Slip system along bridge direction for main bridge steel structure segment slip construction

By adopting a longitudinal sliding system in the construction of the main bridge steel structure and using the cooperation of braking and traction equipment, economic sliding of the main bridge steel structure segments is achieved, which solves the high cost and poor applicability of the existing construction solutions. problems and improve construction efficiency and safety.

CN221822757UActive Publication Date: 2024-10-11NINGBO MUNICIPAL ENG CONSTR GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323141505.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-21
Publication Date
2024-10-11
Estimated Expiration
2033-11-21

AI Technical Summary

Technical Problem

During the construction of the side span steel structure on the Yinzhou side (east side) of the northern main bridge of the Yinzhou Avenue Expressway, due to harsh engineering conditions, existing construction methods such as bracket method, drag method and conventional push method are difficult to implement, and the cost is high, so it cannot Meet construction needs.

Method used

A bridge-wise sliding system is adopted for the sliding construction of steel structure segments of the main bridge. Through the cooperation of braking equipment and traction equipment, the braking wire rope and the traction wire rope are used to drive the steel structure segments of the main bridge to slide from the high-elevation side to the On the low-elevation side, avoid using large-tonnage traveling mechanisms to reduce construction risks and costs.

Benefits of technology

It realizes the economic slippage of the main bridge steel structure segments, avoids the hidden dangers and high costs caused by large-tonnage equipment, is suitable for the construction of variable cross-section sections, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822757U_ABST
    Figure CN221822757U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge-direction slippage system for slippage construction of a main bridge steel structure section, which is used for providing power for slippage operation of the main bridge steel structure section and comprises brake equipment, traction equipment, a brake steel wire rope and a traction steel wire rope, the braking equipment is arranged on the first main pier on the large-elevation side, and the traction equipment is arranged on the second main pier on the low-elevation side; a traction end lifting lug is arranged on the top surface of the main bridge steel structure section, and a braking end lifting lug is arranged on the lower bridge deck slab; the power output end of the braking equipment is connected with the braking end lifting lug through a braking steel wire rope, and the power output end of the traction equipment is connected with the traction end lifting lug through a traction steel wire rope; through cooperation of the traction equipment and the braking equipment, the main bridge steel structure section can be driven to move towards the second main pier. Therefore, power can be provided for sliding operation of the main bridge steel structure section on the full-length track, and main bridge steel structure construction which cannot adopt a land transportation support method and pursues construction economy is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a bridge construction project, in particular to a bridge-direction sliding system for the sliding construction of a main bridge steel structure segment. Background Art

[0002] The construction of the Yinzhou Avenue Expressway (Airport Road-Yinheng Line) project's IV section of the northern main bridge Yinzhou side (east side) steel structure is quite difficult. On the one hand, it is due to the very harsh construction conditions:

[0003] 1) Crossing the Xiku River, with a total width of 50m, including two 15m wide channels and a 20m wide island;

[0004] 2) The river makes a 90° turn near the bridge. The river is parallel to the newly built bridge at the turning section. The river edge is less than 3.0m away from the bridge edge. The total width of the river is more than 30m.

[0005] 3) A 110kV power pipeline is installed on the parallel river channel side of the new bridge, and part of the power pipeline overlaps with the projection surface of the new bridge structure;

[0006] 4) The other side of the new bridge is the existing Yinzhou Bridge, and the gap between the bridge structures is less than 4.0m, with 10kV power pipes (width 1.6m) and DN800 water pipes installed in between;

[0007] 5) The total width between the main pier of the new bridge and the vertical river channel is less than 28m, and is equipped with a 110kV power pipe, a flood control wall, a supporting pile and a shore wall.

[0008] On the other hand, this is because the side span of the Yinzhou side (east side) of the northern main bridge has both vertical curves and horizontal curves:

[0009] 1) The area within 50m of the side pier is plane bending, with a lateral bending peak of 1.49m;

[0010] 2) The side span steel structure has a non-uniform cross-section structure. The total beam height at the main pier is 10.0m, the total beam height at the side pier is 6.0m, and the range of 26.1m near the main pier is a variable height section.

[0011] Therefore, the existing steel structure construction schemes are either unavailable or too expensive to implement:

[0012] 1) The support method (land transportation) is unconditional. One side is the existing bridge, which is not wide enough and has pipelines. The other side is close to the water, and a full-length trestle system needs to be built. Limited by the influence of the 110kV power pipeline (the net distance between the steel pipe pile and the pipeline is not less than 2.0m), the maximum distance between the center of the trestle and the center of the main bridge truss is more than 20m, and a 300T crawler crane is required. The carrying capacity of the site (trestle) is limited and difficult to match.

[0013] 2) The support method (water transport) is feasible, but the cost is high. On the one hand, the water area is small, and the specifications of the floating crane (operating radius) are used to offset the impact of the limited range of activities, so the specifications of the floating crane should not be less than 250T; on the other hand, land assembly sites need to be configured in the surrounding area.

[0014] 3) Both the dragging method (continuous jack process) and the conventional jacking method (walking jack process) rely on the structural bearing capacity and stiffness of the main bridge itself, and both require the setting of a guide beam system. They cannot be applied to the Yinzhou side (east side) side span of the northern main bridge - ① The variable section section is not suitable for the jacking or dragging method construction, so the jacking / drag section is limited to the equal section section with a total length of about 80m; ② In order to balance the overall progress target requirements caused by the delay in pipeline relocation, the elevated connection section on the Yinzhou side of the northern section (prefabricated small box beam system) should be implemented simultaneously with the side span of the main bridge, so a guide beam cannot be set.

[0015] Therefore, in order to complete the construction of the above-mentioned main bridge steel structure, a corresponding construction plan needs to be developed. Utility Model Content

[0016] The utility model aims to provide a sliding system along the bridge direction for the sliding construction of the steel structure segments of the main bridge, so as to provide power for the sliding operation of the steel structure segments of the main bridge on the full-length track, so as to solve the problem of main bridge steel structure construction that cannot adopt the land transport support method and pursues construction economy.

[0017] In order to achieve the above technical objectives, the utility model will adopt the following technical solutions:

[0018] A sliding system along the bridge for sliding construction of steel structure segments of a main bridge, used to provide power for sliding operations of the steel structure segments of the main bridge, including a braking device, a traction device, a braking steel wire rope, and a traction steel wire rope; the braking device is arranged on the first main pier on the high elevation side, and the traction device is arranged on the second main pier on the low elevation side;

[0019] The top surface of the main bridge steel structure segment is provided with traction end lifting lugs, while the lower bridge deck is provided with brake end lifting lugs;

[0020] The power output end of the braking device is connected to the braking end lifting lug through a braking wire rope, while the power output end of the traction device is connected to the traction end lifting lug through a traction wire rope;

[0021] Through the coordination of traction equipment and braking equipment, the steel structure segment of the main bridge can be driven to move toward the second main pier until it reaches the second main pier.

[0022] Preferably, both the braking device and the traction device are winches.

[0023] Preferably, the traction end lifting lug is arranged in the upper chord region of the main bridge steel structure segment.

[0024] Preferably, there are two traction end lifting ears, which are arranged one by one in the two upper chord areas of the main bridge steel structure segment; there are also two traction end lifting ears, which are arranged at intervals on the lower bridge deck of the main bridge steel structure segment.

[0025] Preferably, the center of the lifting eye at the braking end is aligned with the center of the braking device, and the center of the lifting eye at the traction end is aligned with the center of the traction device.

[0026] Preferably, the brake wire rope is connected to the brake end lifting lug after being tensioned by the first wire rope guide pulley, and the first wire rope guide pulley is supported by a pulley bracket installed on the first main pier; the traction wire rope is connected to the traction end lifting lug after being tensioned by the second wire rope guide pulley, and the second wire rope guide pulley is installed on the steel structure segment of the main bridge.

[0027] Preferably, the traction end lifting eye and the brake end lifting eye both include a lifting eye body and stiffening ribs arranged on both sides of the lifting eye body.

[0028] Based on the above technical solution, compared with the prior art, the utility model has the following advantages:

[0029] In order to realize the sliding of the steel structure segment of the main bridge from the high elevation side of the main bridge to the low elevation side of the main bridge, the utility model provides a sliding system along the bridge. The sliding system along the bridge can provide power for the sliding operation of the steel structure segment of the main bridge, so that it can operate in a traction forward mode, effectively avoiding the hidden dangers of sliding operation caused by using a large-tonnage walking mechanism. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a structural schematic diagram of the sliding system along the bridge direction for the sliding construction of the steel structure segment of the main bridge described in the utility model;

[0031] Figure 2 It is the layout diagram of the brake end lifting lugs and traction end lifting lugs on any main bridge steel structure segment;

[0032] Figure 3 It is a structural schematic diagram of the brake end lifting eye / traction end lifting eye described in the utility model;

[0033] In the figure: 11, first main pier; 12, second main pier;

[0034] 21-Track driving assembly;

[0035] 31. Braking device; 32. Braking wire rope; 33. First wire rope guide pulley; 34. Braking end lifting lug; 341. First brake end lifting lug; 342. Second brake end lifting lug; 35. Traction end lifting lug; 351. First traction end lifting lug; 352. Second traction end lifting lug; 36. Second wire rope guide pulley; 37. Traction wire rope; 38. Traction device; 39. Pulley bracket;

[0036] 34-1. Lifting eye body; 34-2. Stiffening rib. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means any restriction on the utility model and its application or use. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Unless otherwise specified, the relative arrangement, expressions and numerical values ​​of the components and steps described in these embodiments do not limit the scope of the utility model. The techniques, methods and equipment known to ordinary technicians in the relevant fields may not be discussed in detail, but in appropriate cases, the techniques, methods and equipment should be regarded as part of the specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, not as a limitation. Therefore, other examples of the exemplary embodiments may have different values.

[0038] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations).

[0039] like Figures 1 to 3As shown, the utility model fully considers the challenges of sliding construction under the full-length track, such as long sliding distance, heavy weight of load-bearing components, and mismatch of track elevation. When automatic traveling equipment is selected, either the load tonnage is too small (refer to the traveling wheel of the electric hoist, the load of a single unit does not exceed 10 tons), or the component size is large (refer to the rail travel of the gantry crane). Large-tonnage automatic traveling equipment not only greatly increases the construction cost, but also increases the moving center of gravity of the carrying component due to the large size of the component, increasing the risk of sliding operation (the risk of overturning caused by slight deviations is increased, such as Figures 1 to 3 As shown in Figure 1, during long-distance sliding, this state is exposed for a long time and poses a greater risk. In addition, the distance between the transport component and the supporting beam is too large, which greatly increases the degree of restriction on the construction environment. For example, in areas across rivers, the large distance may result in limited navigation clearance (as shown in Figure 1); in low-clearance areas, the bottom elevation of the supporting beam may be lower than the ground elevation. In addition, the axle diameter of the large-tonnage walking mechanism is relatively large, usually not less than 500mm, and a single support is close to a "single-point" or "two-point" support. The mismatch in track elevation causes the fulcrum to be emptied, resulting in a decrease in stability and a greatly increased probability of the axle getting stuck on the track. These are all major hidden dangers in sliding construction.

[0040] In summary, the sliding operation of the full-length track should avoid automatic driving equipment, use a winch or continuous jack to provide traction power, and operate in a traction forward mode. To this end, the utility model provides a bridge-direction sliding system for the sliding construction of the steel structure segment of the main bridge, which is used to provide power for the sliding operation of the steel structure segment of the main bridge, including a braking device 31, a traction device 38, a braking wire rope 32, and a traction wire rope 37; and the braking device 31 is arranged on the first main pier 11 (high elevation side), and the traction device 38 is arranged on the second main pier 12 (low elevation side); the top surface of the upper chord of the two segments of the sliding segment is arranged with a traction end lug 35, and the lower bridge deck is arranged with a braking end lug 34; the braking device 31 is arranged on the upper chord of the two segments of the sliding segment. The power output end of the device 31 is connected to the brake end lifting lug 34 through the brake wire rope 32, and the power output end of the traction device 38 is connected to the traction end lifting lug 35 through the traction wire rope 37; the main bridge steel structure segment is movably supported on the through-length track of the first main pier 11 and the second main pier 12 through the track traveling assembly 21, and through the cooperation of the traction device 38 and the brake device 31, the sliding segment on it can be driven by the track traveling assembly 21 to move along the sliding track toward the second main pier 12 until it reaches the second main pier 12. The brake device 31 and the traction device 38 both use winches; the winch at the brake end controls the speed and accuracy, and the winch at the traction end is more likely to provide greater traction.

[0041] like Figure 2As shown, both braking and traction adopt double-point type, that is, there are two traction end lifting ears 35, which are arranged one by one in the two upper chord areas of the main bridge steel structure segment, and there are two brake end lifting ears 34, which are arranged at intervals in the lower bridge deck area of ​​the main bridge steel structure segment. The two traction end lifting ears 35 correspond to the first traction end lifting ear 351 and the second traction end lifting ear 352. The two brake end lifting ears 34 correspond to the first brake end lifting ear 341 and the second brake end lifting ear 342.

[0042] The center of the brake end lifting lug 34 is aligned with the center of the brake tension hoist (brake device 31), and the center of the traction end lifting lug 35 is aligned with the center of the traction end winch, but the relative position with the upper chord of the side span steel structure is not fixed. To this end, the brake wire rope 32 of the utility model is connected to the brake end lifting lug 34 after being tensioned by the first wire rope guide pulley 33, and the first wire rope guide pulley 33 is supported by a pulley bracket 39 installed on the first main pier 11; the traction wire rope 37 is connected to the traction end lifting lug 35 after being tensioned by the second wire rope guide pulley 36, and the second wire rope guide pulley 36 is installed on the main bridge steel structure segment. The configuration of the first wire rope guide pulley 33 and the second wire rope guide pulley 36 can effectively ensure that the center of the brake end lifting lug 34 is aligned with the center of the brake tension hoist (brake device 31), and the center of the traction end lifting lug 35 is aligned with the center of the traction end winch, which is convenient for the traction operation of the system.

[0043] like Figure 3 As shown, the traction end lifting eye 35 and the brake end lifting eye 34 both include a lifting eye body 34 - 1 and stiffening ribs 34 - 2 arranged on both sides of the lifting eye body 34 - 1 .

Claims

1. A sliding system along the bridge direction for sliding construction of steel structure segments of the main bridge, used to provide power for the sliding operation of the steel structure segments of the main bridge, It is characterized in that It includes a braking device, a traction device, a braking steel wire rope, and a traction steel wire rope; the braking device is arranged on the first main pier on the high elevation side, and the traction device is arranged on the second main pier on the low elevation side; The top surface of the main bridge steel structure segment is provided with traction end lifting lugs, while the lower bridge deck is provided with brake end lifting lugs; The power output end of the braking device is connected to the braking end lifting lug through a braking wire rope, while the power output end of the traction device is connected to the traction end lifting lug through a traction wire rope; Through the coordination of traction equipment and braking equipment, the steel structure segment of the main bridge can be driven to move toward the second main pier until it reaches the second main pier.

2. According to claim 1, the sliding system along the bridge direction for the sliding construction of the main bridge steel structure segment, It is characterized in that Braking equipment and traction equipment all use winches.

3. According to claim 2, the sliding system along the bridge direction for the sliding construction of the main bridge steel structure segment, It is characterized in that The traction end lifting lug is arranged in the upper chord region of the main bridge steel structure segment.

4. According to claim 3, the sliding system along the bridge direction for the sliding construction of the main bridge steel structure segment, It is characterized in that There are two traction end lifting ears, which are arranged one by one in the two upper chord areas of the main bridge steel structure segment; there are also two traction end lifting ears, which are arranged at intervals on the lower bridge deck of the main bridge steel structure segment.

5. According to claim 4, the sliding system along the bridge direction for the sliding construction of the main bridge steel structure segment, It is characterized in that The center of the lifting eye at the brake end is aligned with the center of the brake device, and the center of the lifting eye at the traction end is aligned with the center of the traction device.

6. The sliding system along the bridge direction for the sliding construction of the main bridge steel structure segment according to claim 5, It is characterized in that The brake wire rope is connected to the brake end lifting lug after being tensioned by the first wire rope guide pulley, and the first wire rope guide pulley is supported by a pulley bracket installed on the first main pier; the traction wire rope is connected to the traction end lifting lug after being tensioned by the second wire rope guide pulley, and the second wire rope guide pulley is installed on the steel structure segment of the main bridge.

7. The sliding system along the bridge direction for the sliding construction of the main bridge steel structure segment according to claim 6, It is characterized in that The traction end lifting eye and the brake end lifting eye both include a lifting eye body and stiffening ribs arranged on both sides of the lifting eye body.

Citation Information

Cited By

  • Construction method of lattice beam in special terrain environment

    CN120700801A