Auxiliary installation device for creeping formwork
By introducing the lifting mechanism, electromagnet and motor-driven support frame into the climbing formwork device, automatic disassembly and installation of the fixed frame is realized, which solves the problem of low efficiency of the fixed frame hoisting connection in the existing technology, and improves work efficiency and Security.
Patent Information
- Application Number
- CN202420339177.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The existing climbing formwork device requires manual operation during the hoisting and connection process of the fixed frame, resulting in a heavy workload for the staff and low efficiency.
An auxiliary installation device for climbing formwork is designed, including a fixed frame, a fixed block, a movable slot and a support frame. The position of the working platform and slide rails is adjusted through the jacking mechanism, and the electromagnet and motor drive the support frame to adsorb and remove the fixed frame. Improved the efficiency of taking the fixed rack.
It reduces staff participation and work intensity, improves the efficiency of disassembly and installation of the fixed frame, and reduces manual handling labor.
Smart Images

Figure CN221920291U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of climbing formwork equipment, in particular to a climbing formwork auxiliary installation device. Background Art
[0002] Climbing formwork is the abbreviation of climbing formwork, also known as jumping formwork abroad. It consists of climbing formwork, climbing frame (some climbing formworks do not have climbing frame) and climbing equipment. It is an effective tool in the construction of shear wall systems, cylinder systems and bridge piers and other high-rise structures. Because of its self-climbing ability, it does not require lifting machinery, which reduces the lifting workload of transportation machinery during construction. Hanging scaffolding on the self-climbing formwork can save the external scaffolding during the construction process.
[0003] Patent announcement number CN115929022A discloses a construction climbing formwork device and a method of use, belonging to the technical field of climbing formwork devices. The present invention includes a wall and a climbing rail, a climbing rail fixing block is fixed at the connection between the wall and the climbing rail, a carrier is provided on one side of the climbing rail, and a platform is arranged on the outer surface of the carrier; the cylinder end of the hydraulic cylinder is fixed to the carrier, the output end of the hydraulic cylinder is connected to the reversing box, and the reversing box is fixed on the climbing rail; a small winch is installed on one side of the control console, the output end of the small winch is connected to a steel cable, and a hook is provided at the bottom end of the steel cable. After completing the climbing operation, the present invention allows the staff to loosen the climbing rail fixing block and then lift the climbing rail fixing block through the small winch, which can replace the staff to pull and lift the climbing rail fixing block, and use mechanical lifting of the climbing rail fixing block to replace manual handling labor, thereby reducing the workload of the staff, improving work efficiency, and improving safety at the same time.
[0004] Although the prior art CN115929022A has many benefits during use, it still has the following problems: it is inconvenient to hoist and connect the fixed frame, so the hoisting and connection of the fixed frame still requires manual operation by the staff, and the workload of the staff is still large. Utility Model Content
[0005] The purpose of the utility model is to provide a climbing formwork auxiliary installation device to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a climbing formwork auxiliary installation device, comprising a fixed frame, a fixed block, a movable groove and a support frame, a climbing rail is arranged inside the fixed frame, a frame body is arranged on both sides of the outer wall of the climbing rail, a jacking mechanism is installed on the outer wall of the frame body, a top plate is installed on the outer wall of the jacking mechanism, a working platform is installed on the outer wall of the lower end of the top plate, fixed blocks are symmetrically installed on both sides of the outer wall of the upper end of the working platform, and a support frame is rotatably installed inside the fixed block.
[0007] When using a climbing formwork auxiliary installation device in the technical solution, the jacking mechanism drives the top plate and the working platform to move vertically, so as to adjust the working position of the slide rail and the formwork. After the jacking mechanism drives the climbing rail to move upward, the staff manually removes the anchor rod inside the fixed frame, and the motor body drives the support frame to rotate in a circle, so that the support frame passes through the movable groove and moves to one side of the fixed frame, and the magnetic force of the electromagnet can adsorb and fix the fixed frame. After that, the motor body drives the support frame to reset, so that the fixed frame moves to the upper end of the working platform, and the staff can disassemble and take the fixed frame at the upper end of the working platform, thereby improving the taking efficiency of the fixed frame.
[0008] Preferably, slide rails are installed on both sides of the outer wall of the upper end of the top plate, and a template is provided on the upper end of the slide rails.
[0009] The slide rail can control the working position of the formwork, and the formwork can control the pouring range of the concrete.
[0010] Preferably, the support frame is designed in an L-shape, and an electromagnet is installed on the outer wall of one end of the support frame.
[0011] The support frame can drive the electromagnet to move, so that the electromagnet can adsorb and connect to the fixing frame.
[0012] Preferably, movable grooves are provided on the outer walls on both sides of the working platform, and the size of the movable grooves is larger than the size of the supporting frame.
[0013] The support frame can rotate inside the movable slot.
[0014] Preferably, the support frame passes through the outer wall of one end of the fixing block and is provided with a motor body, and the motor body is connected to the outer wall of the fixing block.
[0015] The motor body drives the support frame to rotate in a circle.
[0016] Preferably, the fixing blocks are designed in a rectangular shape, and the fixing blocks are distributed on both sides of the movable groove.
[0017] Preferably, the top plate and the working platform are both designed in a rectangular shape.
[0018] Compared with the prior art, the utility model has the following beneficial effects: the utility model achieves the effect of facilitating the disassembly of the fixed frame by arranging a motor body, an electromagnet and a support frame, the jacking mechanism drives the top plate and the working platform to move vertically, thereby adjusting the working position of the slide rail and the template, and after the jacking mechanism drives the climbing rail to move upward, the staff manually disassembles the anchor rod inside the fixed frame, the motor body drives the support frame to rotate in a circle, so that the support frame passes through the movable groove and moves to one side of the fixed frame, and the magnetic force of the electromagnet can adsorb and fix the fixed frame, and then the motor body drives the support frame to reset, so that the fixed frame moves to the upper end of the working platform, and the staff can disassemble and take the fixed frame at the upper end of the working platform, which improves the taking efficiency of the fixed frame, reduces the participation of the staff, and reduces the work intensity of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the appearance of the fixing frame structure of the utility model;
[0020] Figure 2 It is a schematic cross-sectional view of the working platform structure of the utility model;
[0021] Figure 3 It is an enlarged schematic diagram of the fixed block structure of the utility model.
[0022] In the figure: 1. fixed frame; 11. climbing rail; 12. frame body; 13. working platform; 14. lifting mechanism; 15. top plate; 16. slide rail; 17. movable groove; 2. fixed block; 21. support frame; 22. motor body; 23. electromagnet. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-Figure 3 , five embodiments provided by the utility model:
[0025] Embodiment 1: A climbing formwork auxiliary installation device comprises a fixed frame 1, a fixed block 2, a movable groove 17 and a support frame 21, a climbing rail 11 is arranged inside the fixed frame 1, a frame body 12 is arranged on both sides of the outer wall of the climbing rail 11, a lifting mechanism 14 is installed on the outer wall of the frame body 12, a top plate 15 is installed on the outer wall of the lifting mechanism 14, a working platform 13 is installed on the outer wall of the lower end of the top plate 15, fixed blocks 2 are symmetrically installed on both sides of the outer wall of the upper end of the working platform 13, and a support frame 21 is rotatably installed inside the fixed block 2.
[0026] Slide rails 16 are installed on both sides of the outer wall of the upper end of the top plate 15, and a template is arranged on the upper end of the slide rails 16.
[0027] The slide rail 16 can control the working position of the formwork, and the formwork can control the pouring range of concrete. The jacking mechanism 14 drives the top plate 15 and the working platform 13 to move vertically, thereby adjusting the working position of the slide rail 16 and the formwork. After the jacking mechanism 14 drives the climbing rail 11 to move upward, the staff manually removes the anchor rod inside the fixed frame 1.
[0028] Embodiment 2: A climbing formwork auxiliary installation device comprises a fixed frame 1, a fixed block 2, a movable groove 17 and a support frame 21, a climbing rail 11 is arranged inside the fixed frame 1, a frame body 12 is arranged on both sides of the outer wall of the climbing rail 11, a lifting mechanism 14 is installed on the outer wall of the frame body 12, a top plate 15 is installed on the outer wall of the lifting mechanism 14, a working platform 13 is installed on the outer wall of the lower end of the top plate 15, fixed blocks 2 are symmetrically installed on both sides of the outer wall of the upper end of the working platform 13, and a support frame 21 is rotatably installed inside the fixed block 2.
[0029] Slide rails 16 are installed on both sides of the outer wall of the upper end of the top plate 15, and a template is arranged on the upper end of the slide rails 16.
[0030] The slide rail 16 can control the working position of the template, and the template can control the pouring range of concrete.
[0031] The support frame 21 is designed in an L-shape, and an electromagnet 23 is installed on the outer wall of one end of the support frame 21 .
[0032] The support frame 21 can drive the electromagnet 23 to move, so that the electromagnet 23 can adsorb and connect to the fixed frame 1, and the jacking mechanism 14 drives the top plate 15 and the working platform 13 to move vertically, so as to adjust the working position of the slide rail 16 and the template. After the jacking mechanism 14 drives the climbing rail 11 to move upward, the staff manually removes the anchor rod inside the fixed frame 1, and the motor body 22 drives the support frame 21 to rotate in a circle, so that the support frame 21 passes through the movable groove 17 and moves to one side of the fixed frame 1, and the magnetic force of the electromagnet 23 can adsorb and fix the fixed frame 1.
[0033] Embodiment three: A climbing formwork auxiliary installation device comprises a fixed frame 1, a fixed block 2, a movable groove 17 and a support frame 21, a climbing rail 11 is arranged inside the fixed frame 1, a frame body 12 is arranged on both sides of the outer wall of the climbing rail 11, a lifting mechanism 14 is installed on the outer wall of the frame body 12, a top plate 15 is installed on the outer wall of the lifting mechanism 14, a working platform 13 is installed on the outer wall of the lower end of the top plate 15, fixed blocks 2 are symmetrically installed on both sides of the outer wall of the upper end of the working platform 13, and a support frame 21 is rotatably installed inside the fixed block 2.
[0034] Slide rails 16 are installed on both sides of the outer wall of the upper end of the top plate 15, and a template is arranged on the upper end of the slide rails 16.
[0035] The slide rail 16 can control the working position of the template, and the template can control the pouring range of concrete.
[0036] The support frame 21 is designed in an L-shape, and an electromagnet 23 is installed on the outer wall of one end of the support frame 21 .
[0037] The support frame 21 can drive the electromagnet 23 to move, so that the electromagnet 23 can be adsorbed and connected to the fixing frame 1 .
[0038] The outer walls on both sides of the working platform 13 are provided with movable grooves 17 , and the size of the movable grooves 17 is larger than the size of the supporting frame 21 .
[0039] The support frame 21 can rotate inside the movable groove 17, and the motor body 22 drives the support frame 21 to rotate in a circle, so that the support frame 21 passes through the movable groove 17 and moves to the side of the fixed frame 1, and the magnetic force of the electromagnet 23 can adsorb and fix the fixed frame 1. Then the motor body 22 drives the support frame 21 to reset, so that the fixed frame 1 moves to the upper end of the working platform 13. The staff can disassemble and take the fixed frame 1 at the upper end of the working platform 13, which improves the efficiency of taking the fixed frame 1, reduces the participation of the staff, and reduces the work intensity of the staff.
[0040] Embodiment 4: A climbing formwork auxiliary installation device comprises a fixed frame 1, a fixed block 2, a movable groove 17 and a support frame 21, a climbing rail 11 is arranged inside the fixed frame 1, a frame body 12 is arranged on both sides of the outer wall of the climbing rail 11, a lifting mechanism 14 is installed on the outer wall of the frame body 12, a top plate 15 is installed on the outer wall of the lifting mechanism 14, a working platform 13 is installed on the outer wall of the lower end of the top plate 15, the top plate 15 and the working platform 13 are both designed in a rectangular shape, fixed blocks 2 are symmetrically installed on both sides of the outer wall of the upper end of the working platform 13, and a support frame 21 is rotatably installed inside the fixed block 2.
[0041] Slide rails 16 are installed on both sides of the outer wall of the upper end of the top plate 15, and a template is arranged on the upper end of the slide rails 16. The slide rails 16 can control the working position of the template, and the template can control the pouring range of concrete.
[0042] The support frame 21 is designed in an L-shape, and an electromagnet 23 is installed on the outer wall of one end of the support frame 21. The support frame 21 can drive the electromagnet 23 to move, so that the electromagnet 23 can be adsorbed and connected to the fixing frame 1.
[0043] The outer walls on both sides of the working platform 13 are provided with movable grooves 17 , and the size of the movable grooves 17 is larger than the size of the supporting frame 21 .
[0044] The support frame 21 can rotate inside the movable groove 17 .
[0045] The support frame 21 passes through the outer wall of one end of the fixed block 2 and is provided with a motor body 22. The climbing formwork device of the utility model also needs to provide a motor body 22 to enable it to work normally, and as is well known to those skilled in the art, the provision of the motor body 22 is commonplace, and it all belongs to conventional means or common knowledge, and will not be repeated here. Those skilled in the art can make any selection according to their needs or convenience, and the motor body 22 is connected to the outer wall of the fixed block 2. The motor body 22 drives the support frame 21 to rotate in a circle.
[0046] The fixed block 2 is designed in a rectangular shape, and the fixed block 2 is distributed on both sides of the movable groove 17. The jacking mechanism 14 drives the top plate 15 and the working platform 13 to move vertically, so as to adjust the working position of the slide rail 16 and the template. After the jacking mechanism 14 drives the climbing rail 11 to move upward, the staff manually removes the anchor rod inside the fixed frame 1, and the motor body 22 drives the support frame 21 to rotate in a circle, so that the support frame 21 passes through the movable groove 17 and moves to one side of the fixed frame 1, and the magnetic force of the electromagnet 23 can adsorb and fix the fixed frame 1. Then the motor body 22 drives the support frame 21 to reset, so that the fixed frame 1 moves to the upper end of the working platform 13, and the staff can disassemble and take the fixed frame 1 at the upper end of the working platform 13, which improves the taking efficiency of the fixed frame 1, reduces the participation of the staff, and reduces the work intensity of the staff.
[0047] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A climbing formwork auxiliary installation device, comprising a fixing frame (1), a fixing block (2), a movable groove (17) and a supporting frame (21), characterized in that: The fixed frame (1) is provided with a climbing rail (11) inside, and a frame body (12) is provided on both sides of the outer wall of the climbing rail (11), a lifting mechanism (14) is installed on the outer wall of the frame body (12), a top plate (15) is installed on the outer wall of the lifting mechanism (14), a working platform (13) is installed on the outer wall of the lower end of the top plate (15), and fixed blocks (2) are symmetrically installed on both sides of the outer wall of the upper end of the working platform (13), and a support frame (21) is rotatably installed inside the fixed block (2).
2. A climbing formwork auxiliary installation device according to claim 1, characterized in that: Slide rails (16) are installed on both sides of the outer wall of the upper end of the top plate (15), and a template is arranged on the upper end of the slide rail (16).
3. A climbing formwork auxiliary installation device according to claim 1, characterized in that: The support frame (21) is designed in an L-shape, and an electromagnet (23) is installed on the outer wall of one end of the support frame (21).
4. A climbing formwork auxiliary installation device according to claim 1, characterized in that: The outer walls on both sides of the working platform (13) are provided with movable grooves (17), and the size of the movable grooves (17) is larger than the size of the support frame (21).
5. A climbing formwork auxiliary installation device according to claim 1, characterized in that: The support frame (21) passes through the outer wall of one end of the fixing block (2) and is provided with a motor body (22), and the motor body (22) is connected to the outer wall of the fixing block (2).
6. A climbing formwork auxiliary installation device according to claim 1, characterized in that: The fixing blocks (2) are designed in a rectangular shape, and the fixing blocks (2) are distributed on both sides of the movable groove (17).
7. A climbing formwork auxiliary installation device according to claim 1, characterized in that: The top plate (15) and the working platform (13) are both designed in a rectangular shape.