Building engineering crushing device
By installing a filtration mechanism and a pressurized spraying system in the construction waste crushing device, the problems of dust discharge and water waste have been solved, achieving health protection and resource conservation.
Patent Information
- Application Number
- CN202420209037.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-29
AI Technical Summary
During the crushing of construction waste, the dust generated is discharged directly through the feed inlet, affecting the health of workers. In addition, the spray dust suppression method wastes water resources or clogs the spray nozzles.
A filtration system separates dust and debris, and a booster pump sprays the filtered water into the crushing area to prevent dust from escaping.
It effectively prevents dust from escaping, protects the health of staff, and saves water resources while avoiding clogging of the shower heads.
Smart Images

Figure CN221951296U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of crushing devices, and in particular to a crushing device for construction engineering. Background Art
[0002] A large amount of construction waste is often generated in construction projects. The construction waste here is solid waste generated during the construction, reconstruction, expansion or demolition of buildings. According to the source of construction waste, it can be divided into construction waste and demolition waste.
[0003] In the process of crushing construction waste, a lot of dust will be generated. The dust is directly discharged through the feed port, which will be directly inhaled into the lungs of workers, which may affect their health. Spraying is commonly used to reduce dust. However, if the spraying device is connected to a water source, a lot of water resources will be wasted. If recycled, dust and small-volume garbage after crushing may clog the spray head. Therefore, those skilled in the art provide a construction engineering crushing device to solve the problems raised in the above background technology. Utility Model Content
[0004] In order to solve the problem that a large amount of dust is generated in the process of crushing construction waste, and the dust is directly discharged through the feed port, which will be directly inhaled into the lungs of the staff and may affect the health of the staff, it is common to use spraying to reduce dust. However, if the spraying device is connected to a water source, a large amount of water resources will be wasted. If recycled, the dust and the smaller garbage after crushing may clog the spray head. The present application provides a construction engineering crushing device.
[0005] The present application provides a construction engineering crushing device that adopts the following technical solution:
[0006] A construction engineering crushing device comprises a crushing box, a feed port is arranged at the top of the crushing box, feed plates are fixedly installed on both sides of the feed port, and the two feed plates are arranged obliquely downward, two electric crushing rollers are fixedly installed on the top of the inside of the crushing box, and the two electric crushing rollers are arranged at the bottom ends of two feed plates, a first filter mechanism is installed in the middle of the crushing box, a second filter mechanism is installed at the bottom of the crushing box, and a spray mechanism is fixedly installed on the top of the feed port.
[0007] Preferably, the first filtering mechanism comprises two filter plates, one ends of the two filter plates are fixedly connected to each other, and discharge ports are provided on both sides of the crushing box.
[0008] Preferably, the other ends of the two filter plates are respectively mounted on the two discharge ports by bolts, and the two filter plates are arranged obliquely downward from the connection between the two filter plates to the two discharge ports.
[0009] Preferably, the second filtering mechanism comprises a filter barrel, which is fixedly mounted at the bottom end of the inner side of the crushing box, and a collecting barrel is threadedly mounted on the top end of the filter barrel, and collecting plates are fixedly mounted on both sides of the collecting barrel, and the two collecting plates are arranged obliquely downward from one end of the collecting plate to the filter barrel.
[0010] Preferably, a first filter cartridge and a second filter cartridge are installed on one side from top to bottom inside the filter barrel, and a filter bag is installed between the first filter cartridge and the second filter cartridge.
[0011] Preferably, the spraying mechanism includes a mounting plate, the mounting plate is fixedly mounted on the top of the feed port, a first connecting pipe is fixedly mounted on the top of the mounting plate, a spray head is connected and mounted on the bottom end of the first connecting pipe, and the spray head is arranged at the bottom end of the mounting plate.
[0012] Preferably, the spraying mechanism also includes a booster pump, which is fixedly installed on one side of the bottom of the crushing box, the water outlet of the booster pump is connected to the first connecting pipe, the water inlet of the booster pump is connected to the second connecting pipe, and one end of the second connecting pipe is connected to the bottom of the filter barrel.
[0013] In summary, this application includes the following beneficial technical effects:
[0014] 1. The first filtering mechanism is provided to facilitate filtering the crushed garbage through the two filtering plates, and to enable the filtered garbage to be discharged through the discharge port, thereby preventing large garbage from falling into the second filtering mechanism and causing blockage of the second filtering mechanism;
[0015] 2. The second filter mechanism is set up to facilitate the collection of water and filtered garbage through the collecting plate and the collecting barrel, and the water and garbage are separated through the first filter barrel, the second filter barrel and the filter bag, so as to prevent the garbage from entering the filter barrel and causing the clogging of the spraying mechanism;
[0016] 3. Through the spraying mechanism, the booster pump pumps the water in the filter barrel into the nozzle through the first connecting pipe and the second connecting pipe, and the nozzle sprays, thereby preventing the dust generated by the electric crushing roller from floating out through the feed port when it is working, causing an impact on the health of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of a construction engineering crushing device in an embodiment of the present application;
[0018] Figure 2 is a cross-sectional view of a construction engineering crushing device in an embodiment of the present application;
[0019] Figure 3 It is a construction engineering crushing device in the embodiment of the present application. Figure 2 The structural diagram at A in the middle;
[0020] Figure 4 It is a structural schematic diagram of a second filtering mechanism of a construction engineering crushing device in an embodiment of the present application.
[0021] Explanation of the reference numerals: 1. Crushing box; 2. Feed port; 3. Feed plate; 4. Electric crushing roller; 5. First filtering mechanism; 51. Filter plate; 52. Discharge port; 6. Second filtering mechanism; 61. Filter barrel; 62. Collecting barrel; 63. Collecting plate; 64. First filter cartridge; 65. Second filter cartridge; 66. Filter bag; 7. Spraying mechanism; 71. Mounting plate; 72. First connecting pipe; 73. Spray nozzle; 74. Booster pump; 75. Second connecting pipe. DETAILED DESCRIPTION
[0022] The following is combined with Figure 1-4 This application is described in further detail.
[0023] The present application embodiment discloses a construction engineering crushing device, referring to Figure 1-4 , comprising a crushing box 1, a feed port 2 is arranged at the top of the crushing box 1, feed plates 3 are fixedly installed on both sides of the feed port 2, and the two feed plates 3 are arranged obliquely downward, two electric crushing rollers 4 are fixedly installed at the top of the crushing box 1, and the two electric crushing rollers 4 are arranged at the bottom of the two feed plates 3, a first filtering mechanism 5 is installed in the middle of the crushing box 1, a second filtering mechanism 6 is installed at the bottom of the crushing box 1, and a spraying mechanism 7 is fixedly installed at the top of the feed port 2. Through the first filtering mechanism 5, it is convenient to filter the crushed garbage through the two filter plates 51, and the filtered garbage can be discharged through the discharge port 52, so as to avoid the large volume of garbage falling into the second filtering mechanism 6 and causing the blockage of the second filtering mechanism 6; through the second filtering mechanism 6, it is convenient to collect water and filtered garbage through the collecting plate 63 and the collecting barrel 62, and separate water and garbage through the first filter barrel 64, the second filter barrel 65 and the filter bag 66, so as to avoid the garbage entering the filter barrel 61 and causing the blockage of the spraying mechanism 7. Through the spraying mechanism 7, the booster pump 74 pumps the water in the filter barrel 61 into the nozzle 73 through the first connecting pipe 72 and the second connecting pipe 75, and the nozzle 73 sprays, thereby preventing the dust generated by the electric crushing roller 4 when working from floating out through the feed port 2 and affecting the health of the staff.
[0024] Reference Figure 1 and Figure 2 The first filter mechanism 5 includes two filter plates 51, one end of the two filter plates 51 is fixedly connected to each other, and both sides of the crushing box 1 are provided with discharge ports 52. The two filter plates 51 are provided to facilitate filtering the crushed construction waste through the two filter plates 51, and the filtered waste can be discharged through the discharge port 52, thereby preventing large waste from falling into the second filter mechanism 6 and causing blockage of the second filter mechanism 6.
[0025] Reference Figure 1 and Figure 2 The other ends of the two filter plates 51 are respectively mounted on the two discharge ports 52 by bolts, and the two filter plates 51 are arranged obliquely downward from the connection of the two filter plates 51 to the two discharge ports 52. By arranging the two filter plates 51 obliquely downward, it is convenient for the crushed garbage to roll down directly on the two filter plates 51, so that the garbage can be discharged from the discharge port 52.
[0026] Reference Figure 1 , Figure 2 , Figure 3 and Figure 4 The second filtering mechanism 6 includes a filter barrel 61, which is fixedly mounted at the bottom of the inner side of the crushing box 1. A collection barrel 62 is threadedly mounted on the top of the filter barrel 61. Collection plates 63 are fixedly mounted on both sides of the collection barrel 62. The two collection plates 63 are arranged obliquely downward from one end of the collection plate 63 to the filter barrel 61. The collection plates 63 and the collection barrel 62 are arranged to facilitate the collection of water and filtered garbage.
[0027] Reference Figure 1 , Figure 2 , Figure 3 and Figure 4 The first filter cartridge 64 and the second filter cartridge 65 are installed on one side from top to bottom inside the filter barrel 61, and a filter bag 66 is installed between the first filter cartridge 64 and the second filter cartridge 65. It is convenient to separate water and garbage through the first filter cartridge 64, the second filter cartridge 65 and the filter bag 66, so as to prevent garbage from entering the filter barrel 61 and causing clogging of the spraying mechanism 7.
[0028] Reference Figure 1 , Figure 2 and Figure 4The spraying mechanism 7 includes a mounting plate 71, which is fixedly mounted on the top of the feed port 2, a first connecting pipe 72 is fixedly mounted on the top of the mounting plate 71, a spray head 73 is connected and mounted at the bottom of the first connecting pipe 72, and the spray head 73 is arranged at the bottom of the mounting plate 71. The spray head 73 is convenient for spraying, so as to prevent the dust generated by the electric crushing roller 4 from floating out through the feed port 2 when it is working, causing an impact on the health of the staff.
[0029] Reference Figure 1 , Figure 2 and Figure 4 The spraying mechanism 7 further includes a booster pump 74, which is fixedly installed at one side of the bottom of the crushing box 1, and the water outlet of the booster pump 74 is connected to the first connecting pipe 72, and the water inlet of the booster pump 74 is connected to the second connecting pipe 75, and one end of the second connecting pipe 75 is connected to the bottom of the filter barrel 61. The booster pump 74 is convenient to pump the water in the filter barrel 61 into the nozzle 73 through the first connecting pipe 72 and the second connecting pipe 75, and the nozzle 73 sprays.
[0030] The implementation principle of a construction engineering crushing device in an embodiment of the present application is as follows: the staff adds the construction waste into the crushing box 1 through the feed port 2, and crushes the construction waste through the electric crushing roller 4. Subsequently, the crushed construction waste is filtered through the two filter plates 51 through the set first filtering mechanism 5, and the filtered garbage is discharged through the discharge port 52, so as to prevent large-volume garbage from falling into the second filtering mechanism 6 and causing blockage of the second filtering mechanism 6; then, through the set second filtering mechanism 6, the collecting plate 63 and the collecting barrel 62 collect water and filtered garbage, and separate the water and garbage through the first filter barrel 64, the second filter barrel 65 and the filter bag 66, so as to prevent the garbage from entering the filter barrel 61 and causing blockage of the spraying mechanism 7. Then, through the spraying mechanism 7, the booster pump 74 pumps the water in the filter barrel 61 into the nozzle 73 through the first connecting pipe 72 and the second connecting pipe 75, and the nozzle 73 sprays, thereby preventing the dust generated by the electric crushing roller 4 when working from floating out through the feed port 2 and affecting the health of the staff.
[0031] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction engineering crushing device, comprising a crushing box (1), characterized in that: The top of the crushing box (1) is provided with a feed port (2), and feed plates (3) are fixedly installed on both sides of the feed port (2), and the two feed plates (3) are arranged obliquely downward. Two electric crushing rollers (4) are fixedly installed on the top of the crushing box (1), and the two electric crushing rollers (4) are arranged at the bottom ends of the two feed plates (3). A first filtering mechanism (5) is installed in the middle of the crushing box (1), and a second filtering mechanism (6) is installed at the bottom of the crushing box (1). A spraying mechanism (7) is fixedly installed at the top of the feed port (2).
2. A construction engineering crushing device according to claim 1, characterized in that: The first filtering mechanism (5) comprises two filtering plates (51), one ends of the two filtering plates (51) are fixedly connected to each other, and discharge ports (52) are provided on both sides of the crushing box (1).
3. A construction engineering crushing device according to claim 2, characterized in that: The other ends of the two filter plates (51) are respectively mounted on the two discharge ports (52) by means of bolts, and the two filter plates (51) are both arranged obliquely downward from the connection between the two filter plates (51) to the two discharge ports (52).
4. A construction engineering crushing device according to claim 1, characterized in that: The second filtering mechanism (6) comprises a filtering barrel (61), the filtering barrel (61) being fixedly mounted at the bottom end of the inner side of the crushing box (1), a collecting barrel (62) being threadedly mounted at the top end of the filtering barrel (61), collecting plates (63) being fixedly mounted on both sides of the collecting barrel (62), and the two collecting plates (63) being arranged obliquely downward from one end of the collecting plate (63) toward the filtering barrel (61).
5. A construction engineering crushing device according to claim 4, characterized in that: A first filter cartridge (64) and a second filter cartridge (65) are installed on one side from top to bottom inside the filter barrel (61), and a filter bag (66) is installed between the first filter cartridge (64) and the second filter cartridge (65).
6. A construction engineering crushing device according to claim 4, characterized in that: The spraying mechanism (7) comprises a mounting plate (71), wherein the mounting plate (71) is fixedly mounted on the top of the feed port (2), a first connecting pipe (72) is fixedly mounted on the top of the mounting plate (71), a spray head (73) is connected and mounted on the bottom end of the first connecting pipe (72), and the spray head (73) is arranged on the bottom end of the mounting plate (71).
7. A construction engineering crushing device according to claim 6, characterized in that: The spraying mechanism (7) further comprises a booster pump (74), the booster pump (74) being fixedly mounted on one side of the bottom of the crushing box (1), the water outlet of the booster pump (74) being connected to the first connecting pipe (72), the water inlet of the booster pump (74) being connected to the second connecting pipe (75), and one end of the second connecting pipe (75) being connected to the bottom of the filter barrel (61).