Flood prevention structure for water conservancy project

By designing a flood control structure for water conservancy projects that includes a push device and a collection net, the problem of garbage accumulation and deterioration in flood control dams is solved, the effective salvage of river garbage and the cleaning of the dam surface are achieved, and the water quality is improved.

CN221919195UActive Publication Date: 2024-10-29山东省调水工程运行维护中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420118249.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-10-29
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

When the flood control dams are not releasing floods, the river water drives upstream garbage to accumulate. As the containment time prolongs, the garbage deteriorates and produces stench, affecting the water quality.

Method used

A flood control structure for water conservancy projects is designed, including a dam body and a pushing device. The pushing device is fixedly installed on the front of the dam body, and a pulling device is set inside. The collection net is fixedly installed at the bottom of the pulling device. By pulling the pull rod, it slides left and right in the chute, driving the The collection net slides left and right on the dam surface to salvage garbage from the river surface.

Benefits of technology

It achieves effective salvage of garbage on the surface of the dam body, keeps the surface of the dam body clean, avoids the deterioration of garbage and produces odor, and improves water quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919195U_ABST
    Figure CN221919195U_ABST
Patent Text Reader

Abstract

The utility model provides a flood prevention structure for a water conservancy project. The pushing device is fixedly installed at the top of the front face of the dam body, a pulling device is arranged in the pushing device in a sleeved mode, a collecting net is fixedly installed at the bottom of the pulling device, the pulling device comprises a sliding block, a connecting plate is fixedly installed on one side of the top of the sliding block, and a connecting block is fixedly installed on the rear side of the connecting plate; and a pull rod is fixedly mounted on the other side of the connecting block. According to the flood prevention structure for the water conservancy project, the pull rod is pulled to slide left and right in the sliding groove, the collecting net is driven to slide left and right on the surface of the dam body, garbage floating on the surface of a river is fished, the device is simple in structure and high in practicability, a user can fished the garbage accumulated on the surface of the dam body, and the surface of the dam body is kept clean.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of flood control of water conservancy projects, in particular to a flood control structure of water conservancy projects. Background Art

[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Water is an indispensable and precious resource for human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flows, prevent floods and waterlogging disasters, and regulate and distribute water to meet people's needs for water resources in life and production. Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways, etc.

[0003] When the water level of rivers, lakes, reservoirs, etc. is higher than the dam or the flood breaks the dam, people usually use dam consolidation to prevent floods. Dams are installed at the river mouth to control the water flow, regulate and distribute the water volume, and flood control dams intercept the water flow. The blocked lake water is used to generate electricity and other operations to improve energy utilization. However, when the flood control dam is not discharging floodwater, the river water will drive the garbage from upstream to accumulate on the surface of the flood control dam. As the blocking time increases, the garbage will easily deteriorate and produce foul odor, affecting the water quality.

[0004] Therefore, it is necessary to provide a water conservancy project flood control structure to solve the above technical problems. Utility Model Content

[0005] The utility model provides a flood control structure for a water conservancy project, which solves the problem that when the flood control dam is not discharging flood water, river water will drive garbage from upstream to accumulate on the surface of the flood control dam, and as the containment time is prolonged, the garbage is easy to deteriorate and produce bad smell, thus affecting the water quality.

[0006] In order to solve the above technical problems, the utility model provides a flood control structure of a water conservancy project, comprising: a dam body;

[0007] A pushing device is fixedly installed on the top of the front side of the dam body, a pulling device is sleeved inside the pushing device, a collecting net is fixedly installed on the bottom of the pulling device, the pulling device includes a slider, a connecting plate is fixedly installed on one side of the top of the slider, a connecting block is fixedly installed on the rear side of the connecting plate, and a pulling rod is fixedly installed on the other side of the connecting block.

[0008] Preferably, the pushing device comprises a fixing plate, a sliding groove is provided in the middle of the front side of the fixing plate, a sliding rod is fixedly installed inside the sliding groove, and a spring is sleeved on one side of the outer surface of the sliding rod.

[0009] Preferably, an open groove is provided at the top of the front side of the dam body, and a gate plate is slidably installed inside the open groove.

[0010] Preferably, support blocks are fixedly mounted on the bottom of both the front and rear sides of the dam body.

[0011] Preferably, the slider is sleeved on the outer surface of the slide rod, and the restoring elastic force of the spring pushes the slider to move to the right side of the inner cavity of the slide groove.

[0012] Preferably, a first mounting plate is fixedly installed on the top of one side of the front face of the dam body, a movable groove is opened on one side of the first mounting plate, a reciprocating screw is rotatably installed inside the movable groove, a servo motor is fixedly connected to the top of the reciprocating screw, and a second mounting plate is fixedly installed on the top of the other side of the front face of the dam body, a limiting groove is opened on one side of the second mounting plate, and a limiting rod is fixedly installed inside the limiting groove.

[0013] Preferably, a threaded hole is provided on one side of the top of the fixing plate, and a limiting hole is provided on the other side of the top of the fixing plate.

[0014] Compared with the related art, the flood control structure of a water conservancy project provided by the utility model has the following beneficial effects:

[0015] The utility model provides a flood control structure for a water conservancy project. By pulling a pull rod to slide left and right inside a slide groove, a collecting net is driven to slide left and right on the surface of a dam body, so that garbage floating on the river surface can be salvaged. The device has a simple structure and is highly practical. Users can salvage garbage accumulated on the surface of the dam body to keep the surface of the dam body clean. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A structural schematic diagram of a first embodiment of a flood control structure for a water conservancy project provided by the utility model;

[0017] Figure 2 for Figure 1 An enlarged schematic diagram of point A is shown;

[0018] Figure 3 A structural schematic diagram of a second embodiment of a flood control structure for a water conservancy project provided by the utility model;

[0019] Figure 4 for Figure 3 An enlarged schematic diagram of point B is shown.

[0020] Numbers in the figure: 1. dam body, 2. pushing device, 21. fixed plate, 22. slide groove, 23. slide rod, 24. spring, 3. pulling device, 31. slider, 32. connecting plate, 33. connecting block, 34. pull rod, 4. collecting net, 5. open groove, 6. gate plate, 7. support block, 8. first mounting plate, 9. movable groove, 10. reciprocating screw, 11. servo motor, 12. threaded hole, 13. second mounting plate, 14. limit groove, 15. limit rod, 16. limit hole. DETAILED DESCRIPTION

[0021] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0022] Please refer to Figure 1 and Figure 2 ,in, Figure 1 A structural schematic diagram of a first embodiment of a flood control structure for a water conservancy project provided by the utility model; Figure 2 for Figure 1 The enlarged schematic diagram of point A is shown. A flood control structure of a water conservancy project comprises: a dam body 1;

[0023] A pushing device 2 is fixedly installed on the top of the front side of the dam body 1, a pulling device 3 is sleeved inside the pushing device 2, a collecting net 4 is fixedly installed on the bottom of the pulling device 3, the pulling device 3 includes a slider 31, a connecting plate 32 is fixedly installed on one side of the top of the slider 31, a connecting block 33 is fixedly installed on the rear side of the connecting plate 32, and a pull rod 34 is fixedly installed on the other side of the connecting block 33.

[0024] The pushing device 2 comprises a fixing plate 21 , a slide groove 22 is provided in the middle of the front side of the fixing plate 21 , a slide rod 23 is fixedly installed inside the slide groove 22 , and a spring 24 is sleeved on one side of the outer surface of the slide rod 23 .

[0025] An open groove 5 is provided at the top of the front side of the dam body 1 , and a gate plate 6 is slidably installed inside the open groove 5 .

[0026] Support blocks 7 are fixedly mounted on the bottom of both the front and rear sides of the dam body 1 .

[0027] The slider 31 is sleeved on the outer surface of the slide rod 23 , and the restoring elastic force of the spring 24 pushes the slider 31 to move to the right side of the inner cavity of the slide groove 22 .

[0028] The slider 31 is sleeved on the outer surface of the slide rod 23, the slider 31 and the slide groove 22 are adapted, the spring 24 is sleeved on the outer surface of the slide rod 23, one end of the spring 24 is fixed to the left side of the inner wall of the slide groove 22, and the other end of the spring 24 is fixed to the left side surface of the slider 31.

[0029] Four support blocks 7 are provided, which are respectively fixed on the bottom of the left and right sides of the front and rear of the dam body 1. The support blocks 7 are triangular block-shaped and play a supporting effect.

[0030] The working principle of a flood control structure of a water conservancy project provided by the utility model is as follows:

[0031] During operation, the user first holds the pull rod 34 and slides left and right on the surface of the dam body 1. The pull rod 34 drives the connecting block 33, the connecting plate 32, the slider 31 and the collecting net 4 to slide on the surface of the dam body 1. The collecting net 4 salvages and collects the garbage floating on the river surface.

[0032] The slider 31 slides to the left along the surface of the slide rod 23 , and the slider 31 compresses the spring 24 . The user slides the pull rod 34 to the left and then releases it, and the restoring elastic force of the spring 24 pushes the slider 31 to slide to the right.

[0033] Compared with the related art, the flood control structure of a water conservancy project provided by the utility model has the following beneficial effects:

[0034] The utility model provides a flood control structure for a water conservancy project. By pulling a pull rod 34 to slide left and right inside a slide groove 22, a collection net 4 is driven to slide left and right on the surface of a dam body 1, so that garbage floating on the river surface is salvaged. The device has a simple structure and strong practicality. A user can salvage garbage accumulated on the surface of the dam body 1 to keep the surface of the dam body 1 clean.

[0035] Second embodiment

[0036] Please refer to Figure 3 and Figure 4 Based on the flood control structure of a water conservancy project provided by the first embodiment of the present application, the second embodiment of the present application proposes another flood control structure of a water conservancy project. The second embodiment is only a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.

[0037] Specifically, the difference of a water conservancy project flood control structure provided by the second embodiment of the present application is that, in a water conservancy project flood control structure, a first mounting plate 8 is fixedly installed on the top of one side of the front of the dam body 1, a movable groove 9 is opened on one side of the first mounting plate 8, a reciprocating screw rod 10 is rotatably installed inside the movable groove 9, a servo motor 11 is fixedly connected to the top of the reciprocating screw rod 10, a second mounting plate 13 is fixedly installed on the top of the other side of the front of the dam body 1, a limiting groove 14 is opened on one side of the second mounting plate 13, and a limiting rod 15 is fixedly installed inside the limiting groove 14.

[0038] A threaded hole 12 is formed on one side of the top of the fixing plate 21 , and a limiting hole 16 is formed on the other side of the top of the fixing plate 21 .

[0039] The fixing plate 21 is threadedly engaged with the outer surface of the reciprocating screw rod 10 through the threaded hole 12 , and the fixing plate 21 is sleeved on the outer surface of the limiting rod 15 through the limiting hole 16 .

[0040] The working principle of a flood control structure of a water conservancy project provided by the utility model is as follows:

[0041] During operation, the user first controls the output shaft of the servo motor 11 through an external power supply to drive the reciprocating screw 10 to rotate. The reciprocating screw 10 rotates and the threaded hole 12 of the fixed plate 21 is engaged. The fixed plate 21 slides up and down alternately along the movable groove 9 on the surface of the reciprocating screw 10 through the threaded hole 12 to adjust the height of the fixed plate 21 on the surface of the dam body 1.

[0042] Compared with the related art, the flood control structure of a water conservancy project provided by the utility model has the following beneficial effects:

[0043] The utility model provides a flood control structure for a water conservancy project. The output shaft of a servo motor 11 is controlled by an external power supply to rotate, driving a reciprocating screw rod 10 to rotate. The reciprocating screw rod 10 rotates to threadably engage a threaded hole 12 of a fixing plate 21. The fixing plate 21 moves up or down on the surface of a limiting rod 15 through a limiting hole 16 to adjust the height of a collecting net 4. The device has a simple structure and strong practicality. A user can adjust the height of the collecting net 4 according to the position of the river surface, thereby performing salvage and collection activities on rivers with different water levels, thereby improving the practicality and adaptability of the device.

[0044] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A flood control structure for a water conservancy project, characterized in that: include: Dam body; A pushing device is fixedly installed on the top of the front side of the dam body, a pulling device is sleeved inside the pushing device, a collecting net is fixedly installed on the bottom of the pulling device, the pulling device includes a slider, a connecting plate is fixedly installed on one side of the top of the slider, a connecting block is fixedly installed on the rear side of the connecting plate, and a pulling rod is fixedly installed on the other side of the connecting block.

2. A flood control structure for a water conservancy project according to claim 1, characterized in that: The pushing device comprises a fixing plate, a sliding groove is provided in the middle of the front side of the fixing plate, a sliding rod is fixedly installed inside the sliding groove, and a spring is sleeved on one side of the outer surface of the sliding rod.

3. A flood control structure for water conservancy projects according to claim 1, characterized in that: An open groove is provided at the top of the front side of the dam body, and a gate plate is slidably installed inside the open groove.

4. A flood control structure for water conservancy projects according to claim 1, characterized in that: Support blocks are fixedly installed at the bottom of both the front and rear sides of the dam body.

5. A flood control structure for water conservancy projects according to claim 2, characterized in that: The slider is sleeved on the outer surface of the slide rod, and the restoring elastic force of the spring pushes the slider to move to the right side of the inner cavity of the slide groove.

6. A flood control structure for water conservancy projects according to claim 1, characterized in that: A first mounting plate is fixedly installed on the top of one side of the front face of the dam body, a movable groove is opened on one side of the first mounting plate, a reciprocating screw is rotatably installed inside the movable groove, a servo motor is fixedly connected to the top of the reciprocating screw, and a second mounting plate is fixedly installed on the top of the other side of the front face of the dam body, a limiting groove is opened on one side of the second mounting plate, and a limiting rod is fixedly installed inside the limiting groove.

7. A flood control structure for water conservancy projects according to claim 2, characterized in that: A threaded hole is provided on one side of the top of the fixing plate, and a limiting hole is provided on the other side of the top of the fixing plate.