Marine photovoltaic platform supporting device

By designing marine photovoltaic platform support devices, including columns, pile foundations, valves and water pumps in marine photovoltaic projects, the complex and cost problems are solved, more efficient construction is achieved, safety risks are reduced, and overall benefits are improved.

CN221972317UActive Publication Date: 2024-11-08SHANDONG HAIYUE ENVIRONMENT SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420587279.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-08
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The construction process of offshore photovoltaic projects is complex, with high construction costs and poor resistance to extreme loads. Especially the installation and dismantling of water pumps is complicated, which increases the project cost and construction difficulty.

Method used

A marine photovoltaic platform support device is designed, including columns, pile foundations, valves and water pumps. The water pump is installed on the first installation platform and is connected to the pile foundation through a suction pipe. The valve is on the suction pipe, the outlet is connected to the drain pipe, and the Scale lines, attitude sensors and connecting plates are provided on the column, and the pressure transmitter is used to detect the pressure difference between the inside and outside of the suction barrel, eliminating the link of underwater robots or divers unzipping cables.

Benefits of technology

It reduces the construction cost of marine photovoltaic projects, improves construction efficiency, and reduces potential safety risks. The accurate sinking and leveling of the support structure is achieved through scale lines and attitude sensors, ensuring the stability and normal operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972317U_ABST
    Figure CN221972317U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of ocean photovoltaic platforms, and relates to an ocean photovoltaic platform supporting device which comprises a stand column, a pile foundation, a valve and a water pump, the pile foundation is an inverted suction bucket with an opening at one end and a hollow structure, the stand column is connected to the upper end of the pile foundation, and a first installation platform is arranged on the stand column. The water pump is installed on the first installation platform and communicated with the pile foundation through a water suction pipe, the valve is installed on the water suction pipe, and an outlet of the water pump is connected with a water drainage pipe. The water pump is mounted on the first mounting platform, and the water pump is positioned above the water surface after the pile foundation is driven into the seabed, so that the link of underwater cable untying by an underwater robot or a diver in the construction process is eliminated, the construction cost of an ocean photovoltaic project is reduced, the construction efficiency is improved, and the construction cost is reduced. And the overall benefit of the project is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a marine photovoltaic platform supporting device, belonging to the technical field of artificial islands supported on pile foundations. Background Art

[0002] Compared with land-based photovoltaic projects, offshore photovoltaic projects face higher technical requirements and greater investment pressure. At present, most of the offshore photovoltaic power stations built in my country are small-scale demonstration power stations, lacking large-scale centralized power stations. This is mainly due to the high technical difficulty and investment cost of offshore photovoltaic projects, which limit their large-scale development. In order to promote the development of offshore photovoltaic projects, it is necessary to solve problems such as complex offshore construction processes, high construction costs, and poor resistance to extreme loads.

[0003] At present, the construction of marine photovoltaic projects usually starts with the positioning and installation of pile foundations through pile foundation construction, and then the upper trusses are hoisted at sea. The water pump is usually installed directly on the top of the suction bucket. As the pile foundation sinks to the bottom of the sea, the water pump will also sink synchronously.

[0004] However, marine photovoltaic projects require the installation of a large number of photovoltaic platforms, and each equipped with expensive water pumps will greatly increase the project cost. Therefore, after the pile foundation is sunk, these water pumps will be removed for recycling. During the removal process, underwater robots or divers are needed to remove the underwater connection between the water pump and the pile foundation. This underwater operation is highly complex and requires extremely high skills and experience from the operators, which not only increases the construction steps and difficulty, but also further increases the cost burden of the project. Utility Model Content

[0005] The purpose of the utility model is to provide a new technical solution to improve or solve the technical problems existing in the prior art as described above.

[0006] The technical solution provided by the utility model is as follows: a marine photovoltaic platform support device, including a column, a pile foundation, a valve and a water pump, the pile foundation is an inverted suction bucket with a hollow structure open at one end, the column is connected to the upper end of the pile foundation, a first mounting platform is provided on the column, the water pump is installed on the first mounting platform, the water pump is connected to the pile foundation through a suction pipe, the valve is installed on the suction pipe, and the outlet of the water pump is connected to a drain pipe.

[0007] On the basis of the above technical solution, the present invention can also be improved as follows.

[0008] Furthermore, the column is provided with scale lines.

[0009] The beneficial effect of adopting the above further scheme is that by setting scale lines on the columns, the operator can directly observe the scale lines during the penetration process to accurately judge the sinking depth of the supporting structure. By observing the scale lines, the operator can promptly discover possible abnormal situations, such as the supporting structure sinking too fast or too slow, etc., so as to take timely measures to make adjustments and avoid potential safety risks.

[0010] Furthermore, a second mounting platform is provided on the column.

[0011] Furthermore, a posture sensor is installed on the second mounting platform.

[0012] The beneficial effect of adopting the above further scheme is that the attitude sensor is used to detect the inclination angle of the column. During the sinking process, the scale lines on the pile body need to be closely observed, and the marine photovoltaic platform needs to be leveled in time in combination with the verticality changes of the four pile legs.

[0013] Furthermore, a ladder is provided on the column.

[0014] The beneficial effect of adopting the above further solution is that it is convenient to inspect and disassemble the water pump.

[0015] Furthermore, a plurality of connecting plates are provided on the column from top to bottom, and the water suction pipe is installed on one side of the column by limiting the connection plates.

[0016] The beneficial effect of adopting the above further solution is that the suction pipe is installed in a limited position by the connecting plate, thereby ensuring the stability of the suction pipe, so that the suction pipe can be firmly maintained in a preset position and is not prone to displacement or shaking, thereby ensuring the normal operation of the equipment.

[0017] Furthermore, it also includes a pressure transmitter, which is installed at the suction port of the water pump.

[0018] The beneficial effect of adopting the above further solution is that the pressure transmitter is used to detect the pressure difference between the internal pressure of the suction bucket and the external water pressure.

[0019] Furthermore, the column is a hollow tube or a rod.

[0020] Furthermore, the valve has at least one exhaust port.

[0021] Compared with the prior art, the technical solution provided by the utility model has the following beneficial effects: the utility model installs the water pump on the first installation platform, and when the pile foundation is driven into the seabed, the water pump is located above the water surface. This method eliminates the step of underwater robots or divers performing underwater cable unravelling during the construction process, thereby reducing the construction cost of the marine photovoltaic project, improving construction efficiency, and enhancing the overall benefits of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0023] Figure 1 This is a schematic diagram of the structure of the marine photovoltaic platform support device of the utility model;

[0024] Figure 2 It is a structural schematic diagram of marking scale lines on the column of the utility model;

[0025] Figure 3 This is a schematic diagram of the structure of the marine photovoltaic platform of the utility model;

[0026] Figure 4 For the utility model Figure 3 Side view of

[0027] In the figure, 1, upper truss; 2, column; 201, scale line; 3, pile foundation; 401, water pump; 402, valve; 403, suction pipe; 404, drainage pipe; 5, first installation platform; 6, posture sensor; 7, ladder. DETAILED DESCRIPTION

[0028] The principles and features of the present invention are described below in conjunction with examples. The examples are only used to explain the present invention and are not used to limit the scope of the present invention.

[0029] like Figure 1 As shown, a marine photovoltaic platform supporting device includes a column 2, a pile foundation 3, a valve 402 and a water pump 401, the pile foundation 3 is an inverted suction bucket with an open end and a hollow structure, the column 2 is connected to the upper end of the pile foundation 3, a first mounting platform 5 is provided on the column 2, the water pump 401 is installed on the first mounting platform 5, the water pump 401 is connected to the pile foundation 3 through a suction pipe 403, the valve 402 is installed on the suction pipe 403, and the outlet of the water pump 401 is connected to a drain pipe 404.

[0030] The embodiment of the utility model does not limit the structure of the valve 402. The valve 402 can be a three-way valve or a four-way valve, but the valve 402 should have at least one exhaust port, which is to meet the need to remove the internal air during the self-weight penetration of the pile foundation 3. The design of the exhaust port allows the air to be discharged smoothly, thereby ensuring the stability and construction quality of the pile foundation 3. At the same time, the exhaust port also meets the requirement of conveniently emptying the internal liquid or gas when the water pump 401 needs to be disassembled, making the disassembly process safer and more efficient.

[0031] The column 2 is also provided with a second mounting platform, on which a posture sensor 6 is mounted. The column 2 is also provided with a ladder 7.

[0032] The column 2 is provided with a plurality of connecting plates from top to bottom, and the water suction pipe 403 is installed on one side of the column 2 by limiting the connection plates, so that the water suction pipe 403 can be firmly maintained at a preset position.

[0033] A pressure transmitter is installed at the suction port of the water pump 401 to detect the suction force of the water pump 401 .

[0034] like Figure 2 As shown, the column 2 is also provided with a scale line 201. By providing the scale line 201 on the column 2, the operator can directly observe the scale line 201 during the sinking process to accurately judge the sinking depth of the supporting structure. By observing the scale line 201, the operator can timely discover abnormal conditions that may occur during the sinking process of the marine photovoltaic platform, such as a certain supporting structure sinking too fast or too slow, so as to take timely measures to make adjustments and avoid potential safety risks.

[0035] The embodiment of the utility model does not limit the structure of the column 2, and the column 2 can be a hollow tube or a rod, and as long as the support requirements are met, it should be within the protection scope of this application.

[0036] Reference Figure 3 and 4 As shown, the marine photovoltaic platform includes a marine photovoltaic platform support device and an upper truss. The method for sinking and installing the marine photovoltaic platform is as follows:

[0037] S1, land assembly: install multiple groups of the marine photovoltaic platform support devices below the upper truss 1; the water pump 401 is fixed to the first installation platform 5 by anchor bolts, and when sunk, the water pump 401 is located more than 2 meters above the water surface to prevent the water pump 401 from being wetted by waves; the suction port of the water pump 401 is connected to the outlet of the valve 402, the inlet of the valve 402 is connected to the suction pipe 403, the other end of the suction pipe 403 is connected to the pile foundation 3, and is connected to the inside of the pile foundation 3, the outlet of the water pump 401 is connected to the drain pipe 404, and the overall assembly of the marine photovoltaic platform is completed;

[0038] S2. Marine transportation: Load the assembled marine photovoltaic platform onto the transport ship and secure it on the deck;

[0039] S3. Seabed inspection: Measure and detect the seabed topography. Multi-beam and shallow profiling can be used to scan the seabed to determine the inclination of the seabed at the construction site, the relative height difference of the sinking position of the pile foundation 3 at the deployment location, and whether there are any debris, and determine the specific water depth, coordinates and seabed topography;

[0040] S4, lifting: When the transport ship arrives at the installation sea area, the marine photovoltaic platform is lifted by the crane on the transport ship or the crane on the lifting ship, and the lifting point can be set on the column 2;

[0041] S5. Lowering to the seabed: lowering the marine photovoltaic platform as a whole to the seabed.

[0042] In the process of lowering the marine photovoltaic platform to the seabed, the equipment will first enter the splash zone, which refers to the area above the water surface in the marine environment where waves can splash. Then, the equipment will continue to be lowered, crossing the water surface and entering the water until it reaches the mud line, which is the boundary between the seabed sediment and the water, marking the official entry of the equipment into the seabed environment. Finally, the marine photovoltaic platform will undergo a self-weight penetration process, which means that the equipment uses its own weight to gradually sink in the seabed sediment.

[0043] S6, suction penetration: start the water pump 401, and simultaneously suck the water and mud in each pile foundation 3, so that the pile foundation 3 gradually sinks;

[0044] S7. When the ocean photovoltaic platform reaches the design elevation, or the suction force of the water pump 401 reaches the yield limit of the pile foundation 3, the water pump 401 is turned off and the exhaust port of the valve 402 is opened;

[0045] S8. Recovery of water pump 401: drive the small crane vessel to the first installation platform 5 of the column 2 in turn, disconnect the cables of water pump 401 in turn, remove water pump 401 from the first installation platform 5, seal the pile foundation 3, and lift water pump 401 back to the ship deck; the small crane vessel is maneuverable and flexible, and the crane on the ship should meet the requirements of disassembly and assembly of water pump 401, such as lifting weight of not less than 500kg over a long distance, and be equipped with a hanging basket to facilitate personnel to board the installation platform of water pump 401, and the ship-borne generator can provide an output of not less than 50kW, with a voltage of 380VAC, 50Hz.

[0046] S9, installation at the next position: move the lifting vessel to the next position, drop anchor and position, and repeat steps S3 to S7 to achieve continuous construction.

[0047] In this embodiment, the upper truss 1 is supported by four groups of the supporting structures. Of course, the upper truss 1 can also be supported by 6, 8 or even fewer groups of supporting structures. As long as the requirements for stable support can be met, it should be within the protection scope of the present utility model.

[0048] The marine photovoltaic platform also includes a posture sensor 6 and a pressure transmitter. The posture sensor 6 is installed on the second mounting platform on the column 2 and fixed by bolts. It is used to detect the inclination of the column 2 during the sinking process. The pressure transmitter is installed at the suction port of the water pump 401 to detect the suction force of the water pump 401. One posture sensor 6 is installed on each column 2, and is equipped with a wireless transceiver module. One pressure transmitter is installed at the suction port of each water pump 401. The posture sensor 6 and the pressure transmitter can choose wireless transmission.

[0049] In step S1, after the marine photovoltaic platform is assembled, the cables are connected at the dock, the marine photovoltaic platform is powered on for debugging, and various actions and sensor data collection are tested. After debugging is completed, the cables are disconnected.

[0050] In step S4, when a lifting vessel is used for lifting, the lifting vessel is in position in advance to adjust its course and drop anchor before the transport ship arrives at the designated sea area; when the transport ship arrives at the installation sea area, the crane of the lifting vessel is in position and the lifting rigging is hung; the control rope and cable are connected to the lifting vessel by the transport ship through a hook, and the cable is connected to the control cabinet.

[0051] In step S6, the exhaust port of valve 402 is closed in turn, and all water pumps 401 are simultaneously turned on to suction at 10%-30% of the displacement. The displacement of water pump 401 is controlled according to the penetration speed, the initial pressure difference is controlled within 5 kPa, and the penetration speed is controlled within the range of 30-50 mm / min.

[0052] When the four groups of supporting structures have inconsistent settlement depths during settlement, the columns will tilt. In order to ensure that the inclination is within the specified range, it is necessary to adjust the settlement depth or speed of each group of supporting mechanisms.

[0053] In step S6, the inclination angle of the column 2 during the penetration process is strictly monitored and adjusted by the scale line 201 and the posture sensor 6. Specifically, when it is detected that the inclination angle of the column 2 is less than 0.5°, it means that the pile foundation 3 is being stably penetrated in the expected manner, and the lowering operation can continue at this time. However, when the inclination angle is greater than 0.5°, this indicates that the pile foundation 3 may have deviated from the predetermined trajectory and needs to be adjusted. In this case, the suction operation will be suspended and the system will be allowed to stand for 5-10 minutes to observe the change in the inclination angle. If the inclination angle still exceeds the limit during this period of time, the water pump 401 in the high side direction will be started to perform a forced deflection correction operation. The purpose of this step is to correct the inclination of the foundation by increasing the suction on one side so that it returns to the correct penetration trajectory.

[0054] The embodiment of the utility model does not limit the structure of the water pump 401. The water pump 401 is selected according to the displacement of the pile foundation 3 and the required negative pressure. As long as it can meet the high-efficiency penetration and recovery requirements of the pile foundation 3, it should be within the protection scope of the utility model. For example, the electric direct-drive large suction range water pump 401 can adjust the water pump displacement through remote frequency conversion, and can realize the suction-jet function switching through the forward and reverse rotation of the motor.

[0055] The pile foundation 3 needs to be exhausted and drained during the water entry and self-weight penetration stage, and the utility model adopts water exhaust.

[0056] The embodiment of the utility model does not limit the structure of the valve 402, as long as it meets the exhaust and drainage requirements of the pile foundation 3 entering the water and sinking by its own weight, it should be within the protection scope of the utility model. For example, in order to reduce the risk of manual operation by personnel at sea, an electric three-way ball valve can be used for exhaust switching, and the three-way ball valve selects a T-type valve core, which is driven by an electric drive head to rotate 90°.

[0057] The monitoring parameters of the pile foundation 3 during the sinking process include pressure difference, attitude, height from the bottom, positioning, heading and other parameters. Considering the particularity of the integrated sinking method, attitude and penetration depth are the key to monitoring. The penetration depth and height from the bottom are measured by spraying scale lines 201 on the pile barrel column 2. The penetration depth and penetration speed are determined by direct observation. The positioning and heading of the pile foundation 3 are accurately located by ship-borne differential GPS. A ladder 7 is also provided on the column 2 for easy maintenance.

[0058] The embodiment of the utility model does not limit the structure of the transport ship. The transport ship can be a large barge or a semi-submersible vessel with a sufficient deck area to meet the marine transportation needs of the marine photovoltaic platform. If the barge has no power, it needs to be towed by a tugboat.

[0059] The embodiments of the present invention do not limit the structure of the lifting vessel. The lifting height and rated load of the lifting vessel that meet the offshore lifting requirements of the marine photovoltaic platform should be within the protection scope of the present invention.

[0060] The upper computer human-machine interface integrates the water pump 401, valve 402 control and pile foundation 3 sinking parameter monitoring, which can provide accurate monitoring data for the pile foundation 3 sinking, and realize the pile foundation 3 sinking speed adjustment by adjusting the displacement of the water pump 401, and realize the accurate leveling of the marine photovoltaic platform by adjusting the multi-tube sinking. During the sinking process, it is necessary to closely observe the verticality changes of the pile body scale line 201 and the four pile legs, and timely perform leveling according to the changes of the pile body scale line 201.

[0061] The utility model installs the water pump 401 on the water surface, which eliminates the step of underwater robot or diver to untie the cable underwater during the construction process, thereby reducing the construction cost of the marine photovoltaic project, improving the construction efficiency, and enhancing the overall benefit of the project.

[0062] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A marine photovoltaic platform support device, characterized in that: The invention comprises a column (2), a pile foundation (3), a valve (402) and a water pump (401); the pile foundation (3) is an inverted suction bucket with a hollow structure and an open end; the column (2) is connected to the upper end of the pile foundation (3); a first mounting platform (5) is provided on the column (2); the water pump (401) is mounted on the first mounting platform (5); the water pump (401) is connected to the pile foundation (3) via a water suction pipe (403); the valve (402) is mounted on the water suction pipe (403); and the outlet of the water pump (401) is connected to a drainage pipe (404).

2. The marine photovoltaic platform support device according to claim 1, characterized in that: The upright column (2) is also provided with scale lines (201).

3. The marine photovoltaic platform support device according to claim 1, characterized in that: A second installation platform is also provided on the column (2).

4. The marine photovoltaic platform support device according to claim 3, characterized in that: The second mounting platform is provided with a posture sensor (6).

5. The marine photovoltaic platform support device according to any one of claims 1 to 4, characterized in that: The upright column (2) is also provided with a ladder (7).

6. The marine photovoltaic platform support device according to claim 5, characterized in that: A plurality of connecting plates are provided on the column (2) from top to bottom, and the water suction pipe (403) is installed on one side of the column (2) by limiting the position of the connecting plates.

7. The marine photovoltaic platform support device according to claim 1, characterized in that: It also includes a pressure transmitter, which is installed at the suction port of the water pump (401).

8. The marine photovoltaic platform support device according to claim 1, characterized in that: The upright column (2) is a hollow tube or a rod.

9. The marine photovoltaic platform support device according to claim 1, characterized in that: The valve (402) has at least one exhaust port.