Water conservancy construction slope earthwork retainer

By designing the coordination between limit blocks and limit grooves and the limit structure of the plug-in rod on the earth cage on the slope of water conservancy construction, the offset problem during splicing is solved, a firmer installation is achieved, and the slope is improved Stability and safety.

CN221972238UActive Publication Date: 2024-11-08FUJIAN WUXIANG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420447524.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-11-08
Estimated Expiration
2034-03-07

AI Technical Summary

Technical Problem

The existing earthwork cages on the slope of water conservancy construction are prone to deviation when splicing, resulting in unsolid installation and affecting the stability and safety of the slope.

Method used

A water conservancy construction slope earth cage including a cage main body and a trough is designed. By opening a trough in the middle of both sides of the cage main body, and splicing components are provided on the outer wall, such as docking grooves, limiting grooves, docking blocks. , movable grooves, limit blocks, guide rods and springs, the matching of limit blocks and limit grooves and the limit structure of the plug-in rods ensures the accuracy and firmness of the splicing.

Benefits of technology

Through the coordination between the limit block and the limit slot and the limit of the plug-in rod, the auxiliary limit assembly and installation of the slope earth cage is realized, making the installation of the slope earth cage on the water conservancy construction more firmly and avoiding deviation The problem has improved the stability and safety of the slope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972238U_ABST
    Figure CN221972238U_ABST
Patent Text Reader

Abstract

The utility model discloses a water conservancy construction side slope earthwork retainer, and relates to the technical field of side slope earthwork retainers, the water conservancy construction side slope earthwork retainer comprises a retainer main body and through grooves, the through grooves are formed in the middles of the two sides of the retainer main body, and splicing assemblies are arranged on the outer wall of the retainer main body; and the splicing assembly comprises a butt joint groove, limiting grooves, a butt joint block, a movable groove, a limiting block, a guide rod and a spring, the butt joint groove is formed in the surface of the retainer body, and the limiting grooves are formed in the two sides, close to the butt joint groove, of the interior of the retainer body. According to the water conservancy construction side slope earthwork retainer, through mutual cooperation of the limiting blocks and the limiting grooves which are arranged between every two adjacent retainer bodies and matched with each other, auxiliary limiting can be conducted on the retainer bodies, the water conservancy construction side slope earthwork retainer can be conveniently limited and assembled, limiting is conducted through the inserting rods penetrating through the edges of the retainer bodies, and therefore the water conservancy construction side slope earthwork retainer is convenient to assemble and disassemble. Therefore, the slope earthwork retainer for water conservancy construction can be installed more firmly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slope earthwork retaining frames, in particular to a slope earthwork retaining frame for water conservancy construction. Background Art

[0002] Water conservancy construction refers to engineering construction activities carried out for the purpose of improving water resource utilization, flood control and drainage, water supply and drainage, etc. Water conservancy construction slopes are generally equipped with earthwork retainers, which can fix and support the earthwork to prevent the slope from collapsing and eroding due to gravity, water flow or other factors, and ensure the stability and safety of the slope. Earthwork retainers are usually composed of strong and durable components to provide stable support and the ability to resist earthwork pressure.

[0003] At present, when using the water conservancy construction slope earthwork retaining frames on the market, the existing water conservancy construction slope earthwork retaining frames are generally directly spliced ​​together for use. The directly spliced ​​water conservancy construction slope earthwork retaining frames are easy to deviate during splicing. Therefore, the existing water conservancy construction slope earthwork retaining frames need to be improved. Utility Model Content

[0004] The utility model aims to provide a slope earthwork retainer for water conservancy construction to solve the problems raised by the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water conservancy construction slope earthwork retainer, comprising a retainer body and a through groove, through grooves are opened in the middle of both sides of the retainer body, and a splicing assembly is provided on the outer wall of the retainer body, the splicing assembly includes a docking groove, a limit groove, a docking block, a movable groove, a limit block, a guide rod and a spring, the docking groove is opened on the surface of the retainer body, and the retainer body is close to the inner sides of the docking groove. The retainer body is connected to a docking block on the side surface away from the docking groove.

[0006] Preferably, a movable groove is provided inside the docking block, and limiting blocks are inserted on both sides of the movable groove.

[0007] Preferably, a guide rod passes through both sides of the two limit blocks, and both ends of the guide rod are connected to the inside of the movable groove.

[0008] Preferably, a spring is sleeved on the outer side of the guide rod, one end of the spring is connected to the limit block, and the other end of the spring is connected to the movable groove.

[0009] Preferably, a mounting hole is provided in the middle of the edge of the retaining frame body, and a plug-in rod penetrates the interior of the mounting hole.

[0010] Preferably, an installation groove is formed on the inner wall of the retainer body, a mounting seat is disposed on the outer side of the installation groove, and the mounting seat penetrates the retainer body and is connected to the plug rod.

[0011] Preferably, mounting blocks are connected to both sides of the inner wall of the mounting seat, and the mounting blocks are inserted into the interior of the mounting groove.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: the water conservancy construction slope earthwork retaining frame can assist in limiting the retaining frame body by arranging matching limit blocks and limit grooves between two adjacent retaining frame bodies, which is convenient for limiting the assembly of the water conservancy construction slope earthwork retaining frame, and the installation of the water conservancy construction slope earthwork retaining frame is more secure by limiting the position of the plug-in rod passing through the edge of the retaining frame body.

[0013] 1. The water conservancy construction slope earthwork retainer is firstly connected with the side of the retainer body provided with the docking block and the adjacent retainer body provided with the docking groove, and the retainer body is pushed downward until the surfaces of the two adjacent retainer bodies are in contact, at which time the docking block is completely inserted into the inside of the docking groove, and the position of the limit block corresponds to the position of the limit groove. By setting a matching limit block between the two adjacent retainer bodies and cooperating with the limit groove, the retainer body can be auxiliary limited, thereby facilitating the limited assembly of the water conservancy construction slope earthwork retainer;

[0014] 2. The earthwork retainer for the water conservancy construction slope is firstly arranged with the retainer body staggered in sequence on the surface of the water conservancy construction slope, and then the plug-in rod is passed through the installation hole and pushed inward to the limit position until the plug-in rod is inserted into the interior of the slope earthwork, and then the mounting seat is passed through the inner wall of the retainer body to connect the retainer body with the plug-in rod, and the mounting seat is pressed to the limit position, and the plug-in rod passing through the edge of the retainer body is used to limit the position, so that the installation of the earthwork retainer for the water conservancy construction slope is more secure. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the top view structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the cutaway structure of the utility model from the left side;

[0017] Figure 3 This is a schematic diagram of the three-dimensional structure of the utility model from the first viewing angle;

[0018] Figure 4 This is a schematic diagram of the three-dimensional structure of the utility model from a second viewing angle;

[0019] Figure 5 This is a schematic diagram of the main cutaway structure of the splicing assembly of the utility model;

[0020] Figure 6 It is a schematic diagram of the left-side cutaway structure of the retainer main body of the utility model.

[0021] In the figure: 1. retainer body; 2. through slot; 3. splicing assembly; 31. docking slot; 32. limit slot; 33. docking block; 34. movable slot; 35. limit block; 36. guide rod; 37. spring; 4. mounting hole; 5. plug-in rod; 6. mounting slot; 7. mounting seat; 8. mounting block. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 The utility model provides a technical solution: a water conservancy construction slope earthwork retainer, comprising a retainer body 1 and a through slot 2, through slots 2 are provided in the middle of both sides of the retainer body 1, and a splicing assembly 3 is provided on the outer wall of the retainer body 1, the splicing assembly 3 comprises a docking groove 31, a limiting groove 32, a docking block 33, a movable groove 34, a limiting block 35, a guide rod 36 and a spring 37, the docking groove 31 is provided on the surface of the retainer body 1, and the retainer body 1 is provided with limiting grooves 32 on both sides of the inner side close to the docking groove 31, and a docking block 33 is connected to the surface of the retainer body 1 on one side away from the docking groove 31.

[0024] A movable groove 34 is provided inside the docking block 33, and limit blocks 35 are inserted on both sides of the movable groove 34; a guide rod 36 runs through both sides of the two limit blocks 35, and both ends of the guide rod 36 are connected to the inside of the movable groove 34; a spring 37 is sleeved on the outer side of the guide rod 36, one end of the spring 37 is connected to the limit block 35, and the other end of the spring 37 is connected to the movable groove 34, the size of the limit block 35 matches the size of the limit groove 32, the limit block 35 forms a telescopic structure with the movable groove 34 through the spring 37, and the limit blocks 35 are symmetrically distributed about the center line of the docking block 33.

[0025] When it is implemented specifically, the side of the retainer body 1 on which the docking block 33 is provided is first docked with the docking groove 31 provided on the adjacent retainer body 1, and the retainer body 1 is pushed downward, so that the pushed retainer body 1 drives the docking block 33 and the limit block 35 to move toward the inside of the docking groove 31. As the docking block 33 moves, the inner wall of the docking groove 31 squeezes the limit block 35, and the limit block 35 squeezed by the external force moves along the guide rod 36 toward the inside of the movable groove 34. As the limit block 35 moves, the spring 37 on the outer side of the guide rod 36 is squeezed, until Until the surfaces of the two adjacent retainer bodies 1 are in contact with each other, the docking block 33 is fully inserted into the docking groove 31, and the position of the limit block 35 corresponds to the position of the limit groove 32. At this time, the limit block 35 that is not squeezed by external force can automatically reset outward by the elastic force of the spring 37 until the limit block 35 is plugged into the limit groove 32. By arranging matching limit blocks 35 and limit grooves 32 between the two adjacent retainer bodies 1, the retainer body 1 can be auxiliary limited, thereby facilitating the limited assembly of the water conservancy construction slope earthwork retainer.

[0026] See also Figure 1 , Figure 2 and Figure 6 A mounting hole 4 is provided in the middle of the edge of the retainer body 1, and a plug-in rod 5 passes through the inside of the mounting hole 4; a mounting groove 6 is provided on the inner wall of the retainer body 1, and a mounting seat 7 is provided on the outer side of the mounting groove 6, and the mounting seat 7 passes through the retainer body 1 and connects with the plug-in rod 5; mounting blocks 8 are connected to both sides of the inner wall of the mounting seat 7, and the mounting blocks 8 are inserted into the inside of the mounting groove 6, and the size of the mounting block 8 matches the size of the mounting groove 6.

[0027] During the specific implementation, the retaining frame body 1 is first placed on the surface of the water conservancy construction slope in a staggered manner, and then the plug-in rod 5 is passed through the mounting hole 4 and pushed inward to the limit position until the plug-in rod 5 is inserted into the interior of the slope earthwork, and then the mounting seat 7 is passed through the inner wall of the retaining frame body 1 to connect the retaining frame body 1 with the plug-in rod 5, and the mounting seat 7 is pressed to the limit position until the mounting block 8 on the mounting seat 7 is engaged with the mounting groove 6, and the plug-in rod 5 passing through the edge of the retaining frame body 1 is used to limit the position, so that the installation of the water conservancy construction slope earthwork retaining frame is more secure.

[0028] To sum up, when using the water conservancy construction slope earthwork retainer, the retainer body 1 is first moved to the vicinity of the designated water conservancy construction slope, and then the adjacent retainer bodies 1 are staggered and spliced, and the side of the retainer body 1 with a docking block 33 on the surface is docked with the adjacent retainer body 1 with a docking groove 31, and the retainer body 1 is pushed downward until the surfaces of the two adjacent retainer bodies 1 are in contact, and the docking block 33 is fully inserted into the interior of the docking groove 31. By providing a matching limit block 35 between the two adjacent retainer bodies 1 and cooperating with the limit groove 32, the retainer body 1 can be auxiliary limited. The contents not described in detail in this description belong to the prior art known to professional and technical personnel in this field.

[0029] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A water conservancy construction slope earthwork retainer, comprising a retainer body (1) and a through groove (2), characterized in that: Through grooves (2) are provided in the middle of both sides of the retainer body (1), and a splicing assembly (3) is provided on the outer wall of the retainer body (1), wherein the splicing assembly (3) comprises a docking groove (31), a limiting groove (32), a docking block (33), a movable groove (34), a limiting block (35), a guide rod (36) and a spring (37), wherein the docking groove (31) is provided on the surface of the retainer body (1), and limiting grooves (32) are provided on both sides of the interior of the retainer body (1) close to the docking groove (31), and a docking block (33) is connected to a surface of one side of the retainer body (1) away from the docking groove (31).

2. A water conservancy construction slope earthwork retainer according to claim 1, characterized in that: A movable groove (34) is provided inside the docking block (33), and limiting blocks (35) are inserted on both sides of the movable groove (34).

3. A water conservancy construction slope earthwork retainer according to claim 2, characterized in that: A guide rod (36) passes through both sides of the two limit blocks (35), and both ends of the guide rod (36) are connected to the inside of the movable groove (34).

4. A water conservancy construction slope earthwork retainer according to claim 3, characterized in that: A spring (37) is sleeved on the outer side of the guide rod (36), one end of the spring (37) is connected to the limit block (35), and the other end of the spring (37) is connected to the movable groove (34).

5. The water conservancy construction slope earthwork retainer according to claim 1, characterized in that: A mounting hole (4) is provided in the middle of the edge of the retaining frame body (1), and a plug-in rod (5) penetrates the interior of the mounting hole (4).

6. A water conservancy construction slope earthwork retainer according to claim 5, characterized in that: The inner wall of the retainer body (1) is provided with a mounting groove (6), the outer side of the mounting groove (6) is provided with a mounting seat (7), and the mounting seat (7) penetrates the retainer body (1) and is connected to the plug-in rod (5) for docking.

7. A water conservancy construction slope earthwork retainer according to claim 6, characterized in that: Both sides of the inner wall of the mounting seat (7) are connected with mounting blocks (8), and the mounting blocks (8) are inserted into the interior of the mounting groove (6).