Whole bathroom base plate with side leakage structure
By designing an integrated bathroom chassis with side leakage structure, the problems of difficulty in maintenance, complex installation and poor drainage performance in the existing technology are solved, efficient drainage and simple maintenance are achieved, and the bathroom space is kept dry and overall stability is improved.
Patent Information
- Application Number
- CN202323540404.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2033-12-25
Smart Images

Figure CN221949703U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of integrated bathrooms, in particular to an integrated bathroom chassis with a side leakage structure. Background Art
[0002] Domestic hotels, hospitals, ships, and quick-installed houses have been using a large number of integrated bathrooms, which have developed rapidly because they can be assembled on site. With the increasing popularity of fine-decorated houses, and the introduction of industrialized, low-carbon and environmentally friendly housing policy guidelines, and the fact that integrated bathrooms have surpassed traditional bathrooms in a sense, its integrated characteristics integrate every part of the bathroom space into one, which is pleasing to the eye and pleasant to the heart. The integrated bathroom chassis is waterproof and leak-proof, has a dead-angle structure that is easy to clean, and is suitable for engineering construction. It is gradually entering every household.
[0003] In the prior art, the integrated bathroom is separated into dry and wet areas, separating the washbasin, toilet and shower area. The dry area generally refers to the washbasin, and the wet area generally refers to the shower area. The toilet is placed in the dry area or the wet area as needed. The wall panels of the integrated bathroom are vertically installed on the side of the base plate, and drainage holes are opened on the base plate to discharge sewage through the drainage holes at the bottom.
[0004] The sink and toilet are the most used of the three. Separating the two allows two people to use them at the same time without disturbing each other, which is the most efficient. Placing the toilet in the wet area is convenient for cleaning. Urine marks will be left on the floor or seat, and there will be dirt in the dead corners of the toilet. Placing it in the wet area is convenient for cleaning and can be directly cleaned with a shower head.
[0005] The above-mentioned integrated bathroom chassis with a bottom drainage structure has the following defects: difficult maintenance, the drainage structure is prone to accumulation of dirt and debris, which can easily lead to blockage of the drainage pipe, requiring frequent cleaning and maintenance, and the bottom drainage structure is not conducive to cleaning and maintenance; difficult installation, because the bottom of the integrated bathroom chassis is provided with a drainage structure, the installation process may be more complicated and difficult, requiring more professional knowledge and skills; the drainage performance is slightly poor, the bottom drainage structure cannot guarantee a high drainage speed, which can easily lead to excessive water accumulation on the ground, which is not conducive to keeping the bathroom space dry.
[0006] The existing integral bathroom chassis with a side leakage structure also has the defects of poor drainage and easy accumulation of water on the ground, which poses a risk of slipping and reduces the stability and durability of the integral bathroom chassis. Utility Model Content
[0007] The technical problem to be solved by the utility model is to provide an integral bathroom chassis with a side leakage structure which has a reasonable structure, is easy to install and maintain, has strong drainage performance and is conducive to keeping the bathroom space dry, in view of the deficiencies in the above-mentioned prior art.
[0008] In order to solve the above technical problems, the technical solution of the utility model is: an integral bathroom chassis with a side leakage structure, including a bottom plate, a baffle plate, a wall panel mounting portion, a toilet mounting position and a floor drain mounting position, the bottom plate is horizontally arranged and laid on the upper end of the square pipe, and a first bottom plate, a second bottom plate and a third bottom plate are arranged from left to right in sequence, and the heights gradually decrease, an upwardly protruding first partition step is arranged between the first bottom plate and the second bottom plate, an upwardly protruding second partition step is arranged between the second bottom plate and the third bottom plate, the first partition step and the second partition step have the same shape, and the upper ends of the first bottom plate, the second bottom plate and the third bottom plate are all A floor tile laying position is provided for laying floor tiles, the floor tile laying surface of the first bottom plate is flush with the first partition step, the floor tile laying surface of the second bottom plate is lower than the first partition step and flush with the second partition step, the baffle is vertically arranged on the outer periphery of the first bottom plate, the second bottom plate and the third bottom plate and extends upward, the wall panel mounting portion is arranged on the inner periphery of the baffle for installing the wall panel, the toilet mounting position is arranged on the right side of the middle part of the second bottom plate, the floor drain mounting position is arranged at the end of the third bottom plate on the right side of the rear end of the toilet mounting position, and the lower end surface of the floor drain mounting position is lower than the floor tile laying surface of the surrounding third bottom plate.
[0009] As a further elaboration of the present invention:
[0010] Preferably, the inner peripheries of the first bottom plate and the second bottom plate are both provided with reinforcing clamping plates for enhancing the structural strength of the first bottom plate and the second bottom plate.
[0011] Preferably, the outer periphery of the baffle plate is vertically flush with the first bottom plate, the second bottom plate and the third bottom plate, the width of the baffle plate is 5.0 mm to 5.5 mm, and the height of the baffle plate is 18.5 mm to 21.5 mm.
[0012] Preferably, the width of the first partition step and the second partition step are both 4.5mm~5.5mm, and the height from the upper end surface of the first partition step to the finished surface of the floor tiles at the left end of the second bottom plate is the same as the height from the upper end surface of the second partition step to the finished surface of the floor tiles at the left end of the third bottom plate, both of which are 18.5mm~21.5mm.
[0013] Preferably, the toilet installation position includes two toilet fixing seats, which are FRP toilet fixing seats with a circular cross-section. The diameter of the toilet fixing seats is 34.5mm~37.5mm, the centers of the two toilet fixing seats are 178.5mm~181.5mm apart, the height of the toilet fixing seats above the finished surface of the floor tiles is 3.5mm~6.5mm, and the height of the toilet fixing seats is 23.5mm~26.5mm.
[0014] Preferably, the floor drain installation position includes a floor drain block installation position, a first water discharge connection part and a second water discharge connection part from left to right. The floor drain block installation position is used to install a floor drain block. The side cross-section of the first water discharge connection part is circular, and it is a PVC first water discharge connection part. An FRP wrapping part is provided on its outer periphery to enhance its structural strength. The shape of the second water discharge connection part matches that of the first water discharge connection part, and its diameter is larger than that of the first water discharge connection part, and it is used to connect an external water discharge pipe.
[0015] Preferably, the left and right width of the first bottom plate is 841.0mm~846.0mm, the left and right width of the second bottom plate is 1143.0mm~1148.0mm, the left and right width of the first bottom plate is 123.0mm~128.0mm, the front and back length of the first bottom plate and the second bottom plate is 877.0mm~880.0mm, and the front and back length of the third bottom plate is 752.0mm~755.0mm.
[0016] Preferably, the wall panel mounting part includes a first wall panel mounting part and a second wall panel mounting part, the first wall panel mounting part is arranged at the left end of the first base plate and the inner periphery of the baffle plate at the front end of the first base plate, the second base plate and the third base plate, the second wall panel mounting part is arranged at the rear end of the first base plate, the second base plate and the third base plate and the inner periphery of the baffle plate at the right end of the second base plate and the third base plate, the width of the second wall panel mounting part is greater than the width of the first wall panel mounting part, the width of the first wall panel mounting part is 7.5mm~10.5mm, the height from the upper end surface of the first wall panel mounting part at the far left to the finished surface of the floor tiles is 28.5mm~31.5mm, the width of the second wall panel mounting part is 21.5mm~24.5mm, and the height from the upper end surface of the second wall panel mounting part at the far right to the finished surface of the floor tiles is 93.5mm~96.5mm.
[0017] Preferably, a washbasin mounting position is provided in the middle of the first bottom plate for mounting a washbasin.
[0018] Preferably, the first bottom plate, the second bottom plate, the third bottom plate, the baffle plate, the first wall panel mounting portion and the second wall panel mounting portion are an integrated structure.
[0019] The beneficial effects of the utility model are:
[0020] First, the floor drain installation position of the utility model is arranged at the end of the third bottom plate on the right side of the rear end of the toilet installation position, and the lower end surface of the floor drain installation position is lower than the finished surface of the floor tiles of the surrounding third bottom plate. A side leakage structure is adopted to discharge sewage. The side leakage structure has good drainage performance, can effectively improve the drainage speed, avoid excessive water accumulation, and keep the bathroom space dry.
[0021] Secondly, the floor drain installation position of the utility model includes a floor drain block installation position, a first water discharge connection part and a second water discharge connection part from left to right. The floor drain block installation position is used to install a floor drain block. The side cross-section of the first water discharge connection part is circular, and it is a PVC first water discharge connection part. An FRP wrapping part is provided on its outer periphery to enhance its structural strength. The shape of the second water discharge connection part matches the first water discharge connection part, and its diameter is larger than that of the first water discharge connection part. It is used to connect an external water discharge pipe, has the effects of high structural strength, simple installation and maintenance, is easy to clean and maintain, and the installation process is simpler than the bottom drain structure. Once a fault occurs, it is convenient to repair and the maintenance cost is low.
[0022] Thirdly, the bottom plate of the utility model is provided with a first bottom plate, a second bottom plate and a third bottom plate in sequence from left to right, and the heights gradually decrease; a first partition step protruding upward is provided between the first bottom plate and the second bottom plate, a second partition step protruding upward is provided between the second bottom plate and the third bottom plate, the first partition step and the second partition step are of the same shape, floor tile laying positions are provided at the upper ends of the first bottom plate, the second bottom plate and the third bottom plate for laying floor tiles, the floor tile laying finished surface of the first bottom plate is flush with the first partition step, the floor tile laying finished surface of the second bottom plate is lower than the first partition step and flush with the second partition step, sewage flows from left to right, has the effect of fast water flow speed and quick drying, can reduce dead angles, facilitate cleaning, and help keep the bathroom space dry. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0024] Figure 2 for Figure 1 Schematic diagram of the cross-section along the AA direction.
[0025] Figure 3 for Figure 2 The enlarged structural diagram of part B is shown in the figure.
[0026] Figure 4 for Figure 2 Schematic diagram of the enlarged structure of part C in the middle.
[0027] Figure 5 for Figure 2 The enlarged structural diagram of part D in the middle.
[0028] Figure 6 for Figure 1 Schematic diagram of the cross-section in the EE direction.
[0029] Figure 7 for Figure 1 Schematic diagram of the cross-section in the FF direction.
[0030] Figure 8 for Figure 7Schematic diagram of the enlarged structure of part G in the middle.
[0031] Fig. 9 This is a schematic diagram of the arrangement of the square tubes in Example 1.
[0032] Fig.10 for Fig. 9 Schematic diagram of the cross-section along the HH direction.
[0033] In the figure: 1. square tube; 2. baffle plate; 31. first wall panel installation part; 32. second wall panel installation part; 4. toilet installation position; 5. toilet fixing seat; 6. floor drain installation position; 7. first bottom plate; 8. second bottom plate; 9. third bottom plate; 10. first partition step; 11. second partition step; 12. floor tile laying finish surface; 13. reinforced plywood; 14. floor drain block installation position; 15. first drainage connection part; 16. second drainage connection part. DETAILED DESCRIPTION
[0034] The structural principle and working principle of the utility model are further described in detail below with reference to the accompanying drawings. Embodiment 1:
[0035] like Figures 1 to 10 As shown, the utility model is an integral bathroom chassis with a side leakage structure, including a bottom plate, a baffle plate 2, a wall panel mounting portion, a toilet mounting position 4 and a floor drain mounting position 6. The bottom plate is horizontally arranged and laid on the upper end of the square pipe 1, as shown in FIG. Figure 9-10 As shown, the square tube 1 in this embodiment is a 30*30mm square tube, including three arranged horizontally on the left and right and five arranged vertically on the front and back. The bottom plate is provided with a first bottom plate 7, a second bottom plate 8 and a third bottom plate 9 from left to right, and the height gradually decreases. A first partition step 10 protruding upward is provided between the first bottom plate 7 and the second bottom plate 8, and a second partition step 11 protruding upward is provided between the second bottom plate 8 and the third bottom plate 9. The first partition step 10 and the second partition step 11 have the same shape. The upper ends of the first bottom plate 7, the second bottom plate 8 and the third bottom plate 9 are all provided with floor tile laying positions for laying floor tiles. The floor of the first bottom plate 7 The finished brick laying surface 12 is flush with the first partition step 10, the finished brick laying surface 12 of the second bottom plate 8 is lower than the first partition step 10 and is flush with the second partition step 11, the baffle plate 2 is vertically arranged on the outer periphery of the first bottom plate 7, the second bottom plate 8 and the third bottom plate 9 and extends upward, the wall panel mounting portion is arranged on the inner periphery of the baffle plate 2 for installing the wall panel, the toilet mounting position 4 is arranged on the right side of the middle part of the second bottom plate 8, the floor drain mounting position 6 is arranged at the end of the third bottom plate 9 on the right side of the rear end of the toilet mounting position 4, and the lower end surface of the floor drain mounting position 6 is lower than the finished brick laying surface 12 of the surrounding third bottom plate 9.
[0036] like Figure 2 to Figure 6As shown, the inner peripheries of the first bottom plate 7 and the second bottom plate 8 are both provided with reinforcing clamping plates 13 for enhancing the structural strength of the first bottom plate 7 and the second bottom plate 8 .
[0037] like Figure 2 , Figure 3 , Figure 5 , Figure 8 As shown, the outer periphery of the baffle plate 2 is vertically flush with the first bottom plate 7, the second bottom plate 8 and the third bottom plate 9, the width of the baffle plate 2 is 5.0 mm to 5.5 mm, and the height of the baffle plate 2 is 18.5 mm to 21.5 mm. In this embodiment, the width of the baffle plate 2 is 5.0 mm, and the height of the baffle plate 2 is 20.0 mm.
[0038] like Figure 1-2 , Figure 4-5 As shown, the width of the first partition step 10 and the second partition step 11 are both 4.5mm to 5.5mm, and the height from the upper end surface of the first partition step 10 to the finished floor tile paving surface 12 at the left end of the second bottom plate 8 is the same as the height from the upper end surface of the second partition step 11 to the finished floor tile paving surface 12 at the left end of the third bottom plate 9, both of which are 18.5mm to 21.5mm. In this embodiment, the width of the first partition step 10 and the second partition step 11 are both 5.0mm, and the height from the upper end surface of the first partition step 10 to the finished floor tile paving surface 12 at the left end of the second bottom plate 8 is the same as the height from the upper end surface of the second partition step 11 to the finished floor tile paving surface 12 at the left end of the third bottom plate 9 is 20.0mm.
[0039] like Figure 1 , Figure 6 As shown, the toilet installation position 4 includes two toilet fixing seats 5, the toilet fixing seats 5 are FRP toilet fixing seats 5, the cross section is circular, the diameter of the toilet fixing seats 5 is 34.5mm-37.5mm, the centers of the two toilet fixing seats 5 are 178.5mm-181.5mm apart, the height of the toilet fixing seats 5 above the floor tile paving surface 12 is 3.5mm-6.5mm, and the height of the toilet fixing seats 5 is 23.5mm-26.5mm. In this embodiment, the diameter of the toilet fixing seat 5 is 36.0mm, the centers of the two toilet fixing seats 5 are 180.0mm apart, the height of the toilet fixing seat 5 above the floor tile paving surface 12 is 5.0mm, and the height of the toilet fixing seat 5 is 25.0mm.
[0040] like Figure 1-2 , Figure 5 , Figure 7 to Figure 10As shown, the floor drain installation position 6 includes a floor drain block installation position 14, a first water discharge connection part 15 and a second water discharge connection part 16 from left to right. The floor drain block installation position 14 is used to install a floor drain block. The side cross-section of the first water discharge connection part 15 is circular, and is a PVC first water discharge connection part 15. An FRP wrapping part is provided on its outer periphery to enhance its structural strength. The second water discharge connection part 16 matches the first water discharge connection part 15 in shape, and has a diameter greater than that of the first water discharge connection part 15, and is used to connect an external water discharge pipe.
[0041] Further, the left-right width of the first bottom plate 7 is 841.0 mm to 846.0 mm, the left-right width of the second bottom plate 8 is 1143.0 mm to 1148.0 mm, the left-right width of the first bottom plate 7 is 123.0 mm to 128.0 mm, the front-to-back length of the first bottom plate 7 and the second bottom plate 8 is 877.0 mm to 880.0 mm, and the front-to-back length of the third bottom plate 9 is 752.0 mm to 755.0 mm. In this embodiment, the left-right width of the first bottom plate 7 is 843.0 mm, the left-right width of the second bottom plate 8 is 1145.0 mm, the left-right width of the first bottom plate 7 is 125.0 mm, the front-to-back length of the first bottom plate 7 and the second bottom plate 8 is 878.0 mm, and the front-to-back length of the third bottom plate 9 is 753.0 mm.
[0042] like Figure 1 to Figure 3 , Figure 5 , Figure 7 to Figure 9 As shown, the wall panel mounting portion includes a first wall panel mounting portion 31 and a second wall panel mounting portion 32. The first wall panel mounting portion 31 is arranged at the left end of the first bottom plate 7 and the inner periphery of the baffle plate 2 at the front end of the first bottom plate 7, the second bottom plate 8 and the third bottom plate 9. The second wall panel mounting portion 32 is arranged at the rear end of the first bottom plate 7, the second bottom plate 8 and the third bottom plate 9 and the inner periphery of the baffle plate 2 at the right end of the second bottom plate 8 and the third bottom plate 9. The width of the second wall panel mounting portion 32 is greater than that of the first wall panel mounting portion 31. The width of the wall panel mounting portion 31, the width of the first wall panel mounting portion 31 is 7.5mm-10.5mm, the height from the upper end surface of the leftmost first wall panel mounting portion 31 to the finished floor tile laying surface 12 is 28.5mm-31.5mm, the width of the second wall panel mounting portion 32 is 21.5mm-24.5mm, and the height from the upper end surface of the rightmost second wall panel mounting portion 32 to the finished floor tile laying surface 12 is 93.5mm-96.5mm. In this embodiment, the width of the first wall panel mounting portion 31 is 9.0mm, the height from the upper end surface of the leftmost first wall panel mounting portion 31 to the finished floor tile laying surface 12 is 30.0mm, the width of the second wall panel mounting portion 32 is 23.0mm, and the height from the upper end surface of the rightmost second wall panel mounting portion 32 to the finished floor tile laying surface 12 is 95.0mm.
[0043] Furthermore, a wash basin installation position (not shown in the figure) is provided in the middle of the first bottom plate 7 for installing a wash basin. The first bottom plate 7, the second bottom plate 8, the third bottom plate 9, the baffle plate 2, the first wall plate installation portion 31 and the second wall plate installation portion 32 are an integrated structure.
[0044] The embodiments described with reference to the accompanying drawings are exemplary and intended to be used to explain the present application, and should not be construed as limiting the present application. In the description of the present application, it should be understood that the terms "front", "rear", "left", "right", "upper", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be construed as limiting the present application.
[0045] The above is only a preferred embodiment of the present invention. Any slight modification, equivalent changes and modifications made to the above embodiments according to the technical solution of the present invention are within the scope of the technical solution of the present invention.
Claims
1. An integral bathroom chassis with a side leakage structure, Features: The utility model comprises a bottom plate, a baffle plate, a wall plate mounting part, a toilet mounting position and a floor drain mounting position, wherein the bottom plate is horizontally arranged and laid on the upper end of the square tube, and a first bottom plate, a second bottom plate and a third bottom plate are arranged in sequence from left to right, and the heights gradually decrease, a first partition step protruding upward is arranged between the first bottom plate and the second bottom plate, a second partition step protruding upward is arranged between the second bottom plate and the third bottom plate, the first partition step and the second partition step have the same shape, and floor tile laying positions are arranged on the upper ends of the first bottom plate, the second bottom plate and the third bottom plate for laying floor tiles, and the first bottom plate The finished surface of the floor tiles is flush with the first partition step, the finished surface of the floor tiles of the second bottom plate is lower than the first partition step and flush with the second partition step, the baffle is vertically arranged on the outer periphery of the first bottom plate, the second bottom plate and the third bottom plate and extends upward, the wall panel mounting portion is arranged on the inner periphery of the baffle for installing the wall panel, the toilet mounting position is arranged on the right side of the middle part of the second bottom plate, the floor drain mounting position is arranged at the end of the third bottom plate on the right side of the rear end of the toilet mounting position, and the lower end surface of the floor drain mounting position is lower than the finished surface of the floor tiles of the surrounding third bottom plate.
2. The integrated bathroom chassis with a side leakage structure according to claim 1, Features: The inner peripheries of the first bottom plate and the second bottom plate are both provided with reinforcing clamping plates for enhancing the structural strength of the first bottom plate and the second bottom plate.
3. The integrated bathroom chassis with a side leakage structure according to claim 2, Features: The outer periphery of the baffle plate is vertically flush with the first bottom plate, the second bottom plate and the third bottom plate, the width of the baffle plate is 5.0 mm to 5.5 mm, and the height of the baffle plate is 18.5 mm to 21.5 mm.
4. The integrated bathroom chassis with a side leakage structure according to claim 3, Features: The width of the first partition step and the second partition step are both 4.5mm~5.5mm, and the height from the upper end surface of the first partition step to the finished surface of the floor tiles at the left end of the second bottom plate is the same as the height from the upper end surface of the second partition step to the finished surface of the floor tiles at the left end of the third bottom plate, both of which are 18.5mm~21.5mm.
5. The integrated bathroom chassis with a side leakage structure according to claim 4, Features: The toilet installation position includes two toilet fixing seats, which are FRP toilet fixing seats with a circular cross-section. The diameter of the toilet fixing seats is 34.5mm~37.5mm, the centers of the two toilet fixing seats are 178.5mm~181.5mm apart, the height of the toilet fixing seats above the finished surface of the floor tiles is 3.5mm~6.5mm, and the height of the toilet fixing seats is 23.5mm~26.5mm.
6. The integrated bathroom chassis with a side leakage structure according to claim 5, Features: The floor drain installation position includes, from left to right, a floor drain block installation position, a first water discharge connection part, and a second water discharge connection part. The floor drain block installation position is used to install a floor drain block. The side cross-section of the first water discharge connection part is circular, and it is a PVC first water discharge connection part. An FRP wrapping part is provided on its outer periphery to enhance its structural strength. The shape of the second water discharge connection part matches that of the first water discharge connection part, and its diameter is larger than that of the first water discharge connection part, and it is used to connect an external water discharge pipe.
7. The integrated bathroom chassis with a side leakage structure according to claim 6, Features: The left and right width of the first bottom plate is 841.0mm~846.0mm, the left and right width of the second bottom plate is 1143.0mm~1148.0mm, the left and right width of the first bottom plate is 123.0mm~128.0mm, the front and back length of the first bottom plate and the second bottom plate is 877.0mm~880.0mm, and the front and back length of the third bottom plate is 752.0mm~755.0mm.
8. The integrated bathroom chassis with a side leakage structure according to claim 7, Features: The wall panel mounting part includes a first wall panel mounting part and a second wall panel mounting part. The first wall panel mounting part is arranged at the left end of the first base plate and the inner periphery of the baffle plate at the front end of the first base plate, the second base plate and the third base plate. The second wall panel mounting part is arranged at the rear ends of the first base plate, the second base plate and the third base plate and the inner periphery of the baffle plate at the right ends of the second base plate and the third base plate. The width of the second wall panel mounting part is greater than the width of the first wall panel mounting part. The width of the first wall panel mounting part is 7.5mm~10.5mm, and the height from the upper end surface of the leftmost first wall panel mounting part to the finished surface of the floor tiles is 28.5mm~31.5mm. The width of the second wall panel mounting part is 21.5mm~24.5mm, and the height from the upper end surface of the rightmost second wall panel mounting part to the finished surface of the floor tiles is 93.5mm~96.5mm.
9. The integrated bathroom chassis with a side leakage structure according to claim 8, Features: A washbasin installation position is provided in the middle of the first bottom plate for installing a washbasin.
10. The integrated bathroom chassis with a side leakage structure according to any one of claims 8 to 9, Features: The first bottom plate, the second bottom plate, the third bottom plate, the baffle plate, the first wall plate mounting portion and the second wall plate mounting portion are an integrated structure.
