Large-section tunnel combined yielding structure spanning upper-soft lower-hard stratum
By adopting a large-section tunnel combined pressure yielding structure spanning soft and hard strata above and below, and utilizing the synergistic effect of the inner and outer arches and hydraulic devices during tunnel construction, the problems of shear stress concentration and the inability to adjust the pressure yield in traditional methods are solved. It achieves effective support and deformation adjustment of surrounding rocks, and improves the stability and efficiency of tunnel construction.
Patent Information
- Application Number
- CN202320874166.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-04-18
AI Technical Summary
During tunnel construction, it is difficult for traditional methods to effectively support the layered interface of upper soft and lower hard strata, resulting in concentrated shear stress and severe local deformation of the supporting structure. The existing pressure yield structure cannot adjust the pressure yield after installation and cannot interact with the surrounding rock. Coordinate deformation.
A large-section tunnel combined pressure relief structure spanning soft and hard strata above and below is adopted, including inner and outer arch frames and hydraulic devices, connected through elastic deformations, and reinforced pressure relief devices and hydraulic cylinders are installed to realize hydraulic pressure adjustment to meet the initial requirements of the surrounding rock. Deformation and post-stabilization.
It achieves timely and efficient deformation restriction of weak surrounding rock, avoids damage to the inner support structure, meets the stable process deformation of surrounding rock, improves the pressure yield through hydraulic adjustment, and improves the support effect and flexibility. .
Smart Images

Figure CN221920996U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel support, in particular to a combined pressure-yielding structure of a large-section tunnel across an upper soft and lower hard stratum. Background Art
[0002] In recent years, transportation infrastructure has developed rapidly, and the construction mileage of tunnels has been increasing. During the tunnel construction process, the quality of the surrounding rock is the main reason for the failure of the tunnel construction support structure. For poor geology, surface radial grouting, advance grouting support or advance anchoring and other reinforcement methods are generally used in tunnel construction to carry out advance pre-support treatment. In the upper soft and lower hard strata, there is a problem that the upper soft stratum has a longer stabilization time than the lower hard stratum, and the stabilization distance is greater than the stabilization distance of the lower hard stratum. In addition, the time for the ground stress to be completely released is different, and shear stress concentration occurs at the stratified interface; due to the size effect, the surrounding rock effect of large-span tunnels is significantly amplified, which can easily lead to serious local deformation or even damage of the initial support structure.
[0003] The traditional construction method of a large-span tunnel that passes through soft upper and hard lower strata has the following problems:
[0004] First, when the existing grouting technology does not have the space and conditions for implementation, or the reinforcement effect is not ideal, the upper stratum is weak and difficult to stabilize itself, resulting in large stratum deformation, easy collapse, and difficult to achieve settlement control requirements. In addition, the soft rock stratum cannot converge and stabilize immediately after reinforcement, and deformation stabilization requires a long time. The tunnel is in a bad geological stage and the support structure must be constructed as soon as possible to close the ring as soon as possible. In order to prevent the deformation of the surrounding rock in the later stage from causing the support structure to fail, a yield support must be provided. However, the existing yield structure sets the yield in advance and cannot adjust the yield after installation. There is a problem of too large or too small yield, and it cannot coordinate deformation with the surrounding rock.
[0005] Second, there is a large shear stress at the layered interface. On the one hand, the loosening of the excavation causes a slight sliding of the layered interface, forming a dislocation; on the other hand, the difference in stiffness of the upper and lower surrounding rocks causes different deformations during the convergence process, and the stability distance of the upper soft stratum is greater than that of the lower hard stratum. The above reasons lead to the concentration of shear stress at the layered interface, thereby reducing the support effect and even shearing failure. When a large-span tunnel passes through such a stratum, the problem of severe local deformation of the support structure is further amplified. The existing support structure and construction method cannot meet the needs of such projects. Utility Model Content
[0006] In view of the above-mentioned deficiencies in the prior art, the utility model provides a combined pressure-yielding structure for a large-section tunnel across soft upper and hard lower strata with low cost and strong practicality.
[0007] In order to achieve the above-mentioned invention object, the technical solution adopted by the utility model is:
[0008] Provided is a combined pressure-yielding structure for a large-section tunnel spanning an upper soft and lower hard stratum, comprising an inner arch frame installed on the surface of the large-section tunnel, an outer arch frame arranged between the inner arch frame and the tunnel rock wall, a layer of elastic deformation body arranged between the outer arch frame and the inner arch frame, and the outer arch frame and the inner arch frame being staggeredly connected via the elastic deformation body; a plurality of hydraulic devices are evenly arranged on the outer arch frame, a reinforcement pressure-yielding device is arranged on the piston rod of the hydraulic device, the reinforcement pressure-yielding device comprises a grouting reinforcement casing, the grouting reinforcement casing is connected to the piston rod via an elastic connector, a pressure-yielding casing is arranged in the grouting reinforcement casing, a bearing body for bearing the weight of the rock stratum and the pulling force is arranged in the pressure-yielding casing, and the lower end of the bearing body is connected to the piston rod.
[0009] Furthermore, the hydraulic device is a hydraulic cylinder, an oil filling hole is arranged at the lower end of the hydraulic cylinder, and the hydraulic cylinder is connected to the overflow valve.
[0010] Furthermore, the hydraulic cylinder includes a main piston connecting rod connected to the elastic connecting member and the bearing body, the main piston connecting rod is arranged at the upper end of the hydraulic cylinder, and conversion piston connecting rods are arranged on both sides of the hydraulic cylinder.
[0011] Furthermore, the overflow valve is connected with a regulating pipe, which passes through the inner arch frame and extends into the large-section tunnel.
[0012] Furthermore, the elastic connecting part is a compression spring, and both ends of the compression spring are provided with force-bearing and limiting nuts, the nuts at both ends and the compression spring are all sleeved on the carrier, and the nuts are threadedly connected to the carrier; one end of the nut is fixed to the lower end of the pallet, the grouting reinforcement casing and the compression casing are both fixed on the pallet, and the carrier passes through the pallet.
[0013] Furthermore, a layer of inner waterproof board is provided on the inner surface of the inner arch frame, and enlarged ends are provided at both ends of the outer arch frame.
[0014] The beneficial effects of the utility model are:
[0015] The utility model fully follows the New Austrian Tunneling Method support principle by reinforcing the pressure-releasing device to work together. It allows a certain amount of deformation for the weak surrounding rock while limiting deformation in the early stage. Compared with the existing support method, it integrates pressure-releasing and reinforcement, and limits deformation more timely and efficiently. The combined pressure-releasing structure of the utility model is mainly used for the layered interface with soft upper and hard lower parts. By setting a double-layer arch frame structure and installing an elastic deformable body between the inner and outer arch frames, the inner and outer support structures can be displaced in an annular direction to avoid damage to the inner support structure.
[0016] The utility model adopts a double yielding structure, and the reinforcing yielding device meets the early deformation of the surrounding rock, and meets the yielding while reinforcing the soft rock; the hydraulic device meets the deformation amount of the surrounding rock in the later stabilization process, and at the same time converts the deformation pressure of the surrounding rock, forms a self-locking force arch along the outer arch frame, and further strengthens the support; the hydraulic device adopted by the utility model, by setting an adjusting rod, adjusts the liquid pressure in the later stage, changes the yielding amount, and improves the disadvantage of the existing yielding structure that the yielding amount cannot be adjusted after the construction is completed. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a structural diagram of the combined yielding structure of a large-section tunnel spanning soft upper and hard lower strata.
[0018] Figure 2 for Figure 1 Structural diagram of the enlarged portion A.
[0019] Figure 3 Structural diagram for reinforcing the pressure relief device.
[0020] Among them, 1-enlarged end, 2-outer arch frame, 3-inner arch frame, 4-reinforced pressure-relieving device, 5-hydraulic device, 6-elastic deformation body, 7-inner waterproof board, 41-bearing body, 42-grouting reinforcement casing, 43-pressure-relieving casing, 44-tray, 45-nut, 46-pressure-relieving spring, 51-conversion piston connecting rod, 52-overflow valve, 53-oil filling hole, 54-main piston connecting rod, 55-hydraulic cylinder, 8-adjusting pipe. DETAILED DESCRIPTION
[0021] The specific implementation methods of the utility model are described below to facilitate technical personnel in this technical field to understand the utility model, but it should be clear that the utility model is not limited to the scope of the specific implementation methods. For ordinary technical personnel in this technical field, as long as various changes are within the spirit and scope of the utility model defined and determined by the attached claims, these changes are obvious, and all utility model creations using the concept of the utility model are protected.
[0022] like Figure 1-Figure 3As shown, the combined pressure-yielding structure of a large-section tunnel across soft upper and hard lower strata of the present scheme includes an inner arch frame 3 installed on the surface of the large-section tunnel, an outer arch frame 2 is arranged between the inner arch frame 3 and the tunnel rock wall, a layer of elastic deformation body 6 is arranged between the outer arch frame 2 and the inner arch frame 3, and the outer arch frame 2 and the inner arch frame 3 are staggeredly connected through the elastic deformation body 6; a plurality of hydraulic devices 5 are evenly arranged on the outer arch frame 2, and a reinforcement pressure-yielding device 4 is arranged on the piston rod of the hydraulic device 5, and the reinforcement pressure-yielding device 4 includes a grouting reinforcement casing 42, and the grouting reinforcement casing 42 is connected to the piston rod through an elastic connector, and a pressure-yielding casing 43 is arranged in the grouting reinforcement casing 42, and a bearing body 41 that bears the weight of the rock stratum and the pulling force is arranged in the pressure-yielding casing 43, and the pulling force is the anchoring force applied after the slurry solidifies, and the lower end of the bearing body 41 is connected to the piston rod.
[0023] In this embodiment, the hydraulic device 5 is a hydraulic cylinder 55, the lower end of which is provided with an oil filling hole 53, and the hydraulic cylinder 55 is connected to the relief valve 52. The hydraulic cylinder 55 includes a main piston connecting rod 54 connected to the elastic connecting member and the carrier 41, the main piston connecting rod 54 is arranged at the upper end of the hydraulic cylinder 55, and conversion piston connecting rods 51 are arranged on both sides of the hydraulic cylinder 55. The relief valve 52 is connected with a regulating pipe 8 made of PVC material, and the regulating pipe 8 passes through the inner arch frame 3 and extends into the large-section tunnel.
[0024] The elastic connecting member is a compression spring 46, and both ends of the compression spring 46 are provided with nuts 45 for force and position limiting. The nuts 45 at both ends and the compression spring 46 are both sleeved on the carrier 41, and the nuts 45 are threadedly connected to the carrier 41; one end of the nut 45 is fixed to the lower end of the tray 44, the grouting reinforcement casing 42 and the compression casing 43 are both fixed on the tray, and the carrier 41 passes through the tray 44. The nuts 45 at the front and lower end of the tray 44 are mainly used to allow the force points and position limiting functions of the compression spring 46 during the compression process.
[0025] The inner surface of the inner arch 3 is provided with an inner waterproof board 7, which can prevent oil leakage from the overflow valve 52 to the tunnel drainage system and avoid environmental pollution; the outer surface of the inner arch 3 is provided with a layer of elastic deformation body 6; and the two ends of the outer arch 2 are respectively provided with enlarged end caps 1.
[0026] A rubber sleeve is provided between the piston connecting rod and the hydraulic cylinder 55 to enhance the sealing performance and prevent leakage of hydraulic oil; the pressure relief amount of the hydraulic device 5 satisfies the later deformation of the surrounding rock, an adjusting pipe 8 is reserved in advance at the relief valve 52, an adjusting rod is provided in the adjusting pipe 8, and the rotation of the extended adjusting rod changes the pressure of the relief valve 52, thereby achieving the purpose of adjusting the pressure relief amount.
[0027] The hydraulic device 5 sets a smaller hydraulic pressure in the early stage by reducing the spring deformation, so that the surrounding rock deforms to release the ground stress. In the later stage, strong support is formed by increasing the spring deformation to prevent collapse caused by excessive deformation.
[0028] The specific size of the reinforcement pressure-relieving device 4 is determined comprehensively based on the thickness of the upper soft rock, the deformation modulus of the soft rock and the settlement control requirements. Generally, it is required to meet the following requirements: the diameter of the bearing body 41 is in the range of 18mm to 28mm, and the length is set to 2m to 4m; the inner diameter of the grouting reinforcement casing 42 is in the range of 22mm to 32mm, and the length is set to 1m to 3m; the inner diameter of the pressure-relieving casing 43 is in the range of 20mm to 30mm, and the length is set to 0.5m to 1.5m.
[0029] The anchoring length of the carrier 41 is less than or equal to the critical anchoring length l c , critical anchorage length l c =max{l c1 ,l c2}; where l c2 is the critical anchoring length between the slurry and the rock mass in the tunnel, l c1 is the critical anchoring length between the carrier 41 and the slurry interface; Wherein, m is the axial force attenuation rate of the carrier 41; β a and β b are calculation coefficients, K a is the shear displacement stiffness coefficient of the interface between the carrier 41 and the slurry; d is the rod diameter of the carrier 41; E s is the elastic modulus of the carrier 41; K b is the shear displacement stiffness coefficient of the interface between slurry and rock mass, E m is the elastic modulus of the anchor body, E c is the elastic modulus of the paste, A c is the cross-sectional area of the slurry, A s is the cross-sectional area of the carrier, and D is the diameter of the drilled hole.
[0030] The utility model fully follows the New Austrian Tunneling Method support principle by reinforcing the pressure-releasing device 4 to cooperate with each other, and allows a certain deformation for the weak surrounding rock while limiting the deformation in the early stage. Compared with the existing support method, it integrates pressure-releasing and reinforcement, and limits the deformation more timely and efficiently. The combined pressure-releasing structure of the utility model is mainly used for the layered interface with soft upper and hard lower parts. By setting a double-layer arch frame structure and installing an elastic deformable body 6 between the inner and outer arch frames, the inner and outer support structures can be circumferentially displaced to avoid the damage of the inner support structure.
[0031] The utility model adopts a double yielding structure, and the reinforcing yielding device 4 meets the early deformation of the surrounding rock, and meets the yielding while reinforcing the soft rock; the hydraulic device 5 meets the deformation amount of the surrounding rock stabilization process in the later stage, and converts the deformation pressure of the surrounding rock, and forms a self-locking force arch along the outer arch frame 2, further strengthening the support; the hydraulic device 5 adopted in the utility model, by setting an adjusting rod, adjusts the liquid pressure in the later stage, changes the yielding amount, and improves the disadvantage of the existing yielding structure that the yielding amount cannot be adjusted after the construction is completed.
[0032] The main working principle of the utility model includes the following parts:
[0033] (1) Combined yielding principle: The first stage is to reinforce the yielding device 4 for reinforcement support. Its main function is to avoid deformation of the surrounding rock in a short period of time after excavation is completed. In this stage, grouting reinforcement is the main method, followed by yielding support, to ensure that the surrounding rock can fully exert its self-bearing capacity and limit large-scale displacement and deformation to prevent collapse. In the next stage, the yielding support is completed by the hydraulic device 5. The hydraulic device 5 is installed in combination with the outer arch frame 2 to form an outer support structure. In this stage, the displacement deformation in the stage where the stratum deformation tends to be stable, as well as the stress concentration phenomenon caused by the deformation difference between the upper and lower strata, are mainly targeted. Shear damage of the support structure is avoided by yielding.
[0034] (2) Self-locking reinforcement principle: The outer arch frame 2 is welded to the hydraulic device 5 to form the outer arch frame 2. The hydraulic device 5 changes the surrounding rock pressure generated by the stratum deformation into a circumferential force along the outer arch frame 2 by converting the piston connecting rod 51, thereby forming a self-locking force arch, strengthening the support effect of the outer arch frame 2, and protecting the inner support structure.
[0035] (3) Cooperative deformation principle: Figure 1 As shown, each reinforcement pressure-yielding device 4 is connected to the hydraulic device 5, and the pressure-yielding amount of the hydraulic device 5 can be reasonably adjusted according to the deformation of the surrounding rock, so that the entire pressure-yielding structure deforms accordingly with the deformation of the surrounding rock, perfectly matching the deformation of the surrounding rock.
[0036] (4) Principle of internal and external displacement: An elastic deformable body 6 is installed between the outer pressure-yielding structure and the inner arch frame 3. The characteristics of the deformable body can realize the circumferential displacement of the outer arch frame 2 and the inner arch frame 3, thereby avoiding the outer support structure affecting the inner support structure due to a small sliding of the upper soft and lower hard layer interface, thereby reducing the strong support effect of the inner support structure, and finally ensuring that the entire inner support structure is in a stable state.
Claims
1. A combined pressure-yielding structure for a large-section tunnel across soft upper and hard lower strata, characterized in that: It comprises an inner arch frame installed on the surface of a large-section tunnel, an outer arch frame is arranged between the inner arch frame and the tunnel rock wall, a layer of elastic deformation body is arranged between the outer arch frame and the inner arch frame, and the outer arch frame and the inner arch frame are staggeredly connected through the elastic deformation body; a plurality of hydraulic devices are evenly arranged on the outer arch frame, a reinforcement pressure-releasing device is arranged on the piston rod of the hydraulic device, the reinforcement pressure-releasing device comprises a grouting reinforcement casing, the grouting reinforcement casing is connected to the piston rod through an elastic connecting piece, a pressure-releasing casing is arranged in the grouting reinforcement casing, a bearing body for bearing the weight of the rock formation and the pulling force is arranged in the pressure-releasing casing, and the lower end of the bearing body is connected to the piston rod.
2. The combined pressure relief structure of a large-section tunnel across soft upper and hard lower strata according to claim 1 is characterized in that: The hydraulic device is a hydraulic cylinder, an oil filling hole is arranged at the lower end of the hydraulic cylinder, and the hydraulic cylinder is connected to a relief valve.
3. The combined pressure relief structure of a large-section tunnel across soft upper and hard lower strata according to claim 2 is characterized in that: The hydraulic cylinder comprises a main piston connecting rod connected with an elastic connecting member and a bearing body, wherein the main piston connecting rod is arranged at the upper end of the hydraulic cylinder, and conversion piston connecting rods are arranged on both sides of the hydraulic cylinder.
4. The combined pressure relief structure of a large-section tunnel across soft upper and hard lower strata according to claim 2 is characterized in that: The overflow valve is connected with a regulating pipe, which passes through the inner arch frame and extends into the large-section tunnel.
5. The combined pressure-relief structure of a large-section tunnel across soft upper and hard lower strata according to claim 1 is characterized in that: The elastic connecting part is a pressure-releasing spring, and nuts for bearing force and limiting are arranged at both ends of the pressure-releasing spring. The nuts and pressure-releasing springs at both ends are sleeved on the carrier, and the nuts are threadedly connected to the carrier. The nut at one end is fixed to the lower end of the pallet, and the grouting reinforcement casing and the pressure-releasing casing are fixed on the pallet, and the carrier passes through the pallet.
6. The combined pressure-yielding structure of a large-section tunnel across soft upper and hard lower strata according to claim 1 is characterized in that: The inner surface of the inner arch frame is provided with an inner waterproof board, and both ends of the outer arch frame are respectively provided with enlarged ends.