Engineering construction steel pipe column
By designing a sliding socket and spring support block structure for steel pipe columns, the construction safety risks caused by high-altitude butt welding of steel pipe columns is solved, rapid installation without welding is achieved, and construction safety is improved.
Patent Information
- Application Number
- CN202420213699.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The construction time of steel pipe columns is long when welded at high altitude, resulting in workers suspending at high altitudes for too long, increasing construction safety risks.
Design a steel pipe column for engineering construction. By fixing the No. 1 steel pipe column on the base of the support platform, using the structure of sliding sockets and spring support blocks, the No. 2 steel pipe column is compressed and slidingly inserted through the support block after docking. Achieving fixed connections without welding and simplifying the installation process.
It effectively shortens the installation time of steel pipe columns, reduces the high-altitude suspension time of workers, improves construction safety, and avoids the safety risks of high-altitude welding.
Smart Images

Figure CN221972819U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a steel pipe column for engineering construction. Background Art
[0002] Steel pipe column is a construction component of a compression pipe column in high-rise building projects.
[0003] At present, when installing steel pipe columns, the lowest steel pipe column and the concrete foundation are usually fixed, and then the upper steel pipe columns are hoisted and welded, so as to complete the splicing and installation of the steel pipe columns.
[0004] However, since each section of the steel pipe column is connected at high altitude and the welding construction time is relatively long, the workers will be suspended in the air for a long time, which leads to a greater safety risk during construction. Therefore, the utility model proposes an engineering construction steel pipe column to solve the above problem. Utility Model Content
[0005] The purpose of the utility model is to provide a steel pipe column for engineering construction, so as to solve the problem that the construction time of the steel pipe column in the prior art proposed in the above-mentioned background technology is long during high-altitude butt welding, which causes the workers to be suspended in the air for a long time, resulting in greater safety risks during construction.
[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical solution: a steel pipe column for engineering construction, wherein the steel pipe column for engineering construction comprises:
[0007] A pedestal foundation, wherein the upper end of the pedestal foundation is fixedly connected with a No. 1 steel pipe column, the upper end of the No. 1 steel pipe column is slidably sleeved with a No. 2 steel pipe column, and the side of the No. 2 steel pipe column is slidably inserted with a plurality of support blocks distributed in a circular array, springs are fixedly connected between the plurality of support blocks and the No. 2 steel pipe column, and the support blocks are inserted with the No. 1 steel pipe column after the No. 2 steel pipe column and the No. 1 steel pipe column are sleeved, the upper end of the No. 1 steel pipe column is fixedly connected with a plurality of baffles for guiding the support blocks, the side of the No. 1 steel pipe column is fixedly connected with a plurality of positioning blocks, and the side of the No. 2 steel pipe column is fixedly connected with a plurality of positioning rods, and the positioning rods and the positioning blocks are slidably inserted.
[0008] Preferably, the upper end of the pedestal foundation is fixedly connected with an anchor bolt, one end of the anchor bolt is slidably sleeved with a positioning plate, and the positioning plate is fixedly connected to the No. 1 steel pipe column.
[0009] Preferably, a slot for slidingly sleeved No. 2 steel pipe column is provided at the upper end of the No. 1 steel pipe column, a plurality of positioning slots for sliding support blocks are provided on the side of the No. 1 steel pipe column, and a plug interface for plugging support blocks is provided on one side of the positioning slot.
[0010] Preferably, one end of the support block is fixedly connected to a connecting rod which is sleeved with a spring, the connecting rod is slidably plugged into the No. 2 steel pipe column and one end of the connecting rod is fixedly connected to a limiting plate, and the limiting plate is located on the outside of the No. 2 steel pipe column.
[0011] Preferably, a notch is provided on one side of the positioning groove, and the notch is located at the upper end of the positioning groove.
[0012] Preferably, the baffle is arranged in a "V" shape, and one end of the No. 2 steel pipe column is provided with a plurality of mounting grooves for the baffle to be plugged in.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] The utility model fixes the No. 1 steel pipe column on the foundation, then lifts the No. 2 steel pipe column and connects it with the No. 1 steel pipe column, so that the No. 2 steel pipe column is sleeved on the upper end of the No. 1 steel pipe column. In the process of sleeve connection between the No. 2 steel pipe column and the No. 1 steel pipe column, multiple support blocks on the No. 2 steel pipe column will be compressed first, and then when the No. 2 steel pipe column is in place, it will be slidably plugged with the No. 1 steel pipe column, so that the No. 2 steel pipe column and the No. 1 steel pipe column are fixed together. Workers only need to ensure that the positioning components can be aligned to ensure the smooth installation of the No. 2 steel pipe column, which is very convenient. This also avoids the need for workers to weld the No. 1 steel pipe column and the No. 2 steel pipe column together later, thereby solving the problem that the construction time of the steel pipe columns in the prior art is long when they are butt-welded at high altitude, resulting in a long time for workers to be suspended at high altitude, resulting in a greater safety risk during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a three-dimensional schematic diagram of the overall structure of the utility model;
[0016] Figure 2 It is a partial side sectional schematic diagram of the overall structure of the utility model;
[0017] Figure 3 This is a side schematic diagram of the No. 1 steel pipe column structure of the utility model;
[0018] Figure 4 This is a side schematic diagram of the No. 2 steel pipe column structure of the utility model;
[0019] Figure 5 It is a side schematic diagram of the support block structure of the utility model.
[0020] In the figure: 1. Cap foundation; 11. Anchor bolt; 2. No. 1 steel pipe column; 21. Slot; 22. Positioning plate; 3. No. 2 steel pipe column; 31. Mounting groove; 4. Support block; 41. Connecting rod; 42. Limiting plate; 5. Spring; 6. Baffle; 7. Positioning block; 8. Positioning rod; 9. Positioning groove; 91. Plug interface; 92. Notch. DETAILED DESCRIPTION
[0021] In order to make the purpose and technical solution of the present invention clearly and completely described, and the advantages more clearly understood, the embodiments of the present invention are further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are part of the embodiments of the present invention, rather than all of the embodiments, and are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] In the description of the present invention, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0023] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.
[0025] See also Figures 1 to 5 , the utility model provides a technical solution:
[0026] Embodiment 1, a steel pipe column for engineering construction, the steel pipe column for engineering construction comprises: a No. 1 steel pipe column 2 and a No. 2 steel pipe column 3.
[0027] Specifically, the upper end of the cap foundation 1 is fixedly connected with a No. 1 steel pipe column 2, the upper end of the No. 1 steel pipe column 2 is slidably sleeved with a No. 2 steel pipe column 3, and the side of the No. 2 steel pipe column 3 is slidably inserted with a plurality of support blocks 4 distributed in a circumferential array, and springs 5 are fixedly connected between the plurality of support blocks 4 and the No. 2 steel pipe column 3, and the support blocks 4 are inserted with the No. 1 steel pipe column 2 after the No. 2 steel pipe column 3 and the No. 1 steel pipe column 2 are sleeved, and the upper end of the No. 1 steel pipe column 2 is fixedly connected with a plurality of baffles 6 for guiding the support blocks 4, and the side of the No. 1 steel pipe column 2 is fixedly connected with a plurality of positioning blocks 7, and the side of the No. 2 steel pipe column 3 is fixedly connected with a plurality of positioning rods 8, and the positioning rods 8 and the positioning blocks 7 are slidably inserted, and after the No. 1 steel pipe column 2 is fixed on the cap foundation 1 Finally, the No. 2 steel pipe column 3 is lifted and connected with the No. 1 steel pipe column 2, and then the positioning rod 8 will first be aligned and plugged with the positioning block 7, so as to locate the position of the support block 4, and then the No. 2 steel pipe column 3 will slowly fall and be connected with the No. 1 steel pipe column 2. During the falling process of the No. 2 steel pipe column 3, the baffle 6 will first contact the support block 4, and then push the support block 4 to slide toward the No. 2 steel pipe column 3. Finally, after the No. 2 steel pipe column 3 is in place, the support block 4 will slide and plug with the No. 1 steel pipe column 2 under the action of the spring 5, so as to directly fix the No. 2 steel pipe column 3 on the No. 1 steel pipe column 2, so as to avoid workers welding the No. 1 steel pipe column 2 and the No. 2 steel pipe column 3 together at high altitude, thereby improving the safety factor during the installation of the steel pipe columns.
[0028] In order to facilitate the fixation of the No. 1 steel pipe column 2 on the pedestal foundation 1, the upper end of the pedestal foundation 1 of the present application is fixedly connected with an anchor bolt 11, and one end of the anchor bolt 11 is slidably sleeved with a positioning plate 22, and the positioning plate 22 is fixedly connected to the No. 1 steel pipe column 2. When the No. 1 steel pipe column 2 is lifted and falls on the pedestal foundation 1, the positioning plate 22 will be sleeved with the anchor bolt 11, and the No. 1 steel pipe column 2 can be fixed to the pedestal foundation 1 using a nut.
[0029] In order to facilitate the sliding connection between the No. 2 steel pipe column 3 and the No. 1 steel pipe column 2 and the plug-in connection between the support block 4 and the No. 1 steel pipe column 2, a slot 21 for the sliding connection of the No. 2 steel pipe column 3 is opened at the upper end of the No. 1 steel pipe column 2 of the present application. Through the slot 21, the No. 2 steel pipe column 3 can be connected to the No. 1 steel pipe column 2, and then after the support block 4 and the No. 1 steel pipe column 2 are plugged in, the No. 2 steel pipe column 3 can be restricted from shaking left and right. A plurality of positioning grooves 9 for the support block 4 to slide are opened on the side of the No. 1 steel pipe column 2, and a plug-in interface 91 for the support block 4 to plug in is opened on one side of the positioning groove 9. The positioning groove 9 can provide the support block 4 with sliding space, and the plug-in interface 91 can allow the support block 4 to be plugged into the No. 1 steel pipe column 2.
[0030] In order to facilitate the sliding installation of the support block 4, one end of the support block 4 of the present application is fixedly connected to a connecting rod 41 which is sleeved with a spring 5. The connecting rod 41 is slidably plugged into the No. 2 steel pipe column 3 and one end of the connecting rod 41 is fixedly connected to a limiting plate 42. The limiting plate 42 is located on the outside of the No. 2 steel pipe column 3. The connecting rod 41 can ensure that the support block 4 will not shake when sliding, thereby ensuring that the support block 4 can be accurately plugged into the plug-in interface 91 under the action of the spring 5, and the limiting plate 42 can prevent the support block 4 from being separated from the No. 2 steel pipe column 3.
[0031] In order to further stabilize the steel pipe column after casting, a notch 92 is opened on one side of the positioning groove 9 of the present application, and the notch 92 is located at the upper end of the positioning groove 9. After the steel pipe column is installed, when the concrete is subsequently poured, the concrete will enter the positioning groove 9 along the notch 92, thereby casting the No. 1 steel pipe column 2 and the No. 2 steel pipe column 3 and the fixed structures of the two into a whole, further improving the stability of the steel pipe column after casting.
[0032] In order to better guide the support block 4, the baffle 6 of the present application is set to a "V" shape, and one end of the No. 2 steel pipe column 3 is provided with a plurality of mounting grooves 31 for the baffle 6 to be plugged in. The "V"-shaped baffle 6 can better guide the support block 4, and the mounting grooves 31 can provide the baffle 6 with installation space to prevent the baffle 6 from affecting the socketing of the No. 2 steel pipe column 3 and the No. 1 steel pipe column 2.
[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A steel pipe column for engineering construction, characterized in that: The engineering construction steel pipe column comprises: A pedestal foundation (1), wherein the upper end of the pedestal foundation (1) is fixedly connected to a No. 1 steel pipe column (2), the upper end of the No. 1 steel pipe column (2) is slidably sleeved with a No. 2 steel pipe column (3), the side of the No. 2 steel pipe column (3) is slidably inserted with a plurality of support blocks (4) distributed in a circumferential array, a plurality of springs (5) are fixedly connected between the support blocks (4) and the No. 2 steel pipe column (3), and the support blocks (4) are inserted into the No. 1 steel pipe column (2) after the No. 2 steel pipe column (3) and the No. 1 steel pipe column (2) are sleeved, the upper end of the No. 1 steel pipe column (2) is fixedly connected with a plurality of baffles (6) for guiding the support blocks (4), the side of the No. 1 steel pipe column (2) is fixedly connected with a plurality of positioning blocks (7), the side of the No. 2 steel pipe column (3) is fixedly connected with a plurality of positioning rods (8), and the positioning rods (8) and the positioning blocks (7) are slidably inserted.
2. The engineering construction steel pipe column according to claim 1, characterized in that: The upper end of the cap foundation (1) is fixedly connected with an anchor bolt (11), one end of the anchor bolt (11) is slidably sleeved with a positioning plate (22), and the positioning plate (22) is fixedly connected to the No. 1 steel pipe column (2).
3. The engineering construction steel pipe column according to claim 1, characterized in that: The upper end of the No. 1 steel pipe column (2) is provided with a slot (21) for the No. 2 steel pipe column (3) to slide and sleeve, and the side of the No. 1 steel pipe column (2) is provided with a plurality of positioning slots (9) for the support block (4) to slide, and one side of the positioning slot (9) is provided with an insertion port (91) for the support block (4) to be plugged in.
4. The engineering construction steel pipe column according to claim 3, characterized in that: One end of the support block (4) is fixedly connected to a connecting rod (41) sleeved with a spring (5); the connecting rod (41) and the second steel pipe column (3) are slidably plugged and one end of the connecting rod (41) is fixedly connected to a limiting plate (42); the limiting plate (42) is located on the outside of the second steel pipe column (3).
5. The engineering construction steel pipe column according to claim 3, characterized in that: A notch (92) is provided on one side of the positioning groove (9), and the notch (92) is located at the upper end of the positioning groove (9).
6. The engineering construction steel pipe column according to claim 5, characterized in that: The baffle (6) is arranged in a "V" shape, and one end of the No. 2 steel pipe column (3) is provided with a plurality of placement grooves (31) for the baffle (6) to be inserted into.