Preparation device for preparing calcium chloride from waste hydrochloric acid
By setting up a stirring assembly and pressurized collection assembly in the preparation tank, the reaction speed of limestone and hydrochloric acid waste liquid and the collection efficiency of hydrogen chloride exhaust gas are improved, and the problems of insufficient collection and slow reaction speed of hydrogen chloride exhaust gas in the prior art are solved, and the problems of insufficient collection and slow reaction speed of hydrogen chloride exhaust gas in the existing technology are improved. The production efficiency and environmental safety of calcium chloride preparation.
Patent Information
- Application Number
- CN202323575543.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-27
AI Technical Summary
In the prior art, hydrogen chloride exhaust gas is insufficiently collected and limestone reacts slowly with hydrochloric acid waste liquid, resulting in environmental pollution and low production efficiency.
A stirring assembly is provided in the preparation tank, including a stirring tube and a stirring paddle. The stirring paddle is driven to rotate through the stirring tube to increase the reaction frequency, and air is injected through the blower to increase the reaction speed; at the same time, hydrogen chloride exhaust gas is collected through the pressurized assembly and the exhaust fan.
It effectively improves the reaction speed of limestone and hydrochloric acid waste liquid, ensures the full collection of hydrogen chloride exhaust gas, reduces environmental pollution and improves the production efficiency of calcium chloride preparation.
Smart Images

Figure CN221965319U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of calcium chloride preparation, in particular to a preparation device for preparing calcium chloride by using waste hydrochloric acid. Background Art
[0002] The treatment process of waste hydrochloric acid has received more attention. Waste hydrochloric acid reacts with limestone to generate calcium chloride solution, and the calcium chloride solution is directly sprayed and granulated to generate dihydrate spherical calcium chloride or anhydrous spherical calcium chloride.
[0003] The specific production steps are as follows: limestone is added to the reaction tank by a feed forklift, and hydrochloric acid waste liquid is added at the same time. The reaction completion liquid overflows into the neutralization mixing tank, quicklime is added to the digestion tank for lime digestion, lime milk is generated, and the lime milk is pumped into the lime milk metering tank by a lime milk pump. After metering, it is added to the neutralization mixing tank to remove heavy metal ions in the reaction completion liquid and adjust the pH value. A small amount of hydrogen chloride tail gas will be generated during the acid dissolution reaction. After being collected, it enters the spray absorption tower and is sprayed with liquid alkali for absorption. The remaining tail gas meets the discharge standards;
[0004] However, since the relative molecular mass of hydrogen chloride tail gas is greater than that of air, it is difficult to completely collect hydrogen chloride tail gas under normal pressure, resulting in hydrogen chloride tail gas remaining in the preparation tank and escaping during the process of loading and unloading the preparation tank to pollute the environment and easily cause safety hazards. In addition, the reaction rate between traditional industrial limestone and hydrochloric acid waste liquid is slow, which reduces the overall production efficiency of calcium chloride preparation. Utility Model Content
[0005] In view of the above-mentioned shortcomings of the prior art, the utility model provides a preparation device for preparing calcium chloride from waste hydrochloric acid, which can effectively solve the problems of insufficient collection of hydrogen chloride tail gas and slow reaction speed of limestone and hydrochloric acid waste liquid in the prior art.
[0006] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0007] The utility model provides a preparation device for preparing calcium chloride with waste hydrochloric acid, comprising a preparation tank, a preparation cavity is provided in the preparation tank, a stirring component is arranged in the preparation cavity, the stirring component comprises a stirring tube, a plurality of stirring paddles are vertically fixedly arranged on the outer tube wall of the stirring tube, two opposite outer side walls of the plurality of stirring paddles are penetrated through the inner cavity and are provided with exhaust holes, the plurality of exhaust holes are communicated with the inner tube cavity of the stirring tube, the outer tube wall of the stirring tube is penetrated through the inner tank cavity and is provided with a plurality of air inlet holes, a pressurizing component is arranged in the preparation cavity, the pressurizing component comprises a pressurizing tube, a fixing ring which is connected and arranged in a fixed manner is fixedly arranged at the end of the pressurizing tube, the fixing ring is sleeved on the outer tube wall of the stirring tube, a plurality of air supply holes which are connected with the plurality of air inlet holes are arranged on the inner ring wall of the fixing ring, a collecting component is arranged on the inner cavity wall of the preparation cavity, the collecting component comprises a collecting cover, and an annular collecting cavity is arranged at the bottom end of the collecting cover.
[0008] Furthermore, a feed hopper is installed at the top of the preparation tank, a first solenoid valve is installed at the connection between the feed hopper and the preparation chamber, a discharge pipe is installed at the bottom of the preparation tank, and a second solenoid valve is installed at the connection between the discharge pipe and the preparation chamber.
[0009] Furthermore, a metering pump is installed at the top of the preparation tank, the input end of the metering pump is connected to a feed pipe, a third solenoid valve is installed at the connection between the feed pipe and the inner cavity of the metering pump, a flange mounting plate is installed at one end of the feed pipe away from the metering pump, and a plurality of brackets are installed at the bottom of the preparation tank.
[0010] Furthermore, the stirring assembly also includes a driving motor, which is fixedly installed at the top center position of the preparation tank, and the output end of the driving motor extends into the preparation cavity and is fixedly connected to the top of the stirring tube.
[0011] Furthermore, the pressurizing component also includes a blower, which is fixedly installed on the outer tank wall of the preparation tank, and the output end of the blower is connected to the pressurizing pipe.
[0012] Furthermore, the collection component also includes an exhaust fan, which is fixedly mounted on the outer tank wall of the preparation tank. The input end of the exhaust fan is connected to an exhaust pipe, which extends through the outer tank wall of the preparation tank and the preparation chamber, and is vertically fixedly mounted on the top of the collection cover, and is connected to the annular collection chamber.
[0013] Compared with the known prior art, the technical solution provided by the utility model has the following beneficial effects:
[0014] 1. A stirring assembly is arranged in the preparation chamber, the stirring assembly includes a stirring tube and a plurality of stirring paddles installed on the outer wall of the stirring tube. The stirring tube drives the stirring paddles to rotate, thereby increasing the contact frequency between the limestone and the hydrochloric acid waste liquid, and preliminarily improving the reaction speed of the two. In addition, an exhaust hole connected to the inner cavity of the stirring tube is provided on the plurality of stirring paddles, and air is injected into the inner cavity of the stirring tube by a blower, and finally discharged from the exhaust hole, thereby further increasing the contact frequency between the hydrochloric acid waste liquid and the limestone, and further improving the reaction speed of the two.
[0015] 2. When the blower injects air into the preparation chamber, the pressure in the preparation chamber increases, and the generated hydrogen chloride gas moves upward along with the air and enters the annular collection chamber, and is uniformly extracted by the exhaust fan, so that the hydrogen chloride tail gas generated during the reaction can be fully collected. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure in the preparation cavity of the utility model;
[0019] Figure 3 This is a schematic diagram of the installation structure of the stirring component and the pressurizing component of the utility model;
[0020] Figure 4 It is a schematic diagram of the structure of the collection component of the utility model.
[0021] The numbers in the figure represent respectively: 1. Preparation tank; 11. Feed hopper; 12. First solenoid valve; 13. Discharge pipe; 14. Second solenoid valve; 15. Metering pump; 16. Feed pipe; 17. Third solenoid valve; 18. Flange mounting plate; 19. Bracket; 2. Drive motor; 21. Stirring tube; 22. Stirring paddle; 23. Exhaust hole; 24. Air inlet hole; 3. Blower; 31. Pressurized tube; 32. Fixed ring; 33. Air supply hole; 4. Exhaust fan; 41. Exhaust pipe; 42. Collection hood; 43. Annular collection chamber. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] The utility model is further described below in conjunction with embodiments.
[0024] Example 1
[0025] Reference Figure 1-4 , which is the first embodiment of the utility model, discloses a preparation device for preparing calcium chloride from waste hydrochloric acid, including a preparation tank 1, a preparation chamber is opened in the preparation tank 1, a stirring assembly is installed in the preparation chamber, the stirring assembly includes a stirring tube 21, the interior of the stirring tube 21 is hollow, a plurality of stirring paddles 22 are vertically fixedly installed on the outer tube wall of the stirring tube 21, two opposite outer side walls of the plurality of stirring paddles 22 are penetrated through the inner cavity to open exhaust holes 23, the plurality of exhaust holes 23 are connected with the inner tube cavity of the stirring tube 21 to ensure that the exhaust passage is unobstructed, the outer tube wall of the stirring tube 21 is penetrated through the inner tank cavity to open a plurality of air inlet holes 24, through the attached manual Figure 3 It can be known that the plurality of air inlet holes 24 are evenly distributed on the outer tube wall of the stirring tube 21, and the pressurizing component is installed in the preparation chamber. The pressurizing component includes a pressurizing tube 31, which is made of a hard material and plays a fixing role on the fixing ring 32. A fixing ring 32 arranged in communication is fixedly installed at the end of the pressurizing tube 31, and the fixing ring 32 is sleeved on the outer tube wall of the stirring tube 21. The inner ring wall of the fixing ring 32 is provided with a plurality of air supply holes 33 connected with the plurality of air inlet holes 24. When the stirring tube 21 rotates, the plurality of air inlet holes 24 and the plurality of air supply holes 33 are continuously connected, so that the air blown in from the pressurizing tube 31 can finally enter the stirring tube 21. The collecting component is installed on the inner wall of the preparation chamber, and the collecting component includes a collecting cover 42. The bottom end of the collecting cover 42 is provided with an annular collecting chamber 43. Figure 4 It can be known that the annular collecting chamber 43 opens downward to prevent the reaction solution from entering the exhaust pipe 41 and blocking the collecting gas path.
[0026] Example 2
[0027] Reference Figure 1-4, which is the second embodiment of the utility model, which is different from the first embodiment in that: a feed hopper 11 is installed at the top of the preparation tank 1, and a first solenoid valve 12 is installed at the connection between the feed hopper 11 and the preparation chamber to ensure that the preparation chamber remains closed after loading, a discharge pipe 13 is installed at the bottom of the preparation tank 1, and a second solenoid valve 14 is installed at the connection between the discharge pipe 13 and the preparation chamber to ensure that the preparation chamber remains closed, a metering pump 15 is installed at the top of the preparation tank 1, and a feed pipe 16 is connected to the input end of the metering pump 15, and a third solenoid valve 17 is installed at the connection between the feed pipe 16 and the inner cavity of the metering pump 15 to facilitate the control of the feeding of lime milk, and a flange mounting plate 18 is installed at the end of the feed pipe 16 away from the metering pump 15 to facilitate docking with the lime milk production equipment, and a plurality of brackets 19 are installed at the bottom of the preparation tank 1 to support the weight of the entire preparation tank 1 and to provide discharge at the bottom of the preparation tank 1 The tube 13 reserves enough installation space, the stirring component also includes a driving motor 2, the driving motor 2 is fixedly installed at the top center position of the preparation tank 1, the output end of the driving motor 2 extends into the preparation chamber, and is fixedly connected to the top of the stirring tube 21, the pressurizing component also includes a blower 3, the blowing frequency of the blower 3 can be controlled by adjusting the fan speed, the blower 3 is fixedly installed on the outer tank wall of the preparation tank 1, the output end of the blower 3 is connected to the pressurizing tube 31, the collecting component also includes an exhaust fan 4, the exhaust frequency of the exhaust fan 4 can be controlled by adjusting the fan speed, the exhaust fan 4 is fixedly installed on the outer tank wall of the preparation tank 1, the input end of the exhaust fan 4 is connected with an exhaust pipe 41, the exhaust pipe 41 extends between the outer tank wall of the preparation tank 1 and the preparation chamber, and is vertically fixedly installed on the top of the collecting cover 42, and is connected to the annular collecting chamber 43.
[0028] The remaining structures are the same as those of Example 1.
[0029] First, limestone and hydrochloric acid waste liquid are added into the preparation chamber through the feed hopper 11, and then the first solenoid valve 12 is closed, and the driving motor 2 is started, and the stirring tube 21 drives a plurality of stirring paddles 22 to stir and mix the limestone and the hydrochloric acid waste liquid, thereby increasing the contact frequency between the limestone and the hydrochloric acid waste liquid and preliminarily improving the reaction speed, and then a certain amount of lime milk is injected into the preparation chamber through the metering pump 15 to remove heavy metal ions in the reaction completion liquid and adjust the pH value. A small amount of hydrogen chloride tail gas will be generated during the acid dissolution reaction;
[0030] Secondly, start the blower 3, inject air into the inner cavity of the fixed ring 32 through the pressure pipe 31, enter the stirring tube 21 which is rotating and stirring through the air supply hole 33 and the air inlet hole 24, and finally be discharged from the exhaust holes 23 on the plurality of stirring paddles 22. The air enters the limestone and the hydrochloric acid waste liquid to generate bubbles. The contact frequency between the limestone and the hydrochloric acid waste liquid can be further increased during the floating process of the bubbles, thereby further increasing the reaction speed. Then start the exhaust fan 4. Since the preparation chamber is closed, the air blown in by the blower 3 will increase the pressure in the preparation chamber, so that the hydrogen chloride gas generated in the reaction is concentrated into the annular collection chamber 43 along with the high-pressure air, and then uniformly discharged from the preparation chamber through the exhaust pipe 41.
[0031] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some of the technical features therein by equivalents. These modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.
Claims
1. A preparation device for preparing calcium chloride from waste hydrochloric acid, comprising a preparation tank (1), wherein a preparation chamber is provided in the preparation tank (1), characterized in that: Also includes: A stirring assembly is installed in the preparation chamber, the stirring assembly comprises a stirring tube (21), a plurality of stirring paddles (22) are vertically fixedly installed on the outer tube wall of the stirring tube (21), two opposite outer side walls of the plurality of stirring paddles (22) penetrate the inner cavity and are provided with exhaust holes (23), the plurality of exhaust holes (23) are communicated with the inner tube cavity of the stirring tube (21), and a plurality of air inlet holes (24) are provided on the outer tube wall of the stirring tube (21) penetrate the inner tank cavity; A pressurizing component is installed in the preparation chamber, the pressurizing component comprises a pressurizing tube (31), a fixing ring (32) is fixedly installed at the end of the pressurizing tube (31) and is arranged in communication with each other, the fixing ring (32) is sleeved on the outer tube wall of the stirring tube (21), and the inner ring wall of the fixing ring (32) is provided with a plurality of air supply holes (33) which are in communication with the plurality of air inlet holes (24); The collecting component is installed on the inner wall of the preparation chamber, and the collecting component comprises a collecting cover (42). The bottom end of the collecting cover (42) is provided with an annular collecting chamber (43).
2. A preparation device for preparing calcium chloride from waste hydrochloric acid according to claim 1, characterized in that: A feed hopper (11) is installed at the top end of the preparation tank (1), and a first solenoid valve (12) is installed at the connection point between the feed hopper (11) and the preparation chamber; a discharge pipe (13) is installed at the bottom end of the preparation tank (1), and a second solenoid valve (14) is installed at the connection point between the discharge pipe (13) and the preparation chamber.
3. A preparation device for preparing calcium chloride from waste hydrochloric acid according to claim 2, characterized in that: A metering pump (15) is installed at the top of the preparation tank (1), and the input end of the metering pump (15) is connected to a feed pipe (16). A third solenoid valve (17) is installed at the connection between the feed pipe (16) and the inner cavity of the metering pump (15). A flange mounting plate (18) is installed at one end of the feed pipe (16) away from the metering pump (15). A plurality of brackets (19) are installed at the bottom of the preparation tank (1).
4. A preparation device for preparing calcium chloride from waste hydrochloric acid according to claim 3, characterized in that: The stirring assembly further comprises a driving motor (2), wherein the driving motor (2) is fixedly mounted at the top center position of the preparation tank (1), and the output end of the driving motor (2) extends into the preparation chamber and is fixedly connected to the top end of the stirring tube (21).
5. A preparation device for preparing calcium chloride from waste hydrochloric acid according to claim 4, characterized in that: The pressurizing component further comprises a blower (3), wherein the blower (3) is fixedly mounted on the outer tank wall of the preparation tank (1), and the output end of the blower (3) is connected to the pressurizing pipe (31).
6. A preparation device for preparing calcium chloride from waste hydrochloric acid according to claim 5, characterized in that: The collection assembly further comprises an exhaust fan (4), the exhaust fan (4) being fixedly mounted on the outer tank wall of the preparation tank (1), the input end of the exhaust fan (4) being connected to an exhaust pipe (41), the exhaust pipe (41) extending through and extending between the outer tank wall of the preparation tank (1) and the preparation chamber, and being vertically fixedly mounted on the top of the collection cover (42), and being connected to the annular collection chamber (43).
