Support-free pier column and bent cap quick connection structure

Through the combination technology of prefabricated piers and cap beams, the use of supporting steel corbels and anchoring steel bars, combined with micro-expansion concrete mortar, a quick connection without temporary supports is achieved, which solves the problems of long construction period and high positioning accuracy, and improves the connection stability and integrity.

CN221918940UActive Publication Date: 2024-10-29ANHUI TRANSPORT CONSULTING & DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420154751.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-10-29
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

The existing connection between prefabricated pier columns and cap beams has problems such as long construction period, high positioning accuracy requirements and weak connections, which limits the large-scale promotion of prefabricated structures.

Method used

The combined technology of prefabricated pier columns, prefabricated cover beams, supporting steel corbels, steel cages and mortar is adopted. Through the design of reserved holes, grouting holes and grouting holes, the annular distribution of anchoring steel bars and stirrups is used to combine Micro-expanded concrete mortar mixed with fiber enables quick connection without temporary supports.

Benefits of technology

It improves the installation speed and connection integrity, reduces the construction period and cost, ensures positioning accuracy and connection stability, and reduces workers' operational risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221918940U_ABST
    Figure CN221918940U_ABST
Patent Text Reader

Abstract

The utility model discloses a support-free pier column and cover beam quick connection structure, which relates to the technical field of bridge construction and comprises a prefabricated pier column, a prefabricated cover beam, at least two support steel corbel components, a reinforcement cage and mortar. Wherein a preformed hole is formed in the lower surface of the prefabricated cover beam, and the upper side of the preformed hole communicates with a grouting hole and a grout outlet hole; the supporting steel corbel component is fixed to the outer side of the prefabricated pier column and used for supporting the prefabricated bent cap in the construction period. The lower end of the reinforcement cage is integrally poured and connected with the prefabricated pier column, and the upper end of the reinforcement cage extends into the preformed hole; the mortar is injected into the preformed hole through the grouting hole, and after the mortar is solidified, connection of the prefabricated pier column and the prefabricated cover beam is completed; the beam body of the prefabricated bent cap is directly supported through the supporting steel corbel component, a bent cap construction support or a joist does not need to be additionally erected, the support is not needed, meanwhile, the construction period is shortened, and good economical efficiency can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a bracket-free pier column and cap beam quick connection structure. Background Art

[0002] Prefabricated components have been increasingly used in transportation infrastructure in recent years because of their guaranteed quality, fast construction speed, and little impact on existing traffic and the environment. In the process of urban bridge construction, due to site and traffic requirements, the use of prefabricated piers and cap beams has become more and more common.

[0003] In recent years, a lot of research has been done on the connection of prefabricated piers and cap beams. The main methods currently include various dry and wet connection methods such as grouting sleeve connection, steel bar welding, and prestressed connection. However, the various joints currently have more or less problems, which limits the large-scale promotion of prefabricated structures. The main limiting factors are:

[0004] 1. The prefabrication quality of the components is high, but the construction quality of the joints cannot match, which becomes a weak point;

[0005] 2. The setting of the reserved holes and reserved steel bars of the prefabricated components in the grouting sleeve connection method requires high precision. If the deviation is slightly larger, it will be difficult to install;

[0006] 3. The grouting sleeve connection method requires grouting after the cap beam is positioned. The grouting hole volume is small, and the density test of the grouting material and the pouring quality test are more difficult;

[0007] 4. During the construction of cap beam hoisting, it is necessary to set up temporary brackets or auxiliary measures such as beam support legs. The process is complicated, the construction period is long, and the cost of temporary measures is high. Summary of the invention

[0008] The utility model aims to provide a bracket-free pier column and cap beam quick connection structure, which solves the problems of long construction period, high positioning accuracy requirement and weak connection.

[0009] The utility model solves the above technical problems through the following technical solutions. The utility model includes a prefabricated pier, a prefabricated cap beam, at least two supporting steel bracket components, a steel cage and mortar; wherein:

[0010] The lower surface of the prefabricated cap beam is provided with a reserved hole, and the upper side of the reserved hole is connected with a grouting hole and a grouting hole;

[0011] The supporting steel corbel components are fixed to the outside of the prefabricated piers and are used to support the prefabricated cap beams during the construction period;

[0012] The lower end of the steel cage is integrally cast and connected to the prefabricated pier column, and the upper end thereof extends into the reserved hole;

[0013] The mortar is injected into the reserved hole through the grouting hole, and after the mortar solidifies, the connection between the prefabricated pier column and the prefabricated cap beam is completed.

[0014] Preferably, a supporting steel cylinder is fixed to the upper end of the prefabricated pier column, and the upper end of the supporting steel cylinder has an annular plate extending outward, and the outer diameter of the annular plate is adapted to the inner diameter of the reserved hole.

[0015] Preferably, the steel cage comprises a plurality of anchor steel bars and a plurality of stirrups; wherein:

[0016] The multiple anchoring steel bars are distributed in a ring shape and the lower ends extend into the prefabricated pier column. The lower ends of the multiple anchoring steel bars are welded and fixed to the inner wall of the supporting steel tube, and the multiple stirrups are connected to the multiple anchoring steel bars.

[0017] Preferably, when the anchor steel bar is welded to the supporting steel cylinder on one side, the welding length h2 of the anchor steel bar and the supporting steel cylinder is not less than 10d1; when the anchor steel bar is welded to the supporting steel cylinder on both sides, the welding length h2 of the anchor steel bar and the supporting steel cylinder is not less than 5d1; the depth of the anchor steel bar penetrating into the prefabricated cap beam h1≥25d1, where d1 is the diameter of the anchor steel bar.

[0018] Preferably, the upper ends of the plurality of anchoring steel bars all have a transverse portion, and the length of the transverse portion of the anchoring steel bar is b1≥10d1, wherein d1 is the diameter of the anchoring steel bar.

[0019] Preferably, the supporting steel corbel component is fixed to the supporting steel cylinder, and the supporting steel corbel component comprises a supporting corbel, a bolt, a nut and a supporting plate; wherein:

[0020] The supporting bracket is welded and fixed to the outer wall of the supporting steel cylinder, the bolt is threadedly connected to the supporting bracket, the nut is threadedly connected to the bolt, and the nut is in contact with the supporting bracket, and the supporting plate is fixed to the upper end of the bolt.

[0021] Preferably, the inner wall of the reserved hole is provided with a steel corrugated pipe.

[0022] Preferably, the mortar is fiber-added micro-expansive concrete mortar.

[0023] Preferably, the number of the grouting holes and the number of the grouting holes are 2 respectively.

[0024] Compared with the prior art, the beneficial effects of the present invention are:

[0025] 1. The reserved holes of the prefabricated cap beam have a large diameter, which can be quickly installed in the center and has a large fault tolerance, further shortening the installation time and greatly reducing the safety risks of workers' operations;

[0026] 2. Pre-buried anchor steel bars are used as connecting keys, which have large gaps and good bonding with large volumes of grouting materials. When the opening is large enough, micro-expansive concrete containing coarse aggregate can be directly poured, and the integrity of the joint has been greatly improved;

[0027] 3. The prefabricated cap beam is directly supported by supporting steel bracket components, without the need to set up additional cap beam construction brackets or support beams. The absence of brackets also shortens the construction period and can achieve better economy;

[0028] 4. When supporting the steel corbel components, the height of the support can be adjusted by connecting the bolts to ensure that the vertical elevation of the prefabricated cap beam meets the design requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a front structural schematic diagram of the utility model;

[0030] Figure 2 It is a schematic diagram of a top view and cross-section structure of the utility model;

[0031] Figure 3 This is a schematic diagram of the connecting steel bar structure of the utility model;

[0032] Figure 4 This is a schematic diagram of the supporting steel cylinder structure of the utility model;

[0033] Figure 5 Schematic diagram of the structure supporting the steel corbel components.

[0034] The numbers in the figure represent:

[0035] 1-prefabricated pier; 2-mortar; 3-steel corrugated pipe; 4-prefabricated cap beam; 5-support steel tube; 6-anchor steel bar; 7-hoops; 8-support steel corbel component; 81-bolt; 82-nut; 83-support plate; 84-support corbel; 9-slurry outlet hole; 10-grouting hole. DETAILED DESCRIPTION

[0036] The above and other technical features and advantages of the present invention are described in more detail below in conjunction with the accompanying drawings.

[0037] Embodiment 1

[0038] This embodiment provides a technical solution: a quick connection structure between a pier column and a cap beam without a bracket, such as Figure 1-4 As shown, it includes a prefabricated pier 1, a prefabricated cap beam 4, at least two supporting steel corbel components 8, a steel cage and mortar 2.

[0039] The lower surface of the prefabricated cap beam 4 has a reserved hole, and the cross-section of the reserved hole is a circular structure. The upper side of the reserved hole is connected with a grouting hole 10 and a grouting hole 9. The number of the grouting holes 10 and the number of the grouting holes 9 are 2 respectively. The grouting hole 10 is used to press the mortar 2 into the reserved hole, and the grouting hole 9 is used to observe the pressing of the mortar 2. The inner wall of the reserved hole is provided with a steel corrugated pipe 3, which can increase the shear resistance of the interface.

[0040] The supporting steel corbel components 8 are fixed to the outer side of the prefabricated pier 1 and are used to support the prefabricated cap beam 4 during the construction period. In this embodiment, the number of the supporting steel corbel components 8 is 2 and they are symmetrically arranged.

[0041] The prefabricated pier 1 is a cylindrical structure, and a supporting steel cylinder 5 is fixed to the upper end of the prefabricated pier 1. The diameter D of the prefabricated pier is adapted to the inner diameter of the supporting steel cylinder 5. The upper end of the supporting steel cylinder 5 has an annular plate extending outward, and the outer diameter of the annular plate is adapted to the inner diameter of the reserved hole to support the filling of the mortar 2.

[0042] The lower end of the steel cage is integrally cast and connected with the prefabricated pier 1, and the upper end thereof extends into the reserved hole; the steel cage comprises a plurality of anchoring steel bars 6 and a plurality of stirrups 7, the plurality of anchoring steel bars 6 are vertically arranged, and the upper ends of the plurality of anchoring steel bars 6 all have transverse portions, and the transverse portions are used to increase the load-bearing performance; the plurality of anchoring steel bars 6 are distributed in a ring shape and the lower ends extend into the prefabricated pier 1, and the lower ends of the plurality of anchoring steel bars 6 are all welded and fixed to the inner wall of the supporting steel cylinder 5, thereby ensuring the firmness between the supporting steel cylinder 5 and the steel cage, and the plurality of stirrups 7 are all connected to the plurality of anchoring steel bars 6, and the steel cage ensures the stability of the connection between the prefabricated pier 1 and the prefabricated cap beam 4.

[0043] In this embodiment, the mortar 2 is a fiber-added micro-expansive concrete mortar 2. After the mortar 2 solidifies, the connection between the prefabricated pier 1 and the prefabricated cap beam 4 is completed. At the same time, the mortar 2 contains coarse aggregate, the density of the grouting material and the pouring quality are easier to ensure, and the integrity of the connection is greatly improved.

[0044] The implementation steps of this embodiment are:

[0045] 1. Prefabrication and maintenance of prefabricated piers 1 and prefabricated cap beams 4 are carried out in a prefabrication plant;

[0046] 2. When manufacturing the prefabricated pier column 11, a supporting steel cylinder 5 is embedded in the upper end of the prefabricated pier column 11, and an anchor steel bar 6 is welded on the inner side of the supporting steel cylinder 5. The welding position is the tail end of the anchor steel bar 6. When the anchor steel bar 6 and the supporting steel cylinder 5 are welded on one side, the welding length h2 of the anchor steel bar 6 and the supporting steel cylinder 5 is not less than 10d1; when the anchor steel bar 6 and the supporting steel cylinder 5 are welded on both sides, the welding length h2 of the anchor steel bar 6 and the supporting steel cylinder 5 is not less than 5d1, where d1 is the diameter of the anchor steel bar;

[0047] A supporting steel corbel part 8 is welded on the outside of the supporting steel cylinder 5; the anchor steel bar 6 penetrates into the prefabricated cap beam 4 to a depth of h1≥25d1; the transverse length of the anchor steel b1≥10d1, and the stirrup 7 is in a circular ring shape and is hooped on the outside of the anchor steel bar 6;

[0048] 3. The prefabricated pier column 1 is transported to the site, installed vertically in place, and the connecting mortar is applied on the top. The prefabricated cap beam 4 is hoisted, aligned with the prefabricated pier column 1, and the beam is dropped; at this time, the beam body of the prefabricated cap beam 4 is directly supported by the supporting steel bracket component 8, and there is no need to set up a construction support for the prefabricated cap beam 4;

[0049] 4. Set up a bottom formwork at the connection between the bottom of the prefabricated cap beam 4 and the prefabricated pier 1 to prevent slurry leakage;

[0050] 5. Press the mortar 2 into the grouting hole 10, gradually discharge the air inside through the grouting hole 9, and check the concrete grouting condition through the grouting hole 9;

[0051] 6. After the mortar 2 is cured, the bottom formwork is removed, and the supporting steel corbel parts 8 are cut and removed, and the construction is completed.

[0052] Embodiment 2

[0053] This embodiment is further optimized on the basis of the above embodiment, and the same parts as the above technical solution will not be repeated here. Figure 1 and Figure 5 As shown, in order to better realize the present invention, the following setting is particularly adopted: in this embodiment, the supporting steel bracket component 8 is fixed to the supporting steel cylinder 5, and the supporting steel bracket component 8 includes a supporting bracket 84, a bolt 81, a nut 82 and a supporting plate 83; wherein:

[0054] The supporting corbel 84 is welded and fixed to the outer wall of the supporting steel cylinder 5, the bolt 81 is threaded through the supporting corbel 84, the nut 82 is threaded on the bolt 81, and the nut 82 is abutted against the supporting corbel 84. There are two nuts 82, and the two nuts 82 are respectively located on the upper and lower sides of the supporting corbel 84 to ensure the stability of the connection between the bolt 81 and the supporting corbel 84. The supporting plate 83 is fixed to the upper end of the bolt 81, and the supporting corbel 84 is used to support the prefabricated cap beam 4.

[0055] When the supporting steel corbel component 8 supports the prefabricated cap beam 4, the height of the supporting corbel 84 can be adjusted by screwing the bolt 81, thereby adjusting the vertical elevation of the prefabricated cap beam 4 to meet the design requirements.

[0056] The above are only preferred embodiments of the present invention, which are only illustrative and not restrictive. Those skilled in the art understand that many changes, modifications, and even equivalences may be made to the present invention within the spirit and scope defined by the claims of the present invention, but they will all fall within the scope of protection of the present invention.

Claims

1. A bracket-free pier column and cap beam quick connection structure, characterized in that: It includes prefabricated piers, prefabricated cap beams, at least two supporting steel bracket components, a steel cage and mortar; wherein: The lower surface of the prefabricated cap beam is provided with a reserved hole, and the upper side of the reserved hole is connected with a grouting hole and a grouting hole; The supporting steel corbel components are fixed to the outside of the prefabricated piers and are used to support the prefabricated cap beams during the construction period; The lower end of the steel cage is integrally cast and connected to the prefabricated pier column, and the upper end thereof extends into the reserved hole; The mortar is injected into the reserved hole through the grouting hole, and after the mortar solidifies, the connection between the prefabricated pier column and the prefabricated cap beam is completed.

2. The bracket-free pier column and cap beam quick connection structure according to claim 1 is characterized in that: A supporting steel cylinder is fixed to the upper end of the prefabricated pier column. The upper end of the supporting steel cylinder has an annular plate extending outward, and the outer diameter of the annular plate is adapted to the inner diameter of the reserved hole.

3. The bracket-free pier column and cap beam quick connection structure according to claim 2 is characterized in that: The steel cage comprises a plurality of anchor steel bars and a plurality of stirrups; wherein: The multiple anchoring steel bars are distributed in a ring shape and the lower ends extend into the prefabricated pier column. The lower ends of the multiple anchoring steel bars are welded and fixed to the inner wall of the supporting steel tube, and the multiple stirrups are connected to the multiple anchoring steel bars.

4. The bracket-free pier column and cap beam quick connection structure according to claim 3 is characterized in that: When the anchor steel bar and the supporting steel cylinder are welded on one side, the welding length h2 of the anchor steel bar and the supporting steel cylinder shall not be less than 10d1; when the anchor steel bar and the supporting steel cylinder are welded on both sides, the welding length h2 of the anchor steel bar and the supporting steel cylinder shall not be less than 5d1; the depth of the anchor steel bar penetrating into the prefabricated cap beam h1≥25d1, where d1 is the diameter of the anchor steel bar.

5. The bracket-free pier column and cap beam quick connection structure according to claim 3 is characterized in that: The upper ends of the plurality of anchoring steel bars all have a transverse portion, and the length of the transverse portion of the anchoring steel bar is b1≥10d1, wherein d1 is the diameter of the anchoring steel bar.

6. The bracket-free pier column and cap beam quick connection structure according to claim 2 or 3, characterized in that: The supporting steel corbel component is fixed to the supporting steel cylinder, and the supporting steel corbel component includes a supporting corbel, a bolt, a nut and a supporting plate; wherein: The supporting bracket is welded and fixed to the outer wall of the supporting steel cylinder, the bolt is threadedly connected to the supporting bracket, the nut is threadedly connected to the bolt, and the nut is in contact with the supporting bracket, and the supporting plate is fixed to the upper end of the bolt.

7. The bracket-free pier column and cap beam quick connection structure according to claim 1 is characterized in that: The inner wall of the reserved hole is provided with a steel corrugated pipe.

8. The bracket-free pier column and cap beam quick connection structure according to claim 1 is characterized in that: The mortar is a fiber-added micro-expansive concrete mortar.

9. The bracket-free pier column and cap beam quick connection structure according to claim 1, characterized in that: The number of the grouting holes and the number of the grouting holes are 2 respectively.