Mine roadway anchoring and shotcreting combined supporting structure

By adopting a structure combining multi-layer anchor rods and grid frames in the mine tunnel, using steel mesh and concrete spray layer to improve the stability of the anchor rod, the problem of anchor rod falling off is solved, and high stability and long-life support of the tunnel are achieved. protective effect.

CN221920979UActive Publication Date: 2024-10-29铜陵有色金属集团股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420668099.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-10-29
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

The anchor rods in the existing bolt-blasting combined support structure of mine tunnels are easy to fall off after long-term use, resulting in poor tunnel stability, difficulty in effectively supporting the surrounding rock, and easy deformation and collapse.

Method used

A multi-layer anchor structure is adopted. Each layer of anchors is combined with the inner and outer grids and steel mesh to form a stable connection through steel wire ropes and concrete spray layers to improve the anchor stability and the bearing capacity of the supporting structure.

Benefits of technology

Through the joint action of the steel mesh and the concrete spray layer, a support structure with high load-bearing capacity is formed, which improves the stability and safety of the tunnel and extends its service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920979U_ABST
    Figure CN221920979U_ABST
Patent Text Reader

Abstract

The utility model relates to a mine roadway anchoring and shotcreting combined supporting structure which comprises a plurality of rows of first anchor rod layers which are evenly arranged in the axis direction of a roadway, each row of first anchor rod layers comprises a plurality of first anchor rods which are evenly arranged in the circumferential direction of the periphery of the roadway, and an inner surrounding net frame is fixedly connected to the inner side of the roadway. One end of each first anchor rod penetrates through the roadway, the other end of each first anchor rod is provided with a first nut block, the first nut blocks are fixedly connected to the inner side wall of the roadway, the first nut blocks and the inner surrounding net frame are fixedly connected through first fixing pieces, and a first steel wire rope is fixedly connected between every two adjacent first nut blocks. A first concrete spraying layer is filled between the inner surrounding net frame and the roadway. According to the utility model, the first anchor rod and the second anchor rod are stably connected to the roadway, so that the stability and the safety of the roadway are effectively improved, and the anchor rod has stronger bearing capacity, good adaptability and longer service life.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnels, in particular to an anchor-spray combined supporting structure of a mine tunnel. Background Art

[0002] The combined anchor and shotcrete support structure of mine tunnels is a support method widely used in mine tunnels. It combines the advantages of anchor bolts and shotcrete to improve the stability and safety of the tunnels.

[0003] The prior art, such as the utility model with application number CN201620123516.X, discloses a deep strong dynamic load tunnel anti-impact and anti-compression support structure. However, the anchor rods in the above structure are simply arranged on the tunnel surrounding rock. After long-term use, the anchor rods are easy to fall off from the surrounding rock, and the stability is poor. It is difficult to effectively support the tunnel surrounding rock, which is easy to cause deformation and collapse of the tunnel. Utility Model Content

[0004] In view of the shortcomings of the prior art, the utility model provides a combined anchor-spraying support structure for mine tunnels. The specific technical scheme is as follows:

[0005] The invention discloses a combined anchor-spraying support structure for a mine tunnel, comprising a plurality of rows of first anchor rod layers uniformly arranged along the axial direction of the tunnel, each row of the first anchor rod layers comprising a plurality of first anchor rods uniformly arranged in a circumferential direction along the periphery of the tunnel, and an inner enclosure grid fixedly connected to the inner side of the tunnel, one end of the first anchor rod passing through the tunnel, the other end of the first anchor rod having a first nut block, the first nut block being fixedly connected to the inner side wall of the tunnel, the first nut block and the inner enclosure grid being fixedly connected by a first fixing member, a first steel wire rope being fixedly connected between two adjacent first nut blocks, and a first concrete spraying layer being filled between the inner enclosure grid and the tunnel.

[0006] As an improvement of the above technical solution: it also includes several rows of second anchor rod layers uniformly arranged along the axial direction of the tunnel, each row of the second anchor rod layer includes several second anchor rods uniformly arranged in a circumferential direction along the periphery of the tunnel, the inner enclosure grid is provided with an outer grid fixedly connected to the tunnel on the side away from the first anchor rod, one end of the second anchor rod passes through the tunnel, the other end of the second anchor rod has a second nut block, the second nut block is fixedly connected to the outer side of the inner enclosure grid, the second nut block and the outer grid are fixedly connected by a second fixing piece, the inner enclosure grid and the outer grid are filled with a second concrete spraying layer, and two adjacent second nut blocks are fixedly connected by a second steel wire rope.

[0007] As an improvement of the above technical solution: a first steel mesh is provided on the inner wall of the tunnel, the first steel mesh is fixedly connected to the inner wall of the tunnel by a plurality of first anchors, adjacent first nut blocks and first anchors are connected by a first steel wire rope, a second steel mesh is provided on the side of the inner enclosure grid away from the tunnel, the second steel mesh is fixedly connected to the inner enclosure grid by a plurality of second anchors, and adjacent second nut blocks and second anchors are connected by a second steel wire rope.

[0008] As an improvement of the above technical solution: the first fixing member includes a fourth nut block fixedly connected to the inner enclosure grid side close to the tunnel, and the fourth nut block is fixedly connected to the first nut block through a second screw rod; the second fixing member includes a third nut block fixedly connected to the outer enclosure grid side close to the inner enclosure grid, and the third nut block is fixedly connected to the first nut block through a first screw rod.

[0009] As an improvement of the above technical solution: the inner grid and the outer grid are both arched mesh structures.

[0010] As an improvement of the above technical solution: the thickness of the first concrete spraying layer is 80-120 mm, and the thickness of the second concrete spraying layer is 120-150 mm.

[0011] Beneficial effects of the utility model:

[0012] By connecting a plurality of first steel wires with the first nut block, the first anchor rod can be limited and stabilized in the outer direction, by the first fixing member, the end direction of the plurality of first anchor rods can be limited and stabilized, by connecting a plurality of second steel wires with the second nut block, the outer direction of the second anchor rod can be limited and stabilized, by the second fixing member, the end direction of the plurality of second anchor rods can be limited and stabilized, and by the first steel mesh and the second steel mesh, the tensile strength and impact resistance of the first concrete spraying layer and the second concrete spraying layer can be improved. Through the joint action of the steel mesh and the concrete spraying layer, a support structure with a high bearing capacity is formed, so that the first anchor rod and the second anchor rod are stably connected to the roadway, thereby effectively improving the stability and safety of the roadway, and having a strong bearing capacity, good adaptability and a long service life. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 for Figure 1 Schematic diagram of the enlarged structure at point A in the middle.

[0015] Figure numerals: 1, tunnel; 100, first concrete spraying layer; 200, second concrete spraying layer; 2, first anchor rod; 21, first nut block; 3, second anchor rod; 31, second nut block; 4, outer grid; 41, first screw rod; 42, third nut block; 5, inner grid; 51, second screw rod; 52, fourth nut block; 6, first steel mesh; 61, first anchor; 7, first steel wire rope; 8, second steel mesh; 9, second steel wire rope; 10, second anchor. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0017] Example

[0018] Please refer to Figure 1-Figure 2 The anchor-sprayed combined support structure of a mine tunnel comprises a plurality of rows of first anchor rod layers uniformly arranged along the axial direction of the tunnel 1, each row of the first anchor rod layers comprises a plurality of first anchor rods 2 uniformly arranged in a circumferential direction along the periphery of the tunnel 1, an inner enclosure grid frame 5 is fixedly connected to the inner side of the tunnel 1, one end of the first anchor rod 2 passes through the tunnel 1, and the other end of the first anchor rod 2 has a first nut block 21, the first nut block 21 is fixedly connected to the inner wall of the tunnel 1, the first nut block 21 and the inner enclosure grid frame 5 are fixedly connected by a first fixing member, a first steel wire rope 7 is fixedly connected between two adjacent first nut blocks 21, and a first concrete sprayed layer 100 is filled between the inner enclosure grid frame 5 and the tunnel 1, specifically, the outer side direction of the first anchor rod 2 can be limited and stabilized by connecting a plurality of first steel wire ropes 7 to the first nut block 21, and the end directions of a plurality of first anchor rods 2 can be limited and stabilized by the first fixing member.

[0019] In an optional embodiment: it also includes a plurality of rows of second anchor rod layers uniformly arranged along the axial direction of the tunnel 1, each row of the second anchor rod layer includes a plurality of second anchor rods 3 uniformly arranged in a circumferential direction around the tunnel 1, a peripheral grid frame 4 fixedly connected to the tunnel 1 is arranged on the side of the inner enclosure grid frame 5 away from the first anchor rod 2, one end of the second anchor rod 3 passes through the tunnel 1, and the other end of the second anchor rod 3 has a second nut block 31, the second nut block 31 is fixedly connected to the outer side of the inner enclosure grid frame 5, the second nut block 31 and the peripheral grid frame 4 are fixedly connected by a second fixing member, a second concrete spraying layer 200 is filled between the inner enclosure grid frame 5 and the peripheral grid frame 4, and two adjacent second nut blocks 31 are fixedly connected by a second steel wire rope 9;

[0020] Specifically, the second anchor rod 3 can be limited and stabilized in the outer direction by connecting a plurality of second steel wire ropes 9 with the second nut block 31, and the end directions of a plurality of second anchor rods 3 can be limited and stabilized by the second fixing member.

[0021] In an optional embodiment: the inner wall of the tunnel 1 is provided with a first steel mesh 6, the first steel mesh 6 is fixedly connected to the inner wall of the tunnel 1 through a plurality of first anchors 61, the adjacent first nut blocks 21 and the first anchors 61 are connected by a first steel wire rope 7, a second steel mesh 8 is provided on the side of the inner enclosure grid 5 away from the tunnel 1, the second steel mesh 8 is fixedly connected to the inner enclosure grid 5 through a plurality of second anchors 10, and the adjacent second nut blocks 31 and the second anchors 10 are connected by a second steel wire rope 9;

[0022] Specifically, the first steel mesh and the second steel mesh can improve the tensile strength and impact resistance of the first concrete spraying layer 100 and the second concrete spraying layer 200. Through the joint action of the steel mesh and the concrete spraying layer, a support structure with a high bearing capacity is formed, and the first steel wire rope can further stabilize the lateral limit of the first anchor rod 2, and the second steel wire rope can further stabilize the lateral limit of the second anchor rod 3, so that the first anchor rod 2 and the second anchor rod 3 are stably connected to the roadway, thereby effectively improving the stability and safety of the roadway, and having a strong bearing capacity, good adaptability and a long service life.

[0023] In an optional embodiment: the first fixing member includes a fourth nut block 52 fixedly connected to the side of the inner enclosure grid 5 close to the tunnel 1, and the fourth nut block 52 is fixedly connected to the first nut block 21 through the second screw 51; the second fixing member includes a third nut block 42 fixedly connected to the side of the outer enclosure grid 4 close to the inner enclosure grid 5, and the third nut block 42 is fixedly connected to the first nut block 21 through the first screw 41.

[0024] In an optional embodiment: the inner enclosure grid 5 and the outer enclosure grid 4 are both arched mesh structures, which can be conveniently connected to the inner side of the tunnel 1 on the one hand, and can also conveniently form the first concrete spraying layer 100 and the second concrete spraying layer 200 for the sprayed concrete material on the other hand.

[0025] In an optional embodiment: the thickness of the first concrete spraying layer 100 is 80-120 mm, and the thickness of the second concrete spraying layer 200 is 120-150 mm.

[0026] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A mine tunnel bolt-spraying combined support structure, comprising a plurality of rows of first anchor bolt layers uniformly arranged along the axial direction of a tunnel (1), each row of the first anchor bolt layer comprising a plurality of first anchor bolts (2) uniformly arranged in a circumferential direction along the periphery of the tunnel (1), It is characterized in that It also includes an inner enclosure grid (5) fixedly connected to the inner side of the tunnel (1), one end of the first anchor rod (2) passes through the tunnel (1), the other end of the first anchor rod (2) has a first nut block (21), the first nut block (21) is fixedly connected to the inner side wall of the tunnel (1), the first nut block (21) and the inner enclosure grid (5) are fixedly connected via a first fixing member, a first steel wire rope (7) is fixedly connected between two adjacent first nut blocks (21), and a first concrete spraying layer (100) is filled between the inner enclosure grid (5) and the tunnel (1).

2. The bolt-spray combined support structure for mine tunnels according to claim 1, Features: It also comprises a plurality of rows of second anchor rod layers uniformly arranged along the axial direction of the tunnel (1), each row of the second anchor rod layers comprising a plurality of second anchor rods (3) uniformly arranged in a circumferential direction around the tunnel (1), a peripheral grid frame (4) fixedly connected to the tunnel (1) is arranged on the side of the inner grid frame (5) away from the first anchor rod (2), one end of the second anchor rod (3) passes through the tunnel (1), the other end of the second anchor rod (3) comprises a second nut block (31), the second nut block (31) is fixedly connected to the outer side of the inner grid frame (5), the second nut block (31) and the peripheral grid frame (4) are fixedly connected via a second fixing member, a second concrete spraying layer (200) is filled between the inner grid frame (5) and the peripheral grid frame (4), and two adjacent second nut blocks (31) are fixedly connected via a second steel wire rope (9).

3. The bolt-spray combined support structure for mine tunnels according to claim 2, Features: The inner wall of the tunnel (1) is provided with a first steel mesh (6), the first steel mesh (6) is fixedly connected to the inner wall of the tunnel (1) via a plurality of first anchors (61), adjacent first nut blocks (21) and first anchors (61) are connected via a first steel wire rope (7), a second steel mesh (8) is provided on a side of the inner enclosure grid (5) away from the tunnel (1), the second steel mesh (8) is fixedly connected to the inner enclosure grid (5) via a plurality of second anchors (10), and adjacent second nut blocks (31) and second anchors (10) are connected via a second steel wire rope (9).

4. The bolt-spray combined support structure for mine tunnels according to claim 3, Features: The first fixing member comprises a fourth nut block (52) fixedly connected to a side of the inner enclosure grid (5) close to the tunnel (1), the fourth nut block (52) being fixedly connected to the first nut block (21) via a second screw rod (51), and the second fixing member comprises a third nut block (42) fixedly connected to a side of the outer enclosure grid (4) close to the inner enclosure grid (5), the third nut block (42) being fixedly connected to the first nut block (21) via a first screw rod (41).

5. The bolt-spray combined support structure for mine tunnels according to claim 4, Features: The inner grid frame (5) and the outer grid frame (4) are both arched mesh structures.

6. The bolt-spray combined support structure for mine tunnels according to claim 2, Features: The thickness of the first concrete spraying layer (100) is 80-120 mm, and the thickness of the second concrete spraying layer (200) is 120-150 mm.