Submarine pipe ditch backfilling equipment

By designing the backfill equipment of subsea trench and using the combination of slide and twisted dragon, the problems of low backfill efficiency and high cost in subsea pipeline construction are solved, structural stability and efficient backfill of original soil are achieved, and construction costs are reduced.

CN221956813UActive Publication Date: 2024-11-05HENGTAI GLOBAL OFFSHORE ENG TIANJIN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323476618.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-11-05
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

During the construction of subsea pipelines, existing backfill equipment is difficult to adapt to the subsea environment and cannot effectively support and backfill the original soil, resulting in low construction efficiency and high cost.

Method used

A subsea trench backfill device was designed, using frames, support frames, slides, traction cables and adjustable backfill devices. The sliding spikes and twisted dragons are used to achieve stable support and efficient backfills, and the height of twisted dragons is adjusted by adjusting the mechanism to Adapt to subsea conditions.

Benefits of technology

This equipment overcomes the problem of poor bearing capacity of subsea pipe trench, ensures structural stability and efficient backfill, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956813U_ABST
    Figure CN221956813U_ABST
Patent Text Reader

Abstract

The utility model provides seabed pipe ditch backfilling equipment which comprises a rack, a hoisting cable is arranged on the rack, supporting frames are arranged at the left end and the right end of the lower portion of the rack respectively, sliding pries are arranged at the bottoms of the supporting frames, and traction cables are arranged at the front ends of the two sliding pries; a working frame is installed on a main beam at the lower end of the machine frame, the upper end of the working frame is installed on the main beam in a sliding mode and fixed through a detachable connecting piece, a backfilling device is installed on the working frame, and an adjusting mechanism used for adjusting the height of the backfilling device is installed on the main beam or the working frame. The device is simple in structure and reasonable in design, can be stably supported on the two sides of the seabed pipe ditch by means of the skid, solves the problem that the bearing capacity of the two sides of the pipe ditch is poor, effectively guarantees the structural stability when the device works, is high in original soil backfilling efficiency, and saves the backfilling construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of submarine pipeline construction, and in particular relates to a submarine trench backfilling device. Background Art

[0002] During pipeline construction, trenches are usually excavated, and after laying the pipeline in the trenches, the original soil in the trenches is backfilled to complete the pipeline construction. During roadbed construction, backfilling equipment with walking wheels or vehicle-mounted backfilling devices are generally used for original soil backfilling operations. However, during submarine pipeline construction, since the submarine trenches do not have the bearing capacity of the roadbed, ordinary backfilling equipment is difficult to apply to the backfilling during submarine pipeline construction. Therefore, it is necessary to improve the existing backfilling equipment to meet the needs of submarine construction. Summary of the invention

[0003] In view of this, the present invention aims to overcome the defects in the prior art and proposes a submarine trench backfilling device.

[0004] To achieve the above object, the technical solution created by the present invention is implemented as follows:

[0005] A submarine trench backfilling device comprises a frame, a lifting cable is arranged on the frame, support frames are respectively arranged at the left and right ends of the lower part of the frame, skids are arranged at the bottom of the support frames, and traction cables are arranged at the front ends of the two skids; a working frame is installed on the main beam at the lower end of the frame, the upper end of the working frame is slidably installed on the main beam and fixed by a detachable connecting piece, a backfilling device is installed on the working frame, and an adjustment mechanism for adjusting the height of the backfilling device is installed on the main beam or the working frame.

[0006] Furthermore, the skid includes a rudder plate, and reinforcing ribs are provided on the upper portion of the rudder plate along the length direction.

[0007] Furthermore, the lower surfaces of the two skids are in the same horizontal plane.

[0008] Furthermore, a tilting portion is provided at the front end of the rudder plate.

[0009] Furthermore, the backfilling device includes a horizontally arranged auger.

[0010] Furthermore, the adjustment mechanism includes an adjusting cylinder, which directly drives the auger of the backfilling device to adjust in the height direction, or a connecting rod mechanism is arranged between the extension rod of the adjusting cylinder and the auger, and the adjusting cylinder drives the connecting rod to move, thereby driving the auger to achieve height position adjustment.

[0011] Furthermore, the support frame is detachably connected to the frame, and the skid is detachably connected to the support frame.

[0012] Compared with the prior art, the present invention has the following advantages:

[0013] The equipment has a simple structure and reasonable design. With the help of skids, it can be stably supported on both sides of the trench on the seabed, overcoming the problem of poor bearing capacity on both sides of the trench, effectively ensuring the structural stability of the equipment when working, and having high original soil backfill efficiency, saving backfill construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The drawings constituting part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0015] Figure 1 A schematic diagram of the structure created by the present invention;

[0016] Figure 2 A side view created for the present invention;

[0017] Figure 3 A top view of the invention. DETAILED DESCRIPTION

[0018] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0019] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0020] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.

[0021] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.

[0022] A submarine trench backfilling device, such as Figures 1 to 3 As shown, it includes a frame 1, on which a lifting cable 2 is provided, support frames 3 are respectively provided at the left and right ends of the lower part of the frame, a skid 4 is provided at the bottom of the support frame, and a traction cable 5 is provided at the front end of the two skids; a working frame 6 is installed on the main beam at the lower end of the frame (the main beam is arranged in a direction perpendicular to the length of the skid), and the upper end of the working frame is slidably installed on the main beam 7 and fixed by a detachable connecting piece. Specifically, a connecting arm can be provided at the upper end of the working frame, and the connecting arm slides with the main beam (along the length direction of the main beam). The connecting piece can be a connecting screw or other, as long as the working frame (connecting arm) can be fixed to the main beam.

[0023] The working frame (backfilling device) can adjust the installation position as needed, with high flexibility and small limitations. Under normal working conditions, the two working frames (backfilling devices) are symmetrically arranged with the center of the frame as the center. A backfilling device 8 is installed on the working frame, and an adjustment mechanism 9 for adjusting the height of the backfilling device is installed on the main beam or the working frame. As an example, the above-mentioned backfilling device includes a horizontally arranged auger 13. As an example, a hydraulically or electrically driven auger can be used, which can transport the original soil beside the trench to a predetermined position (and in a predetermined direction).

[0024] The skid comprises a rudder plate 10, and a reinforcing rib 11 is provided on the upper part of the rudder plate along the length direction. The lower surfaces of the two skids are in the same horizontal plane. A tilting portion 12 is provided at the front end of the rudder plate, so that the rudder plate can slide stably on the upper side of the seabed mud. The support frame is detachably connected to the frame, and the skid is detachably connected to the support frame, which is very convenient for assembly and disassembly and replacement.

[0025] The above-mentioned adjustment mechanism includes an adjusting cylinder, which directly drives the auger of the backfilling device to adjust in the height direction through the adjusting cylinder, or a connecting rod mechanism is arranged between the extension rod of the adjusting cylinder and the auger, and the connecting rod is driven by the adjusting cylinder to move, thereby driving the auger to achieve height position adjustment. As long as the height position adjustment can be achieved, the installation position and installation form of the adjustment mechanism are not specifically limited, and technical personnel in this field can choose as needed.

[0026] During construction, the backfill device is adjusted to a suitable height using an adjustment mechanism, and the device is lowered to the seabed by a lifting device. The device posture is monitored using sonar to make it straddle the center of the trench, so that the two side skids are supported on both sides of the trench respectively. The backfill device is started, and the auger begins to rotate. With the help of a traction cable connected to the skid, the traction device moves forward along the trench. The rotation of the auger causes the soil on both sides of the trench to be transported into the trench, thereby achieving the trench backfill effect. The device has a simple structure and a reasonable design. With the help of a skid, it can be stably supported on both sides of the trench on the seabed, overcoming the problem of poor bearing capacity on both sides of the trench, effectively ensuring the structural stability of the equipment when it is working, and having high efficiency in backfilling the original soil, saving backfill construction costs.

[0027] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A submarine trench backfilling device, characterized in that: It includes a frame, which is provided with a lifting cable, support frames are respectively provided at the left and right ends of the lower part of the frame, skids are provided at the bottom of the support frames, and traction cables are provided at the front ends of the two skids; a working frame is installed on the main beam at the lower end of the frame, the upper end of the working frame is slidably installed on the main beam and fixed by a detachable connecting piece, a backfilling device is installed on the working frame, and an adjustment mechanism for adjusting the height of the backfilling device is installed on the main beam or the working frame.

2. The submarine trench backfilling equipment according to claim 1, characterized in that: The skid comprises a rudder plate, and reinforcing ribs are arranged on the upper portion of the rudder plate along the length direction.

3. The submarine trench backfilling equipment according to claim 1, characterized in that: The lower surfaces of the two skids are in the same horizontal plane.

4. The submarine trench backfilling equipment according to claim 2, characterized in that: A tilting portion is provided at the front end of the rudder plate.

5. The submarine trench backfilling equipment according to claim 1, characterized in that: The backfilling device comprises a horizontally arranged auger.

6. The submarine trench backfilling equipment according to claim 1, characterized in that: The adjustment mechanism comprises an adjustment cylinder.

7. The submarine trench backfilling equipment according to claim 1, characterized in that: The support frame is detachably connected to the frame, and the skid is detachably connected to the support frame.