Plugging device for material conveying opening of building floor slab
By designing a combination device of gear rod, reinforcement rod and concrete bottom cover in the material transfer mouth of the building floor slab, the problems of insufficient sealing strength and cumbersome parts disassembly in the existing technology are solved, and higher concrete strength and simple installation are achieved The process improves the sealing effect and aesthetics.
Patent Information
- Application Number
- CN202323466087.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-19
AI Technical Summary
The existing building floor slab material transfer port sealing device has shortcomings in increasing the concrete strength at the sealing site and the cumbersome dismantling of parts, which is difficult to meet construction needs.
A material transfer port sealing device including floor slab body, gear rod, reinforcement rod, fixing plate, positioning pin and concrete cover bottom layer is designed. The gear rod drives the rack to move, and the positioning pin abuts on the inner wall of the material transfer port to increase support. The strength of the plate is increased, and the concrete injection strength is improved through reinforcement rods, and the aesthetics is improved with the concrete cover bottom layer.
It effectively improves the strength of the sealing structure of the material transfer port, simplifies the installation and disassembly of parts, enhances the strength and sealing effect of concrete, and improves the aesthetics below the floor slab.
Smart Images

Figure CN221973094U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of material transfer port blocking, in particular to a material transfer port blocking device for a building floor. Background Art
[0002] During the construction of the main structure, holes for laying out wires and material transfer ports will be left on the floor slabs, which will be sealed after the building is capped. Since the holes are connected from top to bottom, it is difficult to install and support the formwork.
[0003] After searching, the publication number is (CN213742296U), which discloses a wiring hole sealing device, including a bracket supported on the top surface of the floor slab, a template attached to the bottom surface of the floor slab and a waterstop screw locking the template on the bracket; a through hole for the waterstop screw to pass through is opened in the middle of the top of the bracket, and a through hole for the waterstop screw to pass through is opened at a position below the through hole of the bracket corresponding to the template; the waterstop screw has a three-section structure, a waterstop joint is arranged in the middle position of the middle section of the waterstop screw, and a conical nut is screwed on the upper and lower ends of the middle section.
[0004] When implementing this technical solution, there are at least the following defects: although the utility model can block the material transfer port, it is inconvenient to increase the concrete strength at the blocking point, and it is too cumbersome to disassemble the parts, which is in urgent need of improvement. Therefore, we propose a material transfer port blocking device for building floors. Utility Model Content
[0005] The utility model aims to provide a material transfer port blocking device for a building floor, which solves the problems raised in the background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a device for blocking a material transfer port of a building floor, comprising a floor body, a material transfer port is opened inside the floor body, a gear rod is arranged in the inner cavity of the material transfer port, a support plate is rotatably mounted on the lower end of the gear rod through a bearing, and racks are arranged on both the front and rear sides of the gear rod;
[0007] A plurality of reinforcing rods are welded to the upper end of the rack, a fixing plate is welded to one end of the rack, a plurality of positioning pins are welded to one side of the fixing plate, and the positioning pins are equidistantly distributed, a sliding rod is welded to the lower end of the rack, sliding grooves are provided on both sides of the upper end of the support plate, the sliding rod is slidably connected to the sliding grooves, and a concrete sealing layer is provided at the lower end of the support plate, and the concrete sealing layer is flush with the lower end of the floor slab body.
[0008] By adopting the above technical solution, it is convenient to drive the rack to move outward through the gear rod, so that the fixed plate on the rack follows the movement, and the positioning pin on the fixed plate is against the inner wall of the material transfer port, thereby increasing the overall strength of the support plate. At the same time, due to the setting of the reinforcing rod on the rack, the structural strength of the injected concrete can be increased, thereby ensuring the structural strength of the material transfer port blockage, and the concrete sealing layer layer and the support plate can increase the aesthetics of the bottom of the floor slab.
[0009] Optionally, a fixing block is welded to the upper end of the gear rod, and a hexagonal screw hole is opened in the middle of the upper end of the fixing block.
[0010] By adopting the above technical solution, it is convenient to insert an electric screwdriver and a hexagonal drill bit into the hexagonal screw hole to rotate the gear rod, thereby ensuring that the positioning pin can be against the inner wall of the material transfer port.
[0011] Optionally, the size of the support plate is matched with the size of the material transfer port, and the support plate is movably connected to the material transfer port.
[0012] By adopting the above technical solution, the sealing effect of the support plate can be ensured, thereby facilitating the pouring of concrete.
[0013] Optionally, the two racks are arranged on both sides of the gear rod, and the racks are meshed with the gear rod.
[0014] By adopting the above technical solution, it is convenient to drive the rack to move through the gear rod.
[0015] Optionally, pulleys are fixedly mounted on both the front and rear sides of the reinforcing rod, and the pulleys fit against the inner wall of the material transfer port.
[0016] By adopting the above technical solution, the reinforcing rod can be easily moved in the material transfer port.
[0017] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0018] The technical solution of the present application is provided with a floor body, a gear rod, a hexagonal screw hole, a reinforcing rod, a fixing plate and a concrete sealing layer. When in use, the fixing plate on the rack can be made to follow the movement, and the positioning pin on the fixing plate can be pressed against the inner wall of the material transfer port, thereby increasing the overall strength of the support plate. The reinforcing rod on the rack can also be provided to increase the structural strength of the injected concrete, thereby ensuring the structural strength of the material transfer port blockage. The concrete sealing layer layer cooperates with the supporting plate to increase the aesthetics of the lower part of the floor body, and can also avoid the removal of various components, and the sealing area can be left to increase the concrete strength. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0020] Figure 1 This is a schematic diagram of the overall structure of a building floor material transfer port blocking device of the utility model;
[0021] Figure 2 It is a schematic diagram of the top view of the structure of the rack and reinforcing rod of a material transfer port blocking device for a building floor according to the utility model;
[0022] Figure 3 This is a partial enlarged structural schematic diagram of A of a building floor material transfer port blocking device of the utility model;
[0023] Figure 4 It is a schematic diagram of the partially enlarged structure of position B of a building floor material transfer port blocking device of the utility model.
[0024] In the figure: 1. Floor slab body; 11. Material transfer port; 12. Gear rod; 13. Support plate; 14. Fixing block; 15. Hexagonal screw hole; 2. Rack; 21. Reinforcement rod; 22. Pulley; 23. Fixing plate; 24. Positioning pin; 25. Sliding rod; 26. Slide groove; 3. Concrete sealing layer. DETAILED DESCRIPTION
[0025] See also Figure 1-4 The utility model provides a technical solution: a device for blocking a material transfer port of a building floor, comprising a floor body 1, a material transfer port 11 is provided inside the floor body 1, a gear rod 12 is provided in the inner cavity of the material transfer port 11, a support plate 13 is rotatably mounted on the lower end of the gear rod 12 through a bearing, so as to facilitate blocking the material transfer port 11, and racks 2 are provided on both the front and rear sides of the gear rod 12;
[0026] A plurality of reinforcing rods 21 are welded to the upper end of the rack 2, a fixing plate 23 is welded to one end of the rack 2, a plurality of positioning pins 24 are welded to one side of the fixing plate 23, and the positioning pins 24 are equidistantly distributed, a sliding rod 25 is welded to the lower end of the rack 2, and sliding grooves 26 are provided on both sides of the upper end of the support plate 13, and the sliding rod 25 is slidably connected with the sliding grooves 26 to ensure the stability of the rack 2, thereby facilitating the movement of the rack 2, and a concrete sealing layer 3 is provided at the lower end of the support plate 13, and the concrete sealing layer 3 is flush with the lower end of the floor slab body 1, and two racks 2 are arranged on both sides of the gear rod 12, and the rack 2 is meshed with the gear rod 12, so as to facilitate the gear rod 12 to drive the rack 2 to move, and pulleys 22 are fixedly installed on the front and rear sides of the reinforcing rod 21, and the pulley 22 is in contact with the inner wall of the material transfer port 11, so as to facilitate the movement of the reinforcing rod 21 in the material transfer port 11.
[0027] A fixing block 14 is welded to the upper end of the gear rod 12, and a hexagonal screw hole 15 is opened in the middle of the upper end of the fixing block 14, so that an electric screwdriver and a hexagonal drill bit can be inserted into the hexagonal screw hole 15 to rotate the gear rod 12, thereby ensuring that the positioning pin 24 can be against the inner wall of the material transfer port 11.
[0028] The size of the support plate 13 is matched with the size of the material transfer port 11, and the support plate 13 is movably connected to the material transfer port 11, so as to ensure the blocking effect of the support plate 13, thereby facilitating the pouring of concrete.
[0029] When in use, first place the support plate 13 inside the material transfer port 11, then make the concrete sealing layer 3 flush with the lower end of the floor slab body 1, then insert an electric screwdriver with a hexagonal drill bit into the hexagonal screw hole 15, rotate the gear rod 12, and drive the rack 2 to move outward through the gear rod 12, so that the fixed plate 23 on the rack 2 moves with it, and the positioning pin 24 on the fixed plate 23 is against the inner wall of the material transfer port 11, thereby increasing the overall strength of the support plate 13. At the same time, due to the setting of the reinforcing rod 21 on the rack 2, the structural strength of the injected concrete can be increased, thereby ensuring the structural strength of the blocking of the material transfer port 11, and the concrete sealing layer 3 and the support plate 13 can increase the aesthetics of the bottom of the floor slab body 1, and the various components do not need to be removed, and the blocking area can be left to increase the concrete strength.
Claims
1. A device for blocking a material transfer port of a building floor, comprising a floor body (1), characterized in that: A material transfer port (11) is provided inside the floor slab body (1), a gear rod (12) is provided in the inner cavity of the material transfer port (11), a support plate (13) is rotatably mounted on the lower end of the gear rod (12) via a bearing, and racks (2) are provided on both the front and rear sides of the gear rod (12); A plurality of reinforcing rods (21) are welded to the upper end of the rack (2), a fixing plate (23) is welded to one end of the rack (2), a plurality of positioning pins (24) are welded to one side of the fixing plate (23), and the positioning pins (24) are equidistantly distributed, a sliding rod (25) is welded to the lower end of the rack (2), sliding grooves (26) are provided on both sides of the upper end of the support plate (13), the sliding rod (25) is slidably connected to the sliding grooves (26), and a concrete sealing layer (3) is provided at the lower end of the support plate (13), and the concrete sealing layer (3) is flush with the lower end of the floor slab body (1).
2. A building floor material transfer port blocking device according to claim 1, characterized in that: A fixing block (14) is welded to the upper end of the gear rod (12), and a hexagonal screw hole (15) is provided in the middle of the upper end of the fixing block (14).
3. A building floor material transfer port blocking device according to claim 1, characterized in that: The size of the support plate (13) is matched with the size of the material transfer port (11), and the support plate (13) is movably connected to the material transfer port (11).
4. A building floor material transfer port blocking device according to claim 1, characterized in that: The two racks (2) are arranged on both sides of the gear rod (12), and the racks (2) are meshed with the gear rod (12).
5. A building floor material transfer port blocking device according to claim 1, characterized in that: Pulleys (22) are fixedly mounted on both the front and rear sides of the reinforcing rod (21), and the pulleys (22) are in contact with the inner wall of the material transfer port (11).