Column hoop steel bar binding equipment for house building
By designing a column hoop steel bar binding equipment that includes gears and sliding connections, the problem of difficulty in adjusting the binding position is solved, more efficient binding and installation is achieved, and the use of column hoop steel bars in house construction is facilitated.
Patent Information
- Application Number
- CN202420469564.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-12
AI Technical Summary
During the binding process of column hoop steel bars, due to difficulty in adjustment, the binding position is too high or too low, affecting the overall load-bearing effect.
A column hoop steel bar tying equipment including a support table, drive motor, pinion gear, gear plate, mounting base, insert block and tying roller is designed. Height adjustment is achieved through gears and sliding connections. It is combined with servo motors and threaded connections to improve installation convenience. performance and cleanup capabilities.
It improves the binding adjustment ability and installation convenience, ensures accurate binding of column hoop steel bars at the ends and middle positions, enhances the overall load-bearing effect, and improves the column surface cleaning ability.
Smart Images

Figure CN221920337U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of column hoop steel bar binding, in particular to column hoop steel bar binding equipment for building construction. Background Art
[0002] Housing construction refers to the physical facilities provided for people to live, produce, work or other activities at the planned and designed location. The main load-bearing components such as beams, columns, and walls are needed in the structure of the housing building. Column hoop steel bars are one of them. Column hoop steel bars are a kind of steel bar used to enhance the seismic performance of concrete components.
[0003] When tying column stirrups, you need to select suitable reinforcement materials first, and then use column stirrup reinforcement tying equipment to complete the tying work for convenience. When tying, you need to determine the tying position of the column stirrups according to the design drawings and construction specifications. Generally speaking, you need to tie at the ends and the middle to increase the seismic resistance and bearing capacity of the column. At this time, if the tying position is too high or too low due to difficulty in adjustment, it will easily directly affect the overall bearing effect. Utility Model Content
[0004] The purpose of the utility model is to provide a column hoop steel bar binding equipment for house construction, so as to solve the problem proposed in the above background technology that the binding position of the column stirrups needs to be determined according to the design drawings and construction specifications during binding, and generally speaking, it is necessary to bind at the ends and the middle to increase the seismic performance and bearing capacity of the column. At this time, if the binding position is too high or too low due to difficulty in adjustment, it is easy to directly affect the overall bearing effect.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a column hoop steel bar binding equipment for building construction, comprising a support platform, support legs are fixed on both sides of the bottom end of the support platform, mounting frames are fixed on both sides of the top end of the support platform, a reserved groove is opened at the middle position inside the support platform, a driving motor is installed on one side inside the support platform, a pinion is connected to the output end of the driving motor, a gear plate is connected to one side of the pinion, mounting seats are installed on both sides of the top end of the gear plate, an insert block is connected inside the mounting seat, a mounting bolt is connected between the mounting seat and the insert block, a support plate is fixed on the top end of the insert block, a second telescopic rod is connected to the top end of the support plate, a connecting block is installed on the top end of the second telescopic rod, a binding roller is installed on one side of the connecting block, and blocks are embedded on both sides inside the gear plate.
[0006] Preferably, a circular track is provided inside the gear plate, and the circular track and the insert block are adapted to each other to form a sliding connection.
[0007] Preferably, the gear plate and the pinion are meshed with each other, the interior of the gear plate is designed as a hollow groove, and the mounting seats are symmetrically distributed about the central axis of the gear plate.
[0008] Preferably, the inserts are symmetrically distributed about the central axis of the support platform, the support legs are symmetrically distributed about the central axis of the support platform, and a hook is fixed at one end of the support leg.
[0009] Preferably, a guide rod is installed inside one of the mounting frames, and the outer wall of the guide rod is connected to a guide sleeve, and a threaded rod is installed inside the other mounting frame, and the outer wall of the threaded rod is connected to a threaded block, and the top of the threaded rod is connected to a servo motor.
[0010] Preferably, a threaded connection is formed between the threaded rod and the threaded block, and the mounting frame is symmetrically distributed about the central axis of the support platform.
[0011] Preferably, a connecting plate is fixed to one side of the guide sleeve and the threaded block, a cleaning ring is fixed to one side of the connecting plate, a first telescopic rod is installed on the inner wall of the cleaning ring, an arc plate is connected to one side of the first telescopic rod, and a cleaning brush is connected to one end of the arc plate.
[0012] Preferably, the connecting plates are symmetrically distributed about the central axis of the cleaning ring, the first telescopic rods are annularly distributed about the center of the cleaning ring, and the cleaning brushes are evenly distributed at one end of the arc plate.
[0013] Compared with the prior art, the utility model has the following beneficial effects: the column hoop steel bar binding device for house construction not only improves the binding adjustment capability, but also improves the installation convenience and column surface cleaning capability of the column hoop steel bar binding device;
[0014] (1) When the binding work is being performed, the column and the whole body are passed through the reserved groove position and the empty groove position of the gear plate. Then, the insert block is installed at the position of the mounting seat during operation. After the driving motor is started, the small gear can be driven to rotate. At this time, the gear plate cooperates with it to rotate. During rotation, the insert block cooperates with the circular track to rotate and slide. Therefore, the mounting seat rotates synchronously. After the second telescopic rod works, the height of the connecting block can be adjusted so that the connecting block reaches the binding position of the column. The binding process is completed by traction of the steel wire between the binding rollers. The height of the connecting block can be adjusted according to the binding position required. Therefore, the height adjustment ability during the binding process is greatly improved, and binding at the end and middle positions is convenient.
[0015] (2) By fixing the mounting seat on both sides of the top of the gear plate, and then installing the plug block at the position of the mounting seat after the cleaning ring is worked, the connection installation between the plug block and the mounting seat is completed by using the mounting bolt, so that the installation process of the lashing roller can be completed. Therefore, the disassembly process of the lashing roller can be completed after the mounting bolt is disassembled, thereby better improving the overall installation convenience during the work process;
[0016] (3) By installing the mounting frame on both sides of the top of the support platform, during the binding work, the column and the whole body are passed through the reserved slot and the empty slot of the gear plate. At this time, the servo motor is started to drive the threaded rod to rotate. At the same time, the guide sleeve and the guide rod cooperate with each other to form a guide treatment. Therefore, the thread block moves along the threaded rod. At the same time, the cleaning ring can move up and down under the connection of the connecting plate. After the first telescopic rod works, the arc plate and the cleaning brush can be used to clean the outside of the column to remove surface dust and ensure that the stirrups and the column surface can fit tightly. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0018] Figure 2 It is a partial top view structural schematic diagram of the support platform of the utility model;
[0019] Figure 3 This is a schematic diagram of the top view structure of the cleaning ring of the utility model;
[0020] Figure 4 It is a schematic diagram of the front cross-sectional structure of the mounting seat of the utility model.
[0021] In the figure: 1. support platform; 2. support leg; 3. hook; 4. reserved slot; 5. gear plate; 6. drive motor; 7. pinion; 8. mounting frame; 9. guide rod; 10. guide sleeve; 11. connecting plate; 12. cleaning ring; 13. servo motor; 14. threaded rod; 15. threaded block; 16. connecting block; 17. mounting seat; 18. first telescopic rod; 19. arc plate; 20. cleaning brush; 21. embedded block; 22. mounting bolt; 23. plug block; 24. support plate; 25. second telescopic rod; 26. tying roller. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-4 , the utility model provides an embodiment: a column hoop steel bar binding equipment for building construction, including a support platform 1, support legs 2 are fixed on both sides of the bottom end of the support platform 1, mounting frames 8 are fixed on both sides of the top end of the support platform 1, a reserved slot 4 is opened at the middle position inside the support platform 1, a driving motor 6 is installed on one side inside the support platform 1, a pinion 7 is connected to the output end of the driving motor 6, a gear plate 5 is connected to one side of the pinion 7, mounting seats 17 are installed on both sides of the top end of the gear plate 5, an insert block 23 is connected inside the mounting seat 17, a mounting bolt 22 is connected between the mounting seat 17 and the insert block 23, a support plate 24 is fixed to the top end of the insert block 23, a second telescopic rod 25 is connected to the top end of the support plate 24, a connecting block 16 is installed on the top end of the second telescopic rod 25, a binding roller 26 is installed on one side of the connecting block 16, and embedded blocks 21 are embedded on both sides of the gear plate 5.
[0024] A circular track is provided inside the gear plate 5 , and the circular track and the insert block 21 are adapted to each other to form a sliding connection.
[0025] The gear plate 5 and the pinion 7 mesh with each other. The interior of the gear plate 5 is designed as a hollow groove, and the mounting seats 17 are symmetrically distributed about the central axis of the gear plate 5 .
[0026] The insert blocks 21 are symmetrically distributed with respect to the central axis of the support platform 1 , the support legs 2 are symmetrically distributed with respect to the central axis of the support platform 1 , and a hook 3 is fixed at one end of the support leg 2 .
[0027] Preferably, a guide rod 9 is installed inside one mounting frame 8, and the outer wall of the guide rod 9 is connected to a guide sleeve 10, and a threaded rod 14 is installed inside the other mounting frame 8, the outer wall of the threaded rod 14 is connected to a threaded block 15, and the top of the threaded rod 14 is connected to a servo motor 13.
[0028] A threaded connection is formed between the threaded rod 14 and the threaded block 15 , and the mounting bracket 8 is symmetrically distributed about the central axis of the support platform 1 .
[0029] A connecting plate 11 is fixed to one side of the guide sleeve 10 and the threaded block 15, a cleaning ring 12 is fixed to one side of the connecting plate 11, a first telescopic rod 18 is installed on the inner wall of the cleaning ring 12, a curved plate 19 is connected to one side of the first telescopic rod 18, and a cleaning brush 20 is connected to one end of the curved plate 19.
[0030] The connecting plate 11 is symmetrically distributed about the central axis of the cleaning ring 12, the first telescopic rod 18 is annularly distributed about the center of the cleaning ring 12, and the cleaning brush 20 is evenly distributed at one end of the arc plate 19;
[0031] Furthermore, a plumb ball is suspended at the position of the hook 3 using a plumb line. The plumb ball is vertically downward based on gravity, so it can be compared with the center line of the support leg 2 to observe whether the support platform 1 is in a balanced state;
[0032] The binding process is further completed by traction of the steel wire between the binding rollers 26, and the position of the cleaning ring 12 and the installation of the plug 23 need to be adjusted according to the binding position.
[0033] Working principle: First, install the mounting frame 8 on both sides of the top of the support platform 1. When performing the binding work, let the column and the whole pass through the position of the reserved groove 4, and also pass through the empty groove position of the gear plate 5. At this time, start the servo motor 13 to drive the threaded rod 14 to rotate. Under the connection of the connecting plate 11, the cleaning ring 12 can move up and down, and after the first telescopic rod 18 works, use the arc plate 19 and the cleaning brush 20 to clean the outside of the column. After cleaning, the cleaning ring 12 can be gradually moved up, and then the plug block 23 is connected and installed. At this time, start the drive motor 6 to drive the pinion 7 to rotate, and the gear plate 5 cooperates with it to rotate. When rotating, the insert block 21 cooperates with the circular track to limit the rotation and slide, so the mounting seat 17 rotates synchronously. After the second telescopic rod 25 works, the height of the connecting block 16 can be adjusted to allow the connecting block 16 to reach the binding position of the column, and the steel wire traction between the binding rollers 26 is used to complete the binding process. The position of the cleaning ring 12 and the installation of the plug block 23 can be adjusted according to the binding position.
[0034] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
Claims
1. A column hoop steel bar binding device for building construction, comprising a support platform (1), characterized in that: Support legs (2) are fixed on both sides of the bottom end of the support platform (1), mounting frames (8) are fixed on both sides of the top end of the support platform (1), a reserved slot (4) is provided at the middle position inside the support platform (1), a driving motor (6) is installed on one side inside the support platform (1), the output end of the driving motor (6) is connected to a pinion (7), one side of the pinion (7) is connected to a gear plate (5), and mounting seats (17) are installed on both sides of the top end of the gear plate (5). The interior of the mounting seat (17) is connected with an insert block (23), a mounting bolt (22) is connected between the mounting seat (17) and the insert block (23), a support plate (24) is fixed to the top of the insert block (23), a second telescopic rod (25) is connected to the top of the support plate (24), a connecting block (16) is installed at the top of the second telescopic rod (25), a tying roller (26) is installed on one side of the connecting block (16), and embedded blocks (21) are embedded on both sides of the interior of the gear plate (5).
2. The column hoop steel bar binding equipment for building construction according to claim 1 is characterized in that: A circular track is provided inside the gear plate (5), and the circular track and the insert (21) are adapted to each other to form a sliding connection.
3. The column hoop steel bar binding equipment for building construction according to claim 1 is characterized in that: The gear plate (5) and the pinion (7) are meshed with each other, the interior of the gear plate (5) is designed as a hollow groove, and the mounting seats (17) are symmetrically distributed about the central axis of the gear plate (5).
4. The column hoop steel bar binding equipment for building construction according to claim 1 is characterized in that: The inserts (21) are symmetrically distributed about the central axis of the support platform (1), the support legs (2) are symmetrically distributed about the central axis of the support platform (1), and a hook (3) is fixed to one end of the support leg (2).
5. The column hoop steel bar binding equipment for building construction according to claim 1 is characterized in that: A guide rod (9) is installed inside one of the mounting frames (8), and the outer wall of the guide rod (9) is connected to a guide sleeve (10); a threaded rod (14) is installed inside the other mounting frame (8), and the outer wall of the threaded rod (14) is connected to a threaded block (15); and the top end of the threaded rod (14) is connected to a servo motor (13).
6. The column hoop steel bar binding equipment for building construction according to claim 5 is characterized in that: A threaded connection is formed between the threaded rod (14) and the threaded block (15), and the mounting frame (8) is symmetrically distributed about the central axis of the support platform (1).
7. The column hoop steel bar binding equipment for building construction according to claim 5 is characterized by: A connecting plate (11) is fixed to one side of the guide sleeve (10) and the threaded block (15); a cleaning ring (12) is fixed to one side of the connecting plate (11); a first telescopic rod (18) is installed on the inner wall of the cleaning ring (12); a curved plate (19) is connected to one side of the first telescopic rod (18); and a cleaning brush (20) is connected to one end of the curved plate (19).
8. The column hoop steel bar binding equipment for building construction according to claim 7 is characterized in that: The connecting plate (11) is symmetrically distributed about the central axis of the cleaning ring (12), the first telescopic rod (18) is annularly distributed about the center of the cleaning ring (12), and the cleaning brush (20) is evenly distributed at one end of the arc plate (19).