High earth rock cofferdam slope protection structure

By setting up a multi-layer protective structure on the cofferdam of the hydropower station, including a five-strand steel wire gabion layer, an upper rockfill layer, a shotcrete layer and a sandbag slope layer, the problem of the cofferdam being vulnerable to natural disasters in the mountains and valleys is solved. It achieves the protection of the stability and anti-seepage performance of the cofferdam structure and adapts to various adverse geological conditions.

CN221919218UActive Publication Date: 2024-10-29SINOHYDRO BUREAU 12 CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420169791.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-29
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

Hydropower station cofferdams in mountain valleys are vulnerable to natural disasters such as collapses, landslides, gully debris flows and flood erosion, resulting in unstable cofferdam slope structures and damage to the anti-seepage geomembrane.

Method used

A high earth-rock cofferdam slope protection structure is adopted, including a five-strand steel wire gabion layer, an upper rockfill layer, a shotcrete layer, a sandbag slope layer and a second anti-smash rockfill layer, respectively at the foot and edge of the cofferdam. Slope setting provides multi-layer protection to enhance structural stability and anti-seepage performance.

Benefits of technology

It effectively protects the overall stability of the cofferdam and the anti-seepage geomembrane, resists the impact of various natural disasters, ensures the safety and economical rationality of the cofferdam structure, and makes construction simple and efficient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919218U_ABST
    Figure CN221919218U_ABST
Patent Text Reader

Abstract

The utility model discloses a high earth rock cofferdam slope protection structure which comprises a first protection body arranged on a cofferdam foot slope and a second protection body arranged on the middle and upper slope of a cofferdam, the first protection body comprises a five-twisted steel wire gabion layer and an upper rock filling layer which are sequentially laid on the cofferdam foot slope from bottom to top, and the second protection body comprises a five-twisted steel wire gabion layer and a lower rock filling layer which are sequentially laid on the cofferdam foot slope from bottom to top. First anti-smashing rockfill body layers are laid on the two sides, close to mountains on the two banks, of the upper portion of the upper rockfill layer; the second protection body comprises a concrete spraying layer which is sprayed and protected in the cofferdam and on the composite geomembrane on the upper side slope, and sand bag slope attaching layers and second anti-smashing rockfill body layers are sequentially laid on the two sides, close to mountains on the two banks, of the upper portion of the concrete spraying layer from bottom to top. The anti-seepage geomembrane cofferdam is suitable for earth rock cofferdam protection in alpine and gorge regions, the stability of the whole cofferdam is protected, the anti-seepage geomembrane structure is protected against damage to the maximum extent, the stability and safety of the whole cofferdam structure are ensured, and the anti-seepage geomembrane cofferdam can cope with various bad conditions, and is simple in structure and convenient to construct.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cofferdam protection, in particular to a high earth-rock cofferdam slope protection structure. Background Art

[0002] Large hydropower stations are usually built in high-altitude areas, making full use of the huge amount of water and water level difference in mountainous canyon areas to provide power for power generation. They can also rely on the mountains on both sides to form a basin structure to achieve water storage function.

[0003] However, the environment in the mountainous canyon area is relatively harsh, with complex terrain and geological conditions, steep mountains, widespread distribution of dangerous rock masses on natural slopes, and many unfavorable geological bodies on both sides of the cofferdam, which are prone to natural disasters such as collapse, landslides, gully mudslides, etc., causing damage to the cofferdam body and internal anti-seepage structure upstream of the hydropower station. In addition, during the flood season, the river flow is large and the water flow is turbulent. The flood peak is very likely to scour the cofferdam slope, destroy the cofferdam slope structure, and at the same time destroy the cofferdam anti-seepage geomembrane. In particular, the cofferdam foot is located underwater all year round, and it is very easy to be washed away by the river waves, causing pores and stone loss.

[0004] Therefore, there is a particular need for a protective structure that is structurally stable, safe and reliable and can be applied to high earth-rock cofferdams to ensure the overall stability of the cofferdam slope and the integrity of the internal anti-seepage geomembrane. Utility Model Content

[0005] In order to solve the above-mentioned technical problems, the utility model provides a high earth-rock cofferdam slope protection structure, which is particularly suitable for the protection of earth-rock cofferdams in mountainous canyon areas. It not only protects the overall stability of the cofferdam, but also protects the anti-seepage geomembrane structure from damage to the greatest extent, thereby ensuring the stability and safety of the entire cofferdam structure, being able to cope with a variety of adverse situations, having a simple structure and being easy to construct.

[0006] A high earth-rock cofferdam slope protection structure comprises a first protection body arranged on the cofferdam foot slope and a second protection body arranged on the cofferdam middle and upper slopes, the first protection body comprising a five-twisted steel wire gabion layer and an upper rockfill layer sequentially laid on the cofferdam foot slope from bottom to top, and a first anti-smashing rockfill body layer is laid on both sides of the upper part of the upper rockfill layer close to the mountains on both banks; the second protection body comprises a sprayed concrete layer sprayed on a composite geomembrane on the cofferdam middle and upper slopes, and a sandbag slope layer and a second anti-smashing rockfill body layer are sequentially laid on both sides of the upper part of the sprayed concrete layer close to the mountains on both banks from bottom to top.

[0007] A further technical solution is: the five-stranded steel wire gabion layer includes a five-stranded steel wire mesh cage and stones filled in the mesh cage, the porosity of the five-stranded steel wire gabion layer is less than 30%, and the bulk density is not less than 18kN / m 3 .

[0008] A further technical solution is: the upper rockfill layer is formed by laying the excavated stone material with the maximum particle size of ≤800mm and continuous gradation on the upper part of the five-twisted wire gabion layer and then compacting it. After rolling, the porosity is ≤23% and the permeability coefficient is greater than 1×10 -1 cm / s, dry density not less than 2.2g / cm 3 .

[0009] A further technical solution is: the first anti-smash rockfill layer is paved with stone excavation materials with a maximum particle size of ≤800mm.

[0010] A further technical solution is: the sprayed concrete layer is formed by uniformly spraying C25 concrete.

[0011] A further technical solution is: the sandbag slope layer is formed by laying sandbags in a fish scale shape from bottom to top, and the grain size of the sand and gravel in the sandbags is ≤15mm.

[0012] A further technical solution is: the second anti-smash rockfill body layer includes wire gabions and stones filled inside the wire gabions, and the stones are pebbles or boulders with a particle size range of 100 to 300 mm.

[0013] A further technical solution is: the thickness of the five-twisted steel wire gabion layer is set to 0.5m, the thickness of the upper rockfill layer is set to 3m, the thickness of the first anti-smash rockfill body layer is set to 1m, and the width of the first anti-smash rockfill body layer on each side is set to 20m.

[0014] A further technical solution is: the thickness of the shotcrete layer is set to 0.15m, the thickness of the sandbag slope layer is set to 0.3m, the thickness of the second anti-smash rockfill layer is set to 0.5m, and the width of the sandbag slope layer and the second anti-smash rockfill layer on each side is set to 20m.

[0015] Beneficial effects of the utility model:

[0016] The high earth-rock cofferdam slope protection structure of the utility model has good overall stability, small deformation, strong adaptability to deformation, and can cope with the influence of various adverse conditions, such as falling rocks on the slope, river water scouring, rainstorm scouring, settlement of high earth-rock cofferdam, etc. It protects the anti-seepage geomembrane from damage, ensures the stability and safety of the entire cofferdam, has a simple structure, is economical and reasonable, and is easy to construct.

[0017] The five-stranded steel wire gabion layer is laid on the slope of the cofferdam foot. The five-stranded steel wire gabion has a good overall structure and is not easy to be broken. There are uneven pores between the stones in the cage, which has a certain ability to adapt to deformation. When the cofferdam foundation changes, such as uneven settlement, earthquake, etc., the stones in the cage will adjust themselves to form a new balance, which is used to stabilize the slope foot, strengthen the slope strength, and adapt to settlement deformation.

[0018] The upper rockfill layer has high compressive strength, good structural stability, corrosion resistance and good chemical properties. It can withstand the immersion and scouring of river water all year round without being damaged, thus protecting the cofferdam slope and its structural stability.

[0019] The first anti-smash rockfill layer is set close to the mountain slopes on both sides, and has high impact resistance and strong bearing capacity. First, it can resist the impact of falling rocks from the high slopes of the mountain and protect the overall structure of the cofferdam and the internal anti-seepage system; second, it plays the role of fixing the foot and slope, ensuring the stability of the weir foot slope and structure under water for a long time.

[0020] The sprayed concrete layer is sprayed on the upper part of the composite geomembrane on the middle and upper slope of the cofferdam to protect the composite geomembrane from strong ultraviolet erosion and heavy rainfall erosion. It has a certain anti-destruction ability and protects the integrity of the anti-seepage geomembrane and the stability of the slope structure. The construction is efficient and convenient, economical and reasonable, and has good performance.

[0021] The sandbag slope layer is set close to the mountain slopes on both sides. First, it protects the internal anti-seepage geomembrane from damage. The sandbag slope layer has good toughness and can buffer the impact of falling rocks on the high slopes of the mountain, protecting the internal anti-seepage system. Second, it plays a role in consolidating the slope. In case of heavy rainfall, the sandbags will swell when they come into contact with water, which can strengthen the protection of the slope surface. In addition, when rainy season floods come, the rockfall rate on the slope increases, and the sandbags will swell when they come into contact with water, which can enhance their toughness and anti-destruction ability, thereby strengthening the protection of the internal anti-seepage system.

[0022] The second anti-smash rockfill layer is set close to the mountain slopes on both sides. The anti-smash rockfill has high impact resistance and strong bearing capacity. It can resist the impact of falling rocks from high slopes, protect the anti-seepage geomembrane from damage by falling rocks from high slopes to the greatest extent, and protect the overall structure of the cofferdam and the internal anti-seepage system. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the slope protection structure of a high earth-rock cofferdam of the utility model.

[0024] Figure 2 yes Figure 1 An enlarged view of the first protective body portion at A in the middle.

[0025] Figure 3 yes Figure 1 An enlarged view of the second protective body portion at B in the middle.

[0026] In the figure:

[0027] 1. Cofferdam, 2. First protective body, 21. Five-twisted steel wire gabion layer, 22. Upper rockfill layer, 23. First anti-smash rockfill layer, 3. Second protective body, 31. Sprayed concrete layer, 32. Sandbag slope layer, 33. Second anti-smash rockfill layer, 4. Composite geomembrane. DETAILED DESCRIPTION

[0028] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.

[0029] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.

[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0031] Embodiment 1:

[0032] The high earth-rock cofferdam slope protection structure in this embodiment is applied to the protection of the upstream cofferdam of Lawa Hydropower Station. The upstream cofferdam of Lawa Hydropower Station has a narrow river valley and steep terrain. The cofferdam body is as high as 60m, and the excavation depth of the dam foundation pit behind the weir is 70m. The seismic intensity in the weir area is high, the Jinsha River has a large flow and turbulent water flow during the flood season, the natural slope dangerous rock mass is widely distributed, and there are many unfavorable geological bodies on both sides of the cofferdam.

[0033] like Figure 1 As shown, the slope protection structure of the high earth-rock cofferdam includes a first protection body 2 arranged on the slope of the foot of the cofferdam 1 and a second protection body 3 arranged on the middle and upper slopes of the cofferdam 1. The first protection body 2 includes a five-twisted steel wire gabion layer 21 and an upper rockfill layer 22 which are sequentially laid on the slope of the foot of the cofferdam from bottom to top, and a first anti-smashing rockfill body layer 23 is laid on both sides of the upper part of the upper rockfill layer 22 close to the mountains on both sides; the second protection body 3 includes a sprayed concrete layer 31 sprayed on the composite geomembrane 4 in the middle of the cofferdam 1 and on the upper slope, and a sandbag slope layer 32 and a second anti-smashing rockfill body layer 33 are sequentially laid on both sides of the upper part of the sprayed concrete layer 31 close to the mountains on both sides from bottom to top.

[0034] The five-stranded steel wire gabion layer 21 is laid on the slope of the weir foot, including a five-stranded steel wire mesh cage and stones filled in the mesh cage. The porosity of the five-stranded steel wire mesh cage is less than 30%, and the bulk density is not less than 18kN / m 3 The thickness of the five-stranded steel wire gabion layer 21 is set to 0.5m.

[0035] The five-twisted wire gabion layer 21 is formed by assembling hexagonal double-twisted metal mesh woven from low-carbon steel wires. The surface of the steel wires is treated with hot-dip galvanizing for corrosion protection. The tensile strength of the steel wires is greater than 400MPa and the elongation is not less than 12%. The stones filled in the cages are hard, non-weathered, dense and durable pebbles or blocks. The median particle size of the stones in the cages is 1.5 to 2 times the nominal diameter of the cage mesh.

[0036] The upper rockfill layer 22 is formed by laying the excavated stone material with the maximum particle size of ≤800mm and continuous grading on the upper part of the five-twisted steel wire gabion layer 21 and then compacting it. After rolling, the porosity is ≤23% and the permeability coefficient is greater than 1×10 -1 cm / s, dry density not less than 2.2g / cm 3 The thickness of the upper rockfill layer 22 is set to 3 m.

[0037] The first anti-smash rockfill layer 23 is paved with excavated rock with a maximum particle size of ≤800 mm on both sides of the upper rockfill layer 22 close to the two sides of the mountain. The width of each side is set to 20m, and the thickness of the first anti-smash rockfill layer 23 is set to 1m.

[0038] The sprayed concrete layer 31 is made of C25 concrete and is evenly sprayed on the middle part of the cofferdam 1 and the upper part of the composite geomembrane 4 on the upper slope. The thickness of the sprayed concrete layer 31 is set to 0.15m.

[0039] The sandbag slope layer 32 is paved in a fish scale pattern from bottom to top on both sides of the upper part of the shotcrete layer 31 close to the two sides of the mountain. The width of each side is set to 20m and the thickness is set to 0.3m. The gravel particle size in the sandbag is ≤15mm.

[0040] The second anti-smash rockfill layer 33 is laid on the upper part of the sandbag slope layer 32, and includes wire gabions and stones filled inside the wire gabions. The stones are hard, non-weathered, dense and durable pebbles or blocks. The particle size range of the pebbles or blocks is 100-300mm. The width of each side of the second anti-smash rockfill layer 33 is set to 20m, and the thickness is set to 0.5m.

[0041] The high earth-rock cofferdam slope protection structure of this embodiment is arranged on the entire water-facing surface of the upstream earth-rock cofferdam 1, wherein the five-twisted steel wire gabion layer 21, the upper rockfill layer 22, and the first anti-smash rockfill body layer 23 (set on the side of the mountain body) on the slope of the weir foot are synchronously filled and constructed with the earth-rock cofferdam, and the sprayed concrete layer 31, the sandbag slope layer 32 (set on the side of the mountain body) and the second anti-smash rockfill body layer 33 (set on the side of the mountain body) in the middle and upper parts of the cofferdam 1 are constructed in sequence and layer by layer from bottom to top following the filling of the earth-rock cofferdam.

[0042] This embodiment has been well applied on site and can cope with floods (the flood control standard is once in 30 years, and the peak flow is 6330m 3 / s; for super-standard floods, the corresponding flow is 6780m based on the 50-year flood recurrence period. 3 / s), earthquakes (located in an earthquake-prone area, a 6.7-magnitude earthquake once occurred), landslides (many landslides have developed in the Lawa Power Station reservoir area since the Quaternary period, such as the Baige landslide, Shadong landslide, Mindu landslide, etc.), and other natural disasters to ensure the stability of the upstream cofferdam slope and the integrity of the internal anti-seepage composite geomembrane.

[0043] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A high earth-rock cofferdam slope protection structure, characterized in that: It includes a first protective body arranged on the slope surface of the foot of the cofferdam and a second protective body arranged on the middle and upper slope surfaces of the cofferdam. The first protective body includes a five-twisted steel wire gabion layer and an upper rockfill layer laid on the slope surface of the foot of the cofferdam from bottom to top, and a first anti-smashing rockfill body layer is laid on both sides of the upper part of the upper rockfill layer close to the mountains on both sides; the second protective body includes a sprayed concrete layer sprayed on a composite geomembrane on the middle and upper slopes of the cofferdam, and a sandbag slope layer and a second anti-smashing rockfill body layer are laid on both sides of the upper part of the sprayed concrete layer close to the mountains on both sides from bottom to top.

2. A high earth-rock cofferdam slope protection structure according to claim 1, characterized in that: The five-stranded steel wire gabion layer includes a five-stranded steel wire mesh cage and stones filled in the mesh cage. The porosity of the five-stranded steel wire gabion layer is less than 30% and the bulk density is not less than 18kN / m 3 .

3. The high earth-rock cofferdam slope protection structure according to claim 1 is characterized in that: The upper rockfill layer is formed by laying the excavated stone material with the maximum particle size of ≤800mm and continuous grading on the upper part of the five-twisted steel wire gabion layer and then compacting it. After rolling, the porosity is ≤23% and the permeability coefficient is greater than 1×10 -1 cm / s, dry density not less than 2.2g / cm 3 .

4. The high earth-rock cofferdam slope protection structure according to claim 1 is characterized in that: The first anti-smash rockfill layer is paved with stone excavation materials with a maximum particle size of ≤800mm.

5. The high earth-rock cofferdam slope protection structure according to claim 1 is characterized in that: The shotcrete layer is formed by uniformly spraying C25 concrete.

6. The high earth-rock cofferdam slope protection structure according to claim 1 is characterized in that: The sandbag slope layer is formed by laying sandbags in a fish scale pattern from bottom to top, and the gravel particle size in the sandbags is ≤15mm.

7. The high earth-rock cofferdam slope protection structure according to claim 1 is characterized in that: The second anti-smash rockfill layer includes wire gabions and stones filled inside the wire gabions. The stones are pebbles or boulders with a particle size range of 100 to 300 mm.

8. The high earth-rock cofferdam slope protection structure according to claim 1, characterized in that: The thickness of the five-stranded steel wire gabion layer is set to 0.5m, the thickness of the upper rockfill layer is set to 3m, the thickness of the first anti-smash rockfill body layer is set to 1m, and the width of the first anti-smash rockfill body layer on each side is set to 20m.

9. A high earth-rock cofferdam slope protection structure according to claim 8, characterized in that: The thickness of the shotcrete layer is set to 0.15m, the thickness of the sandbag slope layer is set to 0.3m, the thickness of the second anti-smash rockfill layer is set to 0.5m, and the width of the sandbag slope layer and the second anti-smash rockfill layer on each side is set to 20m.