Polyurethane foaming platform of prefabricated directly-buried thermal insulation pipe
By designing prefabricated directly buried structures and adjustment components on the polyurethane foam platform, the problem of pipe shaking and deflection when injecting materials is solved, achieving more uniform foam molding and improving the quality of the insulation pipe.
Patent Information
- Application Number
- CN202420171348.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-24
AI Technical Summary
The existing polyurethane foam platform cannot effectively fix the pipes, causing the pipes to easily shake and shift when the foam material is injected, affecting the quality of the foam-formed insulation pipes.
A polyurethane foam platform for prefabricated directly buried insulated pipes is designed. It uses components such as a base, a bracket, a rotating shaft, a placing table, a chute, and a double-head motor. The two ends of the pipe are clamped through the cooperation of threaded rods and splints, and the adjustment The assembly and gear system tilt the pipe to facilitate material injection and return it to lie flat once foaming is complete.
It achieves stable fixation and convenient operation when injecting foam materials, and improves the uniformity of distribution of polyurethane foam materials and the quality of insulation pipes.
Smart Images

Figure CN221850956U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of thermal insulation pipes, in particular to a polyurethane foaming platform for prefabricated direct-buried thermal insulation pipes. Background Art
[0002] The polyurethane foaming platform mixes the polyurethane material and injects it into the pipe shell through specific processes and equipment, and forms polyurethane foam through foaming reaction, thereby achieving the thermal insulation effect of the pipe. The foaming platform can effectively inject the polyurethane material into the insulation pipe for foaming molding.
[0003] At present, when most polyurethane foaming platforms are in use, the insulation pipes are mostly placed directly on the platform, and then the polyurethane material is injected into the pipe blank, waiting for the material to foam and form. Since the pipes are mostly placed directly on the foaming platform, the pipes are prone to shaking and shifting when the foaming material is injected, resulting in uneven distribution of the formed polyurethane foam material, affecting the quality of the foamed insulation pipe. For this reason, a polyurethane foaming platform for prefabricated direct-buried insulation pipes is proposed. Utility Model Content
[0004] In order to make up for the above shortcomings, the utility model provides a polyurethane foaming platform for prefabricated direct-buried insulation pipes, aiming to improve the problem in the prior art that the foaming platform cannot effectively fix the pipes, and the pipes are prone to shaking and shifting when the foaming material is injected, resulting in uneven distribution of the molded polyurethane foam material, affecting the quality of the foamed insulation pipes.
[0005] The cam is provided with a plurality of guide rails, and the guide rails are provided with a plurality of guide rails, and the guide rails are provided with a plurality of guide rails, and the guide rails are provided with a plurality of guide rails.
[0006] As a further description of the above technical solution:
[0007] Both sides of the bottom of the placing table are fixedly connected with fixed blocks, and one end of the threaded rod away from the double-headed motor is rotatably connected to the middle of the fixed block.
[0008] As a further description of the above technical solution:
[0009] One end of the connecting plate is hingedly connected to the bottom of the clamping plate, and the other end of the connecting plate is hingedly connected to the outer side of the movable plate.
[0010] As a further description of the above technical solution:
[0011] The top of the movable plate is slidably connected to the bottom of the placing table.
[0012] As a further description of the above technical solution:
[0013] The adjusting assembly includes a supporting frame, a mounting frame and a gear, the bottom of the supporting frame is fixedly connected to one side of the top edge of the base, the mounting frame is fixedly connected to the other side of the top edge of the base, a T-shaped guide rail is fixedly connected between the supporting frame and the mounting frame, a rack is slidably connected to the outer side of the T-shaped guide rail, a connecting block is fixedly connected to one side of the top of the rack, a cylinder is fixedly connected to the top of the mounting frame, the output end of the cylinder is fixedly connected to the middle of the connecting block, the middle of the gear is fixedly connected to one end of the rotating shaft, and the gear and the rack are meshed.
[0014] As a further description of the above technical solution:
[0015] The outer side of the rack is slidably connected to the outer side of the bracket.
[0016] As a further description of the above technical solution:
[0017] The top of the stopper is circular, and the top of the injection block is semicircular.
[0018] The utility model has the following beneficial effects:
[0019] 1. In the utility model, by cooperating with a placement table, a slide, an injection block, a stopper, a movable plate, a double-headed motor, a threaded rod, a guide groove, a clamping plate, and a connecting plate, the polyurethane foaming platform of the prefabricated direct-buried thermal insulation pipe can clamp and seal both ends of the pipe when the foaming material is injected, and at the same time clamp and fix the outer side of the pipe body to ensure the stability of the injected foaming material, thereby improving the quality of the thermal insulation pipe.
[0020] 2. In the utility model, through the coordination of the support frame, the mounting frame, the T-shaped guide rail, the rack, the connecting block, the cylinder, the gear and the rotating shaft, the polyurethane foaming platform of the prefabricated direct-buried thermal insulation pipe can tilt the pipe body when injecting the foaming material, so as to facilitate the stable injection of the foaming material into the pipe. After that, the pipe can be laid flat to wait for the foaming of the material to be completed, and the foaming operation is more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A three-dimensional diagram of a polyurethane foaming platform for a prefabricated direct-buried thermal insulation pipe proposed by the utility model;
[0022] Figure 2 This is a front view of a polyurethane foaming platform for a prefabricated direct-buried thermal insulation pipe proposed by the utility model;
[0023] Figure 3 The utility model is a schematic diagram of a slide rail of a polyurethane foaming platform for prefabricated direct-buried thermal insulation pipes.
[0024] Legend:
[0025] 1. Base; 2. Bracket; 3. Rotating shaft; 4. Placing table; 5. Limiting wheel; 6. Slide groove; 7. Injection block; 8. Stop block; 9. Movable plate; 10. Double-head motor; 11. Threaded rod; 12. Guide groove; 13. Clamp; 14. Connecting plate; 15. Fixed block; 16. Support frame; 17. Mounting frame; 18. T-type guide rail; 19. Rack; 20. Connecting block; 21. Cylinder; 22. Gear. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings of the utility model specification to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Reference Figure 1-2 The utility model provides an embodiment: a polyurethane foaming platform for prefabricated direct-buried thermal insulation pipes, including a base 1, which is a supporting component of the entire foaming platform to ensure the stability of the platform. A bracket 2 is fixedly connected to the middle of the base 1, a rotating shaft 3 is rotatably connected to the inner side of the bracket 2, a placing table 4 is fixedly connected to the outer side of the rotating shaft 3, and an adjustment component is installed between the rotating shaft 3 and the bracket 2. Through the cooperation of the adjustment component and the rotating shaft 3, the angle of the placing table 4 can be adjusted, so as to facilitate the injection of the foaming material into the pipe. Limiting wheels 5 are fixedly connected to both sides of the top of the placing table 4, and the pipe is placed on the roller of the limiting wheel 5, so that the pipe can be supported by the limiting wheel 5 and the pipe will not be subjected to torsional force.
[0028] Reference Figure 1-2, both sides of the placing table 4 are provided with chutes 6, one of which is slidably connected with an injection block 7, and the other chutes 6 is slidably connected with a stopper 8, and the bottoms of the injection block 7 and the stopper 8 are fixedly connected with movable plates 9, and the middle side of the bottom of the placing table 4 is fixedly connected with a double-headed motor 10, and the output end of the double-headed motor 10 is fixedly connected with a threaded rod 11, and the outer periphery of the threaded rod 11 is threadedly connected to the inside of the movable plate 9, and the double-headed motor 10 is started to drive the threaded rod 11 to rotate, and the threaded rod 11 rotates to drive the movable plate 9 to move, so that the movable plate 9 drives the injection block 7 and the stopper 8 to move synchronously toward each other. Until the injection block 7 and the stopper 8 clamp and seal the two ends of the pipeline, it is ensured that the pipeline will not leak when the foaming material is injected.
[0029] Reference Figure 1-2 , four symmetrically distributed guide grooves 12 are provided on the edge of the placement table 4, and a clamping plate 13 is slidably connected inside the guide groove 12. A connecting plate 14 is provided between the bottom of the clamping plate 13 and the movable plate 9. As the movable plate 9 moves, the connecting plate 14 is also pulled, so that the connecting plate 14 drives the clamping plate 13 along the inside of the guide groove 12 toward the pipeline, and the injection block 7 and the stopper 8 clamp the two ends of the pipeline tightly and close them. At this time, the two groups of clamping plates 13 are also clamped on the outside of the pipeline, thereby quickly completing the fixing of the pipeline. Fixed blocks 15 are fixedly connected to both sides of the bottom of the placement table 4, and the end of the threaded rod 11 away from the double-headed motor 10 is rotatably connected to the middle of the fixed block 15. The threaded rod 11 is supported by the fixed block 15 to ensure that the threaded rod 11 is more stable when rotating.
[0030] Reference Figure 1-2 , one end of the connecting plate 14 is hinged to the bottom of the clamping plate 13, and the other end of the connecting plate 14 is hinged to the outside of the movable plate 9. The connecting plate 14 enables the platform to synchronously clamp the outside of the pipe when closing the pipe. The top of the movable plate 9 is slidably connected to the bottom of the placing table 4, so that the movable plate 9 can move stably driven by the threaded rod 11. When the double-headed motor 10 reverses, the injection block 7 and the stopper 8 will separate from the two ends of the foamed polyurethane insulation pipe, and the clamping plates 13 on both sides will also synchronously release the clamped pipe, so that the insulation pipe can be removed from the platform. The top of the stopper 8 is circular, and the top of the injection block 7 is semicircular. The circular stopper 8 can close one end of the pipe to prevent the foaming material from leaking. The semicircular injection block 7 can start to close a part of the end of the pipe, and it is also convenient for the foaming material to be injected into the pipe.
[0031] Reference Figure 1 and Figure 3The adjustment assembly includes a support frame 16, a mounting frame 17 and a gear 22. The bottom of the support frame 16 is fixedly connected to one side of the top edge of the base 1, and the mounting frame 17 is fixedly connected to the other side of the top edge of the base 1. A T-shaped guide rail 18 is fixedly connected between the support frame 16 and the mounting frame 17. A rack 19 is slidably connected to the outside of the T-shaped guide rail 18. A connecting block 20 is fixedly connected to one side of the top of the rack 19. A cylinder 21 is fixedly connected to the top of the mounting frame 17. The output end of the cylinder 21 is fixedly connected to the middle of the connecting block 20. The middle of the gear 22 is fixedly connected to one end of the rotating shaft 3. The gear 22 and the rack 19 are meshed. After the pipeline is clamped and fixed by the platform, the cylinder 21 is started to pull the rack 19 to move around the periphery of the T-shaped guide rail 18, so that the rack 19 moves and drives the gear 22 to rotate, thereby driving the rotating shaft 3 to rotate through the rotation of the gear 22, so that the rotating shaft 3 rotates and drives the placing table 4 to flip. At this time, the side of the placing table 4 close to the stopper 8 is downward, and the side close to the injection block 7 is upward, and the pipeline is in an inclined state. Then, when the foaming material is injected, it can be more convenient to fill the inside of the pipe, and then the platform is reset to a horizontal position, so that the foaming material is placed horizontally inside the pipe, waiting for the polyurethane material to foam and expand until it fills the entire prefabricated pipe, and the insulation pipe is completed. The outer side of the rack 19 is slidably connected to the outer side of the bracket 2, so that the rack 19 is more stable when driven by the cylinder 21.
[0032] Working principle: Place the pipe made with the belt on two limit wheels 5, then start the double-headed motor 10 to drive the threaded rod 11 to rotate, and the threaded rod 11 rotates to drive the movable plate 9 to move, so that the movable plate 9 drives the injection block 7 and the stopper 8 to move synchronously towards each other. Until the injection block 7 and the stopper 8 clamp and seal the two ends of the pipe, at the same time, as the movable plate 9 moves, it will also pull the connecting plate 14, so that the connecting plate 14 drives the clamping plate 13 along the inside of the guide groove 12 to approach the pipe, and the injection block 7 and the stopper 8 clamp and seal the two ends of the pipe. At this time, the two sets of clamping plates 13 are also clamped on the outside of the pipe, and then the pipe is quickly fixed. After that, the pipe injected with foam material extends into the pipe along the notch at the top of the injection block 7. At the same time, the cylinder 21 is started to pull the rack 19 to move around the periphery of the T-shaped guide rail 18, so that the rack 19 moves and drives the gear 22 to rotate, thereby driving the rotating shaft 3 to rotate through the rotation of the gear 22, so that the rotating shaft 3 rotates and drives the placement table 4 to flip. At this time, the side of the placement table 4 close to the block 8 is downward, and the side close to the injection block 7 is upward, and the pipeline is in an inclined state. After that, the foaming material is injected into the pipeline, and the foaming material flows downward along the inclined pipeline to prevent the foaming material from leaking. After reaching the injection standard, the cylinder 21 is started to push the rack 19 to reset, and then the rack 19 drives the gear 22 to reverse, so that the inclined placement table 4 returns to a horizontal position, and the pipeline is in a horizontal state at this time. The foaming material in the pipeline will also slowly remain horizontal with the pipeline. After waiting for the foaming material to be formed and fill the interior of the pipeline, the production of the insulation pipe can be completed.
[0033] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A polyurethane foaming platform for prefabricated direct-buried thermal insulation pipes, comprising a base (1), characterized in that: The middle of the base (1) is fixedly connected to a bracket (2), the inner side of the bracket (2) is rotatably connected to a rotating shaft (3), the outer side of the rotating shaft (3) is fixedly connected to a placing platform (4), an adjustment component is installed between the rotating shaft (3) and the bracket (2), both sides of the top of the placing platform (4) are fixedly connected to limiting wheels (5), both sides of the inside of the placing platform (4) are provided with sliding grooves (6), one of the sliding grooves (6) is slidably connected to an injection block (7), the other sliding groove (6) is slidably connected to a stopper (8), the injection block ( 7) and the bottom of the stopper (8) are fixedly connected to a movable plate (9), the middle side of the bottom of the placement table (4) is fixedly connected to a double-headed motor (10), the output end of the double-headed motor (10) is fixedly connected to a threaded rod (11), the outer periphery of the threaded rod (11) is threadedly connected to the inside of the movable plate (9), the edge of the placement table (4) is provided with four symmetrically distributed guide grooves (12), the inside of the guide groove (12) is slidably connected to a clamping plate (13), and a connecting plate (14) is provided between the bottom of the clamping plate (13) and the movable plate (9).
2. The polyurethane foaming platform for prefabricated direct-buried thermal insulation pipe according to claim 1, characterized in that: Both sides of the bottom of the placement table (4) are fixedly connected with fixed blocks (15), and one end of the threaded rod (11) away from the double-headed motor (10) is rotatably connected to the middle of the fixed block (15).
3. The polyurethane foaming platform for prefabricated direct-buried thermal insulation pipe according to claim 1, characterized in that: One end of the connecting plate (14) is hingedly connected to the bottom of the clamping plate (13), and the other end of the connecting plate (14) is hingedly connected to the outside of the movable plate (9).
4. The polyurethane foaming platform for prefabricated direct-buried thermal insulation pipe according to claim 1, characterized in that: The top of the movable plate (9) is slidably connected to the bottom of the placement platform (4).
5. The polyurethane foaming platform for prefabricated direct-buried thermal insulation pipe according to claim 1, characterized in that: The adjustment assembly comprises a support frame (16), a mounting frame (17) and a gear (22); the bottom of the support frame (16) is fixedly connected to one side of the top edge of the base (1); the mounting frame (17) is fixedly connected to the other side of the top edge of the base (1); a T-shaped guide rail (18) is fixedly connected between the support frame (16) and the mounting frame (17); a rack (19) is slidably connected to the outer side of the T-shaped guide rail (18); a connecting block (20) is fixedly connected to one side of the top of the rack (19); a cylinder (21) is fixedly connected to the top of the mounting frame (17); an output end of the cylinder (21) is fixedly connected to the middle of the connecting block (20); the middle of the gear (22) is fixedly connected to one end of the rotating shaft (3); and the gear (22) and the rack (19) are meshed.
6. The polyurethane foaming platform for prefabricated direct-buried thermal insulation pipe according to claim 5, characterized in that: The outer side of the rack (19) is slidably connected to the outer side of the bracket (2).
7. The polyurethane foaming platform for prefabricated direct-buried thermal insulation pipe according to claim 1, characterized in that: The top of the stopper (8) is circular, and the top of the injection block (7) is semicircular.