Bracket structure with unloading device
By designing a cow leg structure with its own unloading device, and using sliding plate components and screw connections, the problems of unsafe and inefficiency in high-altitude operations caused by independent unloading device in the prior art are solved, and safer and more Efficient construction process and protect the concrete appearance.
Patent Information
- Application Number
- CN202420222748.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The existing cow leg and unloading device are independent components, which lead to unsafe and inefficient high-altitude operations, and need to be lifted and installed separately. The horizontal loading leads to sliding problems, affecting construction safety and efficiency.
Design a corrupt leg structure with self-deloading device, including a pressure-bearing plate assembly, a first sliding plate assembly and a second sliding plate assembly, and realizes sliding connection through screws and sliding grooves, reducing independent lifting and installation needs, and improving construction safety Sex and efficiency.
It has realized the self-installed unloading and falling device on the cow legs, reduces high-altitude operations, simplifies construction technology, reduces construction risks, and avoids the impact on the appearance of concrete.
Smart Images

Figure CN221956545U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of corbels, in particular to a corbel structure with a self-unloading device. Background Art
[0002] During the construction of domestic bridge towers or piers, it is often necessary to set load-bearing corbels on the concrete surface of the piers to serve as load-bearing supports for the construction of the upper concrete structure. After the construction of the structure is completed, the structure needs to be dismantled, so a dismounting device is usually installed above the corbels during the construction of the bridge structure.
[0003] At present, the corbel and the unloading device are mostly two independent components. When erecting the bracket, a limiter needs to be set on the corbel to fix the unloading device. This results in the need to separately hoist and install the corbel and the unloading device for aerial work. In addition, due to the effect of horizontal loads, a strong limiter needs to be made between the corbel and the unloading device to limit the sliding of the unloading device, making the overall construction operation unsafe and inefficient.
[0004] Therefore, it is urgent to design a safer, more efficient, economical and comprehensive bracket structure with a self-unloading device. Summary of the invention
[0005] In view of the above-mentioned prior art, the utility model proposes a bracket structure with a self-contained unloading device, which is safe in construction and can ensure the durability of the structure.
[0006] The utility model provides a bracket structure with a self-contained unloading device, comprising:
[0007] A pressure plate assembly; the pressure plate assembly is connected to the pier column;
[0008] A first sliding plate assembly, disposed on the pressure plate assembly;
[0009] The second sliding plate assembly is connected to the first sliding plate assembly in an upward and downward sliding manner.
[0010] Preferably, the pressure plate assembly includes a mounting plate, which is fixed to the pier through a plurality of embedded climbing cones, a plurality of longitudinal ribs are provided on the mounting plate, a plurality of transverse ribs are provided on the longitudinal ribs, and a pressure bottom plate is provided on the mounting plate at the upper ends of the longitudinal ribs and the transverse ribs.
[0011] Preferably, the first sliding plate assembly includes a first sliding plate and a plurality of first partitions, the plurality of first partitions are arranged on the pressure plate assembly, and the first sliding plate is arranged at the upper ends of the plurality of first partitions.
[0012] Preferably, the second sliding plate assembly includes a second sliding plate and a plurality of second partitions, the second sliding plate is slidably connected to the first sliding plate up and down, the plurality of second partitions are arranged at the upper end of the second sliding plate, and an inner end plate is arranged on the inner side of the plurality of second partitions, an outer end plate is arranged on the outer side of the plurality of second partitions, and a pressure-bearing top plate is arranged on the upper end of the plurality of second partitions.
[0013] Preferably, the outer end plate is connected to the pier column via a plurality of screw rods, and the second sliding plate assembly is provided with a sliding groove for the screw rods to pass through when the second sliding plate assembly slides.
[0014] Preferably, the screw rod includes a first threaded segment and a second threaded segment, the first threaded segment is pre-embedded in the pier, the outer end of the first threaded segment is connected to the inner end of the second threaded segment through a sleeve, the outer end of the second threaded segment extends to the outside of the outer end plate and is connected to the outer end plate through a positioning nut.
[0015] Preferably, the sliding surfaces of the first sliding plate assembly and the second sliding plate assembly are inclined surfaces.
[0016] Compared with the prior art, the beneficial effects of the utility model are as follows: the utility model provides a corbel structure with a built-in unloading device, which can reduce the lifting and installation operations through the built-in unloading device on the corbel, and the construction process is simple. The welds on the corbel are all welded in the back field to reduce high-altitude operations. In addition, after the corbel is removed, the impact on the appearance of the concrete can be avoided. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a side view of an embodiment of the utility model;
[0018] Figure 2 It is a front view of an embodiment of the utility model;
[0019] Figure 3 It is a schematic diagram of the structure of the second slide plate in the embodiment of the utility model;
[0020] Figure 4 It is a schematic diagram of the structure of the outer end plate in the embodiment of the utility model;
[0021] In the figure, 1. mounting plate; 2. embedded climbing cone; 3. fastening bolts; 4. pier column; 5. longitudinal rib plate; 6. transverse rib plate; 7. pressure-bearing bottom plate; 8. first slide plate; 9. first partition plate; 10. second slide plate; 11. second partition plate; 12. inner end plate; 13. outer end plate; 14. pressure-bearing top plate; 15. screw; 16. sliding groove; 17. sleeve; 18. positioning nut. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.
[0023] Embodiment: A bracket structure with a self-contained unloading device, such as Figure 1-4 As shown, it includes a pressure plate assembly, a first sliding plate assembly and a second sliding plate assembly.
[0024] Among them, the pressure plate assembly includes a mounting plate 1, which is fixed to the outer surface of the pier 4 by a number of embedded climbing cones 2 and fastening bolts 3. Two symmetrical longitudinal ribs 5 are arranged at the outer end of the mounting plate 1 in the longitudinal direction, and a transverse rib 6 is arranged at the outer end of the two longitudinal ribs 5 in the transverse direction. The two transverse ribs 6 are symmetrically arranged, and a pressure bottom plate 7 is arranged at the upper ends of the longitudinal ribs 5 and the transverse ribs 6 on the mounting plate 1.
[0025] Further, the first sliding plate assembly is arranged on the pressure plate assembly. The first sliding plate assembly includes a first slide plate 8 and a plurality of first baffles 9, the first baffles 9 are arranged in a right triangle, the plurality of first baffles 9 are arranged on the upper end of the pressure bottom plate 7, and the first slide plate 8 is arranged on the upper end of the plurality of first baffles 9. The first sliding plate assembly and the pressure plate assembly are welded into an integrated structure.
[0026] Furthermore, the second sliding plate assembly includes a second slide plate 10 and several second partition plates 11. The second partition plates 11 are arranged in a right-angled trapezoid. The second slide plate 10 is slidably connected to the first slide plate 8 up and down, and the sliding surfaces of the two are inclined surfaces. Several second partition plates 11 are arranged at the upper end of the second slide plate 10, and inner end plates 12 are arranged on the inner sides of several second partition plates 11, and outer end plates 13 are arranged on the outer sides of several second partition plates 11. The length of the outer end plate 13 is greater than the length of the inner end plate 12, and pressure-bearing top plates 14 are arranged on the upper ends of several second partition plates 11.
[0027] Furthermore, the outer end plate 13 is connected to the pier 4 through a plurality of screws 15, the screws 15 are precision-rolled threaded rods, and the second slide plate 10 and the outer end plate 13 are provided with sliding grooves 16 for the screws 15 to pass through when the second sliding plate assembly slides. The screw 15 includes a first thread segment and a second thread segment, the first thread segment is pre-embedded in the pier 4, the outer end of the first thread segment is connected to the inner end of the second thread segment through a sleeve 17, and the outer end of the second thread segment passes through the mounting plate 1, the first slide plate 8, the second slide plate 10 in sequence, and extends to the outer side of the outer end plate 13, and is connected to the outer end plate 13 through a positioning nut 18.
[0028] The construction method of the corbel structure comprises the following steps:
[0029] Step 1: After locating the position of the corbel embedded parts, install the embedded parts when tying the steel bars of pier column 4 and pour concrete.
[0030] Step 2: Complete the welding of individual components in the steel structure workshop;
[0031] Step 3: hoist the integrated structure of the pressure plate assembly and the first sliding plate assembly that have passed the inspection to the operating platform and install it;
[0032] Step 4: Install the second sliding plate assembly and the exposed section screw 15 and tighten the corresponding positioning nut 18 to fix the second sliding plate assembly;
[0033] Step 5: Set up upper brackets and formwork on the pressure-bearing top plate 14, and pour upper concrete;
[0034] Step 6: When the upper concrete reaches the demoulding requirements, remove the upper bracket, loosen the positioning nut 18, and drive the upper bracket to descend by sliding the second sliding plate assembly, remove the upper bracket, and remove the corbel structure;
[0035] Step 7: Repeat the above steps to reverse the corbel structure.
[0036] In this embodiment, when the bridge structure is under construction, since the screw rod 15 passes through the sliding groove 16 of the second sliding plate assembly, the positioning nut 18 is screwed and pressed against the second sliding plate assembly, so that the second sliding plate assembly constituting the unloading device maintains its position unchanged, thereby enabling the unloading device of the corbel to support the bridge structure on the bridge support structure; when the bridge structure is dropped off, since the second sliding plate assembly slides on the first sliding plate assembly, it is only necessary to screw the positioning nut 18 so that the second sliding plate assembly slides downward under gravity, thereby lowering the overall height of the unloading device and causing the bridge structure to drop off, thereby simplifying the construction process of dropping the bridge.
[0037] The above are only implementation methods of the present utility model, and are not intended to limit the patent scope of the present utility model. Any equivalent replacement made using the specification and drawings of the present utility model, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present utility model.
Claims
1. A bracket structure with a built-in unloading device, It is characterized in that include: A pressure plate assembly; the pressure plate assembly is connected to the pier column; A first sliding plate assembly, disposed on the pressure plate assembly; a second sliding plate assembly; The second sliding plate assembly is connected to the first sliding plate assembly in an upward and downward sliding manner.
2. The bracket structure according to claim 1, It is characterized in that The pressure plate assembly includes a mounting plate, which is fixed to the pier column through a plurality of embedded climbing cones, a plurality of longitudinal ribs are arranged on the mounting plate, a plurality of transverse ribs are arranged on the longitudinal ribs, and a pressure bottom plate is arranged on the mounting plate at the upper end of the longitudinal ribs and the transverse ribs.
3. The bracket structure according to claim 1 or 2, It is characterized in that The first sliding plate assembly includes a first sliding plate and a plurality of first partitions, the plurality of first partitions are arranged on the pressure plate assembly, and the first sliding plate is arranged at the upper ends of the plurality of first partitions.
4. The bracket structure according to claim 3, It is characterized in that The second sliding plate assembly includes a second slide plate and a plurality of second partition plates. The second slide plate is slidably connected to the first slide plate up and down. The plurality of second partition plates are arranged at the upper end of the second slide plate, and an inner end plate is arranged on the inner side of the plurality of second partition plates, an outer end plate is arranged on the outer side of the plurality of second partition plates, and a pressure-bearing top plate is arranged on the upper end of the plurality of second partition plates.
5. The bracket structure according to claim 4, It is characterized in that The outer end plate is connected to the pier column through a plurality of screw rods, and the second sliding plate assembly is provided with a sliding groove for the screw rods to pass through when the second sliding plate assembly slides.
6. The bracket structure according to claim 5, It is characterized in that The screw rod includes a first threaded segment and a second threaded segment, the first threaded segment is pre-buried in the pier, the outer end of the first threaded segment is connected to the inner end of the second threaded segment through a sleeve, the outer end of the second threaded segment extends to the outside of the outer end plate and is connected to the outer end plate through a positioning nut.
7. The bracket structure according to claim 1 or 2, It is characterized in that The sliding surfaces of the first sliding plate assembly and the second sliding plate assembly are inclined surfaces.
