Connecting structure of logger pipeline

By using multiple fixing holes and screws of connecting holes in the well logging pipeline connection structure, combined with the design of countershot screws and positioning sleeves, the problems of insufficient tensile force and serious wear in the prior art are solved. Achieve higher detection accuracy and flexibility.

CN221957531UActive Publication Date: 2024-11-05CHINA OILFIELD TECH SERVICES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420281150.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-11-05
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

The connecting structure of the existing logging instrument pipelines has little tension, which is difficult to meet the production and testing needs of high-water oil wells. It is easy to have poor logging instrument flexibility due to wear and jamming during the downwelling process.

Method used

Multiple fixing holes and connection holes are secured by screws, use countersunk screws to increase fixing force, set up positioning sleeves and sealing rings to ensure sealing, and simplify the plug-in process through guide grooves and guide blocks.

Benefits of technology

It significantly improves the tensile force of the connecting pipe, ensures that the logging instrument can accurately and reliably conduct production conditions in high water-containing oil wells, reduces wear and jamming, and improves the flexibility and sealing of the logging instrument.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221957531U_ABST
    Figure CN221957531U_ABST
Patent Text Reader

Abstract

The connecting structure comprises a first connecting pipe, the side wall of one end of the first connecting pipe is provided with a step through which the first connecting pipe can be inserted into other connecting pipes, a plurality of fixing holes are formed in the circumferential direction of the step, and the fixing holes are arranged to be threaded holes; the side wall of the end of the first connecting pipe is provided with a fixing hole, the side wall of the end of the second connecting pipe is provided with a connecting hole corresponding to the fixing hole, the first connecting pipe is inserted into the second connecting pipe, the connecting hole corresponds to the fixing hole, and the first connecting pipe and the second connecting pipe are fixedly connected through a screw. The step of the first connecting pipe is inserted into the second connecting pipe, the fixing holes formed in the first connecting pipe correspond to the connecting holes formed in the second connecting pipe in a one-to-one mode during insertion, then the first connecting pipe and the second connecting pipe are fixedly connected through screws, and the two connecting pipes are fixedly connected through fastening of the screws. The connecting pipe has the effect of improving the tensile force borne by the structure at the fixed position of the two connecting pipes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of petroleum exploration equipment, and in particular to a connection structure of a logging instrument pipeline. Background Art

[0002] With the continuous development of various oil fields, many oil wells are in the high water content stage. Therefore, in order to improve the efficiency of crude oil extraction, it is necessary to detect the production of oil wells in real time. The liquid production profile is a very important monitoring parameter, especially the accurate measurement of the water content and liquid production of high water content oil wells. Understanding the production capacity of oil wells, estimating the output of crude oil, discovering the layers of oil wells producing water and oil, predicting the development life of oil wells, and evaluating the extraction value of oil reservoirs are of great significance to the formulation of production measures for oil fields.

[0003] For example, a non-flow-collecting fluid profile logging instrument comprises a logging instrument body, the logging instrument body is connected with a thermal flow meter and an outflow water content sensor, and the upper and lower outer walls of the logging instrument body are provided with a straightening device, and the straightening device comprises a bearing, and the bearing is fixedly sleeved on the outer wall of the logging instrument body, and a cylinder is fixedly provided on the outer wall of the bearing, and the cylinder is provided with four through holes at equal intervals along the circumferential direction, and springs are provided in the through holes, and one end of the spring is fixedly connected to the outer wall of the bearing. The above structure can convert the sliding friction between the logging instrument and the casing into rolling friction, thereby reducing the friction resistance when the tool is lowered into the well and pulled out, and greatly reducing the wear of the logging instrument and the casing. Secondly, bearings and springs are provided, the cylinder can rotate circumferentially around the logging instrument, and the ball can be retracted and retracted in the through hole, thereby improving the flexibility of the logging instrument during the lowering process and reducing the phenomenon of getting stuck or blocked.

[0004] In the above-mentioned technology, the connection between the connecting rods of the logging tool mostly adopts a three-hole or four-hole connection structure, which can withstand less tensile force. Utility Model Content

[0005] In order to improve the tensile force between connecting rods, the present application provides a connection structure for a logging instrument pipeline.

[0006] The connection structure of a logging instrument pipeline provided in this application adopts the following technical solution:

[0007] A connection structure for a logging instrument pipeline, comprising:

[0008] A first connecting pipe, wherein a step is provided on a side wall of one end of the first connecting pipe for the first connecting pipe to be inserted into other connecting pipes, and a plurality of fixing holes are provided in a circumferential direction of the step, and the fixing holes are configured as threaded holes;

[0009] A second connecting tube, a connecting hole corresponding to the fixing hole is provided on the side wall at the end of the second connecting tube, the first connecting tube is inserted into the second connecting tube, the connecting hole corresponds to the fixing hole, and the first connecting tube and the second connecting tube are fixedly connected by screws.

[0010] By adopting the above technical solution, when the first connecting tube and the second connecting tube are fixedly connected, the step of the first connecting tube is first inserted into the second connecting tube. During the insertion, the fixing holes opened on the first connecting tube correspond one to one with the connecting holes opened on the second connecting tube. Then, the first connecting tube and the second connecting tube are fixedly connected by screws. The two connecting tubes are fixedly connected by tightening the screws, and the tensile force borne by the structure at the fixing point of the two connecting tubes is increased.

[0011] Preferably, five fixing holes and connecting holes are evenly arranged along the connecting ends of the first connecting tube and the second connecting tube, and the angle between any two fixing holes and connecting holes is 72°.

[0012] By adopting the above technical solution, by evenly setting five connecting fixing holes and connecting holes, and using 5 screws to connect and fix the two connecting pipes, the tensile force that can be borne is further increased, and the maximum tensile force that the connection between the two connecting pipes can withstand can reach 5 tons.

[0013] Preferably, the connecting hole and the fixing hole are formed as countersunk holes, and the screw is configured as a countersunk screw.

[0014] By adopting the above technical solution, the two connecting pipes are connected by using countersunk screws. The countersunk screws can make the two objects in close contact, thereby increasing the fixing effect and providing greater fixing force and reliability for the two connecting pipes, while reducing the problems caused by loose objects, further improving the tensile force between the connecting rods, and at the same time, the countersunk screws will not protrude from the outside of the connecting pipes after installation, so that the connecting pipes remain flat, and when the production conditions of the oil well are detected, the connecting pipe will not be affected when it extends into the inside of the oil well.

[0015] Preferably, it further comprises a positioning sleeve, wherein the positioning sleeve is installed in the countersunk hole and the positioning sleeve is detachable.

[0016] By adopting the above technical solution, after the first connecting tube and the second connecting tube are fixedly connected, the pulling force they bear is relatively large. During this period, the connection may be deformed due to the excessive pulling force, causing the two connecting tubes to be stuck and difficult to disassemble. By providing a positioning sleeve in the countersunk hole and installing the positioning sleeve in the countersunk hole, the positioning sleeve is detachable, which can facilitate the disassembly of the two connecting tubes and avoid the difficulty in disassembly after deformation due to excessive pulling force.

[0017] Preferably, the first connecting pipe step is two steps, both of which are in contact with the inside of the pipe at the end of the second connecting pipe. The fixing hole is opened on the side away from the end, and a sealing groove is opened on the side close to the end, and a sealing ring is arranged in the sealing groove.

[0018] By adopting the above technical solution, the logging instrument pipeline will allow the liquid in the oil well to enter the pipeline during the downhole process. In particular, when the water and oil production layers of the oil well need to be accurate, in order to ensure the sealing of the two adjacent connecting pipes after connection, a sealing ring is set to seal the two connecting pipes, which can more accurately measure the inside of the oil well.

[0019] Preferably, two sealing grooves are provided along the length direction of the first connecting pipe, and two corresponding sealing rings are provided.

[0020] By adopting the above technical solution, the sealing rings are arranged into two groups, the sealing performance is better, and the inside of the oil well can be measured more accurately.

[0021] Preferably, a chamfer is provided between the two steps.

[0022] By adopting the above technical solution, when connecting the two connecting pipes, the first connecting pipe needs to be inserted into the second connecting pipe first. By providing a chamfer between the two steps, it is more convenient to insert the first connecting pipe.

[0023] Preferably, a guide groove is provided on the side of the step away from the end of the first connecting pipe, and a guide block is provided on the end of the second connecting pipe.

[0024] By adopting the above technical solution, the two connecting pipes are connected and fixed by five countersunk screws. When the two connecting pipes are inserted and connected, the fixing holes opened on the first connecting pipe and the connecting holes opened on the second connecting pipe are not easy to correspond one to one. By providing a guide groove and a guide block, when the two connecting pipes are plugged in, they can be guided by the guide groove, so that the fixing holes of the first connecting pipe after insertion and the connecting holes of the second connecting pipe can be easily corresponded one to one.

[0025] Preferably, the depth of the guide groove does not exceed the surface of the step close to the end of the first connecting pipe.

[0026] By adopting the above technical solution, the depth of the guide groove does not exceed the surface of the step on one side close to the end of the first connecting pipe, thereby ensuring the sealing of the two connecting pipes during guiding.

[0027] In summary, the present application includes at least one of the following beneficial technical effects:

[0028] 1. When the first connecting pipe and the second connecting pipe are fixedly connected, the step of the first connecting pipe is first inserted into the second connecting pipe. During the insertion, the fixing holes on the first connecting pipe correspond to the connecting holes on the second connecting pipe. Then, the first connecting pipe and the second connecting pipe are fixedly connected by screws. The screws are tightened to fix the two connecting pipes, and the tension on the structure at the fixing point of the two connecting pipes is increased.

[0029] 2. By evenly setting five connecting holes and five connecting holes, and using five screws to connect and fix the two connecting pipes, the tensile force can be further increased, and the maximum tensile force that the connection of the two connecting pipes can withstand can reach 5 tons;

[0030] 3. The two connecting pipes are connected by using countersunk screws. The countersunk screws can make the two objects in close contact, thereby increasing the fixing effect and providing greater fixing force and reliability for the two connecting pipes, while reducing the problems caused by loose objects, and further improving the tensile force between the connecting rods. At the same time, the countersunk screws will not protrude from the outside of the connecting pipes after installation, so that the connecting pipes remain flat, and when the production of the oil well is detected, the connecting pipe will not be affected when it is inserted into the oil well. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the connection structure of a logging instrument pipeline of the present application.

[0032] Figure 2 yes Figure 1 Section view.

[0033] Figure 3 yes Figure 1 Section view at AA.

[0034] Explanation of the accompanying drawings: 1. first connecting pipe; 11. first step; 111. fixing hole; 112. guide groove; 12. second step; 121. sealing groove; 122. sealing ring; 2. second connecting pipe; 21. connecting hole; 22. guide block; 3. positioning sleeve; 4. countersunk screw. DETAILED DESCRIPTION

[0035] The following is combined with Figure 1-3 This application is described in further detail.

[0036] The present application embodiment discloses a connection structure of a logging instrument pipeline. Figure 1 The connection structure of the logging instrument pipeline includes a first connecting pipe 1 and a second connecting pipe 2.

[0037] Reference Figure 2A step is set at the end of the first connecting pipe 1. The step is divided into two layers, namely a first step 11 and a second step 12. The first step 11 is far away from the end of the first connecting pipe 1, and the second step 12 is close to the end of the first connecting pipe 1. The diameter of the first step 11 is larger than that of the second step 12.

[0038] Five fixing holes 111 are circumferentially provided at the middle position in the length direction of the first step 11, and two sealing grooves 121 are provided in the length direction of the second step 12. When the sealing groove 121 of the second step 12 is connected with the second connecting pipe 2, a sealing ring 122 is provided. The sealing ring 122 is configured as an O-type rubber ring to seal the two connecting pipes, so that the inside of the oil well can be measured more accurately. In order to facilitate the insertion of the first connecting pipe 1 into the second connecting pipe 2, a chamfer is provided between the first step 11 and the second step 12, and the chamfer angle can be set to 45°.

[0039] Reference Figure 2 , Figure 3 One end of the second connecting pipe 2 connected to the first connecting pipe 1 abuts against the step, and the second connecting pipe 2 is provided with a connecting hole 21 corresponding to the fixing hole 111. The connecting hole 21 and the fixing hole 111 are formed into countersunk holes. At the same time, a detachable positioning sleeve 3 is provided in the countersunk hole. The two connecting pipes are fixedly connected by a countersunk screw 4. The countersunk screw 4 can be set as a flat head screw. Specifically, five fixing holes 111 and connecting holes 21 are evenly provided along the circumferential direction, and the angle between the hole axes is 72°.

[0040] After the first connecting tube 1 and the second connecting tube 2 are fixedly connected, the tensile force they bear is relatively large. During this period, the connection may be deformed due to the excessive tensile force, causing the two connecting tubes to be stuck and difficult to disassemble. By providing a positioning sleeve 3 in the countersunk hole and installing the positioning sleeve 3 in the countersunk hole, the positioning sleeve 3 is detachable, which can facilitate the disassembly of the two connecting tubes and avoid the difficulty in disassembly after deformation due to excessive tensile force.

[0041] A guide groove 112 is provided at the first step 11, and the depth of the guide groove 112 is higher than the outer surface of the second step 12. A guide block 22 is provided on the inner wall of the end of the second connecting pipe 2 to prevent the problem of mismatch between the fixing hole 111 and the connecting hole 21 when the two connecting pipes are installed.

[0042] The implementation principle of a connection structure of a logging instrument pipeline in an embodiment of the present application is as follows: when the first connecting pipe 1 and the second connecting pipe 2 are fixedly connected, the first connecting pipe 1 is first inserted into the second connecting pipe 2 at the step. During the insertion, the fixing holes 111 opened on the first connecting pipe 1 correspond one-to-one with the connection holes 21 opened on the second connecting pipe 2. Then, the first connecting pipe 1 and the second connecting pipe 2 are fixedly connected by screws. The screws are tightened to fix the two connecting pipes, and the tension borne by the structure at the fixing point of the two connecting pipes is increased.

[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A connection structure for a logging instrument pipeline, characterized in that: include A first connecting tube (1), wherein a step is provided on a side wall at one end of the first connecting tube (1) for the first connecting tube (1) to be inserted into other connecting tubes, and a plurality of fixing holes (111) are provided in a circumferential direction of the step, and the fixing holes (111) are configured as threaded holes; A second connecting tube (2), wherein a connecting hole (21) corresponding to the fixing hole (111) is provided on a side wall at an end of the second connecting tube (2), the first connecting tube (1) is inserted into the second connecting tube (2), the connecting hole (21) corresponds to the fixing hole (111), and the first connecting tube (1) and the second connecting tube (2) are fixedly connected by screws.

2. The connection structure of the logging instrument pipeline according to claim 1, characterized in that: Five fixing holes (111) and five connecting holes (21) are evenly arranged along the connecting ends of the first connecting tube (1) and the second connecting tube (2), and the angle between any two fixing holes (111) and the connecting holes (21) is 72°.

3. The connection structure of the logging instrument pipeline according to claim 1, characterized in that: The connection hole (21) and the fixing hole (111) are formed into countersunk holes, and the screw is configured as a countersunk screw (4).

4. The connection structure of the logging instrument pipeline according to claim 3 is characterized in that: It also comprises a positioning sleeve (3), wherein the positioning sleeve (3) is installed in the countersunk hole, and the positioning sleeve (3) is detachable.

5. The connection structure of the logging instrument pipeline according to claim 1, characterized in that: The first connecting pipe (1) has two steps, both of which are in contact with the inside of the end pipe of the second connecting pipe (2). The fixing hole (111) is provided on a side away from the end, and a sealing groove (121) is provided on the side close to the end. A sealing ring (122) is provided in the sealing groove (121).

6. The connection structure of the logging instrument pipeline according to claim 5, characterized in that: Two sealing grooves (121) are provided along the length direction of the first connecting pipe (1), and two corresponding sealing rings (122) are provided.

7. The connection structure of the logging instrument pipeline according to claim 5, characterized in that: A chamfer is arranged between the two steps.

8. The connection structure of the logging instrument pipeline according to claim 1, characterized in that: A guide groove (112) is provided on the side of the step away from the end of the first connecting pipe (1), and a guide block (22) is provided at the end of the second connecting pipe (2).

9. The connection structure of the logging instrument pipeline according to claim 8, characterized in that: The depth of the guide groove (112) does not exceed the surface of the step on one side close to the end of the first connecting pipe (1).