Air preheating system of gas-fired boiler

By designing an air preheating system in a gas boiler, using boiler feed water to heat air and perform double heat exchange, the problem of unrecovered flue gas heat at the end of the boiler is solved, and combustion efficiency and heat energy utilization are improved.

CN221825387UActive Publication Date: 2024-10-11HONGYUN HONGHE TOBACCO (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420237199.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-10-11
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

There is still a large amount of heat in the flue gas at the tail of the gas boiler that has not been effectively recovered, resulting in heat waste, and the air is not fully preheated, affecting combustion efficiency.

Method used

A gas boiler air preheating system is designed, which heats the air through the boiler feed water and uses primary and secondary economizers for double heat exchange, fully recovering the heat energy of the flue gas at the end of the boiler and improving combustion and heat transfer efficiency.

Benefits of technology

It effectively reduces the boiler exhaust temperature, improves the boiler thermal efficiency by about 2%, strengthens the combustion process, and improves heat energy utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221825387U_ABST
    Figure CN221825387U_ABST
Patent Text Reader

Abstract

The utility model discloses an air preheating system of a gas-fired boiler, which comprises a boiler body provided with a smoke outlet, a water inlet, a burner and a steam supply port, and a boiler water supply pipeline is connected with the water inlet; the first-stage energy saver is arranged between the boiler water supply pipeline and the water inlet; the air feeder is connected with the combustor and used for supplying air to the combustor; the first air pre-heater gas-water heat exchanger is arranged between the air feeder and the combustor; a three-way adjusting valve is arranged at a boiler water supply pipeline opening and supplies water to the first air pre-heater gas-water heat exchanger and the first-stage energy saver. Boiler feed water reaches the water inlet after passing through the first-stage energy saver; boiler flue gas is discharged from the flue gas outlet, is subjected to heat exchange with boiler feed water through the first-stage energy saver and then is discharged; air supplied by the air feeder exchanges heat with boiler feed water through the first air pre-heater air-water heat exchanger and then enters the boiler. According to the system, part of boiler feed water is used for preheating air before entering the boiler, and the boiler heat efficiency can be improved by about 2%.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of gas boiler pipelines, in particular to an air preheating system for a gas boiler. Background Art

[0002] Tobacco production needs to go through the production processes of tobacco leaf primary baking, leaf beating and re-baking, tobacco fermentation, cigarette formula, cigarette silk making, cigarette stick making, cigarette packaging, etc. Many processes require a large amount of steam consumption, so tobacco factories are equipped with power workshops. The gas steam boiler in the workshop is the steam supply equipment that most tobacco companies will choose. It can quickly meet the corresponding needs in terms of steam quality and large-scale steam supply. In addition, the thermal efficiency of the gas steam boiler is above 94%, which can effectively increase the output of tobacco and also control the humidity of the production environment. The flue gas temperature at the tail of the gas boiler is about 245℃, which is directly discharged into the atmosphere, causing a lot of heat waste. Therefore, the current boiler equipment is usually equipped with a heat recovery device, such as a primary energy saver. However, after the primary energy saver, the flue gas temperature is 125℃, and there is still a lot of heat in the flue gas, which is directly discharged into the atmosphere, causing a lot of heat waste.

[0003] Furthermore, air at room temperature is usually introduced into the combustion of the boiler. If the air supply temperature of the boiler is increased from room temperature to about 80°C, the drying, ignition and combustion process of the fuel can be accelerated, stable combustion in the boiler can be ensured, and the thermal efficiency of the boiler can be improved. As the combustion in the furnace is improved and strengthened, and the temperature of the hot air entering the furnace is increased, the average temperature level in the furnace is also increased, thereby enhancing the radiation heat transfer in the furnace. The strengthening of radiation heat exchange can reduce the loss of chemical incomplete combustion. On the other hand, the air preheater uses the waste heat of the flue gas to further reduce the exhaust loss, thereby improving the thermal efficiency of the boiler. Summary of the invention

[0004] In order to solve the existing technical problems, the purpose of this utility model is to provide a gas boiler air preheating system, which uses part of the boiler feed water to heat the air before entering the boiler, preheats the boiler intake air to a certain temperature, thereby strengthening combustion and heat transfer, and at the same time, the flue gas at the tail of the boiler can be used for heat exchange twice, fully recovering its heat energy. The specific contents are as follows:

[0005] A gas boiler air preheating system, comprising:

[0006] The boiler body includes a smoke exhaust port, a water inlet, a burner and a steam supply port; the boiler water supply pipe is connected to the water inlet;

[0007] A primary economizer, arranged and installed between the boiler water feed pipe and the water inlet;

[0008] an air blower connected to the burner and used to supply air to the burner;

[0009] A first air preheater air-water heat exchanger is installed between the blower and the burner;

[0010] A three-way regulating valve is provided at the boiler feed water pipe outlet to supply water to the first air preheater air-water heat exchanger and the first-level economizer respectively; the boiler feed water reaches the water inlet after passing through the first-level economizer; after the boiler flue gas is discharged from the exhaust port, it first passes through the first-level economizer to exchange heat with the boiler feed water before being discharged; the blower air passes through the first air preheater air-water heat exchanger to exchange heat with the boiler feed water before entering the boiler.

[0011] Furthermore, a second air preheater air-water heat exchanger is provided, and the boiler flue gas passing through the first-stage economizer continues to pass through the second air preheater air-water heat exchanger and is then discharged; the boiler feed water passing through the first air preheater air-water heat exchanger continues to enter the second air preheater air-water heat exchanger and performs heat exchange with the boiler flue gas passing through the second air preheater air-water heat exchanger.

[0012] Furthermore, the boiler feed water passes through the first air preheater air-water heat exchanger and the second air preheater air-water heat exchanger in sequence after passing through the three-way regulating valve, and is then fixedly connected between the three-way regulating valve and the first-level economizer; the boiler flue gas passes through the second air preheater air-water heat exchanger and is discharged through the chimney.

[0013] Furthermore, a boiler air supply temperature sensor is installed between the blower and the burner; a boiler final exhaust temperature sensor is installed between the second air preheater air-water heat exchanger and the chimney; and a boiler body exhaust temperature sensor is installed between the exhaust port and the first-level economizer.

[0014] Furthermore, a first temperature sensor is installed between the first-stage economizer and the boiler water inlet; a second temperature sensor is installed at the water outlet after the boiler feed water passes through the second air preheater air-water heat exchanger; and a third temperature sensor is installed between the second air preheater air-water heat exchanger and the first air preheater air-water heat exchanger.

[0015] Furthermore, the flow ratio of the boiler feed water entering the first air preheater air-water heat exchanger and the first-stage economizer after passing through the three-way regulating valve is three to seven.

[0016] The working principle is as follows: the boiler feed water passes through the three-way regulating valve 9 for distribution and regulation, 30% of the boiler feed water enters the first air preheater air-water heat exchanger 4 for heat exchange with air, and the normal temperature air enters the first air preheater air-water heat exchanger 4 through the blower 6 for preheating. The boiler supply air temperature sensor 15 is installed on the air supply pipe to detect the supply air temperature, and the boiler supply air enters the boiler body 1 through the burner 2 and mixes with the gas for combustion. The water temperature of the boiler feed water after heat exchange with the normal temperature air in the first air preheater air-water heat exchanger 4 is reduced, and the first temperature sensor 13 is installed on the outlet pipe to detect the water temperature after heat exchange. The outlet water of the first air preheater air-water heat exchanger 4 returns to the second air preheater air-water heat exchanger 7 for heat exchange with the flue gas of the first-stage economizer 3 and is heated. The outlet pipe of the second air preheater air-water heat exchanger 7 is equipped with the second air preheater temperature sensor 12 for detecting the water temperature. The outlet water of the second air preheater air-water heat exchanger 7 is mixed with 70% of the water distributed to the water supply main pipe by the boiler feed water three-way regulating valve 9 and enters the first-stage economizer 3. The boiler feed water in the first-stage economizer 3 is heat exchanged and heated with the exhaust gas waste heat of the boiler body 1, and enters the boiler body 1 through the boiler water inlet 10. The boiler body exhaust temperature sensor 14 is installed on the exhaust pipe for detecting the exhaust temperature. The steam generated by the boiler body 1 is transported to the steam receiving point through the boiler steam supply port. The boiler final exhaust temperature sensor 16 is installed at the end of the exhaust pipe for detecting the exhaust temperature. The qualified flue gas of the boiler finally enters the chimney 5 and is discharged into the atmosphere.

[0017] The utility model has the following beneficial effects compared with the prior art:

[0018] This system uses part of the boiler feed water to preheat the air before it enters the boiler to a certain temperature, thereby enhancing combustion and heat transfer. The boiler feed water after heat exchange is then heat exchanged with the flue gas at the tail end of the boiler, which can effectively reduce the boiler exhaust temperature while making full use of the huge heat in the flue gas, and can improve the boiler thermal efficiency by about 2%. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the system connection method of the utility model.

[0020] In the figure:

[0021] 1—boiler body, 2—burner, 3—primary economizer, 4—first air preheater air-water heat exchanger, 5—chimney, 6—blower, 7—second air preheater air-water heat exchanger, 8—third temperature sensor, 9—three-way regulating valve, 10—water inlet, 11—steam supply port, 12—second temperature sensor, 13—first temperature sensor, 14—boiler body exhaust temperature sensor, 15—boiler supply air temperature sensor, 16—boiler final exhaust temperature sensor. DETAILED DESCRIPTION

[0022] In order to make the technical means and creative features realized by the utility model and achieve the purpose of being easy to understand, the technical solution of the invention is further explained below in combination with one embodiment and specific implementation method of a gas boiler air preheating system provided by the utility model.

[0023] like Figure 1 As shown, the specific embodiments given for the invention are as follows:

[0024] A gas boiler air preheating system comprises a boiler body 1, a primary economizer 3, a blower 6, a first air preheater air-water heat exchanger 4, and a second air preheater air-water heat exchanger 7.

[0025] The boiler body 1 includes a smoke exhaust port, a water inlet 10, a burner 2 and a steam supply port 11; the boiler water supply pipe is connected to the water inlet 10. The primary economizer 3 is arranged between the boiler water supply pipe and the water inlet 10. The blower 6 is connected to the burner 2 and is used to supply air to the burner 2. The first air preheater air-water heat exchanger 4 is arranged between the blower 6 and the burner 2. A three-way regulating valve 9 is arranged at the boiler water supply pipe port to supply water to the first air preheater air-water heat exchanger 4 and the primary economizer 3 respectively; the boiler feed water reaches the water inlet 10 after passing through the primary economizer 3; after the boiler smoke is discharged from the smoke exhaust port, it first passes through the primary economizer 3 to exchange heat with the boiler feed water before being discharged; the blower 6 sends air through the first air preheater air-water heat exchanger 4 to exchange heat with the boiler feed water before entering the boiler. The boiler flue gas passing through the first-stage economizer 3 continues to pass through the second air preheater air-water heat exchanger 7 and is then discharged; the boiler feed water passing through the first air preheater air-water heat exchanger 4 continues to enter the second air preheater air-water heat exchanger 7 to perform heat exchange with the boiler flue gas passing through the second air preheater air-water heat exchanger 7.

[0026] The boiler feed water passes through the three-way regulating valve 9 and then passes through the first air preheater air-water heat exchanger 4 and the second air preheater air-water heat exchanger 7 in sequence, and then is fixedly connected between the three-way regulating valve 9 and the first-stage economizer 3; the boiler flue gas passes through the second air preheater air-water heat exchanger 7 and then is discharged through the chimney 5.

[0027] A boiler air supply temperature sensor 15 is installed between the blower 6 and the burner 2; a boiler final exhaust temperature sensor 16 is installed between the second air preheater air-water heat exchanger 7 and the chimney 5; a boiler body exhaust temperature sensor 14 is installed between the exhaust port and the first-stage economizer 3. A first temperature sensor 13 is installed between the first-stage economizer 3 and the boiler water inlet 10; a second temperature sensor 12 is installed at the outlet of the boiler feed water after passing through the second air preheater air-water heat exchanger 7; a third temperature sensor 8 is installed between the second air preheater air-water heat exchanger 7 and the first air preheater air-water heat exchanger 4.

[0028] The boiler feed water at 104°C passes through the three-way regulating valve 9 for distribution and regulation, 30% of the boiler feed water enters the first air preheater air-water heat exchanger 4 to exchange heat with the air, and the normal temperature air enters the first air preheater air-water heat exchanger 4 through the blower 6 to be preheated to 80°C. The boiler supply air temperature sensor 15 is installed on the air supply pipe to detect the supply air temperature, and the boiler supply air enters the boiler body 1 through the burner 2 and mixes with the gas for combustion. The water temperature of the boiler feed water after heat exchange with the normal temperature air in the first air preheater air-water heat exchanger 4 is reduced to 65°C, and the first temperature sensor 13 is installed on the outlet pipe to detect the water temperature after heat exchange. The outlet water of the first air preheater air-water heat exchanger 4 at 65℃ returns to the second air preheater air-water heat exchanger 7 to heat exchange with the flue gas of the first economizer 3 at 125℃ and then heats to 104℃. The outlet pipe of the second air preheater air-water heat exchanger 7 is equipped with the second air preheater temperature sensor 12 for detecting the water temperature. The outlet water of the second air preheater air-water heat exchanger 7 is mixed with 70% of the water distributed to the water supply main pipe by the boiler feed water three-way regulating valve 9 and enters the first economizer 3. The boiler feed water in the first economizer 3 is heat exchanged with the exhaust gas waste heat of the boiler body at 1245℃ and heated to 135℃, and enters the boiler body 1 through the boiler water inlet 10. The boiler body exhaust temperature sensor 14 is installed on the exhaust pipe to detect the exhaust temperature. The steam generated by the boiler body 1 is transported to the steam receiving point through the boiler steam supply port. The boiler final exhaust temperature sensor 16 is installed at the end of the exhaust pipe to detect the exhaust temperature. The qualified flue gas of the boiler finally enters the chimney 5 and is discharged into the atmosphere.

[0029] It should be understood that the above specific embodiments are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. The claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.

Claims

1. A gas boiler air preheating system, characterized in that: include: A boiler body (1) comprises a smoke exhaust port, a water inlet (10), a burner (2) and a steam supply port (11); a boiler water supply pipe is connected to the water inlet (10); A primary economizer (3) is installed between the boiler water feed pipe and the water inlet (10); an air blower (6), connected to the burner (2) and used to supply air to the burner (2); A first air preheater air-water heat exchanger (4) is installed between the blower (6) and the burner (2); A three-way regulating valve (9) is provided at the boiler feed water pipe outlet, and water is supplied to the first air preheater air-water heat exchanger (4) and the first-stage economizer (3) respectively; the boiler feed water reaches the water inlet (10) after passing through the first-stage economizer (3); after the boiler smoke is discharged from the smoke exhaust port, it first passes through the first-stage economizer (3) to perform heat exchange with the boiler feed water before being discharged; the blower (6) supplies air through the first air preheater air-water heat exchanger (4) to perform heat exchange with the boiler feed water before entering the boiler.

2. A gas boiler air preheating system according to claim 1, characterized in that: A second air preheater air-water heat exchanger (7) is also provided. The boiler flue gas passing through the first-stage economizer (3) continues to pass through the second air preheater air-water heat exchanger (7) before being discharged; the boiler feed water passing through the first air preheater air-water heat exchanger (4) continues to enter the second air preheater air-water heat exchanger (7) to perform heat exchange with the boiler flue gas passing through the second air preheater air-water heat exchanger (7).

3. A gas boiler air preheating system as claimed in claim 2, characterized in that: The boiler feed water passes through the three-way regulating valve (9) and then passes through the first air preheater air-water heat exchanger (4) and the second air preheater air-water heat exchanger (7) in sequence, and then is fixedly connected between the three-way regulating valve (9) and the first-stage economizer (3); the boiler flue gas passes through the second air preheater air-water heat exchanger (7) and then is discharged through the chimney (5).

4. A gas boiler air preheating system as claimed in claim 3, characterized in that: A boiler air supply temperature sensor (15) is installed between the blower (6) and the burner (2); a boiler final exhaust temperature sensor (16) is installed between the second air preheater air-water heat exchanger (7) and the chimney (5); and a boiler body exhaust temperature sensor (14) is installed between the exhaust port and the primary economizer (3).

5. A gas boiler air preheating system as claimed in claim 3, characterized in that: A first temperature sensor (13) is installed between the primary economizer (3) and the boiler water inlet (10); a second temperature sensor (12) is installed at the water outlet of the boiler feed water after passing through the second air preheater air-water heat exchanger (7); and a third temperature sensor (8) is installed between the second air preheater air-water heat exchanger (7) and the first air preheater air-water heat exchanger (4).

6. The gas boiler air preheating system according to claim 1, characterized in that: The boiler feed water passes through the three-way regulating valve (9) and then enters the first air preheater air-water heat exchanger (4) and the first-stage economizer (3) at a flow ratio of three to seven.