Draw shaft protective fence convenient to install

By designing the safety guardrail of the chute with anti-stone and anti-collision mechanisms, the problem of debris falling in when the chute mouth is not in use has been solved, and the shielding and sealing of the chute mouth and the buffering protection of the blocking rod have been realized to ensure the normal quality of mining equipment and materials. run.

CN221921059UInactive Publication Date: 2024-10-29任 阳阳
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420439189.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing chute guardrail is not in use, debris on the ground may fall into the chute from between the railings, affecting the normal operation of the mining equipment and the quality of the materials, which is more inconvenient.

Method used

A well guardrail is designed that includes a support rod, a blocking rod, a mounting rotating block, an anti-stone mechanism, a warning light, a clamping rod, a spring, an anti-stone mechanism, an anti-collision mechanism and a reflective strip. The baffle is covered by rotating the buckle. Slip well mouth to prevent debris from falling in, and achieve buffering protection through springs and reflective strips.

Benefits of technology

It effectively blocks and seals the entrance of the chute to prevent debris from falling in, ensuring the normal operation of the equipment and material quality. It also provides warning and buffer protection to avoid damage to the barrier rod.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221921059U_ABST
    Figure CN221921059U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of protective fences, in particular to a draw shaft protective fence convenient to install. The draw shaft protective guard convenient to install can shield and seal a draw shaft opening when the draw shaft opening is not used, and prevents sundries from falling into a draw shaft to affect normal operation of mine equipment and quality of materials. A draw shaft protective fence convenient to install comprises supporting rods, a blocking rod, first installation rotating blocks and the like, the supporting rods are arranged on the left side and the right side, the blocking rod is connected between the supporting rods, and the first installation rotating blocks are rotationally connected to the upper portion and the lower portion of the supporting rod on the left portion. By rotating the buckle, the buckle is separated from the baffle, the torsional spring recovers, the baffle is driven to rotate on the fixing block, the baffle covers the top of the draw shaft opening, and the effects that the draw shaft opening can be shielded and sealed when not used, and sundries are prevented from falling into the draw shaft to affect normal operation of mining equipment and quality of materials are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of guardrails, in particular to a chute guardrail which is easy to install. Background Art

[0002] A chute guardrail is a safety protection facility installed in mines, construction sites, etc. to prevent people or objects from falling from high chute openings. The function of the guardrail is to prevent accidents and ensure the safety of people and property.

[0003] The existing chute guardrail is installed on the ground of the chute mouth to prevent people and objects from falling from the chute mouth. However, when the chute mouth is not in use, debris on the ground may fall into the chute through the guardrails, affecting the normal operation of mining equipment and the quality of materials, which is inconvenient.

[0004] Therefore, a conveniently installed chute guardrail has been developed to block and seal the chute opening when it is not in use, thereby preventing debris from falling into the chute and affecting the normal operation of mining equipment and the quality of materials. Utility Model Content

[0005] In order to overcome the inconvenience of existing chute guardrails, when the chute opening is not in use, debris on the ground may fall into the chute through the guardrails, affecting the normal operation of mining equipment and the quality of materials, the utility model provides an easy-to-install chute guardrail that can block and close the chute opening when it is not in use, preventing debris from falling into the chute and affecting the normal operation of mining equipment and the quality of materials.

[0006] A chute guardrail which is easy to install comprises a support rod, a blocking rod, a first mounting rotating block, a second mounting rotating block and a stone prevention mechanism. The support rods are provided with left and right two, the blocking rod is connected between the support rods, the upper and lower parts of the left support rod are both rotatably connected to the first mounting rotating block, the upper and lower parts of the right support rod are both rotatably connected to the second mounting rotating block, and the support rods are provided with a stone prevention mechanism which can prevent ore from falling into the chute mouth.

[0007] Further explanation: there are also warning lights. The upper sides of the support rods are connected with warning lights. When the warning lights are on, people can be warned.

[0008] Further description, it also includes a clamping rod and a first spring. The second mounting rotating block is slidably connected to the clamping rod. The clamping rod is connected to the adjacent second mounting rotating block with a first spring. The first spring rebounds to reset the clamping rod and fix the first mounting rotating block and the second mounting rotating block.

[0009] Further explanation is that it also includes a stone-proof mechanism, which includes a fixed block, a baffle, a torsion spring and a buckle. The lower rear side of the support rod is connected to the fixed blocks, and the baffle is rotatably connected between the fixed blocks. The fixed blocks and the baffle are connected with torsion springs. The middle rear side of the baffle rod is rotatably connected with a buckle. The buckle is in contact with the baffle. At this time, the torsion spring is in a deformed state. The buckle is rotated to disengage from the baffle, so that the torsion spring is restored, driving the baffle to rotate on the fixed block, so that the baffle covers the top of the chute.

[0010] Further explanation is provided, and the anti-collision mechanism includes a second spring and an anti-collision plate. A plurality of anti-collision plates are slidably connected to the front side of the barrier rod, and a plurality of second springs are connected between the anti-collision plates and the barrier rod. When the barrier rod is hit, the hitting object first contacts the anti-collision plate, and the second spring is squeezed and contracted and then rebounds to buffer the impact force.

[0011] Further explanation: there are also reflective strips. The front sides of the anti-collision plates are connected with reflective strips. The reflective strips can remind people of the position of the barrier rod in dim light to avoid collision.

[0012] The beneficial effects of the utility model are as follows: 1. The utility model rotates the buckle to disengage the buckle from the baffle, so that the torsion spring is restored, and the baffle is driven to rotate on the fixed block, so that the baffle covers the top of the chute, so as to achieve the effect of covering and closing the chute when it is not in use, preventing debris from falling into the chute and affecting the normal operation of the mining equipment and the quality of the materials.

[0013] 2. The utility model buffers the impact force by causing the impact object to contact the anti-collision plate first when the barrier rod is impacted, and then the second spring is squeezed and contracted and then rebounds, thereby achieving the effect of buffering and protecting the barrier rod and preventing the barrier rod from being damaged by impact. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.

[0015] Figure 2 It is a partial three-dimensional structural schematic diagram of the utility model.

[0016] Figure 3 It is a three-dimensional structural schematic diagram of the stone protection mechanism of the utility model.

[0017] Figure 4 It is a schematic diagram of the three-dimensional structure of the anti-collision mechanism of the utility model.

[0018] Markings in the accompanying drawings: 1: support rod, 2: baffle rod, 3: first mounting rotating block, 4: warning light, 5: second mounting rotating block, 6: clamping rod, 7: first spring, 8: stone prevention mechanism, 81: fixing block, 82: baffle plate, 83: torsion spring, 84: buckle, 9: anti-collision mechanism, 91: second spring, 92: anti-collision plate, 93: reflective strip. DETAILED DESCRIPTION

[0019] The present invention will be further described below in conjunction with specific embodiments. The illustrative embodiments and descriptions of the present invention are used to explain the present invention but are not intended to limit the present invention.

[0020] A chute guardrail that is easy to install, such as Figure 1 and Figure 2 As shown, it includes a support rod 1, a blocking rod 2, a first mounting rotating block 3, a warning light 4, a second mounting rotating block 5, a clamping rod 6, a first spring 7 and a stone prevention mechanism 8. The support rod 1 has two left and right support rods, and the blocking rod 2 is connected between the support rods 1. The upper and lower parts of the left support rod 1 are both rotatably connected to the first mounting rotating block 3, and the upper side of the support rod 1 is connected to the warning light 4. The upper and lower parts of the right support rod 1 are both rotatably connected to the second mounting rotating block 5, and the second mounting rotating block 5 is slidably connected to the clamping rod 6. The clamping rod 6 is connected to the adjacent second mounting rotating block 5 with a first spring 7, and the support rod 1 is provided with a stone prevention mechanism 8.

[0021] like Figure 1 and Figure 3 As shown, it also includes a stone prevention mechanism 8, which includes a fixed block 81, a baffle 82, a torsion spring 83 and a buckle 84. The lower rear side of the support rod 1 is connected to the fixed block 81, the baffle 82 is rotatably connected between the fixed blocks 81, and the torsion spring 83 is connected between the fixed blocks 81 and the baffle 82. The middle rear side of the baffle rod 2 is rotatably connected to the buckle 84, and the buckle 84 is in contact with the baffle 82. At this time, the torsion spring 83 is in a deformed state.

[0022] When using the utility model, first, according to the size of the well mouth, the first installation rotating block 3 is engaged with the second installation rotating block 5 on the other group of support rods 1, and when engaged, the engaging rod 6 is pulled forward to move, and the first spring 7 is stretched. After the engaging is completed, the engaging rod 6 is reset by the first spring 7 to fix the first installation rotating block 3 and the second installation rotating block 5, so that the support rod 1 is spliced ​​to adapt to the size of the well mouth. Then, according to the shape of the well mouth, the angle of the support rod 1 is rotated and adjusted so that the support rod 1 surrounds the well mouth, and the well mouth is protected by the blocking rod 2. The warning light 4 lights up to warn people. When the well mouth is finished using, the buckle 84 can be rotated to disengage the buckle 84 from the baffle 82, so that the torsion spring 83 is restored, and the baffle 82 is driven to rotate on the fixing block 81, so that the baffle 82 covers the well mouth, thereby playing the role of being able to block and close the well mouth when it is not in use, preventing debris from falling into the well and affecting the normal operation of the mining equipment and the quality of the materials.

[0023] like Figure 1 and Figure 4 As shown, an anti-collision mechanism 9 is also included, which includes a second spring 91, an anti-collision plate 92 and a reflective strip 93. Four anti-collision plates 92 are slidably connected to the front side of the barrier bar 2. Three second springs 91 are connected between the anti-collision plates 92 and the barrier bar 2, and reflective strips 93 are connected to the front sides of the anti-collision plates 92.

[0024] The anti-collision mechanism 9 of the device can prevent the barrier rod 2 from being damaged by impact. When the barrier rod 2 is impacted, the impacting object first contacts the anti-collision plate 92, and the second spring 91 is squeezed and contracted and then rebounds to buffer the impact force. The reflective strip 93 can remind people of the position of the barrier rod 2 when the light is dim to avoid impact, thereby playing a role in buffering and protecting the barrier rod 2 and preventing the barrier rod 2 from being damaged by impact.

[0025] It should be understood that the above description is only for exemplary purposes and is not intended to limit the present invention. Those skilled in the art will understand that variations of the present invention will be included within the scope of the claims herein.

Claims

1. A chute guardrail that is easy to install, characterized by: The invention comprises a support rod (1), a baffle rod (2), a first installation rotating block (3), a second installation rotating block (5) and a stone prevention mechanism (8); the support rod (1) has two left and right support rods, the baffle rod (2) is connected between the support rods (1), the upper and lower parts of the left support rod (1) are both rotatably connected to the first installation rotating block (3), the upper and lower parts of the right support rod (1) are both rotatably connected to the second installation rotating block (5), and the support rod (1) is provided with a stone prevention mechanism (8) capable of preventing ore from falling into the chute; the stone prevention mechanism (8) comprises a fixing block (81), a baffle plate (82), a torsion spring (83) and a buckle (84) ), the lower rear side of the support rod (1) is connected with a fixed block (81), a baffle (82) is rotatably connected between the fixed blocks (81), a torsion spring (83) is connected between the fixed block (81) and the baffle (82), and a buckle (84) is rotatably connected to the rear side of the middle part of the baffle rod (2), the buckle (84) is in contact with the baffle (82), at this time the torsion spring (83) is in a deformed state, the buckle (84) is rotated to make the buckle (84) disengage from the baffle (82), so that the torsion spring (83) is restored, and the baffle (82) is driven to rotate on the fixed block (81), so that the baffle (82) covers the top of the chute.

2. The conveniently installed chute guardrail according to claim 1 is characterized in that: It also includes a warning light (4), and the upper side of the support rod (1) is connected to the warning light (4). When the warning light (4) is lit, it can serve as a warning reminder to people.

3. The conveniently installed chute guardrail according to claim 1 is characterized by: It also includes a clamping rod (6) and a first spring (7). The second installation rotating block (5) is slidably connected to the clamping rod (6). The clamping rod (6) is connected to the adjacent second installation rotating block (5) with the first spring (7). The first spring (7) rebounds to reset the clamping rod (6) to fix the first installation rotating block (3) and the second installation rotating block (5).

4. The conveniently installed chute guardrail according to claim 1 is characterized by: The anti-collision mechanism (9) further comprises a second spring (91) and an anti-collision plate (92). The front side of the blocking rod (2) is slidably connected to a plurality of anti-collision plates (92). A plurality of second springs (91) are connected between the anti-collision plates (92) and the blocking rod (2). When the blocking rod (2) is impacted, the impacting object first contacts the anti-collision plate (92), and the second spring (91) is squeezed and contracted and then rebounds, thereby buffering the impact force.

5. The conveniently installed chute guardrail according to claim 4 is characterized in that: The anti-collision plate (92) also includes a reflective strip (93). The front side of the anti-collision plate (92) is connected with the reflective strip (93). The reflective strip (93) can remind people of the position of the barrier rod (2) when the light is dim, so as to avoid collision.