Foundation pit drill rod detection point distribution tool
By designing a foundation pit drilling point distribution tool and using a sliding rod and a compressed air system to form marking points, the problem of positional inaccuracy caused by lime drift in the existing technology has been solved, and the positioning accuracy and work efficiency of the drilling exploration have been improved.
Patent Information
- Application Number
- CN202323421218.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-14
AI Technical Summary
During the marking process of the existing foundation pit drilling point distribution device, the marking position is inaccurate due to the influence of wind force on the lime, which affects the accuracy of the drilling position.
A foundation pit drilling point detection tool is designed, including a movable bracket, a connecting tube, an ash storage bin, a sliding rod and a cylinder. The marking point is formed by the rapid descent of the sliding rod, and compressed air is used to bring white lime into the marking point to ensure Prominence and reliability of marked locations.
It improves the accuracy and work efficiency of the drill position, ensures that the drill tool can be accurately inserted into the marked point, and reduces the operation time and labor intensity.
Smart Images

Figure CN221837560U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction auxiliary devices, in particular to a foundation pit drilling point distribution tool. Background Art
[0002] Foundation drilling means that after the foundation excavation reaches the design elevation, a standard diameter steel drill with a scale is marked according to regulations, and a hammer with a calibrated weight is used to vertically hit the steel drill into the foundation soil layer by mechanical or manual means. According to the number of hammers required for the steel drill to enter the foundation soil layer to be detected for every 300mm, the hidden structure in the soil layer below the foundation surface is explored, the hardness of the soil is judged, and whether there are pits, ancient tombs, air-raid shelters and underground buried objects are detected. Foundation drilling is an important step before the construction of the entire main project.
[0003] Chinese patent publication number CN219099993U discloses a device for quickly placing plum blossom-shaped drilling probe points in a foundation pit. When marking the points, the device forms the marking points by sprinkling lime on the marking points.
[0004] However, since the lime falls from the funnel to the ground of the foundation pit, during this process, the lime may be scattered everywhere due to the influence of wind, resulting in a large lime coverage area on the ground at the marked position. In this way, during the subsequent probing operation, the probe cannot be accurately found, resulting in a decrease in the position accuracy of the probe. Utility Model Content
[0005] The technical problem to be solved by the utility model is to overcome the defects of the prior art and provide a foundation pit drilling point arrangement tool. In order to solve the above-mentioned technical problems, the utility model provides the following technical solutions:
[0006] The utility model provides: a foundation pit drilling point arrangement tool, comprising:
[0007] Mobile stand;
[0008] A connecting tube vertically fixed to the movable bracket at a fixed arrangement interval;
[0009] An ash storage bin fixedly connected to the lower end of the connecting tube and provided with supporting legs at the bottom, wherein the ash storage bin is provided with a compressed air inlet;
[0010] A sliding rod is coaxially arranged on the connecting tube and can slide freely up and down, and the sliding rod can freely penetrate the ash storage bin. A pointed head is arranged at the lower end of the sliding rod, and a connecting cavity is arranged inside the sliding rod. An ash outlet penetrating the connecting cavity is arranged on the surface of the pointed head, and an ash inlet penetrating the connecting cavity is also arranged on the sliding rod.
[0011] Preferably, the movable bracket includes a long rod and a plurality of short rods vertically fixed to the long rod, a collar is fixed to each of the long rod and the short rod, and the connecting tube is correspondingly inserted into the collar.
[0012] Preferably, the ash storage bin is provided with an ash supply port penetrating the interior thereof.
[0013] Preferably, a cylinder is vertically installed on the top of the connecting tube, and the cylinder rod of the cylinder is connected to the upper end of the sliding rod.
[0014] Preferably, a connecting seat with an internal hollow is provided on the top of the ash storage bin, the compressed air inlet is fixedly connected to the connecting seat and communicates with the interior of the connecting seat, a plurality of connecting grooves which communicate with the interior of the connecting seat are opened on the top of the ash storage bin, a floating rod is vertically penetrated through the connecting seat, the floating rod can slide freely up and down on the connecting seat and the ash storage bin, a baffle is provided on the end of the floating rod which penetrates into the ash storage bin, and the connecting groove can be closed when the upper end surface of the baffle abuts against the top wall of the ash storage bin.
[0015] Preferably, a connecting rod is horizontally fixed to the sliding rod, and a floating pressure block is provided at one end of the connecting rod passing through the connecting tube. The floating pressure block is located above the floating rod. A waist-shaped hole is provided on the connecting tube for the connecting rod to move up and down freely through. An elastic abutment structure is provided in the connecting seat, and the elastic abutment structure is used to drive the floating rod to move upward.
[0016] Preferably, a ball is rotatably embedded on the upper end of the floating rod.
[0017] Preferably, the elastic abutting structure comprises a limiting ring sleeved on the floating rod, and a spring is further sleeved on the floating rod, and the spring elastically abuts against the limiting ring.
[0018] Beneficial Effects
[0019] Compared with the prior art, the beneficial effects of the utility model are:
[0020] By setting the sliding rod and the pointed head, when performing the point arrangement operation, the sliding rod moves downward quickly, so that the pointed head is inserted into the ground of the foundation pit to form a marking point on the ground, and the marking point is small, which is convenient for the subsequent drilling operation, and the drilling tool can be accurately inserted into the marking point, thereby improving the position accuracy of the drilling probe;
[0021] In addition, by setting up an ash storage bin, when the pointed tip is inserted into the ground of the foundation pit, compressed air is generated by an external air compressor, and the compressed air can bring the white lime in the ash storage bin from the ash inlet of the sliding rod to the ash outlet, so that the white lime enters the marked point, which makes the marked point more eye-catching, helps the staff to quickly find the marked point of the probe, and improves the efficiency of the probe work;
[0022] By setting a cylinder to drive the sliding rod to move downward quickly, the pointed head can be quickly inserted into the ground of the foundation pit, saving time and effort;
[0023] By setting the sliding rod to move downward to a fixed position, the floating pressure block contacts the upper end of the floating rod, and then as the sliding rod continues to move downward, the floating rod can move downward, so that the baffle is out of contact with the top wall of the ash storage bin, so that compressed air can enter the connecting seat from the compressed air inlet, and then enter the ash storage bin through the connecting groove. Since compressed air can only enter the ash storage bin during the downward movement of the sliding rod, it is avoided that compressed air enters the ash storage bin when the marking operation is not performed, causing the air pressure in the ash storage bin to increase. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0025] Figure 1 It is a structural schematic diagram of a foundation pit drilling point arrangement tool of the utility model;
[0026] Figure 2 This is a schematic diagram of the structure after the movable bracket is omitted in the utility model;
[0027] Figure 3 for Figure 2 A schematic cross-sectional view of the structure;
[0028] Figure 4 for Figure 3 A schematic diagram of the enlarged local structure at point A in the middle;
[0029] Figure 5 for Figure 2 Schematic diagram of the structure from an upward angle;
[0030] Figure 6 for Figure 5 A magnified schematic diagram of the local structure at point B in the middle.
[0031] In the figure, the description of each reference numeral is as follows: 1-long rod; 2-short rod; 3-ring; 4-ash storage bin; 5-connecting tube; 6-cylinder; 7-ash filling port; 8-leg; 9-floating pressure block; 10-floating rod; 11-connecting seat; 12-compressed air inlet; 13-sliding rod; 14-connecting rod; 15-waist-shaped hole; 16-pointed head; 17-ash inlet; 18-spring; 19-baffle; 20-ball; 21-limiting ring; 22-connecting groove; 23-ash outlet. DETAILED DESCRIPTION
[0032] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0033] Example
[0034] like Figure 1-6 As shown, this embodiment provides a technical solution: a foundation pit drilling point arrangement tool, comprising:
[0035] The mobile bracket includes a long rod 1 and a plurality of short rods 2 vertically fixed to the long rod 1. A collar 3 is fixed to each of the long rod 1 and the short rod 2. The number of the short rods 2 is generally two, or in other words, only two short rods 2 are usually arranged on one long rod 1. Of course, the number of the short rods 2 in this embodiment is not specifically limited. The length directions of the short rod 2 and the long rod 1 are perpendicular to each other. In this embodiment, a collar 3 is welded to each of the free ends of the short rod 2 and the middle part of the long rod 1. The arrangement spacing between the five collars 3 is fixed, or is arranged by the staff according to the specific situation.
[0036] A connecting tube 5 vertically fixed to the mobile bracket at a fixed arrangement interval, and the connecting tube 5 can be inserted into the collar 3 by welding;
[0037] A ash storage bin 4 is fixedly connected to the lower end of the connecting tube 5 and is provided with a support leg 8 at the bottom. The interior of the ash storage bin 4 is hollow and is used to store white lime. A compressed air inlet 12 is provided on the ash storage bin 4. The compressed air inlet 12 is connected to an external air compressor through an air pipe, so that the compressed air generated by the air compressor will enter the ash storage bin 4 from the compressed air inlet 12.
[0038] A sliding rod 13 is coaxially arranged on the connecting tube 5 and can slide freely up and down. The sliding rod 13 can freely penetrate the ash storage bin 4. A pointed head 16 is provided at the lower end of the sliding rod 13, and a connecting cavity is provided inside the sliding rod 13. An ash outlet 23 that passes through the connecting cavity is provided on the surface of the pointed head 16. An ash inlet 17 that passes through the connecting cavity is also provided on the sliding rod 13. In the initial state, the ash inlet 17 on the sliding rod 13 is located in the connecting tube 5, and the ash outlet 23 is located in the ash storage bin 4. In this way, the white lime in the ash storage bin 4 will not enter the ash outlet 23 from the ash inlet 17 on the sliding rod 13 in the initial state. In addition, a cylinder 6 is installed at the upper end of the connecting tube 5. The cylinder rod of the cylinder 6 can be slidably inserted into the connecting tube 5 and is welded to the upper end of the sliding rod 13, so that the cylinder rod of the cylinder 6 can be extended and retracted.
[0039] Specifically, when performing the marking operation, two workers first hold the handles at both ends of the long rod 1 and carry the mobile bracket into the foundation pit, then select a fixed probe coordinate point, and then place one of the ash storage bins 4 on the probe coordinate point, and then start the external air compressor so that the air compressor can supply air to the cylinder 6, thereby extending the cylinder rod of the cylinder 6 to drive the sliding rod 13 to move downward quickly, so that the pointed tip 16 moves downward and is inserted into the foundation pit ground to form a marking point on the ground, and the marking point has a certain depth, so that when subsequent workers perform probe detection, the probe tool is directly inserted into the marking point, thereby making multiple probe marking points (marking points in this embodiment) The number of them is five) with a fixed spacing, and the accuracy of the marking points is high. After the pointed head 16 is inserted into the foundation pit, the ash inlet 17 of the sliding rod 13 moves to the ash storage bin 4, and the ash outlet 23 passes through the ash storage bin 4 and enters the marking point. Then the air compressor supplies air to the compressed air inlet, so that the compressed air can enter the ash storage bin 4. The white lime storage amount in the ash storage bin 4 can be ensured to be flush with the lower edge of the ash inlet 17, so that when the compressed air enters the ash inlet 17 from the ash storage bin 4, the white lime in the ash storage bin 4 can be brought into the connecting cavity of the sliding rod 13, and then sprayed from the ash outlet 23 to the marking point, so that the marking point can be more eye-catching, which is convenient for subsequent staff to accurately find the marking point.
[0040] like Figure 2 , 3 As shown, the ash storage bin 4 is provided with an ash filling port 7 which passes through the interior thereof, and a baffle (not shown in the figure) is installed on the ash filling port 7. Since the storage amount of white lime in the ash storage bin 4 needs to be ensured, the white lime needs to be added to the ash storage bin 4. During the specific operation, the baffle is first opened, and then the dry white lime is poured into the ash filling port 7, thereby replenishing the white lime inside the ash storage bin 4.
[0041] like Figure 4As shown, a connecting seat 11 with an internal hollow is provided on the top of the ash storage bin 4, and a compressed air inlet 12 is fixedly connected to the connecting seat 11 and communicates with the inside of the connecting seat 11. A plurality of connecting grooves 22 communicating with the inside of the connecting seat 11 are provided on the top of the ash storage bin 4, and the communicating grooves 22 are arranged in an axial array of the connecting seat 11. A floating rod 10 is vertically penetrated on the connecting seat 11, and the floating rod 10 can slide freely up and down on the connecting seat 11 and the ash storage bin 4. A baffle 19 is provided on the end of the floating rod 10 that penetrates into the ash storage bin 4, and a rubber layer can be provided on the surface of the baffle 19, so that when the upper end surface of the baffle 19 abuts against the inner top wall of the ash storage bin 4, the connecting groove 22 can be closed. When marking, by pressing the floating rod 10 downward, the floating rod 10 can drive the baffle 19 to move downward, thereby causing the baffle 19 to break away from the contact state with the inner top wall of the ash storage bin 4, thereby making the connecting groove 22 open. At this time, compressed air can enter the ash storage bin 4 from the connecting groove 22.
[0042] like Figure 3 As shown, a connecting rod 14 is horizontally fixed to the sliding rod 13, and a floating pressure block 9 is provided at one end of the connecting rod 14 that passes through the connecting tube 5. A waist-shaped hole 15 is opened on the connecting tube 5 for the connecting rod 14 to move up and down and pass freely. An elastic top structure is provided in the connecting seat 11, and the elastic top structure is used to drive the floating rod 10 to move upward. In the initial state, the elastic top structure can drive the floating rod 10 to move upward, so that the upper surface of the baffle 19 contacts the inner top wall of the ash storage bin 4 and closes the connecting groove 22. When performing the marking operation, as the sliding rod 13 moves downward, the floating pressure block 9 begins to contact the upper end of the floating rod 10, and as the sliding rod 13 continues to move downward, the floating rod 10 will move downward, so that the floating rod 10 can drive the baffle 19 to move downward. When the sliding rod 13 moves upward, the floating rod 10 is driven by the elastic top structure to move upward, so that the baffle 19 can close the connecting groove 22.
[0043] like Figure 4 As shown, a ball 20 is rotatably embedded at the upper end of the floating rod 10, so that the contact between the floating pressure block 9 and the floating rod 10 is converted into rolling contact, thereby avoiding friction and wear on the top of the floating rod 10.
[0044] like Figure 4 As shown, the elastic push-up structure includes a limit ring 21 mounted on the floating rod 10, and a spring 18 is also wound around the floating rod 10. The spring 18 elastically pushes against the limit ring 21. In the initial state of the spring 18, an upward pre-pressure is exerted on the limit ring 21, thereby enabling the baffle 19 to move upward and contact the inner top wall of the ash storage bin 4.
[0045] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A foundation pit drilling point placement tool, characterized in that: include: Mobile stand; A connecting tube (5) vertically fixed to the movable bracket at a fixed arrangement interval; An ash storage bin (4) fixedly connected to the lower end of the connecting tube (5) and provided with supporting legs (8) at the bottom, wherein the ash storage bin (4) is provided with a compressed air inlet (12); A sliding rod (13) is coaxially arranged on the connecting tube (5) and can slide freely up and down. The sliding rod (13) can freely penetrate the ash storage bin (4). A pointed head (16) is provided at the lower end of the sliding rod (13). A connecting cavity is provided inside the sliding rod (13). An ash outlet (23) penetrating the connecting cavity is provided on the surface of the pointed head (16). The sliding rod (13) is also provided with an ash inlet (17) penetrating the connecting cavity.
2. A foundation pit drilling point arrangement tool as claimed in claim 1, characterized in that: The movable bracket comprises a long rod (1) and a plurality of short rods (2) vertically fixed to the long rod (1); a sleeve (3) is fixed to each of the long rod (1) and the short rod (2); and the connecting tube (5) is correspondingly inserted into the sleeve (3).
3. A foundation pit drilling point arrangement tool as claimed in claim 1, characterized in that: The ash storage bin (4) is provided with an ash supply opening (7) penetrating the interior thereof.
4. A foundation pit drilling point arrangement tool as claimed in claim 1, characterized in that: A cylinder (6) is vertically mounted on the top of the connecting tube (5), and a cylinder rod of the cylinder (6) is connected to the upper end of the sliding rod (13).
5. A foundation pit drilling point arrangement tool as claimed in claim 1, characterized in that: The top of the ash storage bin (4) is provided with an internally hollow connecting seat (11), the compressed air inlet (12) is fixedly connected to the connecting seat (11) and communicates with the inside of the connecting seat (11), the top of the ash storage bin (4) is provided with a plurality of connecting grooves (22) that communicate with the inside of the connecting seat (11), a floating rod (10) is vertically penetrated through the connecting seat (11), the floating rod (10) can slide freely up and down on the connecting seat (11) and the ash storage bin (4), and a baffle (19) is provided at one end of the floating rod (10) that penetrates into the ash storage bin (4), and when the upper end surface of the baffle (19) abuts against the inner top wall of the ash storage bin (4), the connecting groove (22) can be closed.
6. A foundation pit drilling point arrangement tool as claimed in claim 5, characterized in that: A connecting rod (14) is horizontally fixed to the sliding rod (13); a floating pressure block (9) is provided at one end of the connecting rod (14) passing through the connecting tube (5); the floating pressure block (9) is located above the floating rod (10); a waist-shaped hole (15) is provided on the connecting tube (5) for the connecting rod (14) to freely pass through when moving up and down; an elastic abutment structure is provided in the connecting seat (11); the elastic abutment structure is used to drive the floating rod (10) to move upward.
7. A foundation pit drilling point arrangement tool as claimed in claim 6, characterized in that: A ball (20) is rotatably embedded on the upper end of the floating rod (10).
8. A foundation pit drilling point arrangement tool as claimed in claim 6, characterized in that: The elastic abutment structure comprises a limiting ring (21) sleeved on the floating rod (10); a spring (18) is also sleeved on the floating rod (10); and the spring (18) elastically abuts against the limiting ring (21).