Geomembrane anti-seepage reinforcing structure of earth and rockfill dam

By using the geomembrane anti-seepage reinforcement structure and the pipe jacking process to set up drainage channels on the earth-rock dam, the problems of reduced anti-seepage capacity and water leakage of the earth-rock dam were solved, an independent drainage system was realized, and the safe operation life of the dam was extended.

CN221919241UActive Publication Date: 2024-10-29POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323514513.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-10-29
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

The anti-seepage capacity of earth-rock dams decreases over time, and the problem of frequent repairs is common. Moreover, the reset anti-seepage structure still has water leakage problems, which affects the normal operating life of the dam.

Method used

The geomembrane anti-seepage reinforcement structure is adopted, including geomembrane, concrete gullets, dam body drainage pipes and drainage channels. Drainage channels are set up in the dam body through the pipe jacking process to guide leakage water and form an independent drainage system to prevent hydraulic erosion. .

Benefits of technology

It effectively improves the anti-seepage capability of the earth-rock dam, extends the safe operation life of the dam, reduces disturbance and damage to the dam, and avoids further damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919241U_ABST
    Figure CN221919241U_ABST
Patent Text Reader

Abstract

The utility model relates to a geomembrane anti-seepage reinforcing structure of an earth and rockfill dam, the earth and rockfill dam is provided with an upstream side and a downstream side in the thickness direction, the geomembrane anti-seepage reinforcing structure comprises a geomembrane anti-seepage layer, a concrete tooth groove, a dam body drainage pipe and a drainage groove, the geomembrane anti-seepage layer comprises a geomembrane, and the geomembrane is laid on the upstream side of the earth and rockfill dam; the concrete tooth groove is located in the upstream side slope toe of the earth and rockfill dam, concrete is poured in the concrete tooth groove, and the geomembrane extends to one side of the concrete tooth groove and is connected with the concrete tooth groove in an anchoring mode. The dam body drainage pipe extends in the thickness direction of the earth and rockfill dam and penetrates through the upstream side and the downstream side of the earth and rockfill dam. The drainage groove extends along the dam face of the earth and rockfill dam and communicates with a dam body drainage pipe. In addition, the geomembrane impermeable layer further comprises a three-dimensional geotechnical drainage net and a cushion layer, and the cushion layer, the three-dimensional geotechnical drainage net and the geomembrane are sequentially laid on the upstream side of the earth and rockfill dam. The geomembrane anti-seepage reinforcing structure can reinforce an anti-seepage structure and a drainage structure of an earth and rockfill dam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of anti-seepage management of earth-rock dams, and in particular to a geomembrane anti-seepage reinforcement structure of an earth-rock dam. Background Art

[0002] In the 1960s and 1970s, my country built a large number of earth-rock dam projects, mainly homogeneous earth dams. After long-term operation, the anti-seepage capacity of the dam body gradually decreased due to the seepage effect. Since the stability of the overall structure of the dam body meets the requirements, the main solution is to carry out anti-seepage reinforcement. The current methods include dam body grouting, adding anti-seepage walls or upstream surface anti-seepage treatment. However, the problem of frequent repairs is common, which not only affects the normal function of the reservoir, but also greatly increases the cost of repairs. The main problem is that the dam is an integral structure that cooperates with each other. Only repairing the anti-seepage structure cannot change the damage problem faced by the dam as a whole. The reset anti-seepage structure still has a certain amount of seepage. The leakage water continues to damage the damaged dam body downstream, and the working conditions of the anti-seepage structure are constantly deteriorating, which directly affects its normal operating life. Therefore, anti-seepage reinforcement cannot only strengthen the anti-seepage body or reset the anti-seepage structure. At the same time, it should also be designed to guide the leakage water to avoid further damage to the damaged dam body. Utility Model Content

[0003] A first aspect of an embodiment of the present application provides a geomembrane anti-seepage reinforcement structure for an earth-rock dam, which can strengthen the anti-seepage structure and drainage structure of the earth-rock dam and ensure the coordinated effects of the dam's anti-seepage, drainage, and stability functions.

[0004] The geomembrane anti-seepage reinforcement structure of the earth-rock dam provided in the first aspect of the embodiment of the present application comprises:

[0005] A geomembrane anti-seepage layer, wherein the geomembrane anti-seepage layer comprises a geomembrane, and the geomembrane is laid on the upstream side of the earth-rock dam;

[0006] A concrete trough, wherein the concrete trough is located at the upstream side slope foot of the earth-rock dam, concrete is poured in the concrete trough, and the geomembrane extends to one side of the concrete trough and is anchored to the concrete trough;

[0007] A dam body drainage pipe, the dam body drainage pipe extending along the thickness direction of the earth-rock dam and penetrating the upstream side and the downstream side of the earth-rock dam;

[0008] A drainage trough extends along the dam surface of the earth-rock dam and is connected to the dam body drainage pipe.

[0009] In addition, the geomembrane anti-seepage reinforcement structure provided in the embodiment of the present application may also have the following additional technical features:

[0010] In an optional solution, the geomembrane anti-seepage layer also includes a three-dimensional geotextile drainage net and a cushion layer. The cushion layer, the three-dimensional geotextile drainage net and the geomembrane are laid in sequence on the upstream side of the earth-rock dam. The geomembrane is a composite geomembrane of two cloths and one membrane.

[0011] In an optional solution, a sand cushion layer is built between the concrete trough and the earth-rock dam, and the concrete trough has an anchoring component extending toward one side of the geomembrane, and the anchoring component fixedly connects the concrete trough and the geomembrane.

[0012] In an optional solution, the bottom of the concrete trough is subjected to foundation consolidation and anti-seepage reinforcement by foundation grouting, and the foundation grouting extends vertically downward to a preset depth.

[0013] In an optional solution, anchor grooves are arranged at intervals on the dam crest, the bridleway, and / or the dam surface of the earth-rock dam;

[0014] The geomembrane is laid in multiple numbers, and part of the geomembrane is arranged in the anchoring groove and anchored on the side facing the dam top, and the adjacent previous geomembrane is welded and connected to the exposed part of this part of the geomembrane; the anchoring groove is filled with clay or sand for anchoring the geomembrane.

[0015] In an optional solution, the downstream elevation of the dam body drainage pipe is lower than the upstream elevation, and the drainage slope formed by the downstream elevation and the upstream elevation is approximately 1%. The highest position of the dam body drainage pipe is lower than the dead water level of the reservoir and close to the original ground of the riverbed.

[0016] In an optional solution, a stainless steel flower pipe is arranged in the drainage trough, and the outer wall of the stainless steel flower pipe is covered with two layers of stainless steel mesh with a spacing of 1 mm and filled with a gravel cushion layer.

[0017] In an optional solution, the stainless steel flower pipe in the drainage trough is inserted into the upstream opening of the dam body drainage pipe, and a concrete plugging body is provided at the connection between the stainless steel flower pipe and the dam body drainage pipe.

[0018] A second aspect of the present application provides a construction method for a geomembrane anti-seepage reinforcement structure, wherein the geomembrane anti-seepage reinforcement structure is the geomembrane anti-seepage reinforcement structure in the first aspect of the present application, and the construction method comprises the following steps:

[0019] 1) Drain the reservoir and build a cofferdam upstream of the earth-rock dam to ensure that the upstream surface of the earth-rock dam is in a dry land construction state;

[0020] 2) The dam drainage pipe is constructed from downstream to upstream by using the pipe jacking technology. The downstream elevation of the dam drainage pipe is lower than the upstream elevation, ensuring a drainage slope of approximately 1%. The entire dam drainage pipe is located below the dead water level of the reservoir and as close to the original riverbed as possible;

[0021] 3) Clean the relatively loose soil layer and plant roots on the upstream dam surface as the base surface for cushion material;

[0022] 4) Digging a drainage ditch along the cleaned upstream dam foot, wherein the lowest elevation of the drainage ditch is consistent with the elevation of the upstream outlet of the dam body drainage pipe;

[0023] 5) Excavate the trough foundation within 2 to 3 m from the upstream slope foot, pour concrete troughs, and grout along the troughs;

[0024] 6) Laying stainless steel flower pipes and gravel materials, inserting the stainless steel flower pipes into the dam body drainage pipes, using concrete to seal the pipe openings of the dam body drainage pipes and the connection parts with the stainless steel flower pipes, and backfilling and compacting the gravel cushion materials to the original dam surface;

[0025] 7) Roll the cushion material in layers and roll the slope after reaching the dam top;

[0026] 8) Casting of dam top pavement and protective railings;

[0027] 9) Lay a three-dimensional geotextile drainage net from the top of the dam downwards, and sew two adjacent three-dimensional geotextile drainage nets with nylon thread;

[0028] 10) Lay geomembrane from the top of the dam to the dam foot, leaving an anchoring area;

[0029] 11) Use a mechanical anchoring structure to anchor the geomembrane in the anchoring area to the downstream side wall of the concrete groove, and backfill the sand cushion layer on the downstream side of the geomembrane;

[0030] 12) Weld the geomembrane in the anchoring area to the geomembrane on the dam surface;

[0031] 13) Lay the protective cover plate for the exposed part of the geomembrane on the dam top;

[0032] In an optional solution, the step 12) includes the following steps:

[0033] The geomembrane is laid from top to bottom to the preset anchor groove position, a strip-shaped anchor groove is excavated on the earth-rock dam, the top of the next-level geomembrane is buried in the anchor groove, and after compaction and anchoring with clay or sand, the upper geomembrane is overlapped on the surface of the lower geomembrane and welded.

[0034] The beneficial effects of the embodiments of the present application are:

[0035] After the geomembrane anti-seepage reinforcement structure and construction method in the embodiment of the present application are used for anti-seepage reinforcement of the dam, the geomembrane anti-seepage layer can play an anti-seepage role, and at the same time, the drainage trough and the dam body drainage pipe can drain the leaking water. The independent drainage system greatly protects the original dam body from hydraulic erosion and can greatly improve the safe operation life of the dam. In the construction method, the jacking process is used to reset the drainage channel in the dam body, which solves the defect that the surface anti-seepage reinforcement solution cannot set up a drainage system or needs to excavate the dam body to set up a drainage channel, and the disturbance and damage to the dam body are minimized.

[0036] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 A schematic structural diagram of a geomembrane anti-seepage reinforcement structure provided in this application in a specific embodiment;

[0038] Figure 2 for Figure 1 Schematic diagram of the longitudinal section structure of the geomembrane anti-seepage reinforcement structure;

[0039] Figure 3 Schematic diagram of geomembrane foundation connection provided for this application;

[0040] Figure 4 A schematic diagram of the structure of a drainage trough provided in the present application in a specific embodiment;

[0041] Figure 5 A schematic diagram of the connection structure between the drainage trough and the dam body drainage pipe provided in this application;

[0042] Figure 6 Schematic diagram of the geomembrane anchoring structure on the slope provided for this application.

[0043] Figure numerals: earth-rock dam 1, geomembrane 2, concrete trough 3, dam body drainage pipe 4, drainage trough 5, three-dimensional geotextile drainage net 6, cushion layer 7, sand cushion layer 8, anchor component 9, foundation grouting 10, anchor groove 11, stainless steel flower pipe 12, concrete sealing body 13, gravel cushion layer 14, dam top pavement 15, guardrail 16, protective cover plate 17.

[0044] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION

[0045] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0046] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0047] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0048] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0049] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.

[0050] like Figure 1-6 As shown, the first aspect of the embodiment of the present application provides a geomembrane anti-seepage reinforcement structure for an earth-rock dam, wherein the geomembrane anti-seepage reinforcement structure uses a geomembrane 2 on the upstream surface of the original earth-rock dam 1 for anti-seepage treatment, and at the same time, a drainage channel (i.e., a drainage ditch 5) is arranged in the dam body of the earth-rock dam 1 through a jacking pipe construction process, so that the seepage water of the upstream anti-seepage structure is discharged to the outside of the dam through the set channel, thereby reducing the damage of the seepage water to the dam structure.

[0051] Specifically, the earth-rock dam 1 has an upstream side and a downstream side in the thickness direction, and the geomembrane anti-seepage reinforcement structure includes a geomembrane anti-seepage layer, a concrete tooth groove 3, a dam body drainage pipe 4 and a drainage groove 5. The geomembrane anti-seepage layer includes a geomembrane 2, and the geomembrane 2 is laid on the upstream side of the earth-rock dam 1; the concrete tooth groove 3 is located at the upstream side of the earth-rock dam 1. Concrete is poured in the concrete tooth groove 3. The geomembrane 2 extends to one side of the concrete tooth groove 3 and is anchored and connected with the concrete tooth groove 3; the dam body drainage pipe 4 extends along the thickness direction of the earth-rock dam 1 and penetrates the upstream and downstream sides of the earth-rock dam 1; the drainage groove 5 extends along the dam surface of the earth-rock dam 1, and the drainage groove 5 is connected to the dam body drainage pipe 4. In this embodiment, the geomembrane anti-seepage layer can play a good anti-seepage role for the earth-rock dam 1, and at the same time, the drainage groove 5 and the dam body drainage pipe 4 can guide and drain the leakage water to prevent the leakage water from causing further damage to the damaged dam body.

[0052] like Figure 4 As shown, in a specific embodiment, the geomembrane anti-seepage layer also includes a three-dimensional geotextile drainage net 6 and a cushion layer 7. The cushion layer 7, the three-dimensional geotextile drainage net 6 and the geomembrane 2 are laid in sequence on the upstream side of the earth-rock dam 1, and the geomembrane 2 is a composite geomembrane of two cloths and one membrane.

[0053] like Figure 3 As shown, in a specific embodiment, a sand cushion layer 8 is built between the concrete tooth groove 3 and the earth-rock dam 1, and the sand cushion layer 8 can protect the geomembrane 2. The concrete tooth groove 3 has an anchoring component 9 extending to one side of the geomembrane 2. The anchoring component 9 is fixedly connected to the concrete tooth groove 3 and the geomembrane 2. The geomembrane 2 can be more stably and firmly installed on the dam surface of the earth-rock dam 1 through the anchoring component 9. In addition, the bottom of the concrete tooth groove 3 is consolidated and reinforced for anti-seepage by the foundation grouting 10, and the foundation grouting 10 extends vertically downward to a preset depth, making the entire structure more solid.

[0054] like Figure 2 and Figure 6 As shown, in a specific embodiment, anchor grooves 11 are arranged at intervals on the dam crest, the horseway, and / or the dam surface of the earth-rock dam 1; the number of geomembranes 2 laid is multiple, and the side of part of the geomembrane 2 facing the dam crest is arranged in the anchor groove 11 and anchored, and the adjacent upper geomembrane 2 is welded and connected to the exposed part of the part of the geomembrane 2; the anchor groove 11 is filled with clay or sand for anchoring the geomembrane 2. It should be noted that the number of anchor grooves 11 can be preset according to the height of the earth-rock dam 1 and the actual leakage situation, so the number and position of the anchor grooves 11 are not specifically limited in this article.

[0055] like Figure 1As shown, in a specific embodiment, the downstream elevation of the dam body drainage pipe 4 is lower than the upstream elevation, and the drainage slope formed by the downstream elevation and the upstream elevation is approximately 1%, so that the leakage water can be discharged from the dam body. The highest position of the dam body drainage pipe 4 is lower than the dead water level of the reservoir and close to the original ground of the riverbed.

[0056] like Figure 4-5 As shown, in a specific embodiment, a stainless steel flower pipe 12 is arranged in the drainage trough 5, and the outer wall of the stainless steel flower pipe 12 is covered with two layers of stainless steel mesh with a spacing of 1 mm and filled with a gravel cushion layer 14. The stainless steel flower pipe 12 in the drainage trough 5 is inserted into the upstream opening of the dam body drainage pipe 4, and a concrete plugging body 13 is arranged at the connection between the stainless steel flower pipe 12 and the dam body drainage pipe 4.

[0057] The second aspect of the embodiment of the present application further provides a construction method of a geomembrane anti-seepage reinforcement structure, the construction method comprising the following steps:

[0058] 1) Drain the reservoir and build a cofferdam upstream of the earth-rock dam 1 to ensure that the upstream surface of the earth-rock dam 1 is in a dry land construction state;

[0059] 2) Using the pipe jacking technology, the dam body drainage pipe 4 is constructed from downstream to upstream. The downstream elevation of the dam body drainage pipe 4 is lower than the upstream elevation, ensuring a drainage slope of approximately 1%. The entire dam body drainage pipe 4 is located below the dead water level of the reservoir and as close to the original riverbed as possible;

[0060] 3) Clean the relatively loose soil layer and plant roots on the upstream dam surface to serve as the base surface for the cushion material (i.e., cushion 7);

[0061] 4) Dig a drainage ditch 5 along the cleaned upstream dam foot, the lowest elevation of which is consistent with the elevation of the upstream outlet of the dam body drainage pipe 4;

[0062] 5) Excavate the trough foundation within 2 to 3 m from the upstream slope foot, pour concrete trough 3, and grout along the trough;

[0063] 6) Lay stainless steel flower pipes 12 and gravel materials, insert the stainless steel flower pipes 12 into the dam body drainage pipes 4, use concrete to seal the pipe opening of the dam body drainage pipes 4 and the connection parts with the stainless steel flower pipes 12, and backfill and compact the gravel cushion layer 14 to the original dam surface;

[0064] 7) Roll the cushion material in layers and roll the slope after reaching the dam top;

[0065] 8) Casting the dam top pavement 15 and protective railings 16;

[0066] 9) Lay a three-dimensional geotextile drainage net 6 from the dam top downwards, and sew two adjacent three-dimensional geotextile drainage nets 6 with nylon thread;

[0067] 10) Lay geomembrane 2 from the dam top to the dam foot, leaving an anchoring area;

[0068] 11) A mechanical anchoring structure is used to anchor the geomembrane 2 in the anchoring area to the downstream side wall of the concrete tooth groove 3, and a sand cushion layer 8 is backfilled on the downstream side of the geomembrane 2;

[0069] 12) Welding the geomembrane 2 in the anchoring area to the geomembrane 2 on the dam surface;

[0070] 13) Laying the protective cover plate 17 of the exposed part of the geomembrane 2 on the dam top;

[0071] In an optional solution, step 12) includes the following steps:

[0072] The geomembrane 2 is laid from top to bottom to the preset anchor groove 11, a strip-shaped anchoring pit is excavated on the earth-rock dam 1, the top of the next-level geomembrane 2 is buried in the anchor groove 11, and after compaction and anchoring with clay or sand, the upper geomembrane 2 is overlapped on the surface of the lower geomembrane 2 and welded.

[0073] After the geomembrane anti-seepage reinforcement structure and construction method in the embodiment of the present application are used for anti-seepage reinforcement of the dam, the geomembrane anti-seepage layer can play an anti-seepage role, and at the same time, the drainage trough 5 and the dam body drainage pipe 4 can drain the leaking water. The independent drainage system greatly protects the original dam body from hydraulic erosion and can greatly improve the safe operation life of the dam. In the construction method, the jacking process is used to reset the drainage channel in the dam body, which solves the defect that the surface anti-seepage reinforcement solution cannot set up a drainage system or needs to excavate the dam body to set up a drainage channel, and the disturbance and damage to the dam body are minimized.

[0074] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A geomembrane anti-seepage reinforcement structure for an earth-rock dam, the earth-rock dam having an upstream side and a downstream side in a thickness direction, It is characterized in that The geomembrane anti-seepage reinforcement structure comprises: A geomembrane anti-seepage layer, wherein the geomembrane anti-seepage layer comprises a geomembrane, and the geomembrane is laid on the upstream side of the earth-rock dam; A concrete trough, wherein the concrete trough is located at the upstream side slope foot of the earth-rock dam, concrete is poured in the concrete trough, and the geomembrane extends to one side of the concrete trough and is anchored to the concrete trough; A dam body drainage pipe, the dam body drainage pipe extending along the thickness direction of the earth-rock dam and penetrating the upstream side and the downstream side of the earth-rock dam; A drainage trough extends along the dam surface of the earth-rock dam and is connected to the dam body drainage pipe.

2. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 1, It is characterized in that The geomembrane anti-seepage layer also includes a three-dimensional geotechnical drainage net and a cushion layer. The cushion layer, the three-dimensional geotechnical drainage net and the geomembrane are laid in sequence on the upstream side of the earth-rock dam. The geomembrane is a composite geomembrane of two cloths and one membrane.

3. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 1 or 2, It is characterized in that A sand cushion layer is built between the concrete tooth groove and the earth-rock dam. The concrete tooth groove has an anchoring component extending toward one side of the sand cushion layer. The anchoring component fixedly connects the concrete tooth groove and the geomembrane.

4. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 3, It is characterized in that The bottom of the concrete tooth groove is consolidated and reinforced for anti-seepage by foundation grouting, and the foundation grouting extends vertically downward to a preset depth.

5. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 1, 2 or 4, It is characterized in that Anchor grooves are arranged at intervals on the dam crest, the bridleway, and / or the dam surface of the earth-rock dam; The geomembrane is laid in multiple numbers, and part of the geomembrane is arranged in the anchoring groove and anchored on the side facing the dam top, and the adjacent previous geomembrane is welded and connected to the exposed part of this part of the geomembrane; the anchoring groove is filled with clay or sand for anchoring the geomembrane.

6. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 5, It is characterized in that The downstream elevation of the dam body drainage pipe is lower than the upstream elevation, and the drainage slope formed by the downstream elevation and the upstream elevation is approximately 1%. The highest position of the dam body drainage pipe is lower than the dead water level of the reservoir and close to the original ground of the riverbed.

7. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 5, It is characterized in that A stainless steel flower pipe is arranged in the drainage trough, and the outer wall of the stainless steel flower pipe is covered with two layers of stainless steel mesh with a spacing of 1 mm and filled with a gravel cushion layer.

8. The geomembrane anti-seepage reinforcement structure of the earth-rock dam according to claim 7, It is characterized in that The stainless steel flower pipe in the drainage trough is inserted into the upstream opening of the dam body drainage pipe, and a concrete plugging body is arranged at the connection between the stainless steel flower pipe and the dam body drainage pipe.