PE thermal insulation pipe capable of being pre-fixed

By designing a clamping and triggering mechanism on the PE insulation pipe, pre-fixed automated installation and disassembly is realized, which solves the problems of installation offset and gaps in the existing technology and improves the insulation effect.

CN221839175UActive Publication Date: 2024-10-15山东聚能控股集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420539392.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-10-15
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

Existing PE insulation pipes need to be pre-fixed during installation, but the tape wrapping method is not strong and disassembly is cumbersome, resulting in installation offset and gap problems, affecting the insulation effect.

Method used

A PE insulation pipe including a connector and a corresponding installation slot is designed. A clamping mechanism and a triggering mechanism are used to achieve the pre-fixing function. The clamping mechanism consists of a semi-circular arc-shaped clamping jaw, a moving block, a connecting rod, a spring and a triggering mechanism. , the guide block and guide groove ensure the precise installation of the connector, and the trigger ring and clamping plate realize the opening and closing of the clamping mechanism.

Benefits of technology

It realizes an automated pre-fixing process and is easy to operate, ensuring the accuracy of installation and convenience of disassembly, avoiding gaps and offset problems, and improving the thermal insulation effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221839175U_ABST
    Figure CN221839175U_ABST
Patent Text Reader

Abstract

The utility model discloses a PE thermal insulation pipe capable of being pre-fixed, which comprises a pipe body, a connector is fixedly arranged at one end of the pipe body, a mounting groove corresponding to the connector is arranged at the other end of the pipe body, and a clamping mechanism for pre-fixing the connector is arranged in the mounting groove. A trigger mechanism used for controlling the clamping mechanism to be opened is further arranged in the mounting groove. The pre-fixing mechanism capable of being automatically triggered is additionally arranged, the mounting efficiency of the PE thermal insulation pipe is improved, meanwhile, the pre-fixing releasing mechanism capable of being manually operated is further arranged in the device, and the convenience of dismounting the PE thermal insulation pipe is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of PE thermal insulation pipes, in particular to a PE thermal insulation pipe which can be pre-fixed. Background Art

[0002] Insulated pipes are also called insulated pipes. They are used for the transportation of liquids, gases and other media, and for the insulation of pipelines in the fields of petroleum, chemical industry, aerospace, hot springs, military, central heating, central air conditioning, municipal engineering, etc. The development and application of insulated pipes are increasingly valued by countries around the world. PE insulated pipes are an important factor affecting energy conservation, and there are very strict requirements for the installation and docking of insulated pipes.

[0003] When installing current PE insulated pipes, they need to be pre-fixed before being fixed. The commonly used method is tape wrapping. This method does not provide firm pre-fixing and is not easy to disassemble. During pre-fixing, installation offset problems may occur, which are inconvenient to correct, resulting in problems with the final installation and fixation. To this end, we propose a PE insulated pipe that can be pre-fixed to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to solve the shortcomings of the prior art, such as: misalignment during installation, resulting in gaps between pipes, which leads to reduced insulation effect, and it is cumbersome to replace the pipes when they need to be removed. A PE insulation pipe that can be pre-fixed is proposed.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A PE thermal insulation pipe that can be pre-fixed comprises a pipe body, one end of the pipe body is fixedly provided with a connector, and the other end of the pipe body is provided with a mounting groove corresponding to the connector, a clamping mechanism for pre-fixing the connector is provided in the mounting groove, and a trigger mechanism for controlling the opening of the clamping mechanism is also provided in the mounting groove.

[0007] Preferably, the clamping mechanism includes two symmetrically arranged jaws, the jaws are arranged in a semicircular arc shape, and the ends of the two jaws are rotatably connected by a second rotating shaft, the curvature of the jaws is matched with the curvature of the connecting head, a moving block is slidably provided in the mounting groove, and the moving block is rotatably connected to two symmetrically arranged connecting rods by a first rotating shaft, and the ends of the two connecting rods away from the first rotating shaft are rotatably connected to the corresponding jaws, a pressure rod is fixedly connected to the side wall of the moving block, and the pressure rod passes through the side wall of the mounting groove and is slidably connected to the side wall of the mounting groove, a spring is sleeved on the pressure rod, and the spring is located between the moving block and the inner wall of the mounting groove.

[0008] Preferably, the trigger mechanism includes a card block and a card plate, the card block and the card plate are card-connected, the card block is fixedly arranged on the side wall of the movable block, and the card plate is slidably arranged in the installation groove, the positions of the card block and the card plate are arranged correspondingly, the card plate is connected to the upper inner wall of the installation groove by a telescopic rod, and a spring 2 is sleeved on the outer side of the telescopic rod, and a trigger ring is provided at the upper end of the tube body, and the position of the trigger ring is arranged correspondingly to the card plate.

[0009] Preferably, a plurality of guide blocks are provided on the upper side of the tube body, and a plurality of guide grooves matching the guide blocks are provided on the side wall of the mounting groove.

[0010] Preferably, one end of the pressure rod away from the moving block is fixedly connected with a pressure ring, and the outer wall of the pressure ring is wrapped with a rubber anti-slip pad.

[0011] Preferably, the arc inner walls of the two clamping jaws are provided with a plurality of anti-slip grooves.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: a connecting head is provided on the upper part of the pipe body and a connecting groove is provided on the lower part; a trigger ring is provided on one end of the connecting head; when the connecting head and the trigger ring enter the bottom connecting groove, they are linked with the pre-fixing mechanism provided on the bottom connecting groove, so that the clamping claw provided in the connecting groove is fixed to the connecting head to achieve the pre-fixing effect; compared with the traditional tape winding method, this method tends to be automated and easy to operate; at the same time, the pre-fixing mechanism is also provided with a pressure rod for canceling the pre-fixing; the pressure rod is pulled to separate the clamping claw from the connecting head to achieve the effect of canceling the pre-fixing; when the PE pipe is offset during installation, the pre-fixing can be conveniently released for correction, thereby ensuring the subsequent installation accuracy of the PE pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 The utility model is a schematic structural diagram of a PE thermal insulation pipe that can be pre-fixed.

[0014] Figure 2 The utility model is a schematic diagram of the cross-sectional structure of a PE thermal insulation pipe that can be pre-fixed.

[0015] Figure 3 for Figure 2 Schematic diagram of the structure at A in the middle.

[0016] Figure 4 The utility model is a schematic structural diagram of the bottom of a PE thermal insulation pipe that can be pre-fixed.

[0017] Figure 5 The utility model is a schematic structural diagram of a fixing clamp in a PE thermal insulation pipe that can be pre-fixed.

[0018] Figure 6This is a front view structural schematic diagram of a PE thermal insulation pipe that can be pre-fixed, which is proposed by the utility model.

[0019] In the figure: 1 tube body, 2 connector, 3 trigger ring, 4 guide block, 5 guide groove, 6 mounting groove, 7 clamping claw, 8 pressure ring, 9 rotating shaft 1, 10 connecting rod, 11 pressure rod, 12 moving block, 13 spring 1, 14 clamping block, 15 clamping plate, 16 telescopic rod, 17 spring 2, 18 rotating shaft 2. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0021] Reference Figure 1-Figure 6 A PE insulated pipe that can be pre-fixed comprises a pipe body 1, a connector 2 is fixedly provided at one end of the pipe body 1, and a mounting groove 6 corresponding to the connector 2 is provided at the other end of the pipe body 1, and the connector 2 is inserted into the mounting groove 6 to realize the connection and installation of two PE insulated pipes, and the connector 2 and the mounting groove 6 have a limiting function to prevent the two PE insulated pipes from having gaps and offsets during installation, thereby affecting the normal operation of the entire PE insulated pipe, and a clamping mechanism for pre-fixing the connector 2 is provided in the mounting groove 6, and a trigger mechanism for controlling the opening of the clamping mechanism is also provided in the mounting groove 6;

[0022] The clamping mechanism includes two symmetrically arranged clamping jaws 7, which are arranged in a semicircular arc shape, and the ends of the two clamping jaws 7 are rotatably connected through a rotating shaft 18. The curvature of the clamping jaws 7 is matched with the curvature of the connector 2. The two semicircular clamping jaws 7 can cooperate to form a ring that matches the connector 2, thereby more firmly clamping the connector 2.

[0023] A moving block 12 is slidably provided in the mounting groove 6, and the moving block 12 is rotatably connected to two symmetrically arranged connecting rods 10 through a rotating shaft 9, and one end of the two connecting rods 10 away from the rotating shaft 9 is rotatably connected to the corresponding clamping claws 7, and a pressure rod 11 is fixedly connected to the side wall of the moving block 12, and the pressure rod 11 passes through the side wall of the mounting groove 6 and is slidably connected to the side wall of the mounting groove 6, and a spring 13 is sleeved on the pressure rod 11, and the spring 13 is between the moving block 12 and the inner wall of the mounting groove 6, when the clamping block 14 and the clamping plate 15 are in a clamping state, the spring 13 is in a stretched state, that is, when the clamping plate 15 and the clamping block 14 are released from the clamping, the moving block 12 moves to the left under the action of the spring 13;

[0024] The trigger mechanism includes a card block 14 and a card plate 15, and the card block 14 and the card plate 15 are connected to each other. Figure 3As shown, the card plate 15 is hook-shaped, and the card plate 15 can block the card block 14 to prevent it from moving to the left or right, thereby achieving the card connection. The height of the card plate 15 is higher than the height of the moving block 12, so that when the trigger ring 3 pushes the card plate 15 upward, the card plate 15 and the card block 14 are in contact and connected in a card connection manner, the trigger ring 3 does not contact the moving block 12, thereby preventing the blocking of the clamping claw 7 from running. The card block 14 is fixedly arranged on the side wall of the moving block 12, and the card plate 15 is slidably arranged in the installation groove 6. The positions of the card block 14 and the card plate 15 are correspondingly arranged. The card plate 15 is connected to the upper inner wall of the installation groove 6 through a telescopic rod 16, and the outer side of the telescopic rod 16 is provided with a spring 2 17. The upper end of the tube body 1 is provided with a trigger ring 3, and the position of the trigger ring 3 is correspondingly arranged with the card plate 15.

[0025] A plurality of guide blocks 4 are provided on the upper side of the tube body 1, and a plurality of guide grooves 5 matching with the guide blocks 4 are provided on the side wall of the mounting groove 6. Figure 1 and Figure 2 As shown, with the cooperation of the multiple guide blocks 4 and the guide grooves 5, the connector 2 can be straightly inserted into the installation groove 6, thus ensuring the accuracy of the connection between the two PE pipes;

[0026] One end of the pressure rod 11 away from the moving block 12 is fixedly connected with a pressure ring 8, and the outer wall of the pressure ring 8 is wrapped with a rubber anti-skid pad, which can better pull the pressure rod 11, thereby releasing the pre-fixation;

[0027] The arc inner walls of the two clamping jaws 7 are both provided with multiple anti-slip grooves, which increases the firmness of the clamping jaws 7 in clamping the connector 2 .

[0028] In the utility model, when it is necessary to connect the PE pipe, the guide block 4 cooperates with the guide groove 5 to make the connector 2 straightly enter the installation groove 6 at the bottom of the pipe body 1, and the trigger ring 3 squeezes the card plate 15, such as Figure 5 The block 14 and the card plate 15 are symmetrical. The lower part of the card plate 15 is in the shape of a hook, and two identical telescopic rods 16 and springs 17 are provided at the back. The telescopic rods 16 and springs 17 are squeezed and slide upward. When the card plate 15 moves upward, when the block 14 is disengaged from the hook of the card plate 15, the card plate 14 slides to the left under the action of the spring 13. The card plate 14 is fixedly connected to the moving block 12, so the moving block 12 will move to the left together. The moving block 12 is slidably connected to the two symmetrical connecting rods 10 through the rotating shaft 9, and the connecting rod 10 is also slidably connected to the upper part of the clamping jaw 7, as shown in FIG. Figure 4 As shown, the clamping jaw 7 is a symmetrical structure and is slidably connected through the second rotating shaft 18. When the moving block 12 moves downward, that is, Figure 3 The connecting rod 10 is driven to rotate through the second rotating shaft 18, and the clamping jaws 7 are driven to move toward the middle and close through the second rotating shaft 18, thereby achieving the effect of fixing the connecting head 2; Figure 3As shown, a pressure ring 8 is fixedly connected to the connecting rod 11. When the PE insulation pipe needs to be dismantled and separated from each other, the pressure ring 8 is pressed to drive the moving block 12 to move to the right through the pressure rod 11. According to the fixing mechanism principle of the above clamping jaws 7, when the moving block 12 moves to the right, the clamping jaws 7 slide outward through the second shaft 18 to achieve the effect of canceling the fixed connecting head 2. At this time, the connecting head 2 is moved out of the connecting groove 6. Since the trigger ring 3 is separated from the card plate 15, the card plate 15 slides outward through the rear spring 2 17 and the telescopic rod 16. At the same time, the card plate 14 moves to the right through the moving block 12. At this time, the card plate 14 and the card plate 15 are fixed by the hook shape of the card plate 15, so that the PE insulation pipe reaches the initial state and is convenient for pre-fixed connection next time.

[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A PE thermal insulation pipe capable of being pre-fixed, comprising a pipe body (1), characterized in that: A connector (2) is fixedly provided at one end of the tube body (1), and a mounting groove (6) corresponding to the connector (2) is provided at the other end of the tube body (1), a clamping mechanism for pre-fixing the connector (2) is provided in the mounting groove (6), and a trigger mechanism for controlling the opening of the clamping mechanism is also provided in the mounting groove (6); The clamping mechanism comprises two symmetrically arranged clamping jaws (7), the clamping jaws (7) are arranged in a semicircular arc shape, and the ends of the two clamping jaws (7) are rotatably connected via a second rotating shaft (18), the curvature of the clamping jaws (7) is arranged to match the curvature of the connecting head (2), a moving block (12) is slidably arranged in the mounting groove (6), the moving block (12) is rotatably connected to two symmetrically arranged connecting rods (10) via a first rotating shaft (9), the ends of the two connecting rods (10) away from the first rotating shaft (9) are rotatably connected to the corresponding clamping jaws (7), a pressure rod (11) is fixedly connected to the side wall of the mounting groove (6), the pressure rod (11) passes through the side wall of the mounting groove (6) and is slidably connected to the side wall of the mounting groove (6), a spring (13) is sleeved on the pressure rod (11), and the spring (13) is located between the moving block (12) and the inner wall of the mounting groove (6); The trigger mechanism comprises a clamping block (14) and a clamping plate (15), wherein the clamping block (14) and the clamping plate (15) are clamped together, the clamping block (14) is fixedly arranged on the side wall of the moving block (12), and the clamping plate (15) is slidably arranged in the mounting groove (6), the positions of the clamping block (14) and the clamping plate (15) are arranged correspondingly, the clamping plate (15) and the upper inner wall of the mounting groove (6) are connected via a telescopic rod (16), and a spring 2 (17) is sleeved on the outer side of the telescopic rod (16), and a trigger ring (3) is arranged at the upper end of the tube body (1), and the position of the trigger ring (3) is arranged correspondingly to the clamping plate (15).

2. A PE thermal insulation pipe capable of being pre-fixed according to claim 1, characterized in that: A plurality of guide blocks (4) are provided on the upper side of the tube body (1), and a plurality of guide grooves (5) matching the guide blocks (4) are provided on the side wall of the mounting groove (6).

3. The PE thermal insulation pipe capable of being pre-fixed according to claim 1, characterized in that: One end of the pressure rod (11) away from the moving block (12) is fixedly connected to a pressure ring (8), and the outer wall of the pressure ring (8) is wrapped with a rubber anti-slip pad.

4. The PE thermal insulation pipe capable of being pre-fixed according to claim 1, characterized in that: The arc inner walls of the two clamping jaws (7) are both provided with a plurality of anti-slip grooves.