Mounting and positioning device for foundation bolts of large device cluster
By adopting adjustable crossbar components and auxiliary components in the anchor bolt installation and positioning device, the problem of insufficient adaptation and support of anchor bolts of different sizes is solved, and a more stable and durable anchor bolt fixation is achieved.
Patent Information
- Application Number
- CN202323602065.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The existing anchor bolt installation and positioning devices cannot adapt to anchor bolts of different sizes, and the support crossbar is insufficient, resulting in unstable connection problems.
Using a device including the support body, steel pipe columns, fixed blocks, crossbars, movable blocks and auxiliary components, the limit fixation of anchor bolts of different sizes is achieved through adjustable crossbar components and auxiliary components, and the limit fixation of anchor bolts is achieved through the positioning rod. The linkage groove ensures the stability of the connecting rod and avoids fracture caused by excessive pressure.
Accurate limit fixation of anchor bolts of different sizes is achieved, which improves the stability and service life of the connection, and avoids damage caused by bolt movement and excessive pressure.
Smart Images

Figure CN221957234U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building installation equipment, in particular to an installation and positioning device for cluster anchor bolts of large-scale devices. Background Art
[0002] Large device clusters refer to clusters of large scientific devices, which usually occupy a large area and need to be fixed with large steel structures. At present, there are various methods for installing anchor bolts of large steel structures at construction sites. The installation accuracy and efficiency of anchor bolts directly affect the installation of steel columns and the overall installation progress of the upper steel structure. They are important nodes in steel structure construction. Since steel structure buildings have high single-story heights and large spans, more anchor bolts are required as the foundation.
[0003] For example, the patent publication number CN202222917984.2 discloses a foundation bolt installation and positioning device, which uses a frame composed of steel pipe columns and steel pipe cross bars to position and fix the foundation bolt installation and positioning device group, which can achieve accurate positioning of the foundation bolt installation and positioning device group, that is, improve the installation accuracy of the foundation bolt installation and positioning device group and speed up the concrete pouring progress. The frame has good independence, fast installation speed, good overall effect, and the frame can be circulated and recycled. It is easy to recycle after use, and the comprehensive cost is low. However, this technical solution still has shortcomings, as follows:
[0004] The crossbar of the installation and positioning device is of fixed size during use, and can only limit and fix one type of anchor bolts. It has great limitations in use. Once anchor bolts of different sizes need to be fixed and there are no crossbars of suitable sizes on site, it cannot be limited, or it is troublesome to carry crossbars of multiple sizes. Secondly, when the steel bars are limited, they are only limited from below, and the supporting crossbars are not limited, which can easily cause unstable connections. For this reason, we propose an installation and positioning device for anchor bolts of large-scale device clusters to solve the above-mentioned problems. Utility Model Content
[0005] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the name of the utility model to avoid blurring the purpose of this section, the abstract of the specification and the name of the utility model, and such simplifications or omissions cannot be used to limit the scope of the utility model.
[0006] Therefore, the purpose of the utility model is to provide an installation and positioning device for cluster anchor bolts of large-scale devices, which can solve the problem that the existing cross bar size is fixed and cannot adapt to different anchor bolts, and the supporting cross bar is not limited, which may cause the anchor bolts to move.
[0007] In order to solve the above technical problems, the utility model provides an installation and positioning device for cluster anchor bolts of large-scale devices, which adopts the following technical solutions: comprising a receiving assembly, which also comprises a cap body, a protective sleeve is connected to the top of the cap body, and support legs are arranged around the cap body;
[0008] A crossbar assembly, further comprising a steel pipe column, wherein the steel pipe column is located inside the protective sleeve, the upper and lower sides of the steel pipe column are connected to fixing blocks, the two sides of the fixing block are connected to first crossbars, extension rods are connected between the first crossbars, and a second crossbar is further arranged above the first crossbar;
[0009] The bolt assembly further comprises a movable block, wherein the movable block is located outside the second cross bar, the inner side of the movable block is connected to a first positioning rod, a connecting rod is arranged above the first positioning rod, a bolt body is connected below the connecting rod, and a second positioning rod is arranged above the connecting rod;
[0010] The auxiliary component also includes an auxiliary rod, which is located on both sides of the fixed block. The auxiliary rod is connected to a receiving rod inside. A second linkage groove is opened above the receiving rod. The second linkage groove is connected to a linkage rod inside. The bottom of the linkage rod is located inside the first linkage groove, and the first linkage groove is located above the load-bearing rod.
[0011] By adopting the above-mentioned technical solution, this solution cooperates with the cross bar assembly and the auxiliary assembly so that the cross bars can adjust the lengths between each other, thereby adapting to the limiting fixation of the anchor bolts under any circumstances. Secondly, the first positioning rod and the second positioning rod are cooperated to ensure the stability of the connecting rod, and the movable block is used to limit the connection to prevent the connecting rod from shaking.
[0012] Optionally, the pedestal body is cast by concrete, and protective sleeves are evenly and equidistantly distributed above the pedestal body. The protective sleeves are connected to the steel pipe columns by sliding connection.
[0013] By adopting the above technical solution, this solution cooperates with the base body and the protective sleeve so that the steel pipe column can be connected to the base body for subsequent limiting work.
[0014] Optionally, the steel pipe column is connected to the fixed block by hot-melt connection, the fixed block is connected to the first cross bar by sliding connection, and the first cross bar is connected to the extension rod by sliding connection.
[0015] By adopting the above technical solution, the present solution limits the first cross bar by cooperating with the steel pipe column and the fixed block to ensure stable support. At the same time, the length of the first cross bar can be adjusted through the extension rod to adapt to any situation.
[0016] Optionally, the size and shape of the second cross bar are consistent with those of the first cross bar, the second cross bar is staggered and distributed on both sides of the fixed block, and the second cross bar is located in the upper part of the steel pipe column.
[0017] By adopting the above technical solution, this solution limits the upper steel pipe column through the second cross bar to ensure the stable operation of the steel pipe column, so as to carry out the subsequent work process.
[0018] Optionally, the movable block is connected to the first positioning rod by sliding connection, the movable block is connected to the second cross bar by sliding connection, and the size of the first positioning rod is consistent with the size of the second positioning rod.
[0019] By adopting the above technical solution, the present solution limits the first positioning rod and the second positioning rod by limiting the movable block, so that the first positioning rod and the second positioning rod will not move randomly, thereby stably limiting the connecting rod.
[0020] Optionally, the first positioning rod and the second positioning rod are symmetrically distributed on the upper and lower sides of the center of the connecting rod, and bolt bodies are evenly and equidistantly distributed below the connecting rod, and the connecting rod and the bolt body are installed in an integrated manner.
[0021] By adopting the above technical solution, the present solution limits the upper and lower sides of the connecting rod by cooperating with the first positioning rod and the second positioning rod to prevent the connecting rod from shaking during use and causing an unstable connection.
[0022] Optionally, the auxiliary rod and the receiving rod are connected in a sliding manner, and second linkage grooves are evenly and equidistantly distributed on both sides of the auxiliary rod and the receiving rod, and the second linkage grooves are connected to the linkage rod in a sliding manner.
[0023] By adopting the above technical solution, the present solution cooperates with the linkage rod through the second linkage groove to limit and fix the receiving rod and the auxiliary rod, thereby preventing them from breaking due to high pressure during use.
[0024] Optionally, the linkage rod and the first linkage groove are connected by sliding connection, the first linkage grooves are evenly and equidistantly distributed above the load-bearing rod, and the load-bearing rod and the steel pipe column are connected by hot-melt connection.
[0025] By adopting the above technical solution, the present solution distributes the pressure to the upper part of the load-bearing rod through the cooperation between the linkage rod and the first linkage groove, thereby ensuring the use of the auxiliary rod and the receiving rod.
[0026] In summary, the present invention has at least one of the following beneficial effects:
[0027] By setting a receiving rod between the auxiliary rods, the spacing between the auxiliary rods can be adjusted to achieve the purpose of limiting and fixing the anchor bolts in different situations. Secondly, by setting a second linkage groove to cooperate with the linkage rod, the receiving rod and the auxiliary rod are limited to avoid breakage caused by excessive pressure. A load-bearing rod is also set below to further share the pressure and extend the service life of the auxiliary rod and the receiving rod.
[0028] By respectively arranging a second positioning rod and a first positioning rod on the upper and lower sides of the connecting rod, the upper and lower sides of the connecting rod are limited to ensure that the limit is stable and will not affect the fixation of the anchor bolts. Secondly, by arranging a movable block to connect the first positioning rod and the second positioning rod, it is ensured that they will not slide around during use, thereby improving stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0030] Figure 1 It is a schematic diagram of the overall front view structure of the utility model;
[0031] Figure 2 This is a schematic diagram of the top view of the crossbar assembly of the utility model;
[0032] Figure 3 This is a schematic diagram of the top view of the bolt assembly of the utility model;
[0033] Figure 4 This is a front view structural diagram of the auxiliary component of the utility model;
[0034] Figure 5 It is a schematic diagram of the top view structure of the auxiliary component of the utility model.
[0035] Description of reference numerals:
[0036] 100, receiving assembly; 101, supporting platform body; 102, protective sleeve; 103, supporting leg;
[0037] 200, crossbar assembly; 201, steel pipe column; 202, fixing block; 203, first crossbar; 204, extension rod; 205, second crossbar;
[0038] 300, bolt assembly; 301, movable block; 302, first positioning rod; 303, second positioning rod; 304, connecting rod; 305, bolt body;
[0039] 400, auxiliary component; 401, auxiliary rod; 402, receiving rod; 403, linkage rod; 404, load-bearing rod; 4011, first linkage slot; 4012, second linkage slot. DETAILED DESCRIPTION
[0040] The following is combined with Figure 1-5 The utility model is described in further detail.
[0041] Embodiment 1, refer to Figure 1-2 In this embodiment, in order to solve the problem that the existing steel pipe column 201 cannot be adapted to different anchor bolts, and the pipe clamp is prone to thread wear during the recycling process and cannot be used anymore, the utility model discloses an installation and positioning device for the anchor bolts of a large device cluster.
[0042] It includes a receiving assembly 100, which also includes a support platform body 101, a protective sleeve 102 is connected to the top of the support platform body 101, and support legs 103 are arranged around the support platform body 101;
[0043] The crossbar assembly 200 also includes a steel pipe column 201, which is located inside the protective sleeve 102. The upper and lower sides of the steel pipe column 201 are connected with fixing blocks 202, and the two sides of the fixing block 202 are connected with a first crossbar 203. The first crossbar 203 is fixed by the fixing block 202 to prevent the pipe from being stuck in the cycle disassembly process due to thread damage and unable to continue to be used. Extension rods 204 are connected between the first crossbars 203, and a second crossbar 205 is also arranged above the first crossbar 203. The extension rod 204 makes the first crossbar 203 adjustable to adapt to the limiting and fixing work of any anchor bolt.
[0044] The pedestal body 101 is made of poured concrete, and protective sleeves 102 are evenly and equidistantly distributed above the pedestal body 101. The protective sleeves 102 are connected to the steel pipe columns 201 by sliding connection. Through the cooperation between the pedestal body 101 and the protective sleeves 102, the steel pipe columns 201 can be connected to the pedestal body 101 for subsequent limiting work.
[0045] The connection method between the steel pipe column 201 and the fixed block 202 is hot-melt connection, the connection method between the fixed block 202 and the first cross bar 203 is sliding connection, and the connection method between the first cross bar 203 and the extension rod 204 is sliding connection. The steel pipe column 201 cooperates with the fixed block 202 to limit the first cross bar 203 to ensure stable support. At the same time, the extension rod 204 makes the length of the first cross bar 203 adjustable to adapt to any situation.
[0046] The size and shape of the second cross bar 205 are consistent with those of the first cross bar 203. The second cross bar 205 is staggered on both sides of the fixed block 202. The second cross bar 205 is located in the upper half of the steel pipe column 201. The second cross bar 205 is used to limit the upper steel pipe column 201 to ensure stable operation of the steel pipe column 201, thereby carrying out subsequent work processes.
[0047] The specific working principle is: first, insert the steel pipe column 201 into the interior of the protective sleeve 102, then insert the first cross bar 203 into the interior of the fixed block 202, and then insert the extension rod 204 into the interior of the first cross bar 203, and then insert it into the new first cross bar 203 from the other side, so that the two first cross bars 203 are connected to the extension rod 204, and the first cross bar 203 is fixedly connected through the extension rod 204, and then the other first cross bars 203 and the second cross bars 205 are spliced in turn to complete the fixed connection work.
[0048] Example 2, refer to Figure 1-3 In order to solve the problem of limited limiting effect of the existing connecting rod 304 in this embodiment, based on the same concept as the above-mentioned embodiment 1, the installation and positioning device of the large-scale device cluster anchor bolts also includes:
[0049] The bolt assembly 300 also includes a movable block 301, which is located on the outside of the second cross bar 205. The first positioning rod 302 and the second positioning rod 303 are limited and fixed by the movable block 301 to prevent them from moving during use and affecting subsequent fixation. The first positioning rod 302 is connected to the inner side of the movable block 301, and a connecting rod 304 is arranged above the first positioning rod 302. The bolt body 305 is connected below the connecting rod 304. The bolt body 305 is limited by the first positioning rod 302 and the second positioning rod 303 respectively to ensure that subsequent fixing work is carried out. The second positioning rod 303 is arranged above the connecting rod 304.
[0050] The movable block 301 is connected to the first positioning rod 302 in a sliding manner, and the movable block 301 is connected to the second cross bar 205 in a sliding manner. The size of the first positioning rod 302 is consistent with the size of the second positioning rod 303. The movable block 301 and the first positioning rod 302 are limited so that the first positioning rod 302 and the second positioning rod 303 will not move at will, thereby stably limiting the connecting rod 304.
[0051] The first positioning rod 302 and the second positioning rod 303 are symmetrically distributed on the upper and lower sides of the center of the connecting rod 304. The bolt bodies 305 are evenly and equidistantly distributed below the connecting rod 304. The connecting rod 304 and the bolt bodies 305 are installed in an integrated manner. The first positioning rod 302 and the second positioning rod 303 cooperate to limit the upper and lower sides of the connecting rod 304 to prevent it from shaking during use and causing an unstable connection.
[0052] The specific working principle is: as mentioned above, after the second cross bar 205 is properly fixed, the bolt body 305 is placed above the base body 101, and the connecting rod 304 above the bolt body 305 is above the second cross bar 205, and the movable block 301 is adjusted, and it slides with the second cross bar 205, and the position changes so that it is aligned with the connecting rod 304, and then the first positioning rod 302 is inserted under the connecting rod 304 to preliminarily limit the connecting rod 304, and then the second positioning rod 303 is also inserted above the movable block 301 to clamp the connecting rod 304 up and down, so as to prevent it from shaking during use and affecting the subsequent connection and fixing work.
[0053] Example 3, refer to Figure 4-5 In this embodiment, in order to solve the problem that the first cross bar 203 is prone to breakage due to excessive pressure during use, based on the same concept as the above-mentioned embodiment 1, the installation and positioning device for the large-scale device cluster anchor bolts also includes:
[0054] The auxiliary component 400 also includes an auxiliary rod 401, which is located on both sides of the fixed block 202. The auxiliary rod 401 is internally connected to the receiving rod 402, and a second linkage groove 4012 is provided above the receiving rod 402. The linkage rod 403 is connected through the second linkage groove 4012 to perform subsequent auxiliary fixing work to avoid damage caused by excessive pressure. The second linkage groove 4012 is internally connected to the linkage rod 403, and the lower part of the linkage rod 403 is located inside the first linkage groove 4011. The first linkage groove 4011 is located above the load-bearing rod 404. The pressure is distributed to the load-bearing rod 404 through the linkage rod 403, thereby extending the service life of the auxiliary rod 401 and the receiving rod 402, and ensuring the subsequent work.
[0055] The auxiliary rod 401 and the receiving rod 402 are connected in a sliding manner. Second linkage grooves 4012 are evenly and equidistantly distributed on both sides of the auxiliary rod 401 and the receiving rod 402. The second linkage grooves 4012 and the linkage rod 403 are connected in a sliding manner. The receiving rod 402 and the auxiliary rod 401 are limited and fixed by cooperating with the second linkage grooves 4012 and the linkage rod 403 to prevent them from breaking due to high pressure during use.
[0056] The connection method between the linkage rod 403 and the first linkage groove 4011 is a sliding connection. The first linkage grooves 4011 are evenly and equidistantly distributed above the load-bearing rod 404. The connection method between the load-bearing rod 404 and the steel pipe column 201 is a hot-melt connection. Through the cooperation between the linkage rod 403 and the first linkage groove 4011, the pressure is distributed above the load-bearing rod 404, ensuring the use of the auxiliary rod 401 and the receiving rod 402.
[0057] The specific working principle is: as mentioned above, after the steel pipe column 201 is installed, the auxiliary rod 401 and the receiving rod 402 are installed with the fixed block 202 according to the method of the first cross bar 203 and the extension rod 204. It should be noted that the auxiliary rod 401 and the second linkage groove 4012 of the receiving rod 402 should be aligned, and then the linkage rod 403 is grabbed and inserted into the first linkage groove 4011 below through the second linkage groove 4012 in turn, so that the linkage rod 403 connects the receiving rod 402 and the load-bearing rod 404 to share their use pressure, so as to carry out subsequent fixing work and extend the service life of the auxiliary rod 401 and the receiving rod 402.
[0058] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. Installation and positioning device for large-scale equipment cluster anchor bolts, Features: include, A receiving assembly (100), further comprising a support platform body (101), a protective sleeve (102) being connected to the top of the support platform body (101), and supporting legs (103) being arranged around the support platform body (101); A crossbar assembly (200), further comprising a steel pipe column (201), wherein the steel pipe column (201) is located inside the protective sleeve (102), the upper and lower sides of the steel pipe column (201) are connected to fixing blocks (202), the two sides of the fixing block (202) are connected to first crossbars (203), extension rods (204) are connected between the first crossbars (203), and a second crossbar (205) is further arranged above the first crossbar (203); A bolt assembly (300), further comprising a movable block (301), the movable block (301) being located outside the second crossbar (205), the inner side of the movable block (301) being connected to a first positioning rod (302), a connecting rod (304) being arranged above the first positioning rod (302), a bolt body (305) being connected below the connecting rod (304), and a second positioning rod (303) being arranged above the connecting rod (304); The auxiliary component (400) further comprises an auxiliary rod (401), wherein the auxiliary rod (401) is located on both sides of the fixed block (202), the auxiliary rod (401) is internally connected to a receiving rod (402), a second linkage groove (4012) is provided above the receiving rod (402), a linkage rod (403) is internally connected to the second linkage groove (4012), the linkage rod (403) is located below the first linkage groove (4011), and the first linkage groove (4011) is located above the load-bearing rod (404).
2. The installation and positioning device for the anchor bolts of a large-scale device cluster according to claim 1, Features: The foundation body (101) is cast by concrete, and protective sleeves (102) are evenly and equidistantly distributed above the foundation body (101). The protective sleeves (102) are connected to the steel pipe column (201) in a sliding manner.
3. The installation and positioning device for the anchor bolts of a large-scale device cluster according to claim 2, Features: The steel pipe column (201) is connected to the fixed block (202) by hot-melt connection, the fixed block (202) is connected to the first cross bar (203) by sliding connection, and the first cross bar (203) is connected to the extension bar (204) by sliding connection.
4. The installation and positioning device for the anchor bolts of a large-scale device cluster according to claim 3, Features: The size and shape of the second crossbar (205) are consistent with those of the first crossbar (203); the second crossbars (205) are staggeredly distributed on both sides of the fixed block (202); and the second crossbar (205) is located at the upper part of the steel pipe column (201).
5. The installation and positioning device for the anchor bolts of a large-scale device cluster according to claim 4, Features: The movable block (301) is connected to the first positioning rod (302) in a sliding manner, and the movable block (301) is connected to the second cross rod (205) in a sliding manner. The size of the first positioning rod (302) is consistent with that of the second positioning rod (303).
6. The installation and positioning device for the anchor bolts of a large-scale device cluster according to claim 5, Features: The first positioning rod (302) and the second positioning rod (303) are symmetrically distributed on the upper and lower sides of the center of the connecting rod (304), and bolt bodies (305) are evenly and equidistantly distributed below the connecting rod (304). The connecting rod (304) and the bolt bodies (305) are installed in an integrated manner.
7. The installation and positioning device for the anchor bolts of a large-scale device cluster according to claim 6, Features: The auxiliary rod (401) and the receiving rod (402) are connected in a sliding manner, and second linkage grooves (4012) are evenly and equidistantly distributed on both sides of the auxiliary rod (401) and the receiving rod (402), and the second linkage grooves (4012) and the linkage rod (403) are connected in a sliding manner.
8. The installation and positioning device for the anchor bolts of a large-scale equipment cluster according to claim 7, Features: The linkage rod (403) and the first linkage groove (4011) are connected by sliding connection. The first linkage grooves (4011) are evenly and equidistantly distributed above the load-bearing rod (404). The load-bearing rod (404) and the steel pipe column (201) are connected by hot-melt connection.