Scraping ring structure for glass fiber tube impregnation process
By using a scraping ring structure with float balls in the glass fiber tube impregnation process, the coating uniformity and stability problems are solved, and higher quality coatings and cost reduction are achieved.
Patent Information
- Application Number
- CN202323437376.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-15
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-15
AI Technical Summary
In the impregnation process of glass fiber tubes, the traditional scraper ring structure cannot effectively ensure the uniformity of the coating and the leveling of the glue, which affects the thickness and quality of the coating. Moreover, due to the different thickness, texture and weft density of glass fiber tubes, the glue is applied, resulting in the amount of glue applied. Instability affects production costs.
Using a structure including a first scraping ring and a second scraping ring, combined with a float, the movement of the float inside the fiberglass tube is maintained in a stretched state, ensuring the uniformity of the coating, and passing through the scraping ring and Design between rubber cylinders, optimize the flow and coating process of rubber.
The coating quality of the glass fiber tube impregnation process is improved, the uniformity and thickness of the coating are ensured, production costs are reduced, and the coating stability and cost problems are solved.
Smart Images

Figure CN221965850U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of impregnation technology, in particular to a scraper ring structure used in a glass fiber tube impregnation process. Background Art
[0002] In the production process of impregnation, how to control the coating process is very critical, which directly affects the quality, performance and production cost of the finished product. There are many factors that affect the processing technology of impregnation coating, including coating glue viscosity and scraping gap. Traditional production methods are difficult to ensure coating uniformity. During the coating process, it is difficult to ensure the surface flatness of the glass fiber tube by relying on the tension of the glass fiber tube itself, which affects the leveling of the glue and thus affects the coating thickness.
[0003] Depending on the thickness, texture, warp and weft density, and tensile deformation of the glass fiber tube, the amount of glue applied to the glass fiber tube will also be different when other conditions remain unchanged. In the gluing device for the glass fiber tube, a scraper ring structure is involved to scrape the excess glue on the outer surface of the glass fiber tube. The gap between the scraper ring and the glass fiber tube and the amount of glue applied will change continuously during the gluing process, which makes it impossible to ensure the stability of the coating and affects the coating quality. Utility Model Content
[0004] The utility model aims to provide a scraper ring structure used in a glass fiber tube impregnation process to solve the problem of poor coating quality of the glass fiber tube during the impregnation process.
[0005] To achieve this purpose, the utility model adopts the following technical solutions:
[0006] The scraper ring structure used in the glass fiber tube impregnation process includes:
[0007] A first scraper ring, wherein the first scraper ring is provided with a first passage which is axially penetrated, and the upper end of the first scraper ring is connected to the glue cylinder, and the glue cylinder is in communication with the first passage;
[0008] A second scraper ring, the second scraper ring is connected to the end of the first scraper ring away from the glue cylinder, the second scraper ring is provided with a second axially penetrating passage, and the glass fiber tube to be dipped and coated with glue passes through the second scraper ring, the first scraper ring and the glue cylinder from bottom to top in sequence and can continuously move upwards for gluing;
[0009] A float, wherein the float is disposed between the first scraper ring and the second scraper ring, and the float is located inside the fiberglass tube so that the fiberglass tube is in an expanded state, the outer diameter of the float is larger than the inner diameter of the fiberglass tube, the outer diameter of the float is larger than the aperture of the first channel, and the outer diameter of the float is larger than the aperture of the second channel.
[0010] Optionally, the end of the first scraper ring facing away from the glue cylinder is a first hemispherical shell, and the end of the second scraper ring facing the first scraper ring is a second hemispherical shell. When the first scraper ring is connected to the second scraper ring, the first hemispherical shell and the second hemispherical shell are connected to form a accommodating cavity, and the float is located in the accommodating cavity.
[0011] Optionally, the aperture of the accommodating cavity is larger than the outer diameter of the float.
[0012] Optionally, the aperture of the first channel is equal to the aperture of the second channel, and the first channel and the second channel are coaxial.
[0013] Optionally, a plurality of gluing holes are provided at the bottom of the glue cylinder, and a plurality of the first scraper rings are connected to the plurality of gluing holes in a one-to-one correspondence.
[0014] Optionally, the glue cylinder is provided with a plurality of glue application tubes, the plurality of glue application tubes are connected to the plurality of glue application holes in a one-to-one correspondence, and the first scraper ring is connected to the glue application tubes.
[0015] Optionally, the first scraper ring is inserted and connected in the upper rubber tube and the first hemispherical shell stops at the end of the upper rubber tube.
[0016] Optionally, an insert boss is provided on the end of the first hemispherical shell of the first scraper ring, and a step hole is provided on the end of the second hemispherical shell of the second scraper ring. The insert boss is inserted into the step hole and stops on the step surface of the step hole, and the end faces of the first hemispherical shell and the second hemispherical shell are abutted.
[0017] Optionally, the first scraper ring is made of Teflon material, and the second scraper ring is made of Teflon material.
[0018] Beneficial effects of the utility model:
[0019] The utility model discloses a scraper ring structure for glass fiber tube impregnation process, by arranging a first scraper ring and a second scraper ring connected to each other below the glue cylinder, and arranging a float between the first scraper ring and the second scraper ring. When the glass fiber tube passes through the second scraper ring and the second scraper ring in sequence from bottom to top, the float is also sleeved inside the glass fiber tube at the same time, so that the glass fiber tube is in an expanded state under the action of the float, and further, when the glass fiber tube moves from bottom to top and is applied with glue, the float is in a continuous motion state, so that a uniform coating is obtained on the outer surface of the glass fiber tube, thereby improving the coating quality of the glass fiber tube impregnation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the exploded structure of a scraper ring structure used in a glass fiber tube impregnation process provided by an embodiment of the utility model;
[0021] Figure 2It is a schematic diagram of the working state of the scraper ring structure used in the glass fiber tube impregnation process provided by an embodiment of the utility model.
[0022] In the figure:
[0023] 100, glass fiber tube; 200, glue tank; 201, glue hole; 202, glue tube; 203, glue liquid surface;
[0024] 1. First scraper ring; 11. First channel; 12. First hemispherical shell; 13. Insertion boss; 2. Second scraper ring; 21. Second channel; 22. Second hemispherical shell; 23. Step hole; 3. Float. DETAILED DESCRIPTION
[0025] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0026] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0028] In the description of this embodiment, the terms "upper", "lower", "left", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0029] The utility model provides a scraper ring structure for glass fiber tube impregnation process, such as Figure 1 and Figure 2 , including a first scraper ring 1, a second scraper ring 2 and a float 3, the first scraper ring 1 is provided with an axially penetrating first channel 11, the upper end of the first scraper ring 1 is connected to the glue cylinder 200, and the glue cylinder 200 is communicated with the first channel 11; the second scraper ring 2 is connected to the end of the first scraper ring 1 away from the glue cylinder 200, and the second scraper ring 2 is provided with an axially penetrating second channel 21, the glass fiber tube 100 to be dipped and coated with glue passes through the second scraper ring 2, the first scraper ring 1 and the glue cylinder 200 from bottom to top in sequence and can continuously move upward for gluing; the float 3 is arranged between the first scraper ring 1 and the second scraper ring 2, and the float 3 is located in the glass fiber tube 100, so that the glass fiber tube 100 is in an expanded state, the outer diameter of the float 3 is greater than the inner diameter of the glass fiber tube 100, the outer diameter of the float 3 is greater than the aperture of the first channel 11, and the outer diameter of the float 3 is greater than the aperture of the second channel 21.
[0030] The scraper ring structure used in the glass fiber tube impregnation process of the utility model is provided with a first scraper ring 1 and a second scraper ring 2 connected to each other below the glue cylinder 200, and a float 3 is provided between the first scraper ring 1 and the second scraper ring 2. When the glass fiber tube 100 passes through the second scraper ring 2 and the first scraper ring 1 from bottom to top, the float 3 is also sleeved inside the glass fiber tube 100 at the same time, so that the glass fiber tube 100 is in an open state under the action of the float 3, and then the float 3 is in a continuous motion state during the process of the glass fiber tube 100 moving from bottom to top and applying glue, so that a uniform coating is obtained on the outer surface of the glass fiber tube 100, thereby improving the coating quality of the glass fiber tube 100 in the impregnation process. Figure 1As shown, the glue cylinder 200 is used to store glue. During the glue coating process, glue needs to be continuously replenished to ensure that the glue liquid level 203 meets the glue coating requirements. During the gluing process, the glass fiber tube 100 passes through the glue during the movement from top to bottom, and part of the glue enters through the first channel 11 of the first scraper ring 1 and contacts the glass fiber tube 100 where the float 3 is outside the float 3. During the continuous upward movement of the glass fiber tube 100, the float 3 continuously rolls inside the glass fiber tube 100, which is conducive to forming a uniform glue coating thickness on the outer surface of the glass fiber tube 100. The outer diameter of the float 3 is slightly larger than the inner diameter of the glass fiber tube 100, so that the float 3 can support the outer surface of the glass fiber tube 100, but the outer diameter of the float 3 cannot be too large, otherwise it is not easy to put it into the glass fiber tube 100. Preferably, the outer diameter of the float 3 is 2-3 mm larger than the inner diameter of the glass fiber tube 100, and the inner diameters of the first channel 11 and the second channel 21 are slightly larger than the outer diameter of the glass fiber tube 100. When the glass fiber tube 100 moves, the glue has a scraping effect on the glue on the outside of the glass fiber tube 100 in the space where the float 3 is located, and the glue will not enter or pass through the second channel 21.
[0031] Optionally, the end of the first scraper ring 1 facing away from the glue cylinder 200 is a first hemispherical shell 12, and the end of the second scraper ring 2 facing the first scraper ring 1 is a second hemispherical shell 22. When the first scraper ring 1 is connected to the second scraper ring 2, the first hemispherical shell 12 and the second hemispherical shell 22 are connected to form a accommodating cavity, and the float 3 is located in the accommodating cavity.
[0032] like Figure 1 As shown, the first scraper ring 1 and the second scraper ring 2 have the same structure and are divided into two sections. One section is tubular and the other section is connected to each other at both ends. The first hemispherical shell 12 and the second hemispherical shell 22 of the same size are provided. The first hemispherical shell 12 and the second hemispherical shell 22 are connected to form a spherical accommodating cavity. The float 3 rolls in the glass fiber tube 100 passing through the accommodating cavity.
[0033] Optionally, the aperture of the accommodating cavity is larger than the outer diameter of the float 3. When the float 3 is located in the fiberglass tube 100 and props up the outer surface of the fiberglass tube 100, there is still a movable gap between the propped-up part of the fiberglass tube 100 and the inner wall of the accommodating cavity, so that the float 3 can roll freely inside the fiberglass tube 100 without affecting the movement and gluing of the fiberglass tube 100.
[0034] Optionally, the aperture of the first channel 11 is equal to the aperture of the second channel 21 , and the first channel 11 and the second channel 21 are coaxial.
[0035] like Figure 1 and Figure 2After the first scraper ring 1 is connected to the second scraper ring 2, the first channel 11, the second channel 21 and the accommodating chamber are all connected to the glue cylinder 200, and the glue in the glue cylinder 200 enters the accommodating chamber through the first channel 11. In the accommodating chamber, as the glass fiber tube 100 moves upward, the outer diameter of the float 3 is larger than the aperture of the first channel 11, so the float 3 is intercepted in the accommodating chamber. During the continuous rolling process of the float 3, the glue is continuously scraped evenly on the glass fiber tube 100, which can ensure the uniformity of the glue coating and ensure the glass fiber tube 100. 0 glue thickness, therefore, the first channel 11 and the second channel 21 are coaxially arranged to facilitate the smooth upward movement of the glass fiber tube 100, and during the movement, the relationship between the upward movement speed of the glass fiber tube 100 and the viscosity of the glue is optimized to match the gap between the accommodating cavity and the glass fiber tube 100 and the gap between the second channel 21 and the glass fiber tube 100, ensuring that the glue is always evenly coated in the accommodating cavity. Therefore, more uniform glue coating can be achieved through a simple structure, the cost is reduced and the glue coating quality is greatly improved.
[0036] Optionally, a plurality of gluing holes 201 are provided at the bottom of the glue cylinder 200 , and a plurality of first scraper rings 1 are connected to the plurality of gluing holes 201 in a one-to-one correspondence.
[0037] like Figure 2 Glue is stored in the glue cylinder 200 to ensure that a certain height of the glue liquid level 203 is maintained. The first scraper ring 1 is connected to the glue hole 201, and the first channel 11 is connected to the glue hole 201, so that the glue can smoothly pass through the glue hole 201 into the first channel 11 and the accommodating cavity. Preferably, the glue hole 201 and the first channel 11 are coaxially arranged to facilitate the upward movement of the glass fiber tube 100.
[0038] Optionally, the glue cylinder 200 is provided with a plurality of glue application tubes 202 , the plurality of glue application tubes 202 are connected to the plurality of glue application holes 201 in a one-to-one correspondence, and the first scraper ring 1 is connected to the glue application tubes 202 .
[0039] Specifically, Figure 2 , the upper glue tube 202 is a protruding part of the integral structure with the glue cylinder 200, so that the glue hole 201 has a downward extension section to facilitate the connection with the first scraper ring 1. In some embodiments, the first scraper ring 1 is inserted and connected in the upper glue tube 202 and the first hemispherical shell 12 stops at the end of the upper glue tube 202. It can be understood that the first hemispherical shell 12 has the function of installation and positioning, ensuring that the pipe section of the first scraper ring 1 is fully inserted into the upper glue tube 202, and has a good sealing effect and connection stability. In other embodiments, the first scraper ring 1 can also be connected to the upper glue tube 202 by threaded connection, and a sealing ring is added for sealing.
[0040] Optionally, a plug-in boss 13 is provided at the end of the first hemispherical shell 12 of the first scraper ring 1, and a step hole 23 is provided at the end of the second hemispherical shell 22 of the second scraper ring 2. The plug-in boss 13 is inserted into the step hole 23 and stops on the step surface of the step hole 23, and the end faces of the first hemispherical shell 12 and the second hemispherical shell 22 are abutted.
[0041] like Figure 1 As shown, the end of the first hemispherical shell 12 has a circular plug-in boss 13, the outer diameter of the plug-in boss 13 is smaller than the outer diameter of the end of the first hemispherical shell 12, and the inner hole wall of the second hemispherical shell 22 is processed with a step hole 23, the axial depth of the step hole 23 is equal to the axial height of the plug-in boss 13, when the first scraper ring 1 and the second scraper ring 2 are docked, the plug-in boss 13 is inserted into the step hole 23 and stops at the step surface, and the cross-sections of the first hemispherical shell 12 and the second hemispherical shell 22 are abutted. It should be noted that the outer diameter of the plug-in boss 13 is matched with the inner hole diameter of the step hole 23 for plug-in, and after plug-in, it has a sealing strength that meets the requirements.
[0042] Optionally, the first scraper ring 1 is made of Teflon material, and the second scraper ring 2 is made of Teflon material. Teflon material not only has good corrosion resistance, but also excellent anti-sticking property, and does not affect the normal scraping of the glue.
[0043] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A scraper ring structure for glass fiber tube impregnation process, characterized in that: include: A first scraper ring (1), wherein the first scraper ring (1) is provided with a first passage (11) which is axially penetrated, wherein the upper end of the first scraper ring (1) is connected to the glue cylinder (200), and the glue cylinder (200) is in communication with the first passage (11); A second scraper ring (2), the second scraper ring (2) being connected to an end of the first scraper ring (1) facing away from the glue cylinder (200), the second scraper ring (2) being provided with an axially penetrating second passage (21), the glass fiber tube (100) to be dipped and coated with glue passes through the second scraper ring (2), the first scraper ring (1) and the glue cylinder (200) in sequence from bottom to top and can continuously move upwards to be coated with glue; A float (3), wherein the float (3) is arranged between the first scraper ring (1) and the second scraper ring (2), and the float (3) is located inside the glass fiber tube (100), so that the glass fiber tube (100) is in an expanded state, the outer diameter of the float (3) is larger than the inner diameter of the glass fiber tube (100), the outer diameter of the float (3) is larger than the aperture of the first channel (11), and the outer diameter of the float (3) is larger than the aperture of the second channel (21).
2. The scraper ring structure for glass fiber tube impregnation process according to claim 1, characterized in that: The end of the first scraper ring (1) facing away from the glue cylinder (200) is a first hemispherical shell (12), and the end of the second scraper ring (2) facing the first scraper ring (1) is a second hemispherical shell (22). When the first scraper ring (1) is connected to the second scraper ring (2), the first hemispherical shell (12) and the second hemispherical shell (22) are connected to form a receiving cavity, and the float (3) is located in the receiving cavity.
3. The scraper ring structure for glass fiber tube impregnation process according to claim 2, characterized in that: The aperture of the accommodating cavity is larger than the outer diameter of the floating ball (3).
4. The scraper ring structure for glass fiber tube impregnation process according to claim 3, characterized in that: The aperture of the first channel (11) is equal to the aperture of the second channel (21), and the first channel (11) and the second channel (21) are coaxial.
5. The scraper ring structure for glass fiber tube impregnation process according to claim 2, characterized in that: The bottom of the glue cylinder (200) is provided with a plurality of glue application holes (201), and the plurality of the first scraper rings (1) are connected to the plurality of glue application holes (201) in a one-to-one correspondence.
6. The scraper ring structure for glass fiber tube impregnation process according to claim 5, characterized in that: The glue cylinder (200) is provided with a plurality of glue application tubes (202), the plurality of glue application tubes (202) are connected and arranged in a one-to-one correspondence with the plurality of glue application holes (201), and the first scraper ring (1) is connected to the glue application tubes (202).
7. The scraper ring structure for glass fiber tube impregnation process according to claim 6, characterized in that: The first scraper ring (1) is inserted and connected in the upper rubber tube (202), and the first hemispherical shell (12) abuts against the end of the upper rubber tube (202).
8. The scraper ring structure for glass fiber tube impregnation process according to claim 2, characterized in that: The end of the first hemispherical shell (12) of the first scraper ring (1) is provided with an insert boss (13), and the end of the second hemispherical shell (22) of the second scraper ring (2) is provided with a step hole (23), the insert boss (13) is inserted into the step hole (23) and stops on the step surface of the step hole (23), and the end faces of the first hemispherical shell (12) and the second hemispherical shell (22) are abutted against each other.
9. The scraper ring structure for glass fiber tube impregnation process according to claim 1, characterized in that: The first scraper ring (1) is made of Teflon material, and the second scraper ring (2) is made of Teflon material.
