Building drainage structure

By designing the building drainage structure of the water collection pit and electrode holes, electroosmosis technology is used to solve the problem of difficult treatment of interlayer water between the raft foundation layer and the flooding layer, achieving rapid and effective water discharge, avoiding structural damage, and is suitable for Long-term maintenance.

CN221878144UActive Publication Date: 2024-10-22THE FOURTH OF CHINA CONSTR SEVENTH ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420451884.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-22
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

The drainage structure of the existing building is inconvenient to operate, especially after large-area underground garages and severe floods. The interlayer water between the raft foundation layer and the flooding layer is difficult to effectively handle. Conventional measures will damage the building structure and are not suitable for long-term maintenance.

Method used

A building drainage structure is designed that includes a sump and electrode holes. The sump runs through the flashing layer and the raft foundation layer. The electrode holes are used to insert anodes and cathodes. The DC electric field drives water into the sump and passes through it. The deflector plates and annular protrusions accelerate the water flow and realize electroosmotic drainage.

Benefits of technology

It effectively solves the problem of difficult drainage of interlayer water. The electroosmotic drainage structure realizes rapid water drainage, avoids damage to the building structure, and is suitable for long-term maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878144U_ABST
    Figure CN221878144U_ABST
Patent Text Reader

Abstract

The utility model provides a building drainage structure which is characterized in that the bottom of a water collecting pit is lower than the lowest position of a building flooding layer, the top of the water collecting pit is opened to serve as a main drainage port, and a water collecting port is formed in the outer wall of the water collecting pit and located between the building flooding layer and a raft foundation layer; a plurality of electrode holes are formed in the building flooding layer and located in the peripheral side of the water collecting pit, and anodes are inserted into the electrode holes; a cathode is inserted in the main water outlet, and the anode and the cathode are respectively connected with a power supply through wires. The anode of the power supply is connected with the anodes in the electrode holes, the cathode of the power supply is connected with the cathodes in the water collecting pits to form a loop, the power supply is direct current, water flows to the water collecting pits of the cathodes through the loop and the interlayer water with positive charges and is finally discharged outwards, and after electromotive force is formed under the action of an electric field, the water flows into the water collecting pits. And water between the building flooding layer and the raft foundation layer flows to the sump under the action.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a building drainage structure. Background Art

[0002] There is no good way to deal with the problem of precipitation of existing building foundations in my country. For large underground garages, precipitation using well points around cannot effectively penetrate deep into the garage, resulting in the continued accumulation of water. After a major flood, the interlayer water between the raft foundation layer and the raft foundation building flooding layer is difficult to treat with conventional drainage measures. A Chinese patent (publication number CN110374125 A) discloses a method for treating interlayer water on the side wall of a subway deep foundation pit. The method can only treat interlayer water through a series of operations such as drilling, filling filter materials, equipment installation, and pumping. This treatment method will destroy the structure of existing buildings and is not suitable for long-term maintenance of buildings. Therefore, the utility model proposes a building drainage structure to improve the above problems. Utility Model Content

[0003] Therefore, the technical problem to be solved by the utility model is to overcome the defect that the building drainage structure in the prior art is inconvenient to operate, thereby providing a building drainage structure.

[0004] In order to solve the above problems, the utility model provides a building drainage structure, including a sump, the sump penetrates the building flooding layer and the raft foundation layer and extends underground, the bottom of the sump is lower than the lowest point of the building flooding layer, the top of the sump is open as a main drainage outlet, the outer wall of the sump is provided with a water collection port, and the water collection port is located between the building flooding layer and the raft foundation layer;

[0005] The building flooding layer is provided with a plurality of electrode holes, the electrode holes are located around the water collection pit, and the electrode holes are used to insert anodes;

[0006] A cathode is inserted into the main drain port, and the anode and the cathode are connected to a power source through wires respectively.

[0007] Preferably, the lowest point of the water collection port is located lower than the lowest point of the building flooding layer;

[0008] A plurality of support rods are arranged in the water collection port, and two ends of the support rods are respectively connected to the top and the bottom of the water collection port.

[0009] Preferably, guide plates are respectively provided on the top and bottom of the inner wall of the sump near the water collection port, and a channel from the building flooding layer to the sump is formed between the two guide plates. The cross-section of the guide plate is inclined downward from the water collection port to the bottom of the sump.

[0010] Preferably, the electrode holes are arranged around the sump with the sump as the center according to different drainage radii.

[0011] Preferably, the electrode holes are arranged in three groups, each group of the electrode holes comprises a plurality of electrode holes at different distances from the sump, and the distance between two adjacent electrode holes in each group of the electrode holes is equal.

[0012] Preferably, the anode and the cathode are both metal tubes or metal rods.

[0013] Preferably, the electrode hole has a depth such that at least the anode contacts the raft base layer.

[0014] Preferably, the electrode hole and the sump are respectively provided with a first protective cover and a second protective cover near the top of the raft foundation layer.

[0015] Preferably, the cathode and the anode are each provided with a connecting ring at one end pointing vertically upward, and the connecting rings are respectively connected to the wires of the power supply;

[0016] A plurality of annular protrusions are evenly arranged on the outer sides of the cathode and the anode.

[0017] The utility model provides a building drainage structure with the following beneficial effects:

[0018] 1. The utility model inserts a cathode in the main drain outlet, and the anode and cathode are connected to the power supply through wires to form a loop. The power supply is direct current. Through the loop, the interlayer water with positive charge flows to the water collection pit of the cathode and is finally discharged. After the electromotive force is formed under the action of the electric field, the water between the flooding layer of the building and the raft foundation layer flows to the water collection pit under this action;

[0019] 2. The utility model also provides guide plates at the top and bottom of the inner wall of the sump near the water collection port, respectively. A channel from the flooding layer of the building to the sump is formed between the two guide plates. The cross section of the guide plate is inclined downward from the water collection port to the bottom of the sump, so that the interlayer water can be diverted when entering the water collection port;

[0020] 3. The utility model also has a plurality of annular protrusions evenly arranged on the outside of the anode and the cathode, and the annular protrusions can increase the contact area between the anode and the cathode, so that the rate of electroosmotic drainage can be accelerated. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the general assembly of the utility model;

[0022] Figure 2 This is a schematic diagram of the installation of the second protective cover structure of the utility model;

[0023] Figure 3 It is a schematic diagram of the cross-sectional structure of the utility model;

[0024] Figure 4 This is a schematic diagram of the sump structure of the utility model;

[0025] Figure 5 This is a schematic diagram of the cross-sectional structure of the sump of the utility model;

[0026] Figure 6 This is a schematic diagram of the anode structure of the utility model.

[0027] The reference numerals are:

[0028] 1. Building flooding layer; 2. Raft foundation layer; 3. Collection pit; 4. Collection port; 5. Cathode; 6. Electrode hole; 7. Anode; 8. Support rod; 9. Guide plate; 10. First protective cover; 11. Second protective cover; 12. Connecting ring; 13. Annular protrusion. DETAILED DESCRIPTION

[0029] like Figure 1-6 As shown, a building drainage structure includes a sump 3, wherein the sump 3 penetrates the building water-flooding layer 1 and the raft foundation layer 2 and extends underground, wherein the bottom of the sump 3 is lower than the lowest point of the building water-flooding layer 1, and the top of the sump 3 is open, serving as a main drainage outlet, and a sump 4 is provided on the outer wall of the sump 3, wherein the sump 4 is located between the building water-flooding layer 1 and the raft foundation layer 2; the building water-flooding layer 1 is provided with a plurality of electrode holes 6, wherein the electrode holes 6 are located around the sump 3, and the electrode holes 6 are used to insert anodes 7; a cathode 5 is inserted into the main drainage outlet, and the anode 7 and the cathode 5 are respectively connected to a power source through wires. Figure 1-6As shown, a building drainage mechanism is installed between the building flooding layer 1 and the raft foundation layer 2, and is used to drain water between the building flooding layer 1 and the raft foundation layer 2, wherein the building flooding layer 1 is located below the ground surface and is a relatively loose and permeable soil layer, mainly to reduce the sinking of the raft foundation layer 2 and improve the stability of the raft foundation layer 2. The permeability of the building flooding allows groundwater to flow through the building flooding layer 1, thereby reducing the pore water pressure of the soil and preventing soil liquefaction and subsidence; wherein the raft foundation layer 2 is the main part of the foundation structure, spanning over the building flooding layer 1, and its main body is generally a concrete layer. The sump 3 penetrates the building flooding layer 1 and the raft foundation layer 2 and extends underground. The bottom of the sump 3 is lower than the lowest point of the building flooding layer 1. The top of the sump 3 is open as the main drainage outlet. The sump 3 is used to temporarily store water and collect water from the raft foundation layer 2 through the channel on the surface of the raft foundation layer 2, and finally discharges it through the main drainage outlet through a drainage pump arranged in the sump 3 through a pipeline; the shape of the sump 3 can be a square cylinder or The circular cylinder has a specific size adjusted according to the size of the raft foundation layer 2, wherein the bottom of the sump 3 is lower than the lowest point of the building flooding layer 1, so as to facilitate the drainage into the sump 3 through the outer wall of the sump 3 close to the water collection port 4 between the building flooding layer 1 and the raft foundation layer 2; the building flooding layer 1 is provided with a plurality of electrode holes 6, the electrode holes 6 are located around the sump 3, and the electrode holes 6 are used to insert the anode 7; the main drain port is inserted with a cathode 5, and the anode 7 and the cathode 5 are respectively connected to the power supply through wires to form a loop, and the power supply is direct current, through which the loop, The positively charged interlayer water flows to the sump 3 of the cathode 5 and is finally discharged. After the electromotive force is formed under the action of the electric field, the water between the building flooding layer 1 and the raft foundation layer 2 flows to the sump 3 under this action; in addition, the additional addition of cheap chemical reagents (Na2SiO3 and CaCl2 solutions are added to the anode 7 and the middle part) can accelerate the chemical electroosmosis rate. At the same time, under the action of electroosmosis, the anode 7 generates insoluble precipitates to fill the electrode holes 6; through the coordination of the entire device, the problem of difficult discharge of interlayer water can be effectively solved.

[0030] In some embodiments, the lowest point of the water collection port 4 is located lower than the lowest point of the building flooding layer 1; a plurality of support rods 8 are provided in the water collection port 4, and the two ends of the support rods 8 are respectively connected to the top and the bottom of the water collection port 4. Figure 1-6 As shown, the height of the lowest point of the water collection port 4 is much lower than the height of the building's flooding layer 1, which facilitates the collection of interlayer water near the water collection port 4. The support rod 8 in the water collection port 4 can be connected to the water collection port 4 in a screw connection, a snap connection, etc., to support the water collection port 4 of the sump 3 so that the interlayer water can flow into the sump 3.

[0031] In some embodiments, the inner wall of the sump 3 is provided with guide plates 9 near the top and bottom of the sump 4, and a passage from the building flooding layer 1 to the sump 3 is formed between the two guide plates 9. The cross section of the guide plates 9 is inclined downward from the sump 4 to the bottom of the sump 3. Figure 1-6 As shown, guide plates 9 are respectively provided on the top and bottom of the inner wall of the sump 3 near the water collection port 4, and a channel from the building flooding layer 1 to the sump 3 is formed between the two guide plates 9. The cross section of the guide plate 9 is inclined downward from the water collection port 4 to the bottom of the sump 3, so that the interlayer water can be guided when entering the water collection port 4. When the interlayer water flow rate is small, it will stick to the vicinity of the water collection port 4 and pass through the guide plate 9 to facilitate it to be sent into the sump 3.

[0032] In some embodiments, the electrode holes 6 are arranged around the water collection pit 3 according to different drainage radii with the water collection pit 3 as the center. Figure 1-6 As shown, the electrode holes 6 arranged according to different radii can make it possible to start the electroosmosis drainage from a place far away from the sump 3 until it is close to the sump 3, so as to completely discharge the interlayer water.

[0033] In some embodiments, the electrode holes 6 are provided in three groups, each group of the electrode holes 6 includes a plurality of electrode holes 6 at different distances from the sump 3, and the distance between two adjacent electrode holes 6 in each group of the electrode holes 6 is equal. Figure 1-6 As shown, the electrode holes 6 can be arranged in sequence at an equal distance from the center of the circle, and anodes 7 are placed in three electrode holes 6 at an equal distance from the center of the circle. Taking the circumferential drainage of r=5m, 10m, 20m, and 30m as an example, when electroosmotic drainage is carried out at r=5m, a chemical solution is added to the electrode hole 6, and a precipitate is later generated at the anode 7. The precipitate does not affect the electroosmotic efficiency of the outer circumference. For subsequent drainage of r=10m, a chemical solution is added to the electrode hole 6 at r=5m, and so on, until the interlayer water within the range of 330m of the sump is completely discharged into the sump 33.

[0034] In some embodiments, the anode 7 and the cathode 5 are both metal tubes or metal rods. Figure 1-6 As shown, the anode 7 and the cathode 5 are both metal tubes or metal rods, so that the electroosmosis can be supported.

[0035] In some embodiments, the depth of the electrode hole 6 is such that the anode 7 at least contacts the raft base layer 2. Figure 1-6 As shown, the depth of the electrode hole 6 is such that the anode 7 at least contacts the raft base layer 2, so that it can perform better electroosmosis to the interlayer water.

[0036] In some embodiments, the electrode hole 6 and the sump 3 are respectively provided with a first protective cover 10 and a second protective cover 11 near the top of the raft foundation layer 2. Figure 1-6 As shown, the electrode hole 6 and the sump 3 are respectively provided with a first protective cover 10 and a second protective cover 11 near the top of the raft base layer 2, which can be snap-connected or threaded to the electrode hole 6 and the sump 3 to protect them when not in use, wherein the second protective cover 11 can be a protective cover with a mesh structure to ensure the safety of activities on the raft base layer 2 and prevent larger debris from falling into it and affecting its use.

[0037] In some embodiments, the cathode 5 and the anode 7 are both provided with a connecting ring 12 at one end thereof which is vertically upward, and the connecting ring 12 is respectively connected to the wire of the power supply; and the cathode 5 and the anode 7 are respectively and evenly provided with a plurality of annular protrusions 13 at the outer side thereof. Figure 1-6 As shown, a connecting ring 12 is provided at one end of the cathode 5 and the anode 7 pointing vertically upward to facilitate the connection of the power supply wire. The connecting ring 12 is respectively connected to the positive and negative wires of the power supply. A plurality of annular protrusions 13 are evenly provided on the outer sides of the cathode 5 and the anode 7. The annular protrusions 13 can increase the contact area between the cathode 5 and the anode 7, so as to accelerate the rate of electroosmotic drainage. The cross-section of the annular protrusion 13 can be a triangle or a circle to increase the contact area between the cathode 5 and the anode 7.

[0038] The above is only a preferred embodiment of the utility model, and is not intended to limit the utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the utility model should be included in the protection scope of the utility model. The above is only a preferred implementation of the utility model. It should be pointed out that for ordinary technicians in this technical field, several improvements and variations can be made without departing from the technical principles of the utility model, and these improvements and variations should also be regarded as the protection scope of the utility model.

Claims

1. A building drainage structure, comprising a sump, wherein the sump penetrates the building flooding layer and the raft foundation layer and extends underground. It is characterized in that The bottom of the sump is lower than the lowest point of the building flooding layer, the top of the sump is open as the main drain, the outer wall of the sump is provided with a water collection port, and the water collection port is located between the building flooding layer and the raft foundation layer; The building flooding layer is provided with a plurality of electrode holes, the electrode holes are located around the water collection pit, and the electrode holes are used to insert anodes; A cathode is inserted into the main drain port, and the anode and the cathode are connected to a power source through wires respectively.

2. The building drainage structure according to claim 1, Features: The lowest point of the water collection port is located lower than the lowest point of the building flooding layer; A plurality of support rods are arranged in the water collection port, and two ends of the support rods are respectively connected to the top and the bottom of the water collection port.

3. The building drainage structure according to claim 2, Features: Guide plates are respectively arranged on the top and bottom of the inner wall of the sump near the water collection port, and a channel from the building flooding layer to the sump is formed between the two guide plates. The cross section of the guide plate is inclined downward from the water collection port to the bottom of the sump.

4. The building drainage structure according to claim 1, Features: The electrode holes are arranged around the sump with the sump as the center according to different drainage radii.

5. The building drainage structure according to claim 4, Features: The electrode holes are arranged in three groups, each group of the electrode holes comprises a plurality of electrode holes at different distances from the sump, and the distance between two adjacent electrode holes in each group of the electrode holes is equal.

6. The building drainage structure according to claim 1, Features: The anode and the cathode are both metal tubes or metal rods.

7. The building drainage structure according to claim 1, Features: The electrode hole has a depth that allows the anode to at least contact the raft base layer.

8. The building drainage structure according to claim 1, Features: The electrode hole and the sump are respectively provided with a first protective cover and a second protective cover near the top of the raft foundation layer.

9. The building drainage structure according to claim 1, Features: The cathode and the anode are each provided with a connecting ring at one end pointing vertically upward, and the connecting rings are respectively connected to the wires of the power supply; A plurality of annular protrusions are evenly arranged on the outer sides of the cathode and the anode.