Sludge reclamation foundation solidification structure utilizing vacuum preloading and gravel piles

By combining vacuum prepression and gravel piles, the problem of rapid drainage and improvement of foundation bearing capacity in blow-filled silt foundation treatment is solved, and rapid curing and efficient construction of silt foundation are achieved.

CN221956686UActive Publication Date: 2024-11-05HARBIN INSTITUTE OF TECHNOLOGY (SHENZHEN) (INSTITUTE OF SCIENCE AND TECHNOLOGY INNOVATION HARBIN INSTITUTE OF TECHNOLOGY SHENZHEN) +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323412019.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-11-05
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

In the prior art, it is difficult to quickly drain the foundation during the blow-filled sludge foundation treatment and the foundation bearing capacity is low after curing.

Method used

Using the method of combining vacuum prepression and gravel piles, the vacuum prepression and curing agent injection are achieved by laying drainage plate layers in the silt landfill and inserting gravel piles. , enhance the bearing capacity of the foundation.

Benefits of technology

The rapid drainage and curing of the silt foundation is achieved, the bearing capacity of the foundation after curing is improved, the construction time is shortened, and it is suitable for the treatment of high moisture content and organic silt.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956686U_ABST
    Figure CN221956686U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydraulic fill silt foundation solidification structure utilizing vacuum preloading and gravel piles, which comprises a first sealing film, a plurality of drain board layers, a plurality of grouting pipes and a plurality of gravel piles arranged at intervals, and a plurality of layers of silt fill bodies are formed on the bottom surface of a target site through hydraulic fill silt in sequence from bottom to top. The drainage plate layers are laid on the upper surfaces of the sludge filling bodies, the first sealing film is laid on the uppermost drainage plate layer, and a plurality of pile holes allowing gravel piles to be inserted therein are vertically drilled in the sludge filling bodies. The grouting pump and the vacuum pump are started and stopped synchronously, the grouting pump injects curing slurry into part of or all pile holes through the grouting pipe, the drainage pipeline of each drainage plate layer is communicated with the pile holes or the gravel piles, the vacuum pump is communicated with the drainage opening of the drainage pipeline and vacuumizes the lower portion of the first sealing film, rapid drainage can be achieved, and the bearing capacity of a cured foundation is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of sludge solidification treatment, and in particular relates to a blown-fill sludge foundation solidification structure utilizing vacuum preloading and crushed stone piles. Background Art

[0002] At present, in the existing blown fill mud foundation treatment methods, vacuum preloading technology is usually used to drain and consolidate the blown fill mud foundation, but the treatment cycle is long and it is often difficult to quickly drain the pore water in the blown fill mud. When the solidification pile filling method is adopted, the composite foundation is formed by the solidification pile and the cushion layer to improve the bearing capacity, but in the treatment of blown fill mud foundation with high water content, it is difficult to ensure the uniformity and bearing capacity of the foundation without drainage or solidification treatment of the blown fill mud.

[0003] Therefore, a new technology is needed to solve the problems in the prior art that it is difficult to quickly drain the water during the solidification treatment of the blown sludge foundation and the bearing capacity of the solidified foundation is low. Utility Model Content

[0004] In order to solve the above problems in the prior art, the utility model provides a blown-fill silt foundation solidification structure using vacuum preloading and gravel piles, which has the effect of quickly draining water during the blown-fill silt foundation solidification process and improving the bearing capacity of the foundation after solidification.

[0005] The utility model adopts the following technical solutions:

[0006] A blown-fill silt foundation solidification structure using vacuum preloading and gravel piles, comprising a vacuum pump, a grouting pump, a first sealing membrane, a plurality of drainage board layers, a plurality of grouting pipes and a plurality of intervally arranged gravel piles, wherein silt is blown-filled in sequence from bottom to top above the bottom surface of a target site to form a plurality of silt landfill bodies, each of the drainage board layers is laid on the upper surface of each layer of the silt landfill body, and the first sealing membrane is laid above the drainage board layer located at the top;

[0007] A plurality of pile holes corresponding to the gravel piles are vertically drilled in the target site, each of the pile holes penetrates each layer of the sludge landfill, each of the gravel piles is inserted into each of the pile holes, and the bottom of each of the gravel piles is flush with the bottom surface of the target site;

[0008] Each of the drainage board layers includes a drainage pipe, and each of the gravel piles is connected to the drainage pipe. The drainage pipe is provided with at least one drainage port near the edge of each of the silt landfill bodies. At least one grouting pipe is inserted in at least one of the pile holes. Each of the grouting pipes passes through the first sealing membrane and extends into the pile hole. The grouting pump and the vacuum pump are started and stopped synchronously. The grouting pump is connected to each of the grouting pipes and injects solidifying slurry into the pile hole. The vacuum pump is connected to the drainage port and is used to evacuate the area below the first sealing membrane.

[0009] As a further improvement of the technical solution of the utility model, the drainage pipe includes a main pipe and several branch pipes which are interconnected. The main pipe passes through the pile holes provided with the grouting pipes and is connected to each of the gravel piles. The several branch pipes are distributed above the silt landfill and are connected to the silt landfill.

[0010] As a further improvement of the technical solution of the utility model, the drainage board includes a plurality of criss-crossing drainage pipes, each of the drainage pipes is provided with a plurality of filter holes at intervals, a part of the filter holes are connected with the sludge landfill body, and another part of the filter holes are respectively connected with the pile holes provided with the grouting pipes, after the vacuum pump and the grouting pump are started synchronously, the solidified slurry in each of the pile holes enters the grouting pipe and the sludge landfill body in turn, and each of the drainage pipes is provided with a drainage outlet near the edge of the sludge landfill body.

[0011] As a further improvement of the technical solution of the utility model, the distance between two adjacent gravel piles is 1.0m-2.0m, and the pile body diameter of each gravel pile is 0.3m-0.7m.

[0012] As a further improvement of the technical solution of the utility model, it also includes a settlement monitoring instrument and a slurry concentration monitoring instrument. The settlement monitoring instrument is used to monitor the settlement in the sludge landfill in real time, and the slurry concentration monitoring instrument is used to detect the concentration of the curing agent in the solidified slurry discharged from the drain outlet.

[0013] As a further improvement of the technical solution of the utility model, at least one grouting pipe is provided in the pile hole located at the center of the sludge landfill body.

[0014] As a further improvement of the technical solution of the utility model, a second sealing film is laid in the edge area of ​​each layer of the sludge landfill.

[0015] As a further improvement of the technical solution of the utility model, the first sealing membrane is provided with grouting ports corresponding to each of the grouting pipes at the grouting gravel piles, and the first sealing membrane is a geomembrane.

[0016] As a further improvement of the technical solution of the utility model, the height of each sludge landfill body is 0.1m-0.3m, and the distance between two adjacent drainage boards is 0.6m-3.0m.

[0017] As a further improvement of the technical solution of the utility model, the vacuum degree under the first sealing film is greater than 0.060MPa, and the grouting pressure when the grouting pump synchronously grouts into each of the pile holes is 0.3MPa-0.7MPa.

[0018] Compared with the prior art, the beneficial effects of the utility model are:

[0019] Vacuum preloading and grouting are carried out simultaneously. Piles can be inserted into the filling field before preloading, which saves the steps of removing the membrane, testing, and inserting piles after vacuum preloading, and can greatly reduce the construction time. The curing agent slurry diffuses in a larger range in the silt landfill with the help of horizontal drainage boards. Its curing reaction products have a filling and compacting effect on the voids in the gravel piles and the voids inside the soil of the silt landfill, while enhancing the strength of the pile body and the silt strength in the filling field; through vacuum drainage, the moisture content in the silt in the filling field can be quickly reduced to achieve the purpose of drainage and consolidation. By simultaneously strengthening the gravel pile body and soil body and draining and consolidating the soil body, the bearing capacity of the foundation treated by the conventional vacuum preloading and gravel pile method can be achieved. The drainage board is not only used for drainage, but also for the transportation and diffusion of the curing agent slurry in a large range of the silt landfill, making full use of the structural characteristics of the drainage board.

[0020] The blown-fill silt foundation solidification structure using vacuum preloading and gravel piles in the present application has a wide range of applications. By combining vacuum drainage consolidation with the solidification reaction of the curing agent, the moisture content of the silt can be further reduced. By changing the solidification slurry with different characteristics, it can cope with situations such as ultra-high moisture content and organic silt. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The technology of the utility model is further described in detail below in conjunction with the accompanying drawings and specific embodiments:

[0022] Figure 1 It is a cross-sectional view of the utility model of the blown-fill silt foundation solidification structure using vacuum preloading and crushed stone piles;

[0023] Figure 2 It is a top view of the blown-fill silt foundation solidification structure utilizing vacuum preloading and crushed stone piles of the utility model.

[0024] Reference numerals:

[0025] 1- Silt landfill;

[0026] 2- Gravel piles;

[0027] 3-Drainage board;

[0028] 4- first sealing film;

[0029] 5-Grouted gravel piles;

[0030] 6-Pile hole;

[0031] 7- Second sealing film. DETAILED DESCRIPTION

[0032] The following will be combined with the embodiments and drawings to clearly and completely describe the concept, specific structure and technical effects of the utility model, so as to fully understand the purpose, scheme and effect of the utility model. It should be noted that the embodiments and features in the embodiments in this application can be combined with each other without conflict. The same reference numerals used throughout the drawings indicate the same or similar parts.

[0033] It should be noted that, unless otherwise specified, when a feature is referred to as being "fixed" or "connected" to another feature, it can be directly fixed or connected to the other feature, or it can be indirectly fixed or connected to the other feature. In addition, the descriptions of up, down, left, right, etc. used in the present invention are only relative to the relative positional relationship of the components of the present invention in the accompanying drawings.

[0034] Reference Figure 1 and Figure 2 A blown-fill silt foundation solidification structure using vacuum preloading and gravel piles, comprising a vacuum pump, a grouting pump, a first sealing membrane 4, a plurality of drainage board 3 layers, a plurality of grouting pipes and a plurality of intervally arranged gravel piles 2, wherein silt is blown in sequence from bottom to top on the bottom surface of a target site to form a plurality of layers of silt landfill 1, wherein each of the three drainage board layers is laid on the upper surface of each layer of the silt landfill 1, and the first sealing membrane 4 is laid above the uppermost layer of the three drainage board layers, and a plurality of pile holes 6 corresponding to the gravel piles 2 are vertically drilled in the target site, wherein each of the pile holes 6 penetrates each layer of the silt landfill 1, and each of the gravel piles 2 is inserted into each of the pile holes 6, and the bottom of each of the gravel piles 2 is flush with the bottom surface of the target site.

[0035] Each of the drainage boards 3 layers includes a drainage pipe, each of the gravel piles 2 is connected to the drainage pipe, and the drainage pipe is provided with at least one drainage port near the edge of the silt landfill 1, and the drainage port is connected to a vacuum pump. At least one grouting pipe is inserted into at least one of the pile holes 6, and each of the grouting pipes passes through the first sealing membrane 4 and extends into the pile hole 6. The grouting pump and the vacuum pump are started and stopped synchronously, and the grouting pump is connected to each of the grouting pipes and injects solidified slurry into the pile hole 6. The vacuum pump is connected to the drainage pipe and is used to evacuate the area below the first sealing membrane 4.

[0036] Vacuum preloading and grouting are carried out simultaneously, and piles can be inserted into the landfill before preloading, which saves the steps of removing the membrane, testing, and inserting the piles after vacuum preloading, and can greatly reduce the construction time. The curing agent slurry diffuses in a larger range in the silt landfill 1 by means of the horizontal drainage board 3, and its curing reaction product has a filling and compacting effect on the voids in the gravel pile 2 and the voids inside the soil of the silt landfill 1, while enhancing the strength of the pile body and the silt strength in the landfill; through vacuum drainage, the moisture content in the silt in the landfill can be quickly reduced to achieve the purpose of drainage and consolidation. By simultaneously strengthening the gravel pile 2 body and the soil body and drainage consolidation, a bearing capacity superior to that of the conventional vacuum preloading and gravel pile 2 method for treating the foundation can be achieved. The drainage board 3 is not only used for drainage, but also for the transportation and diffusion of the curing agent slurry in a large range of the silt landfill 1, making full use of the structural characteristics of the drainage board 3.

[0037] The blown-fill silt foundation solidification structure using vacuum preloading and gravel piles 2 of the present application has a wide range of applications. By combining vacuum drainage consolidation with the solidification reaction of the curing agent, the moisture content of the silt can be further reduced. By changing the solidification slurry with different characteristics, it can cope with situations such as ultra-high moisture content and organic silt.

[0038] Specifically, the drainage pipe includes a main pipe and a plurality of branch pipes that are interconnected. The main pipe passes through the pile holes 6 each provided with the grouting pipe and is connected to each of the gravel piles 2. The plurality of branch pipes are distributed above the sludge landfill 1 and are connected to the sludge landfill 1. The main pipe is mainly arranged between the piles. When the distance between the piles is small, the area surrounded by the four gravel piles 2 is relatively small. In this case, the main pipe can be laid between the piles. When the distance between the piles is too large, the area surrounded by the four gravel piles 2 is relatively large. In this case, a cross-shaped branch pipe can be laid in the middle as a supplement to the main pipe. Among them, the arrangement of the main pipe and the arrangement of the branch pipe can be arranged on each layer according to the actual situation.

[0039] Specifically, the drain board 3 is permeable, and the permeability effect can be achieved by setting filter holes. The drain board 3 with a filter layer and a drainage layer can also be selected, and the water seepage effect can also be achieved by the material properties of the drain board 3. When the drain board 3 achieves the permeability effect by setting filter holes, the drain board 3 includes a plurality of crisscross drainage pipes, and common drainage pipes can be selected according to actual conditions. When a plurality of filter holes are provided at intervals on each of the drainage pipes, the filter holes serve as the water inlet of the drain board 3, and the water is finally discharged through the drainage port connected to the vacuum pump. A part of the filter holes is connected to the sludge landfill 1, and another part of the filter holes is respectively connected to the pile holes 6 provided with the grouting pipes. After the vacuum pump and the grouting pump are started synchronously, the solidified slurry in each of the pile holes 6 enters the grouting pipe and the sludge landfill 1 in turn.

[0040] The vacuum pump evacuates the drainage pipe, which can draw moisture in the internal gaps of the sludge into the drainage pipe and discharge it from the drain port. At the same time, the grouting pump injects solidifying slurry into the pile hole 6. Since the main pipeline of the drainage pipe passes through each pile hole 6, under the action of pressure difference, the solidifying slurry injected into the pile hole 6 by the grouting pump can enter the drainage pipe from the filter holes on each drainage pipe located at the pile hole 6. Under the action of vacuum extraction, the solidifying slurry in the drainage pipe can be transported in each drainage pipe and enter each drainage pipe located above the sludge respectively. When the solidifying slurry flows in the drainage pipe, it can penetrate into the sludge in various places from the filter holes on the drainage pipe. While achieving the drainage function, each drainage pipe can evenly disperse the solidifying slurry in each part of the sludge, and the drainage efficiency is relatively high. The water content of the sludge can be further reduced by combining vacuum drainage consolidation with the curing reaction of the curing agent. By changing the solidifying slurry with different characteristics, it can cope with situations such as ultra-high water content and organic sludge.

[0041] Specifically, the distance between two adjacent gravel piles 2 is 1.0m-2.0m, and the diameter of the gravel pile 2 is 0.3m-0.7m.

[0042] Specifically, it also includes a sedimentation monitoring instrument and a slurry concentration monitoring instrument. The sedimentation monitoring instrument is used to monitor the sedimentation in the sludge field in real time, and the slurry concentration monitoring instrument is used to detect the concentration of the curing agent in the solidified slurry discharged from the drain outlet.

[0043] Specifically, in the actual construction process, according to different construction conditions, one of the gravel piles 2 can be selected for grouting, and the solidifying slurry can be transported to the silt landfill 1 and the adjacent gravel piles 2 through the drainage board 3; or multiple gravel piles 2 or all gravel piles 2 can be grouted at the same time to make the solidifying slurry flow in the silt field. When one of the gravel piles 2 is selected to be injected with the solidifying slurry, the gravel pile 2 at the center can be grouted. Figure 1 , 2 At least one grouting pipe is provided in the pile hole 6 at the center of the silt landfill 1, and solidifying slurry is injected into the pile hole 6 at the center and the gravel pile 2 in the pile hole 6 to form a grouting gravel pile 5. Injecting solidifying slurry into the gravel pile 2 or the pile hole 6 at the center of the silt landfill 1 can facilitate the uniform transportation of solidifying slurry to the surroundings to avoid uneven or large differences in the distribution of solidifying slurry in different areas. When injecting solidifying slurry into a pile hole 6 at the center, the tops of other gravel piles 2 need to be well sealed.

[0044] The method for consolidating a silt-fill foundation using a silt-fill foundation consolidation structure using vacuum preloading and crushed stone piles of the present invention comprises the following steps:

[0045] S1. Before construction, clean and level the site. When blowing silt, blow several layers of silt into the site from bottom to top and form several layers of silt until the silt is blown to the required height of the project. After each layer of silt is blown, level the silt surface and horizontally lay several drainage boards 3 arranged in a rectangular or square array. Connect the drainage pipe to the vacuum pump. A second sealing membrane 7 can be laid in the edge area of ​​each layer of the silt landfill 1 to prevent gas leakage. The second sealing membrane 7 can be specifically laid on the side of each layer of the silt landfill 1. The height of each layer of silt blown is 0.1m-0.3m, and the distance between two adjacent drainage boards 3 in the horizontal direction is 0.6m-3.0m. The second sealing membrane 7 can preferably be a geomembrane, and the drainage board 3 can be selected from commonly used materials.

[0046] S2. After the required height of silt filling is completed, a pile hole 6 is drilled at a pre-designed position in the uppermost silt landfill 1, and a gravel pile 2 is inserted into each pile hole 6, and a plurality of gravel piles 2 are arranged in a rectangular or square array. Each of the pile holes 6 provided with the grouting pipe is located on the drainage pipe of the drainage board 3. Before the gravel pile 2 is filled, the grouting pipe needs to be inserted until the bottom of the pile hole 6 or the gravel pile 2. Multiple grouting pipes can be used to inject solidifying slurry in one pile hole 6 to form a grouting gravel pile 5. According to the actual construction situation, one or more of the gravel piles 2 can be injected with the configured solidifying slurry. After the filling is completed, the first sealing membrane 4 is covered on the upper surface of the silt landfill 1 and each gravel pile 2. When only part of the gravel pile 2 is grouted, a grouting port for the grouting pipe to pass through is reserved at the top of the other part of the gravel pile. The first sealing membrane 4 can preferably be a geomembrane, and each of the grouting pipes corresponds to the grouting port one by one.

[0047] S3. Simultaneous vacuuming and pressure grouting: synchronously start the grouting pump and the vacuum pump, inject the solidifying slurry into the designated gravel pile 2 or pile hole 6, the vacuum degree under the first sealing film 4 is greater than 0.06MPa, and the grouting pressure when the grouting pump is synchronously grouting into each of the pile holes 6 is 0.3MPa-0.7MPa, so as to extract water, and at the same time, make the solidifying slurry flow in the drainage board and evenly distribute in each layer of the silt landfill 1. Before the start of the filling, the solidifying slurry needs to be solidified indoors The test is carried out to determine the best ratio of the silt to be solidified. The pore water in the silt is discharged from the drain pipe, and the injected solidifying slurry enters the drain pipe from the gravel pile 2, flows along the drain pipe and penetrates into all parts of the silt landfill 1. Monitor the changes of vacuum degree under the membrane in real time, and monitor the settlement in the sludge landfill 1 in real time, detect the designated concentration of injected curing agent for the discharged solidified slurry, and reconfigure it to the grouting concentration to participate in the circulating grouting. When the concentration of curing agent in the discharged slurry reaches a certain level and the settlement reaches a certain degree, stop vacuuming and grouting, close the drain valve, pull out the grouting pipe, maintain and wait until the designated curing age is reached, and measure the required parameters of the foundation of the target site.

[0048] For other contents of the blown-fill silt foundation solidification structure using vacuum preloading and crushed stone piles described in the utility model, please refer to the prior art and will not be repeated here.

[0049] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Therefore, any modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A dredger-filled mud foundation solidification structure using vacuum preloading and gravel piles, characterized in that: It includes a vacuum pump, a grouting pump, a first sealing membrane, a plurality of drainage board layers, a plurality of grouting pipes and a plurality of gravel piles arranged at intervals, and sludge is blown in sequence from bottom to top above the bottom surface of the target site to form a plurality of layers of sludge landfill bodies, each of the drainage board layers is laid on the upper surface of each layer of the sludge landfill body, and the first sealing membrane is laid above the drainage board layer located at the top; A plurality of pile holes corresponding to the gravel piles are vertically drilled in the target site, each of the pile holes penetrates each layer of the sludge landfill, each of the gravel piles is inserted into each of the pile holes, and the bottom of each of the gravel piles is flush with the bottom surface of the target site; Each of the drainage board layers includes a drainage pipe, and each of the gravel piles is connected to the drainage pipe. The drainage pipe is provided with at least one drainage port near the edge of each of the silt landfill bodies. At least one grouting pipe is inserted in at least one of the pile holes. Each of the grouting pipes passes through the first sealing membrane and extends into the pile hole. The grouting pump and the vacuum pump are started and stopped synchronously. The grouting pump is connected to each of the grouting pipes and injects solidifying slurry into the pile hole to form a grouted gravel pile. The vacuum pump is connected to the drainage port and is used to evacuate the area below the first sealing membrane.

2. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: The drainage pipeline includes a main pipeline and a plurality of branch pipelines that are interconnected. The main pipeline passes through the pile holes each provided with the grouting pipe and is connected to each of the gravel piles. The plurality of branch pipelines are distributed above the sludge landfill and are connected to the sludge landfill.

3. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 2 is characterized in that: The drainage board includes a plurality of crisscrossing drainage pipes, each of which is provided with a plurality of filter holes at intervals, a part of the filter holes being connected with the sludge landfill body, and another part of the filter holes being connected with the pile holes provided with the grouting pipes, respectively. After the vacuum pump and the grouting pump are started synchronously, the solidified slurry in each pile hole enters the grouting pipe and the sludge landfill body in turn, and each of the drainage pipes is provided with a drainage outlet near the edge of the sludge landfill body.

4. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: The distance between two adjacent gravel piles is 1.0m-2.0m, and the diameter of each gravel pile is 0.3m-0.7m.

5. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: It also includes a settlement monitoring instrument and a slurry concentration monitoring instrument. The settlement monitoring instrument is used to monitor the settlement in the sludge landfill in real time, and the slurry concentration monitoring instrument is used to detect the concentration of the curing agent in the solidified slurry discharged from the drain outlet.

6. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: At least one grouting pipe is arranged in the pile hole located at the center of the sludge landfill body.

7. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: A second sealing membrane is laid at the filling edge area of ​​each layer of the sludge landfill.

8. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: The first sealing film is provided with grouting ports corresponding to each of the grouting pipes at the grouting gravel piles.

9. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: The height of each sludge landfill is 0.1m-0.3m, and the distance between two adjacent drainage boards is 0.6m-3.0m.

10. The vacuum preloading and gravel pile-assisted silt foundation solidification structure according to claim 1 is characterized in that: The vacuum degree under the first sealing film is greater than 0.060 MPa, and the grouting pressure when the grouting pump synchronously grouts into each of the pile holes is 0.3 MPa-0.7 MPa.