Crack-resistant lightweight concrete filled bridge pile foundation karst cave treatment device
By using crack-resistant lightweight concrete filling device in the internal caves of the slope, using the combination of agitating components and pumping pipelines, the solidification and hardening problems caused by foam cement slurry filling are solved, and efficient filling effect and material saving are achieved, and the improvement of the efficiency of filling and material saving is enhanced. The stability of the bridge pile foundation.
Patent Information
- Application Number
- CN202420009722.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-03
AI Technical Summary
In the prior art, the treatment structure of the cave inside the slope is directly filled with foam cement slurry, which causes a large amount of material to be filled and the concrete does not stir for a long time, resulting in solidification and hardening, which affects the infusion effect.
The bridge pile foundation cave treatment device is used to fill crack-resistant light concrete, including pumping pipes and filling components, and the active shaft, main stirring rod, and auxiliary shaft are used through the mixing box, stirring member, steel casing and pump body. Components such as the secondary mixing rod, main gear, secondary gear and sliding wheel are stirred and poured to prevent concrete from solidifying.
It effectively avoids concrete solidification, ensures the infusion effect, improves the compactness and use efficiency of the filler, reduces material waste, and enhances the stability of the bridge pile foundation.
Smart Images

Figure CN221972396U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of civil engineering, in particular to a crack-resistant lightweight concrete filled bridge pile foundation karst cave treatment device. Background Art
[0002] Many karst areas are located in karst landforms. Bridges have the characteristics of large spans and high bridge piles. The higher the bridge piles, the greater the pressure and self-weight they bear from the bridge body. If the strength of the cave filling material is insufficient or the filling material is heavy, the filling material will cause the cave to collapse when it is subjected to a large load, and finally cause the settlement of the bridge pile foundation to increase or even collapse. Ordinary lightweight concrete has the advantages of high strength and light weight. Lightweight concrete is usually filled into the cave through a pumping conduit. However, caves have the characteristics of different development states, different depths, and different filling states. If they are not handled properly, they will cause greater safety hazards and a large waste of engineering materials.
[0003] The existing announcement number CN212582653U discloses a structure for treating karst caves inside a slope, including a slope rock and soil body and a slope support structure. There are multiple karst caves of different sizes distributed in the slope rock and soil body, and one or more filling holes are provided in each karst cave, and foam cement slurry fillers are injected into the karst caves through the filling holes; the filling holes are vertically drilled from the top surface of the slope rock and soil body to each karst cave, and the drilling depth of each filling hole into the karst cave is not less than 1m, and a grouting pipe is buried in the filling hole; the foam cement slurry filler is injected into the karst cave through the grouting pipe, and the grouting pressure is 0.6MPa to 2.5MPa. The defect of conventional cement slurry (concrete) not being filled in place is avoided, the waste of cement materials is reduced, the compactness of the karst cave filling is ensured, and thus the slope support effect is ensured.
[0004] However, the treatment structure of the internal karst caves of the above-mentioned slope is directly filled with foam cement slurry, which requires a large amount of filler. If the concrete is not stirred for a long time, it will solidify and harden, affecting the pouring effect. Utility Model Content
[0005] The purpose of the utility model is to provide a crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device, which solves the problem that the treatment structure of the karst cave inside the above-mentioned slope is directly filled with foam cement slurry, which requires a large amount of filler, and the concrete will solidify and harden if not stirred for a long time, thus affecting the pouring effect.
[0006] To achieve the above-mentioned purpose, the utility model provides a crack-resistant lightweight concrete-filled bridge pile foundation cave treatment device, including a pumping pipeline and a pouring component;
[0007] The perfusion assembly includes a mixing box, a stirring member, a steel casing and a pump body. The stirring member is arranged inside the mixing box, the steel casing is located in the hole, the pump body is connected with the interior of the mixing box through a pipeline, and is connected with the pumping pipe, and the pumping pipe extends into the interior of the steel casing.
[0008] Wherein, the stirring member includes a driving shaft and a main stirring rod, the driving shaft is rotatably connected to the mixing box and is located inside the mixing box; the main stirring rod is fixedly connected to the driving shaft and is located inside the mixing box.
[0009] Wherein, the stirring member also includes an auxiliary shaft and an auxiliary stirring rod, the auxiliary shaft is rotatably connected to the mixing box and is located inside the mixing box; the auxiliary stirring rod is fixedly connected to the auxiliary shaft and is located inside the mixing box.
[0010] Wherein, the stirring member further comprises a main gear and a sub-gear, wherein the main gear is fixedly connected to the driving shaft and is located above the driving shaft; the sub-gear is fixedly connected to the sub-drive shaft and meshes with the main gear.
[0011] Wherein, the perfusion component also includes a sliding wheel and a sensor, the sliding wheel is rotatably connected to the mixing box; the sensor is located in the cave.
[0012] The utility model discloses a crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device, wherein lightweight concrete and palm fiber are placed in the mixing box, the stirring component is started to stir and mix them as filler, the steel casing is inserted into the hole, i.e., above the karst cave, the pumping pipe applies pressure to the filler to pump it into the pumping pipe, the pumping pipe passes through the steel casing and then extends into the karst cave to transport the filler, and the stirring component is used to stir and pour at the same time to avoid concrete solidification and ensure the pouring effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0014] Figure 1 It is a cross-sectional view of a crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device according to the first embodiment of the utility model.
[0015] Figure 2 It is a construction schematic diagram of a crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device according to the first embodiment of the utility model.
[0016] Figure 3It is a step diagram of a method for treating karst caves in bridge pile foundations filled with crack-resistant lightweight concrete according to the second embodiment of the utility model.
[0017] In the figure: 101-pumping pipeline, 102-mixing box, 103-steel casing, 104-pump body, 105-driving shaft, 106-main stirring rod, 107-auxiliary driving shaft, 108-auxiliary stirring rod, 109-main gear, 110-auxiliary gear, 111-sliding wheel, 112-sensor. DETAILED DESCRIPTION
[0018] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0019] The first embodiment of the present application is:
[0020] See also Figure 1 and Figure 2 ,in, Figure 1 It is a cross-sectional view of a crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device according to the first embodiment of the utility model. Figure 2 The utility model provides a crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device: comprising a pumping pipeline 101 and a pouring assembly, the pouring assembly comprising a mixing box 102, a stirring member, a steel casing 103, a pump body 104, a sliding wheel 111 and a sensor 112, the stirring member comprising a driving shaft 105, a main stirring rod 106, a secondary driving shaft 107, a secondary stirring rod 108, a main gear 109 and a secondary gear 110.
[0021] According to this specific embodiment, the mixing box 102 is provided with the stirring member, the steel casing 103 is located in the hole, the pump body 104 is connected to the inside of the mixing box 102 through a pipeline, and is connected to the pumping pipe 101, and the pumping pipe 101 extends into the inside of the steel casing 103. Lightweight concrete and palm fiber are added to the mixing box 102, and the stirring member is used to stir them evenly. The steel casing 103 is inserted into the hole at the upper part of the cave, and the pump body 104 is used to apply pressure to pump the filling material in the mixing box 102 into the pumping pipe 101. The pumping pipe 101 passes through the steel casing 103 and extends into the cave to transport the filling material.
[0022] The driving shaft 105 is rotatably connected to the mixing box 102 and is located inside the mixing box 102; the main stirring rod 106 is fixedly connected to the driving shaft 105 and is located inside the mixing box 102. A servo motor is arranged above the driving shaft 105 to drive it to rotate, and a plurality of the main stirring rods 106 are fixed at the lower part to stir by rotating.
[0023] Secondly, the auxiliary drive shaft 107 is rotatably connected to the mixing box 102 and is located inside the mixing box 102; the auxiliary stirring rod 108 is fixedly connected to the auxiliary drive shaft 107 and is located inside the mixing box 102. The main gear 109 is fixedly connected to the driving shaft 105 and is located above the driving shaft 105; the auxiliary gear 110 is fixedly connected to the auxiliary drive shaft 107 and meshes with the main gear 109. The auxiliary drive shaft 107 is parallel to the driving shaft 105, and a plurality of auxiliary stirring rods 108 are fixed at the lower part. There are two auxiliary drive shafts 107. The main gear 109 is a double gear fixed on the driving shaft 105. The two auxiliary drive shafts 107 are respectively fixed with auxiliary gears 110 that match the double gears. When the servo motor drives the driving shaft 105 to rotate, it drives the main gear 109 to rotate, and drives the meshing auxiliary gear 110 to rotate, and then the auxiliary drive shaft 107 follows the rotation, and the main stirring rod 106 and the auxiliary stirring rod 108 rotate together, so that the stirring range is wider and the stirring effect is better.
[0024] At the same time, the sliding wheel 111 is rotatably connected to the mixing box 102; the sensor 112 is located in the cave. The sliding wheel 111 facilitates the movement of the mixing box 102, and the sensor 112 is buried during the filling process to collect various indicators of lightweight concrete to ensure that the filling process proceeds smoothly.
[0025] A crack-resistant lightweight concrete-filled bridge pile foundation karst cave treatment device according to the present embodiment is used. After the filling material is placed in the mixing box 102, the driving shaft 105 is started to drive the main gear 109 and the main stirring rod 106 to rotate, and the secondary gear 110 and the secondary drive shaft 107 to rotate. The secondary stirring rod 108 follows the rotation. After the filling material is fully mixed, the pump body 104 pumps the filling material into the pumping pipe 101. The pumping pipe 101 passes through the steel casing 103 and then extends into the karst cave to transport the filling material into the karst cave. During the transportation process, the driving shaft 105 and the secondary drive shaft 107 continue to rotate to prevent the concrete from solidifying and hardening, thereby ensuring the pouring effect.
[0026] The second embodiment of the present application is:
[0027] Based on the first embodiment, please refer to Figure 3 ,in, Figure 3 This is a step diagram of the method for treating karst caves in bridge pile foundations filled with crack-resistant lightweight concrete in the second embodiment of the utility model. The method for treating karst caves in bridge pile foundations filled with crack-resistant lightweight concrete in this embodiment includes the following steps:
[0028] S201: Obtain the development of karst caves;
[0029] S202: Making fiber-reinforced crack-resistant lightweight concrete;
[0030] S203: a steel casing 103 is arranged on the upper part of the cave, and a pumping pipe 101 is arranged inside the steel casing 103 to fill the fiber-reinforced crack-resistant lightweight concrete into the cave;
[0031] S204: embedding the sensor 112 during the filling process.
[0032] Specifically, the development of the cave is obtained through advance drilling; fiber-reinforced crack-resistant lightweight concrete is made, 0.6% to 1.5% of palm fiber is added to the lightweight concrete, the optimal fiber length is 6 to 20 mm, and the foaming begins after being stirred evenly; a steel casing 103 is set on the upper part of the cave, and a pumping pipeline 101 is set in the steel casing 103 to fill the fiber-reinforced crack-resistant lightweight concrete into the cave; a sensor 112 is buried during the filling process, and the next step is carried out after completion. Fiber-reinforced crack-resistant lightweight concrete is a filling material for the cave. Compared with the commonly used filling materials, it has the advantages of light weight, high strength, economic and environmental protection, and convenient construction. Sensor 112 is a monitoring device for lightweight concrete. It is buried in lightweight concrete to collect various indicators of lightweight concrete to ensure the smooth progress of the filling process. This method is intended to fill caves with weak groundwater activity and bear the load of large bridge pile foundations. In case of bridge pile foundation construction in beaded karst areas, continuous backfilling can be carried out to save time and cost.
[0033] The density of ordinary lightweight concrete is only 1 / 5 to 1 / 8 of that of ordinary concrete, but the crack resistance of ordinary lightweight concrete is not strong. On this basis, the reinforcement of palm fiber enhances the crack resistance of lightweight concrete, and also greatly reduces the deadweight of the filling material. Fiber-reinforced crack-resistant lightweight concrete is porous, which makes its elastic modulus low. When the pile foundation is subjected to vehicle loads on the bridge, fiber-reinforced crack-resistant lightweight concrete can help the bridge pile foundation absorb or disperse the load, and it has good crack resistance and can effectively resist various load impacts. The raw materials required for fiber-reinforced crack-resistant lightweight concrete are concrete, palm fiber, and foaming agent. The required raw materials do not contain harmful substances and do not pollute the environment. Compared with ordinary concrete, fiber-reinforced crack-resistant lightweight concrete has a shorter hardening time, and after the reinforcement of the fiber, it is not easy to crack, and its integrity is stronger after hardening. Fiber-reinforced crack-resistant lightweight concrete also has the advantage of water resistance. In the case of groundwater activity, its overall performance will be more stable. Fiber-reinforced crack-resistant lightweight concrete is constructed by pumping. Its advantages of light weight and simple process also save a lot of manpower and material resources for the project.
[0034] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A crack-resistant lightweight concrete-filled bridge pile foundation cave treatment device, comprising a pumping pipeline, characterized in that: Also included is a perfusion assembly; The perfusion assembly includes a mixing box, a stirring member, a steel casing and a pump body. The stirring member is arranged inside the mixing box, the steel casing is located in the hole, the pump body is connected with the interior of the mixing box through a pipeline, and is connected with the pumping pipe, and the pumping pipe extends into the interior of the steel casing.
2. The crack-resistant lightweight concrete filled bridge pile foundation cave treatment device according to claim 1, characterized in that: The stirring member comprises a driving shaft and a main stirring rod, wherein the driving shaft is rotatably connected to the mixing box and is located inside the mixing box; the main stirring rod is fixedly connected to the driving shaft and is located inside the mixing box.
3. The crack-resistant lightweight concrete-filled bridge pile foundation cave treatment device according to claim 2, characterized in that: The stirring member further comprises an auxiliary driving shaft and an auxiliary stirring rod, wherein the auxiliary driving shaft is rotationally connected to the mixing box and is located inside the mixing box; the auxiliary stirring rod is fixedly connected to the auxiliary driving shaft and is located inside the mixing box.
4. The crack-resistant lightweight concrete-filled bridge pile foundation cave treatment device according to claim 3, characterized in that: The stirring member further comprises a main gear and a sub gear, wherein the main gear is fixedly connected to the driving shaft and is located above the driving shaft; the sub gear is fixedly connected to the sub drive shaft and meshes with the main gear.
5. The crack-resistant lightweight concrete-filled bridge pile foundation cave treatment device according to claim 1, characterized in that: The pouring assembly also includes a sliding wheel and a sensor, wherein the sliding wheel is rotatably connected to the mixing box; and the sensor is located in the cave.