Movable air monitoring station house

By designing a movable air monitoring station building, the disassembly connection and split transportation of the steel structure main body and guardrail components are solved, and the problem of the traditional station building is not easy to move and resource waste is achieved, and the flexible position adjustment of the station building and the efficient resource of the resources are achieved. use.

CN221957296UActive Publication Date: 2024-11-05HALUMM CONSTRUCTION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323294601.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-04
Publication Date
2024-11-05
Estimated Expiration
2033-12-04

AI Technical Summary

Technical Problem

Traditional air monitoring stations are not easy to transfer and reuse according to changes in monitoring points, resulting in waste of resources, high construction costs and construction waste.

Method used

A movable air monitoring station building is designed, using the main body of the steel structure and the guardrail assembly to be disassembled and connected by locking components, which can separate the installation and disassembly transport, simplify the installation and disassembly process, reduce the construction cycle, and realize the location of the station building. Adjust and reuse.

Benefits of technology

It realizes flexible movement and reuse of air monitoring station buildings, avoids waste of resources and high construction costs, and reduces the generation of construction waste caused by changes in monitoring points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957296U_ABST
    Figure CN221957296U_ABST
Patent Text Reader

Abstract

The utility model discloses a movable air monitoring station house which comprises a steel structure body and a guardrail assembly, a supporting base is arranged at the lower end of the steel structure body in the height direction, and the supporting base is arranged perpendicular to the height direction and used for being arranged on an elevated concrete pier in a separable mode. A plurality of fixing bases are arranged at the upper end of the steel structure body at intervals along the section contour, perpendicular to the height direction, of the steel structure body. The guardrail assembly is detachably connected to the upper end of the fixed base through the locking assembly. According to the utility model, not only can transfer and reuse be carried out, the phenomenon of resource waste be avoided, but also high construction cost and construction waste caused by position replacement of the monitoring points can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering and environmental air monitoring, and in particular to a movable air monitoring station building. Background Art

[0002] Air monitoring station is a common device for fixed-point, continuous or timed sampling, measurement and analysis of pollutants in the atmosphere and air. In order to monitor the air, several air stations are usually set up in a key environmental protection city. Multi-parameter automatic monitoring instruments are installed in the station for continuous automatic monitoring. The monitoring results are stored in real time and analyzed to obtain relevant data. The air monitoring station is the basic platform for air quality control and reasonable assessment of air quality, and is an infrastructure for urban air environment protection.

[0003] Traditional air monitoring station buildings are built on elevated concrete piers with brick walls and cast-in-place concrete roofs. Traditional air monitoring station buildings cannot be moved after installation and have poor flexibility. When the monitoring point changes, it is not easy to transfer and reuse the air monitoring station building, which easily leads to waste of air monitoring station building resources. Utility Model Content

[0004] Therefore, the technical problem to be solved by the utility model is to overcome the defect that the air monitoring station in the prior art is not easy to transfer and reuse according to the changes in the monitoring points, which easily causes waste of air monitoring station resources, thereby providing a movable air monitoring station.

[0005] A movable air monitoring station provided by the utility model includes:

[0006] The steel structure body has a support base disposed at the lower end along the height direction, the support base is arranged perpendicular to the height direction, and is used to be detachably arranged on the elevated concrete pier; a plurality of fixed bases are arranged at intervals along the cross-sectional profile of the steel structure body perpendicular to the height direction at the upper end of the steel structure body;

[0007] The guardrail assembly is detachably connected to the upper end of the fixed base via a locking assembly.

[0008] A movable air monitoring station according to the utility model has at least the following technical effects:

[0009] By providing a support base on the lower end face of the steel structure body, the support base is arranged perpendicular to the height direction, thereby increasing the abutment contact area with the upper end face of the elevated concrete pier, and the steel structure body can be stably supported, so that the air monitoring station can be stably supported for normal use on the elevated concrete pier at the monitoring point; at the same time, the guardrail assembly is detachably connected to the upper end of the steel structure body through a locking assembly, and because the steel structure body and the elevated concrete pier can be separately arranged, when it is necessary to install the air monitoring station at the monitoring point, the steel structure body and the guardrail assembly can be manufactured separately first, and after being transported to the monitoring point separately, they can be moved to the monitoring point by hoisting equipment for assembly, without the need to assemble at the monitoring point. The air monitoring station building can be directly constructed, and the construction period is greatly shortened. By transporting the steel structure body and the guardrail components separately, the problem of the overall height of the air monitoring station building being too high and inconvenient to transport can be effectively avoided. When the air monitoring station building is no longer used at a certain monitoring point, the guardrail components can be quickly removed from the upper end of the steel structure body, and transported to the required monitoring point respectively, and then moved to the required monitoring point by lifting equipment for assembly, so that the air monitoring station building that is no longer used at the monitoring point can be moved to the required monitoring point for reuse, which can avoid the waste of resources and the high construction cost and construction waste caused by the need to change the location of the monitoring point.

[0010] Preferably, a first internal threaded hole is provided at the upper end of the fixed base along the height direction, and a first through hole is provided on the guardrail assembly in a one-to-one correspondence with the position of the first internal threaded hole; the locking assembly includes a first mounting bolt matching the first internal threaded hole; during assembly, the first mounting bolt passes through the first through hole and is threadedly connected in the first internal threaded hole.

[0011] Preferably, a fifth through hole is provided on the fixed base along the height direction, and a sixth through hole is provided on the guardrail assembly in a one-to-one correspondence with the position of the fifth through hole; the locking assembly includes a second mounting bolt and a mounting nut, and during assembly, the second mounting bolt passes through the fifth through hole and the sixth through hole and is screwed onto the mounting nut.

[0012] Preferably, the first through hole is configured as a first waist-shaped through hole.

[0013] Preferably, a second internal threaded hole is arranged at the upper end of the steel structure body at a position corresponding to the fixed base, and a second through hole is arranged at a position corresponding to the second internal threaded hole on the fixed base, and the second through hole penetrates the fixed base in the height direction; during assembly, the locking bolt passes through the second through hole and is threadedly connected in the second internal threaded hole;

[0014] And / or, the four corners of the upper end surface of the steel structure body are respectively provided with lifting rings;

[0015] And / or, the guardrail assembly includes four arc corner guardrails, which are respectively installed at the four corners of the steel structure body, and a straight section guardrail is detachably connected between two adjacent arc corner guardrails;

[0016] And / or, the steel structure body includes a first steel component and a second steel component, the first steel component is located directly above the second steel component along the height direction, the cross-sectional profile of the first steel component perpendicular to the height direction is a rectangle, and the projection of the first steel component along the height direction overlaps with the second steel component; a plurality of supporting steel pipes are arranged between the first steel component and the second steel component along the rectangular profile at intervals, and the supporting steel pipes are arranged parallel to the height direction; the fixed base is arranged on the upper end surface of the first steel component, and the supporting base is arranged on the lower end surface of the second steel component.

[0017] Preferably, two adjacent arc corner guardrails are provided with a third through hole at one end facing each other, and each of the straight segment guardrails is provided with a third internal threaded hole at both ends corresponding to the third through hole along the length direction of the straight segment guardrail; during assembly, the first fastening bolt passes through the third through hole and is threadedly connected in the third internal threaded hole;

[0018] And / or, the second through hole is configured as a second waist-shaped through hole, and the second waist-shaped through hole is arranged parallel to the length direction of the fixed base.

[0019] Preferably, the first steel component comprises a first steel pipe, a second steel pipe, a third steel pipe and a fourth steel pipe, wherein the first steel pipe, the second steel pipe, the third steel pipe and the fourth steel pipe are connected end to end in sequence to form a rectangular outline; the first steel pipe and the third steel pipe are arranged parallel to the width direction, the second steel pipe and the fourth steel pipe are arranged parallel to the length direction, and a plurality of first reinforcing steel pipes are arranged between the second steel pipe and the fourth steel pipe at intervals along the length direction;

[0020] And / or, the second steel component includes a fifth steel pipe, a sixth steel pipe, a seventh steel pipe and an eighth steel pipe, the fifth steel pipe, the sixth steel pipe, the seventh steel pipe and the eighth steel pipe are connected end to end in sequence to form a rectangular outline, the fifth steel pipe and the seventh steel pipe are arranged parallel to the width direction, the sixth steel pipe and the eighth steel pipe are arranged parallel to the length direction, and a plurality of second reinforcing steel pipes are arranged between the sixth steel pipe and the eighth steel pipe along the length direction;

[0021] And / or, the steel structure body further includes a climbing ladder, and the climbing ladder is obliquely connected between the first steel component and the second steel component.

[0022] Preferably, the circumferential surface of the steel structure body is covered with an exterior wall assembly, which includes an aluminum plate and a decorative panel, wherein the aluminum plate is located on the side of the decorative panel away from the geometric center of the steel structure body along the thickness direction of the aluminum plate; thermal insulation rock wool is filled between the aluminum plate and the decorative panel.

[0023] Preferably, the exterior wall assembly also includes a plurality of reinforcing square tubes, which are arranged at intervals between the aluminum plate and the decorative plate along the length direction of the aluminum plate, and the aluminum plate and the decorative plate are respectively abutted against both sides of the reinforcing square tubes along the thickness direction of the aluminum plate.

[0024] Preferably, a fourth through hole is formed through the support base along the height direction, and the fourth through hole is used for the second fastening bolt embedded in the elevated concrete pier to pass through; during assembly, the second fastening bolt passes through the fourth through hole and is screwed with a fastening nut.

[0025] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 A schematic diagram of the three-dimensional structure of a movable air monitoring station building of this embodiment;

[0028] Figure 2 for Figure 1 An enlarged schematic diagram of A in FIG.

[0029] Figure 3 This is a schematic diagram of the exploded structure of a movable air monitoring station building of this embodiment;

[0030] Figure 4 Another exploded structural schematic diagram of a movable air monitoring station building of this embodiment;

[0031] Figure 5 This is a schematic diagram of the structure of the steel structure main body in a movable air monitoring station building of this embodiment;

[0032] Figure 6 for Figure 5 An enlarged schematic diagram of point B in FIG.

[0033] Figure 7 for Figure 5 An enlarged schematic diagram of C in FIG.

[0034] Figure 8 This is a schematic structural diagram of an arc corner guardrail in a movable air monitoring station building of this embodiment;

[0035] Fig. 9 It is a schematic diagram of a cross-sectional top view of the structure of an exterior wall assembly in a movable air monitoring station building of the present embodiment.

[0036] Description of reference numerals:

[0037] 1-steel structure body, 11-support base, 12-fixed base, 121-first internal threaded hole, 122-second through hole, 123-locking bolt, 13-lifting ring, 14-first steel assembly, 141-first steel pipe, 142-second steel pipe, 143-third steel pipe, 144-fourth steel pipe, 145-first reinforced steel pipe, 15-second steel assembly, 151-fifth steel pipe, 152-sixth steel pipe, 153-seventh steel pipe, 154-eighth steel pipe, 155-second reinforced steel pipe, 16-support steel pipe, 17-climbing ladder, 18-first mounting plate, 19-second mounting plate;

[0038] 2-guardrail assembly, 21-first through hole, 22-first mounting bolt, 23-arc corner guardrail, 231-third through hole, 24-straight segment guardrail;

[0039] 3-exterior wall components, 31-aluminum plate, 32-insulating rock wool, 33-reinforced square tube, 34-decorative panel. DETAILED DESCRIPTION

[0040] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0041] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0042] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0044] like Figures 1 to 8 The present embodiment shows a movable air monitoring station, which includes a steel structure main body 1 and a guardrail assembly 2. The lower end of the steel structure main body 1 along the height direction is provided with a support base 11, which is arranged perpendicular to the height direction and is used to be detachably arranged on the elevated concrete pier; the upper end of the steel structure main body 1 is provided with a plurality of fixed bases 12 arranged at intervals along the cross-sectional profile of the steel structure main body 1 perpendicular to the height direction, preferably eighteen fixed bases 12; the guardrail assembly 2 is detachably connected to the upper end of the fixed base 12 via a locking assembly. It can be understood that the height direction of the present embodiment refers to Figure 1 The height direction.

[0045] The air monitoring station house of the present embodiment is provided with a support base 11 on the lower end face of the steel structure main body 1. The support base 11 is arranged perpendicular to the height direction to increase the abutment contact area with the upper end face of the elevated concrete pier, so that the steel structure main body 1 can be stably supported, thereby stably supporting the air monitoring station house of the present embodiment for normal use on the elevated concrete pier at the monitoring point; at the same time, the guardrail assembly 2 is detachably connected to the upper end of the steel structure main body 1 through a locking assembly, and because the steel structure main body 1 and the elevated concrete pier can be detachably arranged, when the air monitoring station house of the present embodiment needs to be installed at the monitoring point, the steel structure main body 1 and the guardrail assembly 2 can be manufactured separately first, and after being transported to the monitoring point separately, they can be moved to the monitoring point by hoisting equipment for assembly, without The air monitoring station building needs to be built directly at the monitoring point, and the construction period is greatly shortened; and by separating the steel structure main body 1 and the guardrail assembly 2 for transportation, the problem that the overall height of the air monitoring station building of this embodiment is too high and inconvenient to transport can be effectively avoided; when the air monitoring station building of this embodiment is no longer used at a certain monitoring point, the guardrail assembly 2 can be quickly removed from the upper end of the steel structure main body 1, and transported to the required monitoring point respectively, and then moved to the required monitoring point by lifting equipment for assembly, so that the air monitoring station building of this embodiment that is no longer used at the monitoring point can be moved to the required monitoring point for reuse, which can avoid the waste of resources and the high construction cost and construction waste caused by the need to change the location of the monitoring point.

[0046] like Figure 1 , Figure 2 , Figure 5 , Figure 6 and Figure 8As shown, in some embodiments of the utility model, a first internal threaded hole 121 is provided at the upper end of the fixed base 12 along the height direction, and a first through hole 21 is provided at a position corresponding to the first internal threaded hole 121 on the guardrail assembly 2; the locking assembly includes a first mounting bolt 22 matching the first internal threaded hole 121; when the guardrail assembly 2 is assembled and connected to the upper end of the steel structure body 1, the first through hole 21 of the guardrail assembly 2 is first aligned with the corresponding first internal threaded hole 121, and then the first mounting bolt 22 is passed through the first through hole 21 and threaded into the first internal threaded hole 121 to complete the assembly of the guardrail assembly 2 and the steel structure body 1; when the guardrail assembly 2 needs to be removed from the upper end of the steel structure body 1, it is only necessary to screw down each first mounting bolt 22 from the corresponding first internal threaded hole 121 to complete the quick disassembly work, and the entire disassembly and assembly process is easy to operate. It is understandable that, in specific applications, there is no specific limitation on how the first internal threaded hole 121 is connected to the fixed base 12. For example, in some embodiments, the first internal threaded hole 121 is processed in the upper end of the fixed base 12 by drilling and tapping; in other embodiments, a nut with the first internal threaded hole 121 is connected to the upper end of the fixed base 12.

[0047] In some embodiments of the utility model, the fixed base 12 is provided with a fifth through hole in the height direction, and the guardrail assembly 2 is provided with a sixth through hole corresponding to the position of the fifth through hole; the locking assembly includes a second mounting bolt and a mounting nut; when the guardrail assembly 2 is assembled and connected to the upper end of the steel structure body 1, the sixth through hole of the guardrail assembly 2 is first aligned with the corresponding fifth through hole, and then the second mounting bolt is passed through the fifth through hole and the sixth through hole and the mounting nut is tightened to complete the assembly of the guardrail assembly 2 and the steel structure body 1; when the guardrail assembly 2 needs to be removed from the upper end of the steel structure body 1, it is only necessary to unscrew each mounting nut from the corresponding second mounting bolt to complete the quick disassembly work, and the whole disassembly process is easy to operate. It should be noted that when the guardrail assembly 2 is assembled and connected to the upper end of the steel structure body 1, the mounting nut can be connected to the upper end of the second mounting bolt, or the mounting nut can be connected to the lower end of the second mounting bolt.

[0048] like Figure 1 , Figure 2 , Figure 5 and Figure 6As shown, in some embodiments of the utility model, a second internal threaded hole is provided at a position corresponding to the fixed base 12 at the upper end of the steel structure main body 1, and a second through hole 122 is provided at a position corresponding to the second internal threaded hole on the fixed base 12, and the second through hole 122 penetrates the fixed base 12 along the height direction; when the fixed base 12 is assembled and connected to the upper end of the steel structure main body 1, the second through hole 122 of the fixed base 12 is first aligned with the corresponding second internal threaded hole, and then the locking bolt 123 is passed through the second through hole 122 and threadedly connected in the second internal threaded hole to complete the assembly; when the fixed base 12 needs to be removed from the upper end of the steel structure main body 1, it is only necessary to unscrew the locking bolt 123 from the second internal threaded hole, and the entire disassembly and assembly process is convenient to operate. At the same time, the fixed base 12 is detachably connected to the upper end of the steel structure body 1 by threading the locking bolt 123 with the second internal threaded hole. After multiple disassembly, assembly and movement, if the first internal threaded hole 121 on the fixed base 12 is damaged and the guardrail assembly 2 cannot be firmly connected, the old fixed base 12 can be removed from the upper end of the steel structure body 1 and replaced with a new fixed base 12 with a new first internal threaded hole 121, thereby reducing maintenance costs.

[0049] In order to reduce the machining accuracy of the fixed base 12 and control the machining cost, the first mounting bolt 22 and the locking bolt 123 can be accurately threadedly connected with the first internal threaded hole 121 and the second internal threaded hole respectively; Figure 6 As shown, specifically, the second through hole 122 is configured as a second waist-shaped through hole, and the second waist-shaped through hole is arranged parallel to the length direction of the fixed base 12. Figure 8 As shown, more specifically, the first through hole 21 is configured as a first waist-shaped through hole.

[0050] In order to reduce the machining accuracy of the fixed base 12 and control the machining cost while ensuring that the second mounting bolt smoothly passes through the fifth through hole and the sixth through hole to screw on the mounting nut, specifically, the fifth through hole and the sixth through hole are both configured as waist-shaped through holes.

[0051] like Figure 5 and Figure 7 As shown, in some embodiments of the present invention, the four corners of the upper end surface of the steel structure main body 1 are respectively provided with lifting rings 13. The four lifting rings 13 provide sufficient hooking space for the hooks of the lifting equipment, which is convenient for the steel structure main body 1 to be stably placed on the upper end of the elevated concrete pier; and it is convenient to stably lift the steel structure main body 1 and separate it from the upper end of the elevated concrete pier.

[0052] like Figure 1 , Figure 3 and Figure 4As shown, in some embodiments of the utility model, the guardrail assembly 2 includes four arc corner guardrails 23, and the four arc corner guardrails 23 are respectively installed at the four corners of the steel structure body 1, and a straight section guardrail 24 is detachably connected between two adjacent arc corner guardrails 23. The guardrail assembly 2 can be divided into four arc corner guardrails 23 and four straight section guardrails 24, and the arc corner guardrails 23 and the straight section guardrails 24 are detachably connected, so that the various components of the guardrail assembly 2 can be manufactured separately and then transported to the monitoring point for assembly, which can further shorten the construction period of the air monitoring station of this embodiment and reduce the cost of transporting the air monitoring station of this embodiment.

[0053] The present embodiment does not impose any restriction on the detachable connection between the arc corner guardrail 23 and the straight segment guardrail 24. In order to ensure the tightness of the connection between the arc corner guardrail 23 and the straight segment guardrail 24 while improving the convenience of disassembly and assembly of the arc corner guardrail 23 and the straight segment guardrail 24, preferably, the ends of the two adjacent arc corner guardrails 23 facing each other are each provided with a third through hole 231, and the two ends of each straight segment guardrail 24 along the length direction of the straight segment guardrail 24 correspond to the third through hole 231. A third internal threaded hole is respectively arranged at the position of the three through holes 231; when the arc corner guardrail 23 and the straight segment guardrail 24 are assembled and connected, the third through hole 231 is first aligned with the third internal threaded hole, and then the first fastening bolt is passed through the third through hole 231 and threadedly connected in the third internal threaded hole to complete the assembly; when the arc corner guardrail 23 and the straight segment guardrail 24 need to be separated, it is only necessary to unscrew the first fastening bolt from the third internal threaded hole, and the entire disassembly and assembly process is convenient to operate. In other embodiments, a clamping portion is provided at one end of two adjacent arc corner guardrail pieces 23 that face each other, and a clamping groove matching the clamping portion is provided at both ends of each straight segment guardrail piece 24 along the length direction of the straight segment guardrail piece 24. When the arc corner guardrail piece 23 and the straight segment guardrail piece 24 are assembled and connected, the clamping portion is inserted into the corresponding clamping groove, and the friction force between the clamping portion and the clamping groove is utilized to connect the arc corner guardrail piece 23 and the straight segment guardrail piece 24; when the arc corner guardrail piece 23 and the straight segment guardrail piece 24 need to be separated, it can be achieved by applying a pulling force greater than the friction force between the clamping portion and the clamping groove, and the entire disassembly and assembly process is easy to operate.

[0054] Specifically, the side of the arc corner guardrail member 23 away from the geometric center of the guardrail assembly 2 along the thickness direction of the arc corner guardrail member 23 is covered with an aluminum plate, and the side of the straight section guardrail member 24 away from the geometric center of the guardrail assembly 2 along the thickness direction of the straight section guardrail member 24 is also covered with an aluminum plate; the aluminum plate has better rainproof and anti-corrosion properties, thereby improving the rainproof and anti-corrosion properties of the guardrail assembly 2 without significantly increasing the overall weight of the air monitoring station room of this embodiment.

[0055] like Figure 3 and Figure 5 As shown, in some embodiments of the utility model, the steel structure body 1 includes a first steel component 14 and a second steel component 15, the first steel component 14 is located directly above the second steel component 15 in the height direction, the cross-sectional profile of the first steel component 14 perpendicular to the height direction is a rectangle, and the projection of the first steel component 14 in the height direction overlaps with the second steel component 15; a plurality of support steel pipes 16 are arranged between the first steel component 14 and the second steel component 15 along the rectangular profile, and the support steel pipes 16 are arranged parallel to the height direction; the fixed base 12 is arranged on the upper end surface of the first steel component 14, and the support base 11 is arranged on the lower end surface of the second steel component 15. The steel structure body 1 is arranged as a structure composed of the first steel component 14, the second steel component 15 and the support steel pipe 16 welded together, so that the overall structure of the steel structure body 1 is more reliable and stable, thereby improving the earthquake resistance and wind resistance of the air monitoring station building of this embodiment.

[0056] like Figure 5 As shown, specifically, the first steel component 14 includes a first steel pipe 141, a second steel pipe 142, a third steel pipe 143 and a fourth steel pipe 144. The first steel pipe 141, the second steel pipe 142, the third steel pipe 143 and the fourth steel pipe 144 are welded end to end in sequence to form a rectangular outline; the first steel pipe 141 and the third steel pipe 143 are arranged parallel to the width direction, the second steel pipe 142 and the fourth steel pipe 144 are arranged parallel to the length direction, and a plurality of first reinforcing steel pipes 145 are arranged between the second steel pipe 142 and the fourth steel pipe 144 at intervals along the length direction. The structural strength of the first steel component 14 is increased by adding the first reinforcing steel pipe 145, so that the overall structure of the steel structure body 1 is more reliable and stable, thereby improving the earthquake resistance and wind resistance of the air monitoring station building of this embodiment. In order to facilitate the assembly of other components on the first steel component 14, such as Figure 1 , Figure 3 and Figure 4As shown, more specifically, a first mounting plate 18 is provided between the second steel tube 142 and the fourth steel tube 144, and the first mounting plate 18 abuts against the upper end surface of the first reinforcing steel tube 145. It can be understood that the length direction and width direction described in this embodiment refer to Figure 1 The length and width directions.

[0057] like Figure 5 As shown, specifically, the second steel component 15 includes a fifth steel pipe 151, a sixth steel pipe 152, a seventh steel pipe 153 and an eighth steel pipe 154. The fifth steel pipe 151, the sixth steel pipe 152, the seventh steel pipe 153 and the eighth steel pipe 154 are welded end to end in sequence to form a rectangular outline. The fifth steel pipe 151 and the seventh steel pipe 153 are arranged parallel to the width direction, the sixth steel pipe 152 and the eighth steel pipe 154 are arranged parallel to the length direction, and a plurality of second reinforcing steel pipes 155 are arranged between the sixth steel pipe 152 and the eighth steel pipe 154 at intervals along the length direction. The structural strength of the second steel component 15 is increased by adding the second reinforcing steel pipe 155, so that the overall structure of the steel structure body 1 is more reliable and stable, thereby improving the earthquake resistance and wind resistance of the air monitoring station building of this embodiment. In order to facilitate the assembly of other components on the second steel component 15, such as Figure 3 As shown, more specifically, a second mounting plate 19 is provided between the sixth steel tube 152 and the eighth steel tube 154 , and the second mounting plate 19 abuts against and fits against the upper end surface of the second reinforcing steel tube 155 .

[0058] like Figure 3 and Figure 5 As shown, specifically, the steel structure body 1 further includes a climbing ladder 17, and the climbing ladder 17 is obliquely connected between the first steel component 14 and the second steel component 15. The climbing ladder 17 provides a passage from the second mounting plate 19 to the first mounting plate 18 for people to pass between the interior and the top of the air monitoring station room of this embodiment.

[0059] like Figure 3 , Figure 4 and Fig. 9As shown, in some embodiments of the utility model, the circumference of the steel structure body 1 is covered with an exterior wall assembly 3, and the exterior wall assembly 3 includes an aluminum plate 31 and a decorative panel 34, and the aluminum plate 31 is located on the side of the decorative panel 34 away from the geometric center of the steel structure body 1 along the thickness direction of the aluminum plate 31, that is, the aluminum plate 31 is located on the outdoor side of the decorative panel 34; and the space between the aluminum plate 31 and the decorative panel 34 is filled with thermal insulation rock wool 32. The aluminum plate 31 is covered on the outdoor side of the steel structure main body 1 to improve the rainproof and anti-corrosion performance of the steel structure main body 1, and the decorative panel 34 is covered on the indoor side of the steel structure main body 1 to improve the decorative effect of the steel structure main body 1. The thermal insulation rock wool 32 is filled between the aluminum plate 31 and the decorative panel 34, and the thermal insulation rock wool 32 plays a role in heat insulation and heat insulation, thereby improving the thermal insulation performance of the steel structure main body 1. The aluminum plate 31 and the thermal insulation rock wool 32 are made of light materials, thereby achieving the improvement of the rainproof and anti-corrosion performance and heat insulation performance of the air monitoring station room of this embodiment without significantly increasing the overall weight of the air monitoring station room of this embodiment. Specifically, the decorative panel 34 is made of bamboo fiberboard or carbon crystal board.

[0060] like Figure 5 and 9 As shown, specifically, the exterior wall assembly 3 further includes a plurality of reinforcing square tubes 33, and the plurality of reinforcing square tubes 33 are arranged at intervals between the aluminum plate 31 and the decorative plate 34 along the length direction of the aluminum plate 31, and the aluminum plate 31 and the decorative plate 34 are respectively abutted against the two sides of the reinforcing square tubes 33 along the thickness direction of the aluminum plate 31. By adding the reinforcing square tubes 33, the structural strength of the aluminum plate 31 and the decorative plate 34 along the thickness direction of the aluminum plate 31 is enhanced, and deformation of the exterior wall assembly 3 is effectively avoided, so that the overall structure of the air monitoring station house of this embodiment is more reliable and stable, thereby improving the earthquake resistance and wind resistance of the air monitoring station house of this embodiment.

[0061] In some embodiments of the utility model, a fourth through hole is formed on the support base 11 along the height direction, and the fourth through hole is used for the second fastening bolt embedded in the elevated concrete pier to pass through; when the steel structure main body 1 is hoisted and assembled on the upper end surface of the elevated concrete pier, the steel structure main body 1 is first hoisted to a position where the fourth through hole is aligned with the corresponding second fastening bolt, and then the steel structure main body 1 is stably placed in place so that the second fastening bolt passes through the fourth through hole, and finally a fastening nut is tightened on the part where the second fastening bolt passes through the fourth through hole. Through the locking action of the fastening nut and the second fastening bolt, the steel structure main body 1 can be effectively prevented from tilting relative to the elevated concrete pier under strong winds, thereby further improving the earthquake resistance and wind resistance of the air monitoring station building of this embodiment; when the steel structure main body 1 needs to be lifted off the upper end surface of the elevated concrete pier, the steel structure main body 1 can be lifted by simply unscrewing the fastening nut from the second fastening bolt, and the whole process is convenient for disassembly and assembly.

[0062] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention of the utility model.

Claims

1. A movable air monitoring station, characterized in that: include: A steel structure main body (1) is provided with a support base (11) at the lower end along the height direction, the support base (11) is arranged perpendicular to the height direction and is used to be detachably arranged on the elevated concrete pier; a plurality of fixed bases (12) are arranged at intervals along the cross-sectional profile of the steel structure main body (1) perpendicular to the height direction at the upper end of the steel structure main body (1); The guardrail assembly (2) is detachably connected to the upper end of the fixed base (12) via a locking assembly.

2. A movable air monitoring station according to claim 1, characterized in that: A first internal threaded hole (121) is arranged at the upper end of the fixed base (12) along the height direction, and first through holes (21) are arranged on the guardrail assembly (2) at positions corresponding to the first internal threaded holes (121); the locking assembly includes a first mounting bolt (22) matching the first internal threaded hole (121); during assembly, the first mounting bolt (22) passes through the first through hole (21) and is threadedly connected in the first internal threaded hole (121).

3. A movable air monitoring station according to claim 1, characterized in that: The fixing base (12) is provided with a fifth through hole extending through it in the height direction, and the guardrail assembly (2) is provided with a sixth through hole corresponding to the position of the fifth through hole; the locking assembly comprises a second mounting bolt and a mounting nut, and during assembly, the second mounting bolt passes through the fifth through hole and the sixth through hole and is screwed onto the mounting nut.

4. A movable air monitoring station according to claim 2, characterized in that: The first through hole (21) is configured as a first waist-shaped through hole.

5. A movable air monitoring station according to any one of claims 1 to 3, characterized in that: A second internal threaded hole is arranged at the upper end of the steel structure body (1) at a position corresponding to the fixed base (12); a second through hole (122) is arranged on the fixed base (12) at a position corresponding to the second internal threaded hole; the second through hole (122) penetrates the fixed base (12) in the height direction; during assembly, a locking bolt (123) passes through the second through hole (122) and is threadedly connected in the second internal threaded hole; And / or, four corners of the upper end surface of the steel structure body (1) are respectively provided with hanging rings (13); And / or, the guardrail assembly (2) comprises four arc corner guardrail members (23), the four arc corner guardrail members (23) are respectively installed at the four corners of the steel structure body (1), and a straight section guardrail member (24) is detachably connected between two adjacent arc corner guardrail members (23); And / or, the steel structure body (1) comprises a first steel component (14) and a second steel component (15), the first steel component (14) is located directly above the second steel component (15) in the height direction, the cross-sectional profile of the first steel component (14) perpendicular to the height direction is a rectangle, and the projection of the first steel component (14) in the height direction overlaps with the second steel component (15); a plurality of support steel pipes (16) are arranged at intervals along the rectangular profile between the first steel component (14) and the second steel component (15), and the support steel pipes (16) are arranged parallel to the height direction; the fixed base (12) is arranged on the upper end surface of the first steel component (14), and the support base (11) is arranged on the lower end surface of the second steel component (15).

6. A movable air monitoring station according to claim 5, characterized in that: The ends of two adjacent circular arc corner guardrail members (23) facing each other are each provided with a third through hole (231), and each straight segment guardrail member (24) is respectively provided with a third internal threaded hole at both ends along the length direction of the straight segment guardrail member (24) at positions corresponding to the third through hole (231); during assembly, a first fastening bolt passes through the third through hole (231) and is threadedly connected in the third internal threaded hole; And / or, the second through hole (122) is configured as a second waist-shaped through hole, and the second waist-shaped through hole is arranged parallel to the length direction of the fixed base (12).

7. The movable air monitoring station building according to claim 5 is characterized in that: The first steel component (14) comprises a first steel tube (141), a second steel tube (142), a third steel tube (143) and a fourth steel tube (144); the first steel tube (141), the second steel tube (142), the third steel tube (143) and the fourth steel tube (144) are connected end to end in sequence to form a rectangular outline; the first steel tube (141) and the third steel tube (143) are arranged parallel to the width direction, the second steel tube (142) and the fourth steel tube (144) are arranged parallel to the length direction, and a plurality of first reinforcing steel tubes (145) are arranged between the second steel tube (142) and the fourth steel tube (144) along the length direction; And / or, the second steel component (15) comprises a fifth steel tube (151), a sixth steel tube (152), a seventh steel tube (153) and an eighth steel tube (154); the fifth steel tube (151), the sixth steel tube (152), the seventh steel tube (153) and the eighth steel tube (154) are connected end to end in sequence to form a rectangular outline; the fifth steel tube (151) and the seventh steel tube (153) are arranged parallel to the width direction; the sixth steel tube (152) and the eighth steel tube (154) are arranged parallel to the length direction; and a plurality of second reinforcing steel tubes (155) are arranged between the sixth steel tube (152) and the eighth steel tube (154) along the length direction at intervals; And / or, the steel structure body (1) further comprises a climbing ladder (17), wherein the climbing ladder (17) is obliquely connected between the first steel component (14) and the second steel component (15).

8. The movable air monitoring station building according to claim 1 is characterized in that: The peripheral surface of the steel structure main body (1) is covered with an external wall assembly (3), the external wall assembly (3) comprising an aluminum plate (31) and a decorative plate (34), the aluminum plate (31) being located on a side of the decorative plate (34) away from the geometric center of the steel structure main body (1) along the thickness direction of the aluminum plate (31); and thermal insulation rock wool (32) is filled between the aluminum plate (31) and the decorative plate (34).

9. The movable air monitoring station building according to claim 8 is characterized in that: The exterior wall assembly (3) further comprises a plurality of reinforcing square tubes (33), wherein the plurality of reinforcing square tubes (33) are arranged at intervals between the aluminum plate (31) and the decorative plate (34) along the length direction of the aluminum plate (31), and the aluminum plate (31) and the decorative plate (34) are respectively abutted against two sides of the reinforcing square tubes (33) along the thickness direction of the aluminum plate (31).

10. The movable air monitoring station building according to claim 1 is characterized in that: The support base (11) is provided with a fourth through hole along the height direction, and the fourth through hole is used for passing a second fastening bolt pre-buried in the elevated concrete pier; during assembly, the second fastening bolt passes through the fourth through hole and is screwed with a fastening nut.