcement ribs extend to the bottom of the cement cushion. The horizontal reinforcement ribs include transverse reinforcement ribs and longitudinal reinforcement ribs. A lap joint is fixed to the vertical reinforcement ribs. The lap joint includes a fixed rod, a first lap joint rod and a second lap joint rod, and the first lap joint rod and the second lap joint rod are both welded to the fixed rod. In the practical implementation process, the construction is simple, easy to operate, and low in cost. It can ensure the structural strength of the cement cushion, extend its service life, avoid breakage after long-term use, and facilitate the laying of horizontal reinforcement ribs when the device is under construction.

[0004] However, the base treatment structure has the following shortcomings: when in use, the treatment structure can strengthen its overall structural strength by placing reinforcing ribs in the cement cushion layer, but the reinforcing ribs are often connected to the fixed rods one by one by welding, which leads to low overall laying efficiency and affects the progress of construction.

[0005] Therefore, the utility model provides a cement cushion base treatment structure to solve the above problems. Utility Model Content

[0006] In view of the deficiencies in the prior art, the utility model provides a cement cushion base treatment structure to solve the above problems.

[0007] To achieve the above purpose, the utility model is implemented by the following technical solutions: a cement cushion base treatment structure, comprising a road base, a cement cushion is arranged above the road base, a cement base is arranged above the cement cushion, a road surface layer is arranged above the cement base, and a reinforcement mechanism is arranged in the cement cushion;

[0008] The strengthening mechanism includes a plurality of placing platforms arranged in the cement cushion layer, the top of the placing platforms is fixedly connected with a mounting column, connecting rods are arranged around the mounting column, both ends of the connecting rods are fixedly connected with an insert tube, two reinforcing ribs are arranged between each two adjacent mounting columns, one end of the plurality of reinforcing ribs respectively slides and extends into the corresponding insert tube, and a plurality of strengthening rods are fixedly connected between each two connected reinforcing ribs.

[0009] Preferably, a fixing plate is provided above the mounting column, and four sides of the fixing plate are respectively connected to corresponding connecting rods, and the four connecting rods can be fixed by the fixing plate, so that the installation is convenient.

[0010] Preferably, the top of the mounting column is fixedly connected with a bolt, and the bolt slides through the corresponding fixing plate. A nut is threadedly sleeved on the bolt. The mounting column and the fixing plate can be conveniently and firmly connected together by using the provided bolt and nut, and are convenient for disassembly and assembly, thereby facilitating transportation.

[0011] Preferably, a plurality of concrete casting blocks are arranged in the road base layer, and a ground-inserted column is fixedly connected to the bottom of the placing platform, and the bottom ends of the plurality of ground-inserted columns respectively extend into the corresponding concrete casting blocks. By using the arranged concrete casting blocks and the ground-inserted columns in combination, the installation column and the road base layer can be conveniently connected together, thereby facilitating paving.

[0012] Preferably, the outer wall fixing sleeve of the ground-inserted column is provided with a plurality of extension plates, and extension rods are welded on all four sides of the ground-inserted column. The contact area between the ground-inserted column and the concrete casting block can be increased by using the provided extension plates and extension rods in combination, thereby improving the connection strength.

[0013] Preferably, the bottoms of the corresponding multiple insertion tubes are fixedly connected with positioning tubes, and the top of the placement table is fixedly connected with four anti-deflection rods, and the top ends of the anti-deflection rods slide and extend into the corresponding positioning tubes. The positioning tubes and anti-deflection rods are used in combination to facilitate the positioning and installation of the insertion tubes.

[0014] Preferably, the reinforcing ribs are made of threaded steel, and the strengthening rods are made of threaded steel. The reinforcing ribs and strengthening rods made of threaded steel can improve the overall strength of the cement cushion layer and effectively prevent it from breaking.

[0015] Beneficial Effects

[0016] The utility model provides a cement cushion base treatment structure. Compared with the prior art, it has the following beneficial effects:

[0017] (1) The cement cushion base treatment structure can improve the overall strength of the cement cushion through the reinforcement mechanism arranged by the longitudinally and transversely distributed reinforcement ribs, thereby preventing the cement cushion from breaking after long-term use and thus increasing its service life. At the same time, its construction method is simple, and only requires simple plug-in to quickly connect, thereby improving installation efficiency and thus improving overall construction efficiency.

[0018] (2) The cement cushion base treatment structure can fix the placement platform and the ground-inserted column by pouring concrete blocks on the road base, so that the installation column and the road base can be firmly connected, thereby improving the connection strength between the cement cushion and the road base. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;

[0020] Figure 2 It is a schematic diagram of the relevant mechanism of the strengthening mechanism in the utility model;

[0021] Figure 3 It is a schematic diagram of the relevant structure of the installation column in the utility model;

[0022] Figure 4 It is a relevant assembly drawing of the connecting rod in the utility model.

[0023] In the figure: 1. road base; 2. cement cushion layer; 3. cement base layer; 4. pavement layer; 5. placement platform; 6. mounting column; 7. connecting rod; 8. insertion tube; 9. reinforcing rib; 10. strengthening rod; 11. fixing plate; 12. bolt; 13. nut; 14. concrete casting block; 15. ground column; 16. expansion plate; 17. extension rod; 18. positioning tube; 19. anti-deflection rod. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Embodiment 1:

[0026] See also Figure 1 and Figure 2 A cement cushion base treatment structure comprises a road base 1, a cement cushion 2 is arranged above the road base 1, a cement base 3 is arranged above the cement cushion 2, a road surface layer 4 is arranged above the cement base 3, and a reinforcement mechanism is arranged in the cement cushion 2;

[0027] The strengthening mechanism includes a plurality of placing platforms 5 arranged in the cement cushion layer 2, the top of the placing platform 5 is fixedly connected with a mounting column 6, connecting rods 7 are arranged around the mounting column 6, both ends of the connecting rod 7 are fixedly connected with an insert tube 8, two reinforcing ribs 9 are arranged between each two adjacent mounting columns 6, one end of the plurality of reinforcing ribs 9 respectively slides and extends into the corresponding insert tube 8, and a plurality of strengthening rods 10 are fixedly connected between each two connected reinforcing ribs 9; a fixing plate 11 is arranged above the mounting column 6, and the four sides of the fixing plate 11 are respectively connected to the corresponding connecting rod 7; a bolt 12 is fixedly connected to the top of the mounting column 6, the bolt 12 slides through the corresponding fixing plate 11, and a nut 13 is threadedly sleeved on the bolt 12.

[0028] Embodiment 2:

[0029] See also Figures 1 to 4 This embodiment provides a technical solution based on the first embodiment: a plurality of concrete casting blocks 14 are arranged in the roadbed 1, and a ground-inserted column 15 is fixedly connected to the bottom of the placement platform 5, and the bottom ends of the plurality of ground-inserted columns 15 extend into the corresponding concrete casting blocks 14 respectively; a plurality of expansion plates 16 are fixedly sleeved on the outer wall of the ground-inserted column 15, and extension rods 17 are welded around the ground-inserted column 15; a positioning cylinder 18 is fixedly connected to the bottom of the corresponding plurality of insertion cylinders 8, and four anti-deflection rods 19 are fixedly connected to the top of the placement platform 5, and the top ends of the anti-deflection rods 19 slide and extend into the corresponding positioning cylinders 18; the reinforcing ribs 9 are made of threaded steel, and the strengthening rods 10 are made of threaded steel.

[0030] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0031] Working principle: When in use, first mark the installation position of the placement platform 5 on the road base layer 1, then straighten the placement platform 5, insert the ground column 15 into the road base layer 1, and then pour the concrete casting block 14 on the outside of the ground column 15 so that it completely wraps the ground column 15. At this time, the placement platform 5 is firmly fixed on the road base layer 1, and then the reinforcing rib 9 is aligned with the insertion tube 8 and inserted, and then the insertion tube 8 on another installation column 6 is aligned with the other end of the reinforcing rib 9 and inserted, and then the installation column 6 is poured again to make it firmly fixed to the road base layer 1, and then the operation is repeated to install multiple installation columns 6, and finally the cement cushion layer 2, cement base layer 3 and pavement layer 4 are laid in sequence.

[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A cement cushion base treatment structure, comprising a road base (1), characterized in that: A cement cushion layer (2) is arranged above the roadbed layer (1), a cement base layer (3) is arranged above the cement base layer (2), a pavement layer (4) is arranged above the cement base layer (3), and a reinforcement mechanism is arranged inside the cement cushion layer (2); The strengthening mechanism comprises a plurality of placement platforms (5) arranged in the cement cushion layer (2), the top of the placement platform (5) is fixedly connected with a mounting column (6), connecting rods (7) are arranged around the mounting column (6), both ends of the connecting rods (7) are fixedly connected with an insert tube (8), two reinforcing ribs (9) are arranged between each two adjacent mounting columns (6), one end of each of the plurality of reinforcing ribs (9) respectively slides and extends into the corresponding insert tube (8), and a plurality of strengthening rods (10) are fixedly connected between each two connected reinforcing ribs (9).

2. A cement cushion base treatment structure according to claim 1, characterized in that: A fixing plate (11) is arranged above the mounting column (6), and four sides of the fixing plate (11) are respectively connected to corresponding connecting rods (7).

3. A cement cushion base treatment structure according to claim 2, characterized in that: A bolt (12) is fixedly connected to the top of the mounting column (6), and the bolt (12) slides through the corresponding fixing plate (11), and a nut (13) is threadedly sleeved on the bolt (12).

4. A cement cushion base treatment structure according to claim 1, characterized in that: A plurality of concrete casting blocks (14) are arranged in the road base layer (1), and a ground-inserted column (15) is fixedly connected to the bottom of the placement platform (5), and the bottom ends of the plurality of ground-inserted columns (15) respectively extend into the corresponding concrete casting blocks (14).

5. A cement cushion base treatment structure according to claim 4, characterized in that: The outer wall of the ground-inserting column (15) is fixedly sleeved with a plurality of expansion plates (16), and extension rods (17) are welded around the four sides of the ground-inserting column (15).

6. A cement cushion base treatment structure according to claim 1, characterized in that: The bottoms of the corresponding plurality of inserting tubes (8) are fixedly connected to positioning tubes (18), and the top of the placing platform (5) is fixedly connected to four anti-deflection rods (19), the top ends of the anti-deflection rods (19) slidingly extending into the corresponding positioning tubes (18).

7. The cement cushion base treatment structure according to claim 1, characterized in that: The reinforcing ribs (9) are made of threaded steel, and the reinforcing rods (10) are made of threaded steel.