Cast-in-place pile construction reinforcement cage lowering and position correcting device

By using a rebar cage lowering and positioning device for cast-in-place pile construction, the position of the rebar cage is adjusted using sleeves and support components, which solves the problem of inaccurate rebar cage lowering, improves construction accuracy and efficiency, and ensures the quality and safety of the pile.

CN221972407UActive Publication Date: 2024-11-08SHANXI MECHANIZATION CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323529836.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-08
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

In the construction of cast-in-place piles, inaccurate placement of the reinforcing cage can affect the quality and safety of the pile, leading to uneven concrete pouring, non-standard arrangement of reinforcing bars in the pile body, reduced bearing capacity and seismic performance, and increased construction difficulty and cost.

Method used

A device for lowering and aligning a reinforcing cage for cast-in-place pile construction is adopted, comprising a sleeve, a base, a hanging rod, a support assembly, and a support rod. The sleeve guides the reinforcing cage to a designated position, and the lifting spring and the support assembly are used to adjust the tilt of the reinforcing cage to ensure vertical lowering.

Benefits of technology

It improves the accuracy and efficiency of steel cage placement, reduces labor and time costs, ensures construction quality and safety, and enhances the bearing capacity and seismic performance of piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972407U_ABST
    Figure CN221972407U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pre-embedding positioning, in particular to a cast-in-place pile construction reinforcement cage lowering and position correcting device. The cast-in-place pile construction reinforcement cage lowering and position correcting device comprises a sleeve and a base, the sleeve is in a frustum shape, two symmetrically-distributed hanging rods are installed on the top of the sleeve, the base comprises a guide sleeve, a supporting sleeve and a top plate, the top plate is installed on the top of the guide sleeve, the top plate is installed in the supporting sleeve, the upper end of the guide sleeve is in a frustum shape, and the lower end of the guide sleeve is in a cylindrical shape. According to the utility model, the reinforcement cage is effectively guided to a specified position, so that the construction process of the cast-in-place pile is more accurate and efficient; the reinforcement cages under various inclination conditions are effectively supported, the adjustment precision and efficiency of the positions of the reinforcement cages are improved, and the construction precision and efficiency are improved; stable hanging of the sleeve on the reinforcement cage is achieved, positioning of the reinforcement cage in the construction process is facilitated, and construction efficiency and accuracy are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pre-embedded positioning, in particular to a steel cage lowering and positioning device for cast-in-place pile construction. Background Art

[0002] In the construction of bored piles, the steel cage is a very important component. It plays a role in reinforcing and enhancing the strength of the pile body. It is usually made by steel workers at the prefabrication site or construction site. The steel cage is usually made of longitudinal and transverse steel bars woven crosswise to form a cage-like structure; the longitudinal steel bars are generally main bars with larger diameters, while the transverse steel bars are stirrups used to connect and fix the main bars. During the construction of bored piles, the steel cage needs to be lowered into the pile hole and maintained in the position and direction required by the design; before lowering, the pile hole needs to be cleaned and processed to ensure that the steel cage can be lowered into place smoothly.

[0003] During the lowering process, whether the steel cage is in place directly affects the quality of the pile foundation. If the steel cage is not vertical, the concrete pouring will be uneven, making it impossible to guarantee the quality of the pile, affecting the service life and bearing performance of the pile. If the steel cage is not lowered to the center or vertically, the steel bars inside the pile body will be arranged irregularly, which will reduce the bearing capacity and seismic resistance of the pile and increase the risk of deformation and cracking of the pile, thereby affecting the safety of the entire structure and increasing the difficulty of subsequent construction, including subsequent concrete pouring, pile body molding, etc. Additional adjustments and repairs may be required, increasing construction costs and cycles. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a device for lowering and calibrating the position of a reinforcement cage in cast-in-place pile construction.

[0005] The technical solution of the utility model is achieved in this way:

[0006] A device for lowering and calibrating a reinforcement cage for cast-in-place pile construction comprises a sleeve and a base, wherein the sleeve is in a frustum shape, and two symmetrically distributed hanging rods are installed on the top of the sleeve; the base comprises a guide sleeve, a support sleeve and a top plate, and the top plate is installed on the top of the guide sleeve, and the top plate is installed in the support sleeve; the upper end of the guide sleeve is in a frustum shape, and the lower end is in a cylindrical shape.

[0007] Furthermore, a plurality of lifting springs are centrally symmetrically installed between the top plate and the support sleeve, and the top plate is slidably installed in the support sleeve.

[0008] Furthermore, a support assembly is provided on the top plate, and the support assembly includes a support base, a telescopic cylinder, a telescopic rod and a fan-shaped baffle; the fan-shaped baffle is installed on one end of the telescopic rod, and the other end is threadedly installed in the telescopic cylinder, the telescopic cylinder is rotatably installed on the upper end of the support base, and the bottom of the support base is installed on the top plate.

[0009] Furthermore, the support assembly also includes a sliding block, which is installed at the bottom of the support base. A sliding groove is provided on the top plate, and the sliding block is located in the sliding groove.

[0010] Furthermore, the hanging rod includes a vertical rod, a rotating block, a rotating cylinder, a threaded groove and a clamping block. The bottom of the vertical rod is installed on the sleeve, and the upper end is installed with a rotating block. A threaded groove is opened on one side of the rotating cylinder, and the other side is fixedly connected to the clamping block. The rotating block is located in the threaded groove.

[0011] Furthermore, a plurality of support rods distributed in a centrally symmetrical manner are installed at the bottom of the support sleeve.

[0012] The utility model has the following beneficial effects:

[0013] 1. The utility model effectively guides the steel cage to a designated position by setting the sleeve and the guide sleeve, making the cast-in-place pile construction process more accurate and efficient.

[0014] 2. The utility model effectively supports steel cages in various tilting conditions by setting support components and slide grooves, improves the adjustment accuracy and efficiency of the steel cage position, and improves construction accuracy and efficiency.

[0015] 3. The utility model realizes stable suspension of the sleeve on the steel cage by setting the vertical pole, which is beneficial to the positioning of the steel cage during the construction process and improves the efficiency and accuracy of the construction.

[0016] 4. The utility model facilitates construction workers to observe and monitor the conditions of the steel cage by setting the support rods, which is beneficial to the control of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is an overall schematic diagram of a device for lowering and calibrating the position of a reinforcement cage in cast-in-place pile construction;

[0018] Figure 2 It is a cross-sectional view of a device for lowering and calibrating the position of a reinforcement cage in cast-in-place pile construction;

[0019] Figure 3 It is an overall schematic diagram of the support components in a device for lowering and calibrating the position of a steel cage in cast-in-place pile construction;

[0020] Figure 4The present invention is an overall schematic diagram of the middle hanging rod in a reinforcement cage lowering and positioning device for cast-in-place pile construction.

[0021] In the figure: 1. sleeve; 2. base; 2-1. guide sleeve; 2-2. support sleeve; 2-3. top plate; 3. hanging rod; 3-1. vertical rod; 3-2. rotating block; 3-3. rotating cylinder; 3-4. threaded groove; 3-5. clamping block; 4. lifting spring; 5. supporting assembly; 5-1. supporting base; 5-2. telescopic cylinder; 5-3. telescopic rod; 5-4. fan-shaped baffle; 5-5. slider; 6. slide groove; 7. support rod. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] Please refer to Figures 1 to 4 The utility model provides a device for lowering and calibrating a steel cage for bored pile construction, comprising a sleeve 1 and a base 2. The sleeve 1 is in a cone shape. Two symmetrically distributed hanging rods 3 are installed on the top of the sleeve 1. The hanging rods 3 are suspended on the annular hoop reinforcement of the steel cage. The sleeve 1 is sleeved on the bottom of the steel cage through the hanging rods 3. The end of the steel cage can be separated from the base 2 to extend the service life of the device. The base 2 comprises a guide sleeve 2-1, a support sleeve 2-2 and a top plate 2-3. The top plate 2-3 is installed on the top of the guide sleeve 2-1, and the top plate 2-3 is installed in the support sleeve 2-2. The upper end of the guide sleeve 2-1 is in a cone shape and the lower end is in a cylindrical shape. The sleeve 1 can guide the steel cage to the inside of the guide cylinder, and the steel cage then passes through the guide sleeve 2-1 into the pile hole of the bored pile, which can effectively guide the steel cage to the specified position and maintain a stable calibration, making the bored pile construction process more accurate and efficient, improving the efficiency of bored pile construction, reducing manpower and time costs, and ensuring construction quality and safety.

[0024] A plurality of lifting springs 4 are installed between the top plate 2-3 and the support sleeve 2-2 in a centrally symmetrical distribution. The top plate 2-3 is slidably installed in the support sleeve 2-2. When the steel cage enters the guide sleeve 2-1, if the steel cage is tilted, the sleeve 1 will press the guide sleeve 2-1 downward, and the guide sleeve 2-1 drives the top plate 2-3 to move downward. The lifting spring 4 is compressed, and the tilt of the steel cage can be detected in time, and the steel cage can be adjusted immediately to ensure that the steel cage can accurately pass through the sleeve 1 and maintain a vertical state, which can improve the efficiency of monitoring and adjusting the position of the steel cage during construction, and ensure construction quality and safety; a support assembly 5 is slidably installed on the top plate 2-3, and the support assembly 5 includes a support base 5-1, a telescopic cylinder 5-2, a telescopic rod 5-3, a fan-shaped baffle 5-4 and a slider 5-5; a fan-shaped baffle 5-4 is installed at one end of the telescopic rod 5-3, and the other end is threadedly installed in the telescopic cylinder 5-2. The telescopic cylinder 5- 2 is rotatably mounted on the upper end of the support base 5-1, the bottom of the support base 5-1 is mounted on the top plate 2-3, the slider 5-5 is mounted on the bottom of the support base 5-1, and a slide groove 6 is provided on the top plate 2-3, and the slider 5-5 is located in the slide groove 6; when the steel cage is tilted, the telescopic cylinder 5-2 can be rotated, and the telescopic cylinder 5-2 drives the telescopic rod 5-3 and the fan-shaped stopper to move in the direction of the steel cage to adjust the position of the steel cage. When the steel cage is adjusted to a vertical state, the lifting spring 4 rebounds quickly, drives the top plate 2-3 to reset, and stops rotating the telescopic cylinder 5-2 to ensure that it can accurately pass through the sleeve 1 and maintain a vertical state. The slider 5-5 and the slide groove 6 enable the support assembly 5 to slide on the top plate 2-3, and can support the steel cage in various tilting conditions without artificial support, thereby improving the safety of construction, effectively improving the adjustment accuracy and efficiency of the steel cage position, and improving the construction accuracy and efficiency.

[0025] The hanging rod 3 includes a vertical rod 3-1, a rotating block 3-2, a rotating drum 3-3, a threaded groove 3-4 and a clamping block 3-5. The bottom of the vertical rod 3-1 is installed on the sleeve 1, and the upper end is installed with a rotating block 3-2. A threaded groove 3-4 is opened on one side of the rotating drum 3-3, and the other side is fixedly connected with the clamping block 3-5. The rotating block 3-2 is located in the threaded groove 3-4. During construction, the sleeve 1 is hung on the annular stirrups on the steel cage through the hanging rod 3 through the gap on the clamping block 3-5. When the steel cage is pressed down in the guide sleeve 2-1, the vertical rod 3-1 is fixed, and the rotating drum 3-3 is screwed on the vertical rod 31 through the threaded groove 3-4 and the rotating block 3-2. The groove rotates, and the clamping block 3-5 rotates to the outside of the annular hoop on the steel cage, and the steel cage can continue to move down along the sleeve 1 to achieve stable suspension of the sleeve 1 on the steel cage, which is beneficial to the positioning of the steel cage during construction and the protection of the guide sleeve 2-1 and the inner wall of the pile hole when pressing down, so that the steel cage can smoothly pass through the sleeve 1 into the pile hole of the cast-in-place pile, thereby improving the efficiency and accuracy of construction; a plurality of support rods 7 with central symmetry are installed at the bottom of the support sleeve 2-2, and the support rods 7 prop up the base 2, which is convenient for construction personnel to observe and monitor the situation of the steel cage, and is beneficial to the control of construction.

[0026] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A device for lowering and calibrating the position of a steel cage for cast-in-place pile construction, characterized in that: The invention comprises a sleeve (1) and a base (2); the sleeve (1) is in the shape of a frustum; two symmetrically distributed hanging rods (3) are installed on the top of the sleeve (1); the base (2) comprises a guide sleeve (2-1), a support sleeve (2-2) and a top plate (2-3); the top plate (2-3) is installed on the top of the guide sleeve (2-1); the top plate (2-3) is installed in the support sleeve (2-2); the upper end of the guide sleeve (2-1) is in the shape of a frustum; and the lower end is in the shape of a cylinder.

2. A device for lowering and calibrating the position of a steel cage for cast-in-place pile construction according to claim 1, characterized in that: A plurality of lifting springs (4) are centrally symmetrically installed between the top plate (2-3) and the support sleeve (2-2), and the top plate (2-3) is slidably installed in the support sleeve (2-2).

3. The device for lowering and calibrating the position of a steel cage for cast-in-place pile construction according to claim 1, characterized in that: A support assembly (5) is arranged on the top plate (2-3), and the support assembly (5) comprises a support base (5-1), a telescopic cylinder (5-2), a telescopic rod (5-3) and a fan-shaped baffle (5-4); one end of the telescopic rod (5-3) is mounted with the fan-shaped baffle (5-4), and the other end is threadedly mounted in the telescopic cylinder (5-2); the telescopic cylinder (5-2) is rotatably mounted on the upper end of the support base (5-1), and the bottom of the support base (5-1) is mounted on the top plate (2-3).

4. A device for lowering and calibrating the position of a steel cage for cast-in-place pile construction according to claim 3, characterized in that: The support assembly (5) further comprises a sliding block (5-5), wherein the sliding block (5-5) is mounted on the bottom of the support base (5-1), a sliding groove (6) is provided on the top plate (2-3), and the sliding block (5-5) is located in the sliding groove (6).

5. The device for lowering and calibrating the position of a steel cage for cast-in-place pile construction according to claim 1, characterized in that: The hanging rod (3) comprises a vertical rod (3-1), a rotating block (3-2), a rotating cylinder (3-3), a threaded groove (3-4) and a clamping block (3-5); the vertical rod (3-1) is mounted on the sleeve (1) at the bottom, and the rotating block (3-2) is mounted on the upper end; the rotating cylinder (3-3) is provided with a threaded groove (3-4) on one side, and is fixedly connected to the clamping block (3-5) on the other side; and the rotating block (3-2) is located in the threaded groove (3-4).

6. The device for lowering and calibrating the position of a steel cage for cast-in-place pile construction according to claim 1, characterized in that: A plurality of support rods (7) distributed in a centrally symmetrical manner are installed at the bottom of the support sleeve (2-2).

Citation Information

Cited By

  • Cast-in-place pile reinforcement cage safety protection construction method and device

    CN121429003A

  • A construction method and device for safety protection of a reinforcement cage of a cast-in-place pile

    CN121429003B