Rapid slag discharging and transporting device for expanding excavation tunnel

By designing multiple transport devices that extend into the tunnel and height-adjusting components, the problem of low efficiency in soil transportation in the expanded tunnel is solved, and efficient soil transportation and the ability to adapt to different tunnel lengths are achieved.

CN221915949UActive Publication Date: 2024-10-29CHINA RAILWAY (GUANGZHOU) INVESTMENT & DEV CO LTD +3
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420643270.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-10-29
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

The transportation efficiency of the soil generated during tunnel expansion is low, and the tunnel space is limited, so only one slag truck can work at the same time.

Method used

A rapid slag transportation device is designed that includes a frame, a first transmission module and a plurality of second transmission modules extending into the tunnel. The efficient transportation of soil is achieved through a motor-driven conveyor belt, and the height adjustment assembly is used to adapt to different conditions. length of tunnel.

Benefits of technology

It improves the transportation efficiency of soil, allowing multiple second transmission modules to extend into the tunnel to facilitate the transportation of soil to the first transmission module, and increases the number of transmission modules according to the depth of excavation, reducing the problem of the height of the transmission module being too high. Adapt to different occasions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221915949U_ABST
    Figure CN221915949U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of slag conveying devices, in particular to a rapid slag discharging and conveying device for expanding excavation of a tunnel, which comprises a rack arranged outside the tunnel. The first conveying module is arranged on the rack and is suitable for conveying soil residues; the multiple second conveying modules are sequentially connected so as to extend into the tunnel, and one second conveying module is connected with the first conveying module; the multiple second conveying modules are suitable for conveying the soil residues in the tunnel to the first conveying module so that the soil residues can be conveyed out of the tunnel. According to the rapid slag discharging and transporting device for the expanded excavation tunnel, the second conveying modules extend into the tunnel, soil slag in the tunnel can be conveyed to the first conveying modules conveniently, then the soil slag can be conveyed out of the tunnel conveniently, and meanwhile the number of the second conveying modules can be increased according to the expanded excavation depth; therefore, the method adapts to expanded excavation tunnels with various lengths.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slag transport devices, in particular to a fast slag transport device for tunnel expansion. Background Art

[0002] When expanding a tunnel, a large amount of soil debris will be generated. Due to the limited space in the tunnel, only one slag truck can work in the tunnel at the same time, resulting in low slag transportation efficiency. Utility Model Content

[0003] The technical problem to be solved by the utility model is: in order to solve the technical problems in the prior art, the utility model provides a rapid slag transport device for tunnel expansion.

[0004] The technical solution adopted by the utility model to solve its technical problems is: a fast slag transport device for expanding a tunnel, comprising a frame, which is arranged outside the tunnel; a first conveying module, which is arranged on the frame and is suitable for conveying soil slag; a second conveying module, which is provided with a plurality of and is connected in sequence to extend into the tunnel, wherein one of the second conveying modules is connected to the first conveying module; and a plurality of the second conveying modules are suitable for conveying the soil slag in the tunnel to the first conveying module, so as to convey the soil slag to the outside of the tunnel.

[0005] The utility model provides a rapid slag transport device for expanding and excavating a tunnel, which extends into the tunnel through a plurality of second conveying modules, so as to facilitate the conveying of soil slag in the tunnel to the first conveying module, and then to facilitate the conveying of soil slag to the outside of the tunnel. Meanwhile, the number of the second conveying modules can be increased according to the expansion and excavation depth, so as to adapt to the expansion and excavation tunnels of various lengths.

[0006] Furthermore, the second conveying module includes a support frame, the support frame is connected to a motor, the output end of the motor is connected to a first rotating roller, the support frame is also rotatably connected to a second rotating roller, and the first rotating roller and the second rotating roller are sleeved with a first conveyor belt.

[0007] Furthermore, the motor is arranged at one end of the support frame close to the first conveying module, the first conveying module is provided with a first socket at one end close to the conveying module, and the support frame is provided with a second socket at one end away from the first conveying module.

[0008] Furthermore, the support frame is connected to a first hinged plate at one end close to the first conveying module, and is connected to a second hinged plate at one end close to the second conveying module. The first hinged plate is hinged to the second hinged plate; and a height adjustment component is provided at one end of the second conveying module away from the first conveying module.

[0009] Furthermore, the height adjustment assembly includes a first supporting leg and a second supporting leg, one end of the first supporting leg is hinged to the supporting frame, and the other end is inserted into the second supporting leg, a plurality of limiting holes are provided on the first supporting leg along the vertical direction, and a limiting rod is inserted on the second supporting leg, and the limiting rod is suitable for being inserted into the limiting holes at the same time.

[0010] Furthermore, a rotating plate is fixedly connected to the bottom of the support frame, a first hinge rod is connected to the rotating plate, and the rotating plate is hinged to the first supporting leg via the first hinge rod.

[0011] Furthermore, a circular arc waist-shaped groove is opened on the rotating plate along the circumference of the first hinge rod, and a second hinge rod is inserted into the circular arc waist-shaped groove, and the second hinge rod is also connected to the first supporting leg.

[0012] Furthermore, the bottom of the second supporting leg is connected to a bottom plate.

[0013] Furthermore, four moving wheels are provided at the bottom of the frame.

[0014] The beneficial effects of the utility model are:

[0015] 1. Multiple second conveying modules are extended into the tunnel to facilitate the conveying of soil residue in the tunnel to the first conveying module, and then to facilitate the conveying of soil residue to the outside of the tunnel. At the same time, the number of second conveying modules can be increased according to the excavation depth to adapt to the excavation of tunnels of various lengths;

[0016] 2. By setting the height adjustment component, it is convenient to adjust the height of the second conveying module away from the end of the first conveying module to adapt to different occasions. At the same time, the height of the second conveying module away from the end of the first conveying module can be made almost flush with the height of the first conveying module, thereby reducing the problem of the second conveying module extending out of the tunnel being too high due to the continuous accumulation of the second conveying modules. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0019] Figure 2 yes Figure 1 A partial enlarged view of part A in the middle.

[0020] In the figure: 1. frame; 11. moving wheel; 2. first conveying module; 21. second hinged plate; 22. first socket; 3. second conveying module; 31. support frame; 32. motor; 33. first conveyor belt; 34. first hinged plate; 35. second socket; 4. height adjustment assembly; 41. first supporting leg; 42. second supporting leg; 43. limiting rod; 431. limiting hole; 44. first hinged rod; 45. second hinged rod; 46. arc waist groove; 47. rotating plate. DETAILED DESCRIPTION

[0021] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.

[0022] Reference Figure 1 and Figure 2 A rapid slag transport device for tunnel expansion includes a frame 1, which can be placed on the ground outside the tunnel. A first conveying module 2 is connected to the frame 1, and a plurality of second conveying modules 3 are sequentially connected to the first conveying module 2 toward one end of the tunnel. The plurality of second conveying modules 3 extend into the tunnel, and one of the second conveying modules 3 is connected to the first conveying module 2. When working, the plurality of second conveying modules 3 are suitable for conveying soil slag in the tunnel to the first conveying module 2, so as to transport the soil slag out of the tunnel.

[0023] Specifically, the second conveying module 3 includes a support frame 31, a motor 32 is fixedly connected to the support frame 31, an output end of the motor 32 is connected to a first rotating roller, and the first rotating roller is rotatably connected to the support frame 31. A second rotating roller is also rotatably connected to the support frame 31, and the first rotating roller and the second rotating roller are sleeved with a first conveyor belt 33. When working, the first rotating roller is driven to rotate by the motor 32, thereby driving the first conveyor belt 33 to work, thereby realizing the conveyance of materials.

[0024] The structure of the first transmission module 2 is the same as that of the second transmission module 3, and will not be described again here.

[0025] Furthermore, the motor 32 is arranged at one end of the support frame 31 close to the first conveying module 2, and the first conveying module 2 is connected to the first socket 22 at one end close to the conveying module, and the second socket 35 is arranged at one end of the support frame 31 away from the first conveying module 2. The first socket 22 facilitates the power supply of the motor 32 on the second conveying module 3 connected to the first conveying module 2, and facilitates the power supply of the subsequent second socket 35. The second socket 35 facilitates the power supply of the motor 32 on the subsequent second conveying module 3, and the circuit is arranged on the support frame 31, which can greatly reduce safety hazards.

[0026] Specifically, the end of the support frame 31 close to the first conveying module 2 is fixedly connected with the first hinge plate 34, the end of the first conveying module 2 close to the second conveying module 3 is fixedly connected with the second hinge plate 21, the first hinge plate 34 is hinged to the second hinge plate 21, and the end of the second conveying module 3 away from the first conveying module 2 is provided with a height adjustment component 4. The height adjustment component 4 is convenient for adjusting the height of the end of the second conveying module 3 away from the first conveying module 2 to adapt to different occasions, and at the same time, the height of the end of the second conveying module 3 away from the first conveying module 2 can be made almost flush with the height of the first conveying module 2, thereby reducing the problem of excessive height of the second conveying module 3 extending out of the tunnel due to the continuous accumulation of the second conveying modules 3.

[0027] More specifically, the height adjustment assembly 4 includes a first supporting leg 41 and a second supporting leg 42. One end of the first supporting leg 41 is hinged to the supporting frame 31, and the other end is inserted into the second supporting leg 42. A plurality of limiting holes 431 are provided on the first supporting leg 41 along the vertical direction, and a limiting rod 43 is inserted into the second supporting leg 42. The limiting rod 43 is suitable for being inserted into the limiting hole 431 at the same time.

[0028] It should be noted that a rotating plate 47 is fixedly connected to the bottom of the support frame 31, and a first hinge rod 44 is connected to the rotating plate 47, and the rotating plate 47 is hinged to the first support leg 41 through the first hinge rod 44. A circular waist groove 46 is provided on the rotating plate 47 along the circumference of the first hinge rod 44, and a second hinge rod 45 is inserted in the circular waist groove 46, and the second hinge rod 45 is also connected to the first support leg 41. A bottom plate is fixedly connected to the bottom of the second support leg 42, and the area of ​​the bottom plate is larger than the area of ​​the second support leg 42 to ensure the stability of the support.

[0029] In addition, the bottom of the frame 1 is rotatably connected with four moving wheels 11, which facilitates the movement of the frame 1. The second conveying module 3 can be stacked on the first conveying module 2, thereby facilitating the overall transfer.

[0030] Working principle: By extending multiple second transmission modules 3 into the tunnel, it is convenient to transmit the soil residue in the tunnel to the first transmission module 2, and then to transport the soil residue to the outside of the tunnel. At the same time, the number of second transmission modules 3 can be increased according to the excavation depth to adapt to various lengths of excavated tunnels. Through the setting of the height adjustment component 4, it is convenient to adjust the height of the second transmission module 3 away from the first transmission module 2 to adapt to different occasions. At the same time, the height of the second transmission module 3 away from the first transmission module 2 can be made almost flush with the height of the first transmission module 2, reducing the problem of the second transmission module 3 extending out of the tunnel being too high due to the continuous accumulation of the second transmission modules 3.

[0031] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A rapid slag transport device for tunnel expansion, characterized in that: include A frame (1) is provided outside the tunnel; A first conveying module (2) is arranged on the frame (1) and is suitable for conveying soil residue; A plurality of second transmission modules (3) are provided and are connected in sequence to extend into the tunnel, wherein one of the second transmission modules (3) is connected to the first transmission module (2); The plurality of second conveying modules (3) are suitable for conveying soil debris in the tunnel to the first conveying module (2), so as to transport the soil debris to the outside of the tunnel.

2. The rapid slag transport device for tunnel expansion as claimed in claim 1, characterized in that: The second conveying module (3) comprises a support frame (31), the support frame (31) is connected to a motor (32), the output end of the motor (32) is connected to a first rotating roller, the support frame (31) is also rotatably connected to a second rotating roller, and the first rotating roller and the second rotating roller are sleeved with a first conveyor belt (33).

3. The rapid slag transport device for tunnel expansion as claimed in claim 2, characterized in that: The motor (32) is arranged at one end of the support frame (31) close to the first conveying module (2); the first conveying module (2) is provided with a first socket (22) at one end close to the conveying module; and the support frame (31) is provided with a second socket (35) at one end away from the first conveying module (2).

4. The rapid slag transport device for tunnel expansion as claimed in claim 2, characterized in that: One end of the support frame (31) close to the first conveying module (2) is connected to a first hinged plate (34), and one end of the first conveying module (2) close to the second conveying module (3) is connected to a second hinged plate (21), and the first hinged plate (34) is hinged to the second hinged plate (21); A height adjustment component (4) is provided at one end of the second conveying module (3) away from the first conveying module (2).

5. The rapid slag transport device for tunnel expansion as claimed in claim 4, characterized in that: The height adjustment assembly (4) comprises a first supporting leg (41) and a second supporting leg (42); one end of the first supporting leg (41) is hinged to the supporting frame (31), and the other end is inserted into the second supporting leg (42); a plurality of limiting holes (431) are provided on the first supporting leg (41) along the vertical direction; a limiting rod (43) is inserted into the second supporting leg (42); and the limiting rod (43) is suitable for being inserted into the limiting holes (431) at the same time.

6. The rapid slag transport device for tunnel expansion as claimed in claim 5, characterized in that: A rotating plate (47) is fixedly connected to the bottom of the support frame (31), a first hinge rod (44) is connected to the rotating plate (47), and the rotating plate (47) is hinged to the first support leg (41) via the first hinge rod (44).

7. The rapid slag transport device for tunnel expansion as claimed in claim 6, characterized in that: The rotating plate (47) is provided with an arc waist-shaped groove (46) along the circumference of the first hinge rod (44), and a second hinge rod (45) is inserted into the arc waist-shaped groove (46). The second hinge rod (45) is also connected to the first supporting leg (41).

8. The rapid slag transport device for tunnel expansion as claimed in claim 5, characterized in that: The bottom of the second supporting leg (42) is connected to a bottom plate.

9. The rapid slag transport device for tunnel expansion as claimed in claim 1, characterized in that: Four moving wheels (11) are provided at the bottom of the frame (1).

Citation Information

Cited By

  • Stable deslagging device and method for small-section tunnel

    CN120990625A