By designing adjustable canopy and limit structure on the construction climbing frame, the problem of lack of ceiling is solved, the construction environment protection and transportation stability are achieved, and maintenance and transportation costs are reduced.
Patent Information
- Application Number
- CN202420480354.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-13
AI Technical Summary
The existing construction climbing frame lacks a ceiling design, which leads to the construction materials and personnel being easily affected by the natural environment during the construction process, the structure is easily damaged, and the maintenance costs are high. At the same time, the uneven aisles lead to unstable transportation, affecting the construction progress and costs.
An adjustable canopy structure and limit structure are designed to adjust the ceiling and ceiling panels through a foldable flexible rainproof cloth and snap-on structure, ensuring protection and stable transportation in different situations.
The construction climbing frame is effectively capped, protecting construction personnel and materials, reducing maintenance costs, and ensuring transportation stability and safety through roof adjustment.
Smart Images

Figure CN221972963U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction engineering, in particular to a construction climbing frame. Background Art
[0002] Construction climbing frame is a new type of scaffolding technology, also known as "mobile scaffolding" or "climbing frame". Compared with traditional scaffolding, construction climbing frame has higher safety and convenience, so it is widely used in construction.
[0003] The main structure of the construction climbing frame includes: frame, guide rail, anti-fall device, electric hoist, etc. The frame is the main load-bearing structure of the entire climbing frame, which can be lifted as the floor rises; the guide rail is used to control the lifting and lowering of the frame and prevent the frame from overturning; the anti-fall device is a safety device set to prevent the frame from accidentally falling; the electric hoist is the power equipment used to drive the lifting and lowering of the entire climbing frame.
[0004] The advantage of the construction climbing frame is that it can be raised as the floor rises, and does not need to be manually erected and dismantled like traditional scaffolding. This greatly saves manpower and time costs, and also improves the safety of construction. In addition, the construction climbing frame can also be customized according to different building structures and construction requirements, with high flexibility and adaptability.
[0005] However, in the prior art, the construction climbing frame still has the following disadvantages including but not limited to:
[0006] 1. In the prior art, construction climbing frames are often not capped, which reduces the safety of the entire construction process. Due to the lack of capping, construction materials and personnel are vulnerable to natural environmental factors such as wind, rain, and dust. These factors may cause damage to construction materials, degradation of performance, and may even pose a threat to the health and safety of construction workers. In addition, uncapped construction climbing frames may be more prone to damage during long-term use, resulting in higher maintenance costs. Due to the lack of capping protection, construction climbing frames are easily eroded by natural factors such as wind, rain, and ultraviolet rays, resulting in the degradation of their structure and performance. This means more frequent maintenance and replacement of parts, increasing the cost of the project.
[0007] 2. Construction scaffolds often need to carry goods for transportation at the same time. However, in actual applications, the aisles of the scaffolds are trampled and padded for a long time, which will cause the aisles to be uneven and the transported goods to be unstable. This not only increases the transportation risk, but may also cause damage to the goods, thus affecting the construction progress and cost.
[0008] In view of this, it is necessary to provide a completely new solution to improve the above problems. Utility Model Content
[0009] The technical problem to be solved by the utility model is to overcome the above-mentioned defects and provide a construction climbing frame.
[0010] In order to solve the above technical problems, the technical solution provided by the utility model is:
[0011] A construction climbing frame comprises an aisle, wherein a top plate of the same shape as the aisle is arranged above the aisle, the top plate and the aisle are connected to each other by a plurality of evenly distributed hollow support columns, the top plate slides on the support columns, the support columns and the top plate are connected to each other by a limiting structure, the top end of the top plate is fixedly connected to a slide rail, both sides of the aisle are fixedly connected to a guardrail, the top of the guardrail is provided with a slide groove, one side of the slide groove is fixedly connected to a canopy 1, the inside of the slide groove is slidably connected to a canopy 2 on a side away from the canopy 1, the canopy 1 and the canopy 2 are connected to each other by a foldable flexible rainproof cloth, the bottom ends of the canopy 2 away from the canopy 1 are fixedly connected to a slider 1 on both sides, and the slider 1 and the slide groove are connected to each other by a snap-fit structure.
[0012] As an improvement, the limiting structure includes a plurality of evenly distributed through holes longitudinally opened on the support column, a latch is inserted into the interior of the through hole, a through slot and a groove are respectively opened on the top plate for cooperating with the latch, and a pulling part is fixedly connected to one end of the latch close to the through slot.
[0013] As an improvement, a spring 1 is sleeved on the outside of the latch 1, and the two ends of the spring 1 are respectively fixedly connected to a limit block and a limit plate, the limit plate is located at one end close to the through slot and fixedly connected to the through slot, and the limit block is fixedly connected to the latch 1.
[0014] As an improvement, the snap-fit structure includes a cavity opened inside slider one, a sliding rod is fixedly connected in the cavity, a slider two is slidably connected on the sliding rod, a push rod and a latch two are fixedly connected to the top and bottom ends of the slider two, respectively, and the push rod and the latch two both pass through the cavity and extend to the outside.
[0015] As an improvement, the inner wall of the slide slot is provided with a plurality of evenly distributed grooves 2 for use with the second latch, the portion of the second latch located in the cavity is fixedly connected to a second spring, the end of the second spring away from the second latch is fixedly connected to a fixing portion, and the fixing portion is fixedly connected in the cavity.
[0016] Compared with traditional technology, the advantages of this utility model are:
[0017] 1. The utility model designs canopy 1 and canopy 2 located at the top of the guardrail, and connects them through a foldable flexible rainproof cloth to achieve a capping effect. The canopy can be opened and closed to different degrees by adjusting the buckle structure. When the weather is fine, it can be folded up, and when the weather is bad with rain or snow, it can be closed. It has rich application scenarios and can meet multiple needs.
[0018] 2. The utility model is designed with a top plate located on the support column that is adjusted by a limiting structure, thereby realizing the adjustment of the top plate. When goods need to be transported, the top plate can be lowered, and then the freight trolley can be placed on the slide rail to slide. When the goods do not need to be transported, it can be moved up and stored to protect it from damage, thereby ensuring the separation of people and goods and making transportation more stable and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a three-dimensional structural diagram of a construction climbing frame of the utility model
[0020] Figure 2 This is an internal structure diagram of a construction climbing frame of the utility model;
[0021] Figure 3 This is a top cross-sectional view of a construction climbing frame of the utility model;
[0022] Figure 4 It is an enlarged view of A of a construction climbing frame of the utility model;
[0023] Figure 5 It is an enlarged view of B of a construction climbing frame of the utility model;
[0024] Figure 6 It is an enlarged view of C of a construction climbing frame of the utility model;
[0025] Figure 7 It is a side cross-sectional view of a buckle structure of a construction climbing frame of the utility model;
[0026] As shown in the figure: 1. Aisle; 2. Top plate; 3. Support column; 4. Limiting structure; 5. Slide rail; 6. Guardrail; 7. Slide groove; 8. Awning one; 9. Awning two; 10. Flexible rainproof cloth; 11. Slider one; 12. Buckle structure; 13. Through hole; 14. Pin one; 15. Through groove; 16. Groove one; 17. Pulling part; 18. Spring one; 19. Limiting block; 20. Limiting plate; 21. Cavity; 22. Fixed part; 23. Sliding rod; 24. Slider two; 25. Push rod; 26. Pin two; 27. Groove two; 28. Spring two. DETAILED DESCRIPTION
[0027] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0028] The working principle of the utility model is as follows Figure 1-Figure 7 As shown, a construction climbing frame includes an aisle 1 (the aisle is often built according to the building and therefore is often annular. In a preferred embodiment of the present invention, the drawings in the specification are only used as a convenient display of a structural relationship and cannot be interpreted as a limitation of the present invention). A top plate 2 of the same shape as the aisle 1 is arranged above the aisle 1. The top plate 2 and the aisle 1 are connected to each other by a number of evenly distributed hollow support columns 3. The top plate 2 slides on the support columns 3. The support columns 3 and the top plate 2 are connected to each other by a limiting structure 4. By adjusting the limiting structure 4, its height on the support column 3 can be controlled. According to different usage conditions, it can be lowered to the lowest or other heights, and the top of the top plate 2 is fixedly connected with a slide rail 5. Therefore, when in use, a cart carrying goods is placed on the slide rail 5 for stable sliding transportation.
[0029] Both sides of the corridor 1 are fixedly connected with guardrails 6, and a slide 7 is provided at the top of the guardrail 6. A canopy 1 8 is fixedly connected to one side of the slide 7, and a canopy 2 9 is slidably connected to the other side. A canopy 1 8 and canopy 2 9 are connected to each other by a foldable flexible rainproof cloth 10. By adjusting the distance between canopy 2 9 and canopy 1 8, the capping of the construction climbing frame can be adjusted. When the sun is shining, canopy 2 9 can be slid to open it, so that the sun can shine on the workers, bringing them warmth and power. In rainy weather, it can be folded up to keep out the rain. Finally, for the purpose of fixing, the utility model is fixedly connected with a slider 11 on both sides of the bottom of canopy 2 9 away from canopy 1 8, and a buckle structure 12 is provided between the slider 11 and the slide 7.
[0030] The above-mentioned components together constitute the general appearance structure of a construction climbing frame of the utility model.
[0031] In order to further explain the specific working principle of the construction climbing frame of the utility model, the above-mentioned limiting structure 4 includes a plurality of evenly distributed through holes 13 longitudinally opened on the support column 3, a latch 14 is inserted inside the through hole 13, a through slot 15 and a groove 16 used in conjunction with the latch 14 are respectively opened on the top plate 2, and a pulling part 17 is fixedly connected to one end of the latch 14 near the through slot 15. A spring 18 is sleeved on the outside of the latch 14, and the two ends of the spring 18 are respectively fixedly connected to a limiting block 19 and a limiting plate 20, the limiting plate 20 is located at one end near the through slot 15 and is fixedly connected to the through slot 15, and the limiting block 19 is fixedly connected to the latch 14.
[0032] The technical effect achieved by the technical solution composed of the above-mentioned technical features is: by pulling the pulling part 17, the latch 14 is forced to move outward and slowly disengage from the groove 16 and the through hole 13 on the support column 3. At this time, the limit block 19 approaches the limit plate 20 and squeezes the spring 18 until it is completely disengaged from the through hole 13. At this time, the top plate 2 and the support column 3 are released from the restriction, and the user can move it to the desired height and align the latch 14 with the through hole 13 at the desired height, and let go. The latch 14 is reset under the action of the spring 18 and inserted into the through hole 13 at the target position to complete the height adjustment.
[0033] In order to further explain the specific working principle of the construction climbing frame of the utility model, the above-mentioned buckle structure 12 includes a cavity 21 opened inside the slider 11, a slide rod 23 is fixedly connected inside the cavity 21, a slider 24 is slidably connected to the slide rod 23, a push rod 25 and a latch 26 are fixedly connected to the top and bottom ends of the slider 24, respectively, and the push rod 25 and the latch 26 pass through the cavity 21 and extend to the outside. The inner wall of the slide 7 is opened with a plurality of evenly distributed grooves 27 used in conjunction with the latch 26, the part of the latch 26 located in the cavity 21 is fixedly connected to the spring 28, and the end of the spring 28 away from the latch 26 is fixedly connected to the fixing part 22, and the fixing part 22 is fixedly connected to the cavity 21.
[0034] The technical effects achieved by the technical solution composed of the above technical features are:
[0035] Push the push rod 25, and the push rod 25 will drive the slider 24 to slide on the slide rod 23, and simultaneously drive the latch 26 to start to disengage from the groove 27, until it completely disengages from the groove 27 and retracts into the cavity 21. At this time, the spring 28 is squeezed and contracted, and the slider 11 and the slide groove 7 are released from the limit. The user can adjust the canopy 29 to the desired position, and align the latch 26 with the groove 27 at the desired position, and release the hand to complete the fixation. (The principle is the same as above)
[0036] It should be specially noted here that the components described and identified in the text and drawings of the utility model are the key components constituting the utility model, and the remaining non-key components or obvious prior art components, such as screws, nuts and other connectors, and technical features similar to the prior art are not shown. However, this does not mean that the above-mentioned components do not exist in the utility model, nor can it be interpreted as a practical limitation on the utility model.
[0037] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A construction climbing frame, comprising a passageway (1), characterized in that: A top plate (2) of the same shape as the passageway (1) is arranged above the top plate (2), the top plate (2) and the passageway (1) are connected to each other by means of a plurality of evenly distributed hollow support columns (3), the top plate (2) slides on the support columns (3), the support columns (3) and the top plate (2) are connected to each other by means of a limiting structure (4), the top of the top plate (2) is fixedly connected to a slide rail (5), both sides of the passageway (1) are fixedly connected to guardrails (6), the top of the guardrails (6) are open A slide groove (7) is provided, one side of the slide groove (7) is fixedly connected to a canopy one (8), the inside of the slide groove (7) is slidably connected to a canopy two (9) on a side away from the canopy one (8), the canopy one (8) and the canopy two (9) are mutually connected by a foldable flexible rainproof cloth (10), the bottom sides of the canopy two (9) away from the canopy one (8) are fixedly connected to a slider one (11), and the slider one (11) and the slide groove (7) are mutually connected by a buckle structure (12).
2. A construction climbing frame according to claim 1, characterized in that: The limiting structure (4) comprises a plurality of evenly distributed through holes (13) longitudinally opened on the support column (3); a latch pin (14) is inserted into the interior of the through hole (13); a through slot (15) and a groove (16) for cooperating with the latch pin (14) are respectively opened on the top plate (2); and a pulling portion (17) is fixedly connected to one end of the latch pin (14) close to the through slot (15).
3. A construction climbing frame according to claim 2, characterized in that: The outer portion of the latch pin (14) is sleeved with a spring (18), and the two ends of the spring (18) are respectively fixedly connected to a limit block (19) and a limit plate (20), and the limit plate (20) is located at one end close to the through slot (15) and fixedly connected to the through slot (15), and the limit block (19) is fixedly connected to the latch pin (14).
4. A construction climbing frame according to claim 1, characterized in that: The buckle structure (12) comprises a cavity (21) opened inside the slider (11), a sliding rod (23) is fixedly connected inside the cavity (21), a slider (24) is slidably connected to the sliding rod (23), a push rod (25) and a latch (26) are fixedly connected at the top and bottom ends of the slider (24), respectively, and the push rod (25) and the latch (26) both pass through the cavity (21) and extend to the outside.
5. A construction climbing frame according to claim 4, characterized in that: The inner wall of the slide groove (7) is provided with a plurality of evenly distributed grooves (27) for use with the second latch (26); the portion of the second latch (26) located in the cavity (21) is fixedly connected to the second spring (28); one end of the second spring (28) away from the second latch (26) is fixedly connected to a fixing portion (22); and the fixing portion (22) is fixedly connected in the cavity (21).