Blanking buffer mechanism of forging heating furnace
By designing the blanking buffer mechanism of the forging heating furnace and using the cooperation of the arc-shaped side frame plate and the multi-layer spring piston, the problem of deformation and sparks flying when the forged parts are taken out is solved, safe blanking processing is achieved, and the forging process is avoided. damage to parts and risk of sparks.
Patent Information
- Application Number
- CN202420344217.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-26
AI Technical Summary
When taking out the forged parts from the existing forging heating furnace, the forgings are manually dropped directly on the ground, causing damage and sparks flying, posing safety risks, and lacking an effective buffering mechanism for unloading.
A blanking buffer mechanism for a forging heating furnace is designed, including a material receiving box and a material receiving mechanism. It uses an arc-shaped side frame plate, a rotating roller, a sliding rod, a spring and a limiting piston. Through the rotating roller and the arc-shaped side frame plate The cooperation of the multi-layer spring and the piston provides multi-layer buffering to avoid collision of the forged parts and sparks flying.
It effectively avoids deformation and sparks flying when the forged parts are taken out, improving safety, and uses a multi-layer buffer mechanism to ensure that the forged parts are stably lowered in the receiving box, solving the potential safety hazard of being dropped directly on the ground.
Smart Images

Figure CN221909667U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of forging of forged pieces, in particular to a material discharge buffer mechanism of a forging heating furnace. Background Art
[0002] Forging is a common process in mechanical processing. In order to achieve certain characteristics, the workpiece needs to be forged at high temperature to obtain such performance; the forging heating furnace is an indispensable processing equipment in forging processing; the existing forging heating furnaces mostly use coal combustion or electric power generation for heating, and a small number use gas combustion for heating.
[0003] After processing the forgings in the existing forging heating furnace, they are mostly taken out manually. When taking them out, the forgings are often directly thrown on the ground. This method not only damages the forgings and deforms them, but also causes sparks to fly, posing a great safety hazard. Therefore, a material unloading buffer mechanism for the forging heating furnace is urgently needed. Utility Model Content
[0004] The purpose of the utility model is to provide a material unloading buffer mechanism for a forging heating furnace to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a material unloading buffer mechanism of a forging heating furnace, comprising a material receiving box, wherein a material receiving mechanism is arranged inside the material receiving box;
[0006] The material receiving mechanism includes two side frame plates, the two side frame plates are rotatably connected with rotating rollers inside, the bottoms of the two side frame plates are respectively fixedly connected with first sliding rods, the bottoms of the first sliding rods are sleeved with a first sleeve, the interior of the first sleeve is provided with a first spring, the top of the first spring is provided with a first limiting piston, the right sides of the tops of the two side frame plates are respectively fixedly connected with first baffles, the left sides of the first baffles are fixedly connected with a second spring, and the left sides of the second springs are fixedly connected with a second baffle.
[0007] Preferably, the left ends of the two side frame plates that are away from each other are movably connected to the inner wall of the material receiving box, and the middle parts of the two side frame plates are respectively arc-shaped.
[0008] When taking the forging out of the forging heating furnace, the worker takes out the forging and places it on the rotating roller in the middle of the two side frame plates. When the forging falls on the rotating roller, due to the certain curvature of the middle part of the two side frame plates, the forging slides to the right on the rotating roller under the action of the rotating roller. At this time, the first sliding rod at the bottom right side of the two side frame plates compresses the first limiting piston, and the first limiting piston contracts the first spring to mitigate the impact force.
[0009] Preferably, a plurality of the rotating rollers are provided, and the plurality of rotating rollers are respectively arranged in sequence along one end of the two side frame plates close to each other.
[0010] Preferably, the first limiting pistons are slidably disposed in the first sleeves, and the tops of the first limiting pistons are fixedly connected to the first sliding rods.
[0011] When the forged piece slides to the right, it will hit the second baffle, and the second baffle will shrink the second spring to cushion the forged piece, thereby preventing the forged piece from sliding to the right and hitting the right side wall of the material receiving box when the first spring shrinks.
[0012] Preferably, a shell is provided at the bottom of the material receiving box, four second sleeves are fixedly connected to the inner bottom wall of the shell, second sliding rods are slidably inserted at the tops of the four second sleeves, and the tops of the second sliding rods are fixedly connected to the material receiving box.
[0013] Preferably, a third spring is disposed inside each of the four second sleeves, and a second piston is disposed on the top of each of the third springs.
[0014] When the material receiving box is subjected to force, the second slide rod will squeeze the second piston, and the second piston will slide in the second sleeve and squeeze the third spring. With the cooperation of the second piston and the third spring, the material receiving box can be buffered.
[0015] Preferably, the tops of the second pistons are fixedly connected to the second sliding rods, and the second pistons are slidably disposed in the second sleeves.
[0016] Compared with the prior art, the beneficial effects achieved by the utility model are:
[0017] First, according to the utility model, when taking out the forging from the forging heating furnace, the worker takes out the forging and places it on the rotating roller in the middle of the two side frame plates. When the forging falls on the rotating roller, due to the certain curvature of the middle parts of the two side frame plates, the forging slides to the right on the rotating roller under the action of the rotating roller, and at this time, the first sliding rod at the bottom right side of the two side frame plates compresses the first limiting piston, and the first limiting piston contracts the first spring to reduce the impact force, and when the forging slides to the right, it will resist the second baffle plate, and the second baffle plate contracts the second spring to buffer the forging, thereby preventing the forging from sliding to the right and hitting the right side wall of the material receiving box when the first spring contracts, so that it is formed into a material unloading buffer in the material receiving box, which solves the problem of directly dropping the forging on the ground. This method not only damages the forging and deforms it, but also causes sparks to fly, posing a great safety hazard.
[0018] Secondly, according to the utility model, when the material receiving box is subjected to force, the second slide rod will squeeze the second piston, and the second piston will slide in the second sleeve to squeeze the third spring. With the cooperation of the second piston and the third spring, the material receiving box can be buffered, thereby further buffering is performed. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0020] Figure 2 It is a front cutaway and three-dimensional structural schematic diagram of the material receiving box and the first sleeve of the utility model;
[0021] Figure 3 This is a schematic diagram of the three-dimensional structure of the front cutaway of the housing of the utility model;
[0022] Figure 4 This is a schematic diagram of the front section structure of the housing and the second sleeve of the utility model.
[0023] Among them: 1. material receiving box; 11. side frame plate; 12. rotating roller; 13. first slide bar; 14. first sleeve; 15. first spring; 16. first limit piston; 17. first baffle; 18. second spring; 19. second baffle; 2. outer shell; 21. second sleeve; 22. second slide bar; 23. third spring; 24. second piston. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] The utility model provides the following technical solutions:
[0026] Embodiment 1
[0027] See also Figure 1 , Figure 2 , a material unloading buffer mechanism of a forging heating furnace, comprising a material receiving box 1, wherein a material receiving mechanism is arranged inside the material receiving box 1;
[0028] The material receiving mechanism includes two side frame plates 11, and the two side frame plates 11 are rotatably connected to the inside of the rotating rollers 12, the bottom of the two side frame plates 11 are respectively fixedly connected to the first sliding rods 13, the bottom of the first sliding rod 13 is sleeved with a first sleeve 14, the interior of the first sleeve 14 is provided with a first spring 15, the top of the first spring 15 is provided with a first limiting piston 16, the right sides of the tops of the two side frame plates 11 are respectively fixedly connected to the first baffle plates 17, the left sides of the first baffle plates 17 are fixedly connected to the second springs 18, and the left sides of the second springs 18 are fixedly connected to the second baffle plates 19.
[0029] The ends of the two side frame plates 11 that are away from each other on the left side are movably connected to the inner wall of the material receiving box 1, and the middle parts of the two side frame plates 11 are respectively in an arc shape.
[0030] A plurality of rotating rollers 12 are provided, and the plurality of rotating rollers 12 are sequentially arranged along one end of the two side frame plates 11 that are close to each other.
[0031] The first limiting pistons 16 are slidably disposed in the first sleeves 14 , and the tops of the first limiting pistons 16 are fixedly connected to the first sliding rods 13 .
[0032] Through the above technical scheme, when the forging is taken out of the forging heating furnace, the worker takes out the forging and places it on the rotating roller 12 in the middle of the two side frame plates 11. When the forging falls on the rotating roller 12, due to the certain curvature of the middle part of the two side frame plates 11, the forging slides to the right on the rotating roller 12 under the action of the rotating roller 12. At this time, the first slide bar 13 at the bottom right side of the two side frame plates 11 compresses the first limiting piston 16, and the first limiting piston 16 contracts the first spring 15 to reduce the impact force. When the forging slides to the right, it will resist the second baffle plate 19, and the second baffle plate 19 contracts the second spring 18 to buffer the forging, thereby preventing the forging from sliding to the right and hitting the right side wall of the material receiving box 1 when the first spring 15 contracts, so that it is formed in the material receiving box 1. The material unloading buffer solves the problem of directly dropping the forging on the ground. This method not only damages the forging and deforms it, but also causes sparks to fly, posing a great safety hazard.
[0033] Embodiment 2
[0034] See also Figure 3 , Figure 4 On the basis of Example 1, it is further obtained that: a shell 2 is provided at the bottom of the material receiving box 1, four second sleeves 21 are fixedly connected to the inner bottom wall of the shell 2, and second slide bars 22 are slidably inserted at the tops of the four second sleeves 21, and the tops of the second slide bars 22 are fixedly connected to the material receiving box 1 respectively.
[0035] A third spring 23 is disposed inside each of the four second sleeves 21 , and a second piston 24 is disposed on the top of each of the third springs 23 .
[0036] The tops of the second pistons 24 are fixedly connected to the second sliding rods 22 , and the second pistons 24 are slidably disposed in the second sleeves 21 .
[0037] Through the above technical solution, when the receiving box 1 is subjected to force, the second slide rod 22 will squeeze the second piston 24, and the second piston 24 will slide in the second sleeve 21 to squeeze the third spring 23. With the cooperation of the second piston 24 and the third spring 23, the receiving box 1 can be buffered, thereby further buffering.
[0038] In actual operation, when this device is in use, the worker takes out the forging and places it on the rotating roller 12 in the middle of the two side frame plates 11. When the forging falls on the rotating roller 12, due to the certain curvature of the middle part of the two side frame plates 11, the forging slides to the right on the rotating roller 12 under the action of the rotating roller 12. At this time, the first slide bar 13 at the bottom right side of the two side frame plates 11 compresses the first limiting piston 16, and the first limiting piston 16 contracts the first spring 15 to reduce the impact force. When the forging slides to the right, it will resist the second baffle plate 19, and the second baffle plate 19 contracts the second spring 18 to buffer the forging, thereby preventing the forging from sliding to the right and bumping against the right side wall of the material receiving box 1 when the first spring 15 contracts, so that it is formed into a material unloading buffer in the material receiving box 1, which solves the problem of directly dropping the forging on the ground. This method not only damages the forging and deforms it, but also causes sparks to fly, posing a great safety hazard.
[0039] When the receiving box 1 is subjected to force, the second slide rod 22 will squeeze the second piston 24, and the second piston 24 will slide in the second sleeve 21 to squeeze the third spring 23. With the cooperation of the second piston 24 and the third spring 23, the receiving box 1 can be buffered, thereby further buffering.
[0040] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit thereof, and the scope of the invention is defined by the appended claims and their equivalents.
Claims
1. A material unloading buffer mechanism for a forging heating furnace, comprising a material receiving box (1), Features: The material receiving box (1) is provided with a material receiving mechanism inside; The material receiving mechanism comprises two side frame plates (11), the inside of the two side frame plates (11) is rotatably connected with a rotating roller (12), the bottom of the two side frame plates (11) is respectively fixedly connected with a first sliding rod (13), the bottom of the first sliding rod (13) is sleeved with a first sleeve (14), the inside of the first sleeve (14) is provided with a first spring (15), the top of the first spring (15) is provided with a first limiting piston (16), the right side of the top of the two side frame plates (11) is respectively fixedly connected with a first baffle plate (17), the left side of the first baffle plate (17) is fixedly connected with a second spring (18), and the left side of the second spring (18) is fixedly connected with a second baffle plate (19).
2. A material discharge buffer mechanism for a forging heating furnace according to claim 1, Features: The left ends of the two side frame plates (11) that are away from each other are movably connected to the inner wall of the material receiving box (1), and the middle parts of the two side frame plates (11) are respectively in an arc shape.
3. The material discharge buffer mechanism of a forging heating furnace according to claim 1, Features: A plurality of rotating rollers (12) are provided, and the plurality of rotating rollers (12) are arranged in sequence along one end of the two side frame plates (11) that are close to each other.
4. The material unloading buffer mechanism of a forging heating furnace according to claim 1, Features: The first limiting pistons (16) are slidably disposed in the first sleeves (14), and the tops of the first limiting pistons (16) are fixedly connected to the first sliding rods (13).
5. The material unloading buffer mechanism of a forging heating furnace according to claim 1, Features: The bottom of the material receiving box (1) is provided with an outer shell (2), the inner bottom wall of the outer shell (2) is fixedly connected with four second sleeves (21), the tops of the four second sleeves (21) are respectively slidably plugged with second sliding rods (22), and the tops of the second sliding rods (22) are respectively fixedly connected with the material receiving box (1).
6. A material discharge buffer mechanism for a forging heating furnace according to claim 5, Features: A third spring (23) is disposed inside each of the four second sleeves (21), and a second piston (24) is disposed on the top of each of the third springs (23).
7. A material discharge buffer mechanism for a forging heating furnace according to claim 6, Features: The tops of the second pistons (24) are respectively fixedly connected to the second sliding rods (22), and the second pistons (24) are respectively slidably arranged in the second sleeves (21).