Bagged solidified soil guide pipe structure
By arranging storage grooves and buffer plates inside the conduit, combined with buffer spring ribs, the problem of bag rupture caused by the rapid decline of bagged solidified soil is solved, and the safety and accuracy of placement in land reclamation projects are improved.
Patent Information
- Application Number
- CN202420372658.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-28
AI Technical Summary
In the reclamation project of the existing guide conveying device, the weight of the bagged solidified soil is likely to drop too quickly during the conveying process, causing the packaging bag to break and making it impossible to deliver it accurately.
A bagged solidified soil conduit structure is designed. By arranging storage grooves and buffer plates inside the conduit, combined with buffer spring ribs, the falling speed of the bagged solidified soil is limited, the impact force is reduced, and the packaging bag is prevented from breaking.
It effectively limits the impact force of bagged solidified soil when it contacts the water surface, improves the safety and accuracy of placement, and prevents soil loss.
Smart Images

Figure CN221919355U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of guiding and conveying devices, in particular to a bagged solidified soil conduit structure. Background Art
[0002] Soil stabilizer is a new type of energy-saving and environmentally friendly engineering material synthesized from a variety of inorganic and organic materials for solidifying various types of soil. After mixing with the soil, it changes the engineering properties of the soil through a series of physical and chemical reactions. It can fix a large amount of free water in the soil in the form of crystalline water, thereby reducing the surface current of the soil micelles, thinning the double electric layer absorbed by the micelles, enhancing the electrolyte concentration, and causing the particles to agglomerate and expand in volume, further filling the soil pores. Under the action of compaction work, the solidified soil is easy to compact and stabilize, thus forming an overall structure and achieving a compaction density that cannot be achieved by conventional methods.
[0003] At present, solidified soil is a very good reclamation material for land reclamation projects. Therefore, packaging bags are used on the market to pack the solidified soil and then transport it to designated sea areas for placement in land reclamation. When placing bagged solidified soil, in order to ensure that the placement position does not have a large deviation, a conveying conduit is generally used to transport the bagged solidified soil along the conduit to achieve the purpose of precise placement. However, the current conduit conveying structure is simple, with only a single pipe body for the bagged solidified soil to sink and limit, and it lacks a structure to buffer the bagged solidified soil. When the bagged solidified soil sinks inside the conveying conduit, it is easy to descend too fast due to its own weight, resulting in violent contact between the bagged solidified soil and the water body, which can easily cause the outer packaging bag of the bagged solidified soil to rupture under the force of the impact, resulting in the loss of soil inside the bagged solidified soil, and it cannot be accurately placed at the predetermined location, which has poor practicality. Utility Model Content
[0004] The utility model aims to provide a bagged solidified soil conduit structure, which has the advantage of buffering.
[0005] The above technical purpose of the utility model is achieved through the following technical scheme: a bagged solidified soil conduit structure, including a first conduit, a second conduit is arranged at the bottom of the first conduit, the interior of the first conduit and the interior of the second conduit are symmetrically provided with storage grooves, the interior of the storage groove is rotatably connected with a buffer plate through a rotating shaft, and a buffer spring rib is installed between the buffer plate and the storage groove through a fixing part.
[0006] By adopting the above technical scheme, the utility model provides a storage groove inside the first conduit and the second conduit, and a buffer plate is installed inside the storage groove. In cooperation with the elastic force provided by the buffer spring rib, when the bagged solidified soil passes through the guide hopper and enters the first conduit, it will be restricted by the buffer plate inside the first conduit, limiting its descending speed, so that it slowly falls between the two buffer plates in the second conduit, and is speed-limited again. This structure can limit the impact force generated when the bagged solidified soil contacts the water surface, prevent the packaging bag of the bagged solidified soil from being broken by the impact force, and improve the safety of placing the bagged solidified soil.
[0007] The utility model is further configured as follows: a material guide hopper is installed on one side of the first conduit, and the material guide hopper is communicated with the interior of the first conduit.
[0008] The above technical solution is adopted to facilitate the transportation of bagged solidified soil into the first conduit.
[0009] The utility model is further configured as follows: a first mounting seat is installed on one side of the first conduit, and a hinge hole groove is opened on the first mounting seat.
[0010] The above technical solution makes it easy to install the first conduit on the offshore operating platform.
[0011] The utility model is further configured as follows: a second mounting seat is bolted to the top of the first conduit, and the second mounting seat is used in conjunction with an output end of an external hydraulic cylinder.
[0012] The above technical solution facilitates the connection between the hydraulic cylinder of the offshore operating platform and the first conduit, and facilitates the adjustment of the inclination angle of the first conduit by the first mounting seat.
[0013] The utility model is further configured as follows: the bottom of the first conduit and both ends of the second conduit are fixedly sleeved with connecting flanges, and the two connecting flanges are threadedly connected by bolts.
[0014] The above technical solution facilitates the fixing of the first conduit and the second conduit together.
[0015] The utility model is further configured as follows: the bottom of the first conduit and the bottom of the second conduit are both bolted with an annular clamping block, and the top of the second conduit is provided with an annular clamping groove used in conjunction with the annular clamping block.
[0016] The above technical solution is adopted to facilitate the positioning of the first conduit and the second conduit.
[0017] The utility model is further configured as follows: the material of the buffer plate is hard wear-resistant plastic.
[0018] The above technical solution is adopted to improve the wear resistance of the buffer plate.
[0019] The utility model is further configured that: the material of the first conduit and the material of the second conduit are polyethylene tubes.
[0020] By adopting the above technical solution, the corrosion resistance of the first conduit and the second conduit is improved.
[0021] In summary, the utility model has the following beneficial effects:
[0022] The utility model has a first conduit and a second conduit both provided with receiving grooves, a buffer plate is installed inside the receiving groove, and cooperates with the elastic force provided by the buffer spring ribs. When the bagged solidified soil enters the first conduit through the guide hopper, it will be restricted by the buffer plate inside the first conduit, and its descending speed will be restricted, so that it will slowly fall between the two buffer plates in the second conduit and be speed-restricted again. This structure can limit the impact force generated when the bagged solidified soil contacts the water surface, prevent the packaging bag of the bagged solidified soil from being broken due to the impact force, and improve the safety of placing the bagged solidified soil. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0024] Figure 2 It is a partial structural cross-sectional view of the utility model;
[0025] Figure 3 This utility model Figure 2 Enlarged view of point A in the middle.
[0026] Figure numerals: 1. first conduit; 2. second conduit; 3. storage groove; 4. buffer plate; 5. buffer spring rib; 6. guide hopper; 7. first mounting seat; 8. second mounting seat; 9. connecting flange; 10. annular clamping block; 11. annular clamping groove. DETAILED DESCRIPTION
[0027] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0028] Embodiment 1:
[0029] refer to Figure 1 , Figure 2 and Figure 3The bagged solidified soil conduit structure comprises a first conduit 1, a second conduit 2 is arranged at the bottom of the first conduit 1, a receiving groove 3 is symmetrically opened inside the first conduit 1 and inside the second conduit 2, a buffer plate 4 is rotatably connected inside the receiving groove 3 through a rotating shaft, a buffer spring rib 5 is installed between the buffer plate 4 and the receiving groove 3 through a fixing part, the receiving groove 3 is opened inside the first conduit 1 and the second conduit 2, and the buffer plate 4 is installed inside the receiving groove 3, with the elastic force provided by the buffer spring rib 5, when the bagged solidified soil passes through the guide hopper 6 and enters the first conduit 1, it will be restricted by the buffer plate 4 inside the first conduit 1, limiting its descending speed, so that it slowly falls between the two buffer plates 4 in the second conduit 2, and is speed-limited again, this structure can limit the impact force generated when the bagged solidified soil contacts the water surface, prevent the packaging bag of the bagged solidified soil from being broken due to the impact force, and improve the safety of placing the bagged solidified soil.
[0030] refer to Figure 1 and Figure 2 A material guide hopper 6 is installed on one side of the first conduit 1 , and the material guide hopper 6 is connected to the interior of the first conduit 1 . By setting the material guide hopper 6 , it is convenient to transport the bagged solidified soil into the first conduit 1 .
[0031] refer to Figure 1 A first mounting seat 7 is installed on one side of the first conduit 1, and a hinge hole groove is opened on the first mounting seat 7. By setting the first mounting seat 7, it is convenient to install the first conduit 1 on the offshore working platform.
[0032] refer to Figure 1 A second mounting seat 8 is bolted to the top of the first conduit 1, and the second mounting seat 8 is used in conjunction with the output end of the external hydraulic cylinder. By setting the second mounting seat 8, it is convenient to connect the hydraulic cylinder of the offshore working platform with the first conduit 1, and it is convenient to adjust the inclination angle of the first conduit 1 with the first mounting seat 7.
[0033] refer to Figure 1 The bottom of the first conduit 1 and both ends of the second conduit 2 are fixedly sleeved with connecting flanges 9, and the two connecting flanges 9 are threadedly connected by bolts. By setting the connecting flanges 9, the first conduit 1 and the second conduit 2 are conveniently fixed together.
[0034] refer to Figure 2 and Figure 3 The bottom of the first conduit 1 and the bottom of the second conduit 2 are both bolted with an annular clamping block 10, and the top of the second conduit 2 is provided with an annular clamping groove 11 used in conjunction with the annular clamping block 10. By setting the annular clamping block 10 and the annular clamping groove 11, it is convenient to limit the first conduit 1 and the second conduit 2.
[0035] refer to Figure 2The material of the buffer plate 4 is hard wear-resistant plastic. By setting the material of the buffer plate 4 to be hard wear-resistant plastic, the wear resistance of the buffer plate 4 is improved.
[0036] refer to Figure 1 and Figure 2 The material of the first conduit 1 and the material of the second conduit 2 are polyethylene tubes. By setting the material of the first conduit 1 and the material of the second conduit 2 to be polyethylene tubes, the corrosion resistance of the first conduit 1 and the second conduit 2 is improved.
[0037] Brief description of the use process: a receiving groove 3 is opened inside the first conduit 1 and the second conduit 2, and a buffer plate 4 is installed inside the receiving groove 3. With the elastic force provided by the buffer spring rib 5, when the bagged solidified soil passes through the guide hopper 6 and enters the first conduit 1, it will be restricted by the buffer plate 4 inside the first conduit 1, limiting its descending speed, so that it slowly falls between the two buffer plates 4 in the second conduit 2, and is speed-limited again. This structure can limit the impact force generated when the bagged solidified soil contacts the water surface, prevent the packaging bag of the bagged solidified soil from being broken by the impact force, and improve the safety of placing the bagged solidified soil. If you want to extend the length of the conduit, you only need to splice multiple second conduits 2 together.
[0038] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A bagged solidified soil conduit structure, comprising a first conduit (1), characterized in that: A second conduit (2) is arranged at the bottom of the first conduit (1); a receiving groove (3) is symmetrically provided inside the first conduit (1) and inside the second conduit (2); a buffer plate (4) is rotatably connected inside the receiving groove (3) via a rotating shaft; a buffer spring rib (5) is installed between the buffer plate (4) and the receiving groove (3) via a fixing member.
2. The bagged solidified soil conduit structure according to claim 1, characterized in that: A material guide hopper (6) is installed on one side of the first conduit (1), and the material guide hopper (6) is communicated with the interior of the first conduit (1).
3. The bagged solidified soil conduit structure according to claim 1, characterized in that: A first mounting seat (7) is installed on one side of the first conduit (1), and a hinge hole groove is provided on the first mounting seat (7).
4. The bagged solidified soil conduit structure according to claim 1, characterized in that: A second mounting seat (8) is bolted to the top of the first conduit (1), and the second mounting seat (8) is used in conjunction with an output end of an external hydraulic cylinder.
5. The bagged solidified soil conduit structure according to claim 1, characterized in that: The bottom of the first conduit (1) and both ends of the second conduit (2) are fixedly sleeved with connecting flanges (9), and the two connecting flanges (9) are threadedly connected by bolts.
6. The bagged solidified soil conduit structure according to claim 1, characterized in that: The bottom of the first conduit (1) and the bottom of the second conduit (2) are both bolted with an annular clamping block (10), and the top of the second conduit (2) is provided with an annular clamping groove (11) for use with the annular clamping block (10).
7. The bagged solidified soil conduit structure according to claim 1, characterized in that: The material of the buffer plate (4) is hard wear-resistant plastic.
8. The bagged solidified soil conduit structure according to claim 1, characterized in that: The material of the first conduit (1) and the material of the second conduit (2) are polyethylene tubes.