Continuous cadmium powder preparation production line
By designing a continuous cadmium powder preparation production line and using automated control and a closed system, the problems of high labor intensity and high purity requirements under the single-furnace intermittent operation method were solved, and efficient, low-cost production of high-purity cadmium powder was achieved.
Patent Information
- Application Number
- CN202420452296.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The existing cadmium powder production line uses a single-furnace intermittent operation method, which is labor-intensive and has a high risk of occupational diseases. It can only use 99.99% pure refined cadmium as raw material, and cannot use low-purity cadmium and cadmium-containing materials, which increases production costs.
A continuous cadmium powder preparation production line was designed, including a reduction furnace, distillation furnace, condenser, screening machine and packaging machine. It adopts automated control and a closed system to refine and remove impurities from crude cadmium through the reduction furnace, reducing manual intervention and allowing the use of low-cost purity cadmium material, and accelerate the impurity removal reaction through a flap valve and a mixer.
It improves production efficiency, reduces raw material purity requirements, reduces production costs, reduces the risk of occupational diseases, and realizes the automated production of high-purity cadmium powder.
Smart Images

Figure CN221909804U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cadmium powder preparation, in particular to a continuous cadmium powder preparation production line. Background Art
[0002] Cadmium is a rare heavy metal element of group IIB. It is used in the manufacture of various alloy materials, atomic energy industry, electroplating, coatings, batteries and other fields, and has unique economic value. High-purity cadmium powder is mainly used in semiconductors, optoelectronic materials, high-purity alloys, solar energy, optical glass, pesticides and other industries, which require low impurities and high powder purity in cadmium powder to meet the material requirements of this field.
[0003] The preparation method of high-purity cadmium powder mainly adopts vacuum distillation method, generally using 99.99% refined cadmium ingots / rods as raw materials, and adopting single furnace intermittent operation mode for production. For example, the invention patents with announcement numbers CN113199031A and CN115627365A both adopt a single furnace simple production mode.
[0004] In the single-furnace intermittent operation mode, the refined cadmium ingot is first put into the melting furnace for melting and liquid preparation, and then the cadmium liquid is transferred to the distillation furnace. The steam generated by the distillation furnace is introduced into the condenser to make metallic cadmium powder, and finally enters the cadmium powder tank at the bottom for collection. After the collection is full, it needs to be manually transferred and replaced. Each furnace needs to be manually fed into the melting furnace and the cadmium powder tank needs to be manually replaced. The operators have to contact the materials many times, which has the disadvantages of high labor intensity, high risk of occupational diseases, and low production efficiency. In addition, the existing cadmium powder production line can only use 99.99% pure refined cadmium as raw material for production, and cannot use low-purity cadmium and cadmium-containing materials. It has high requirements for the purity of raw materials, which increases production costs. Therefore, it is necessary to make improvements. Utility Model Content
[0005] The utility model aims to provide a continuous cadmium powder preparation production line, which solves the above-mentioned problems existing in the existing cadmium powder production line.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a continuous cadmium powder preparation production line, comprising a reduction furnace, a flap valve feeding device is arranged on the left side of the upper end of the reduction furnace, an alkali slag flaker is arranged on the lower left side of the reduction furnace, a slag discharge pipe is arranged on the lower part of the left side wall of the reduction furnace, and the slag discharge pipe is connected to the alkali slag flaker, a discharge pipe is arranged on the lower part of the right side wall of the reduction furnace, a distillation furnace is arranged on the end of the discharge pipe away from the reduction furnace, a water-cooled box condenser is arranged on the right side of the distillation furnace, and an air guide pipe is arranged between the water-cooled box condenser and the distillation furnace, A vacuum pump is arranged on the upper right side of the water-cooled box condenser, a double-layer pneumatic flap valve is arranged on the bottom of the water-cooled box condenser, a Z-type pipe chain conveyor is arranged below the water-cooled box condenser, a silo is arranged below the horizontal part of the Z-type pipe chain conveyor located at a high place, the silo is connected to a screening machine through a pipeline, a qualified cadmium powder storage tank and an unqualified storage tank are respectively arranged on the left and right sides of the screening machine, the qualified cadmium powder storage tank is connected to a packaging machine equipment through a pipeline, a roller conveyor is arranged below the packaging machine equipment, and an empty barrel is placed on the top of the roller conveyor.
[0007] Preferably, a stirrer is provided on the top of the reduction furnace, a driving motor of the stirrer is fixedly installed on the top of the reduction furnace, an output shaft of the stirrer extends to the inside of the reduction furnace, and a stirring fan blade is provided at the bottom of the shaft of the output shaft. The setting of the stirrer can accelerate the refining and impurity removal reaction of the material.
[0008] Preferably, a molten salt valve is provided in the middle section of the discharge pipe. By selecting a molten salt valve, corrosion of the valve by the material can be prevented.
[0009] Preferably, the unqualified storage tank is connected to a flap valve feeding device through a pipeline. The unqualified cadmium powder can be put into the reduction furnace again through the flap valve feeding device for secondary reaction.
[0010] Preferably, a pneumatic capping machine is arranged above the empty barrel and on the right side of the packaging machine. Through the arrangement of the pneumatic capping machine, the empty barrel can be capped after being filled with materials.
[0011] Preferably, a water pump is connected between the alkali slag flaker and the water-cooled box-type condenser through a pipeline, and high-pressure clean water can be delivered to the alkali slag flaker and the water-cooled box-type condenser through the water pump.
[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0013] 1. The utility model adopts continuous production rather than single-furnace intermittent production mode. The reduction furnace and the distillation furnace are closed and the materials are passed through the reduction furnace and the distillation furnace respectively at any time through valve control, thereby improving production efficiency. The reduction furnace is used to refine and remove impurities from the crude cadmium, thereby reducing the quality requirements of the raw materials and reducing production costs. The powder discharge operation does not require manual intervention, thereby reducing the risk of employees suffering from occupational diseases.
[0014] 2. The production line equipment of the utility model adopts a computer control mode based on PLC + remote host computer, which improves the working environment and has a high degree of automation. The reduction furnace is fed with a belt conveyor, and a robot can be configured in the front section to further reduce human intervention and provide automation. The material transfer process is in a closed environment to avoid powder leakage that pollutes the working environment and harms the health of employees. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is the equipment connection diagram of the utility model.
[0016] In the figure: 1. Alkali slag flake machine; 2. Flap valve feeding device; 3. Reduction furnace; 4. Discharge pipe; 5. Distillation furnace; 6. Air duct; 7. Water-cooled box condenser; 8. Vacuum pump; 9. Double-layer pneumatic flap valve; 10. Z-type pipe chain conveyor; 12. Silo; 13. Screening machine; 131. Qualified cadmium powder storage tank; 132. Unqualified storage tank; 14. Packaging machine equipment; 15. Roller conveyor; 16. Empty barrel; 17. Pneumatic capping machine; 18. Water pump. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] See also Figure 1 , a continuous cadmium powder preparation production line includes a reduction furnace 3, a stirrer is arranged on the top of the reduction furnace 3, a driving motor of the stirrer is fixedly installed at the top of the reduction furnace 3, an output shaft of the stirrer extends to the inside of the reduction furnace 3, and a stirring fan blade is arranged at the bottom of the shaft body of the output shaft. The setting of the stirrer can accelerate the refining and impurity removal reaction of the material, a flap valve feeding device 2 is arranged on the left side of the upper end of the reduction furnace 3, an alkali slag flaker 1 is arranged on the lower left side of the reduction furnace 3, a slag discharge pipe is arranged on the lower part of the left side wall of the reduction furnace 3, and the slag discharge pipe is connected to the alkali slag flaker 1, a discharge pipe 4 is arranged on the lower part of the right side wall of the reduction furnace 3, and a molten salt valve is arranged in the middle section of the discharge pipe 4. By selecting a molten salt valve, corrosion of the valve by the material can be prevented.
[0019] See also Figure 1 A distillation furnace 5 is arranged at one end of the discharge pipe 4 away from the reduction furnace 3, a water-cooled box condenser 7 is arranged on the right side of the distillation furnace 5, and an air guide pipe 6 is arranged between the water-cooled box condenser 7 and the distillation furnace 5, and a water pump 18 is connected between the alkali slag flake machine 1 and the water-cooled box condenser 7 through a pipeline. The water pump 18 can transport high-pressure clean water to the alkali slag flake machine 1 and the water-cooled box condenser 7. A vacuum pump 8 is arranged on the upper right side of the water-cooled box condenser 7, a double-layer pneumatic flap valve 9 is arranged at the bottom of the water-cooled box condenser 7, a Z-type pipe chain conveyor 10 is arranged below the water-cooled box condenser 7, and a silo 12 is arranged below the horizontal part of the Z-type pipe chain conveyor 10 located at a high place.
[0020] See also Figure 1 The silo 12 is connected to a screening machine 13 through a pipeline. A qualified cadmium powder storage tank 131 and an unqualified storage tank 132 are respectively arranged on the left and right sides of the screening machine 13. The unqualified storage tank 132 is connected to the flap valve feeding device 2 through a pipeline. The unqualified cadmium powder can be put into the reduction furnace 3 again through the flap valve feeding device 2 for secondary reaction. The qualified cadmium powder storage tank 131 is connected to a packaging machine 14 through a pipeline. A roller conveyor 15 is arranged below the packaging machine 14, and an empty barrel 16 is placed on the top of the roller conveyor 15. A pneumatic capping machine 17 is arranged above the empty barrel 16 and on the right side of the packaging machine 14. Through the setting of the pneumatic capping machine 17, the empty barrel 16 can be capped after being filled with materials.
[0021] The specific implementation process of the utility model is as follows: crude cadmium ingots / rods and caustic soda flakes containing more than 97% cadmium are fed into the reduction furnace 3 through a belt conveyor, and the feeding process can be carried out by manually or by robot equipment to grab the materials and put them on the belt conveyor; the materials entering the reduction furnace 3 are melted at about 450-500°C, and then the agitator is turned on to stir them to accelerate the refining and impurity removal reaction of the materials; after the impurity removal is completed, the vacuum pump 8 is turned on to evacuate the distillation furnace 5, the water-cooled box condenser 7, the pipe chain machine, and the air guide pipe 6, and then the evacuation valve is closed, and nitrogen is filled from the front end of the water-cooled box condenser 7 and continuously purged to maintain the system pressure at about 0.5Kpa, and all double-layer pneumatic flap valves 9 under the cone bucket are closed at the same time;
[0022] After the purging is completed, the cadmium discharge valve of the material pipe between the reduction furnace 3 and the distillation furnace 5 is opened, and the cadmium liquid enters the distillation furnace 5. At the same time, the distillation furnace 5 is turned on for heating, and then the heating process parameters of the distillation furnace 5 are set on the upper computer. After the temperature of the furnace top thermocouple is observed to rise to 300° C., the air guide pipe 6 is opened for electric auxiliary heating. At this time, high-purity cadmium vapor begins to be generated on the furnace top, and enters the water-cooled box condenser 7 through the air guide pipe 6;
[0023] The cooling water system of the water-cooled box condenser 7 is turned on. After a period of time, a certain amount of powder has accumulated in the cone bucket. Then, the Z-type pipe chain conveyor 10 is turned on and operated. The upper layer of the double-layer pneumatic flap valve 9 is opened in sequence. When the powder enters the closed cavity between the double-layer pneumatic flap valves 9, the upper layer of the double-layer pneumatic flap valve 9 is closed. At the same time, the lower layer of the double-layer pneumatic flap valve 9 is opened. The powder falls into the Z-type pipe chain conveyor 10 and is promptly output through the pipeline to enter the closed silo 12 above the screening machine 13 for storage.
[0024] After a certain amount of material is accumulated in the silo 12, the sieving machine 13 is turned on, and the valve between the silo 12 and the sieving machine 13 is opened, and the powder enters the sieving machine 13 for sieving. The qualified cadmium powder is collected by the sealed cadmium powder storage tank 131 and transferred to the packaging line equipment for packaging. The unqualified coarse powder is collected by the unqualified storage tank 132 and sent to the reduction furnace 3 for batching and remelting regularly.
[0025] The reduction furnace 3, alkali slag flake machine 1, screening machine 13 and packaging machine equipment 14 in the above links need to be ventilated and dust collected during operation, and the exhaust gas is discharged to the outside after being treated by a professional dust removal system.
[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A continuous cadmium powder production line, comprising a reduction furnace (3), characterized in that: A flap valve feeding device (2) is arranged on the left side of the upper end of the reduction furnace (3), an alkali slag flaker (1) is arranged on the lower left side of the reduction furnace (3), a slag discharge pipe is arranged on the lower part of the left side wall of the reduction furnace (3), and the slag discharge pipe is connected to the alkali slag flaker (1), a discharge pipe (4) is arranged on the lower part of the right side wall of the reduction furnace (3), a distillation furnace (5) is arranged on the end of the discharge pipe (4) away from the reduction furnace (3), a water-cooled box condenser (7) is arranged on the right side of the distillation furnace (5), and an air guide pipe (6) is arranged between the water-cooled box condenser (7) and the distillation furnace (5), a vacuum pump (8) is arranged on the upper right side of the water-cooled box condenser (7), and the water-cooled box condenser (7) is arranged on the upper right side of the water-cooled box condenser (7). A double-layer pneumatic flap valve (9) is arranged at the bottom of the condenser (7), a Z-shaped pipe chain conveyor (10) is arranged below the water-cooled box-type condenser (7), a silo (12) is arranged below the horizontal part of the Z-shaped pipe chain conveyor (10) located at a high position, the silo (12) is connected to a screening machine (13) through a pipeline, and a qualified cadmium powder storage tank (131) and an unqualified storage tank (132) are arranged on the left and right sides of the screening machine (13), respectively, the qualified cadmium powder storage tank (131) is connected to a packaging machine (14) through a pipeline, a roller conveyor (15) is arranged below the packaging machine (14), and an empty barrel (16) is placed on the top of the roller conveyor (15).
2. The continuous cadmium powder production line according to claim 1, characterized in that: A stirrer is arranged on the top of the reduction furnace (3), a driving motor of the stirrer is fixedly installed on the top of the reduction furnace (3), an output shaft of the stirrer extends to the inside of the reduction furnace (3), and a stirring fan blade is arranged at the bottom of the shaft body of the output shaft.
3. The continuous cadmium powder production line according to claim 1, characterized in that: The middle section of the discharge pipe (4) is provided with a molten salt valve.
4. The continuous cadmium powder production line according to claim 1, characterized in that: The unqualified storage tank (132) is connected to the flap valve feeding device (2) through a pipeline.
5. The continuous cadmium powder production line according to claim 1, characterized in that: A pneumatic capping machine (17) is arranged above the empty barrel (16) and on the right side of the packaging machine (14).
6. The continuous cadmium powder production line according to claim 1, characterized in that: A water pump (18) is connected between the alkali slag flaker (1) and the water-cooled box-type condenser (7) via a pipeline.